Home / Financial Firm (Unknown - Insurer) / Determination 322990

Determination 322990

Denial of water damage claim to bathroom under home policy

FirmFinancial Firm (Unknown - Insurer)
Decided2013-12-17
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant claimed for water damage to a bathroom, which the FSP denied after a contractor found a leaking shower recess that had leaked for some years. AFCA found the gradual escape of water exclusion applied and that the FSP was entitled to deny the claim.

The insured bears the onus of proving an insured event, and the gradual escape of water exclusion applies where the insured knew of the leak.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 322990 Determination Page 1 of 6 Case number: 322990 General Insurance - Domestic Insurance - Home Contents - FSP Decision - Denial of Claim 16 December 2013 Summary Description: This dispute concerns a claim by the Applicant under a home building insurance policy for water damage. Basis for Determination: The Applicant has not established that the loss was caused by an insured event. The FSP has adduced sufficient evidence to establish the application of an exclusion clause. Determination: The FSP is entitled to deny the claim. Background 1. I have reviewed all the material submitted by the parties and save where I make note specifically, I am satisfied the background as set out in the Recommendation is accurate and is as follows. 2. The Applicant’s home was insured under a Home Insurance policy underwritten by the Financial Services Provider (FSP). The policy incepted on 28 March 2008 and provided cover for a number of listed events. 3. On 8 November 2011 the Applicant lodged a claim under the policy noting the date of loss as 25 October 2011 which was recorded in the FSP’s system as follows: “We found a lot of mould in the tiles in the bathroom and we tried to clean it off and it keeps com ing back and tiles have started to lift”. 4. Based on a report commissioned by it, the FSP denied the claim on the ground the cause for the loss was not from a leaking pipe but a failure in the water proof membrane. 5. The Applicant contends the FSP has incorrectly interpreted the information provided to the consultant commissioned by it and argues the claim should succeed. 6. As the Applicant did not agree with the FSP’s decision, the dispute was the subject of a Recommendation. The Recommendation was in favour of the Determination Case No: 322990 Determination Page 2 of 6 FSP and was not accepted by the Applicant. The FSP accepted the Recommendation. In the circumstances, the matter has been referred to me for Determination. Summary of Applicant’s p osition 7. I have reviewed all the material submitted by the parties and save where I make note specifically, I am satisfied the Applicant’s position as set out in the Recommendation is accurate and is as follows. 8. The Applicant contends the FSP is manipulating her conversation with the assessor and has incorrectly interpreted the discussion about the water leak. 9. The FSP has relied on incorrect and untrue information to deny the claim. 10. The FSP relies on failure of water proofing membrane. However the house was built in the 70’s when water proof membrane was not installed. 11. The water problem was only discovered when renovating and the wall was removed. Hence there was no way of knowing there was a leak until the wall was removed. 12. The Applicant states that when the assessor attended the premises, the wall was stripped, the rotten wood frame was still intact and remained for assessment and yet the assessor’s report made no mention of the rotte d timber. She questions whether this was done because it may have assisted her claim. 13. The Applicant believes the wood was rotten due to a leaking pipe fixture. She says this belief was supported by the plumber who commented that the damage was more likely to be due to a leaking pipe. 14. The Applicant is seeking some compensation for the claim she has made. 15. The Applicant rejected the Recommendation and provided no further documentary information in support of her position save for an email dated 3 December 2013 in which she essentially reiterated her position. She also says she did not attend with the assessor but it was her husband who was present with him. Summary of FSP’ s position 16. I have reviewed all the material submitted by the parties and save where I make note specifically, I am satisfied the FSP’s position as set out in the Recommendation is accurate and is as follows. 17. The FSP relies on the following policy terms. “ 11. Water or other liquid damage Case No: 322990 Determination Page 3 of 6 ... We will pay for loss or damage which results directly from the bursting, leaking, discharging or overflowing of:  fixed apparatus,  dishwashers,  washing machines,  fixed tanks,  fixed pipes,  waterbeds, or  aquariums designed to hold more than 20 litters of water ... We will not pay: a for loss or damage caused as a result of the gradual escape of liquid over a period of time:  where you or a reasonable person in the circumstances could be expected to have been aware of such gradual escape of liquid,  due to lack of maintenance, wear and tear, or neglect, or  from a shower base, shower recess, shower alcove or the walls surrounding the shower.” 18. The FSP states information in respect of the loss is non-existent other than the information provided by the Applicant to the contractor at the time he attended the Applicant’s p remises. The FSP states that it relies on that information. 19. No other evidence is available to it. At the time the claim was lodged the bathroom had already been fully stripped back to the framework as part of a renovation of the entire premises. 20. As such, it had been prejudiced in respect of any investigation and it was not possible to examine the damage in situ to establish the cause. 21. The FSP relies on a report and statutory declaration by the contractor and concludes the shower recess was the cause for the loss. 22. The policy does not cover leaks from a shower recess. In addition the policy excludes damage that occurred over a period of time such as gradual deterioration, wear and tear. 23. The FSP submits that no insured event has operated and the damage occurred over a period of time. Accordingly it was entitled to deny the claim. 24. The FSP accepted the Recommendation and did not provide any further documentary information in support of its position save to say in an email dated 4 December 2013 that: Case No: 322990 Determination Page 4 of 6 “No further response required, as the Applicant supports the fact that her husband provided information to the contractor that we sent.” Issue 25. Whether the FSP was entitled to deny liability for the water damage to the bathroom of the Applicant’s home. Reasons for Decision 26. There has been an exchange of material between each party, and I am satisfied each party has had an opportunity to reply to the issues raised. 27. Each FOS case is decided on its merits, taking into account the facts of the case. I have reviewed all the material submitted by the parties both before and after the Recommendation was issued, in order to reach my decision. I will only refer to the relevant submissions and materials raised. Evidence and contentions of the parties Contractors’ report 28. The FSP engaged a building contractor to report on the cause of the damage. He also quoted to remove and repair the wall in the amount of $1,650. 29. The contractor’s report of 14 November 2011 said:  He was unable to advise of the pre-existing condition of the bathroom as the entire premises were undergoing a full renovation. The bathroom had been stripped back to frame work prior to his assessment.  The insured advised there was a leaking shower recess. This had been leaking for more than 3 years and was noticed by a pest controller during a routine inspection of the premises over 3 years ago.  The insured had advised he was not in a position financially to rectify the leaking bathroom when it was first noticed and allowed the leak to continue until the claim was lodged. 30. The contractor concluded: “Based on my assessment I advise that it would be of my opinion that the shower recess was leaking due to a failing of and a lack of any water proof membrane in the recess and most likely the latter of the 2 scenarios and may well have been an inherent defect purchased with the premises some 5 years ago....” Statutory declaration of the contractor dated 8 June 2013 31. The contractor deposed: Case No: 322990 Determination Page 5 of 6 “At the time of my assessment I was advised by the insured that bathroom shower had been leaking for some years and this was brought to your insured’s attention by a pest extermination company during a routine visit. The insured advised that visit from the pest extermination company was approximately 3 years prior to my assessment and at that time the insured was not in a position to be able to afford bathroom repairs.” Analysis 32. It is an accepted principle of general insurance law that an insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. 33. Accordingly in this matter the Applicant must prove on the balance of probabilities that the loss was caused by an insured event such as water damage. The policy says that the FSP will pay for loss or damage which results directly from the bursting, leaking, discharging or overflowing of certain listed item s which included “fixed pipes”. 34. If that is established, the onus shifts to the FSP to prove on the balance of probabilities the loss was caused as a result of the gradual escape of water over a period of time. 35. The Applicant has adduced no evidence about the cause of the damage and so I am not satisfied on the balance of probabilities that the damage was caused by an insured event. She says that a rotten wood frame was evident and was not commented on by the assessor. But this contention alone is insufficient to satisfy me that the damage done to the frame etc was due to a leaking pipe. 36. The Applicant says the plumber commented that the damage was likely due to a leaking pipe and yet she has adduced no evidence from him when evidence from a plumber may have enabled her to prove on the balance of probabilities that the damage was caused by an insured event. 37. But even if I was to accept that the damage was caused by a leaking pipe, I am satisfied that the damage is excluded as I accept that the damage was caused a result of the gradual escape of water over a period of time. I accept the evidence in the Statutory Declaration of the contractor that he was told by the insured (the Applicant’s husband) that the shower had been leaking for some years and that the insured (the Applicant and her husband) knew of this as it was brought to the attention by a pest extermination company during a routine visit some three years prior. I note the contractor does not refer to the Applicant or her husband by name in the Statutory Declaration but rather uses the more generic words “the insured” which could be referrable to either of them. Case No: 322990 Determination Page 6 of 6 38. The Applicant says the FSP manipulated the conversation with her husband but she does not deny the substance of it. As such I accept the FSP can rely on the conversation and the evidence of the contractor about it to deny the claim. 39. In short, the claim fails as I accept that an exclusion applies as the insured was aware of the gradual escape of liquid. Whether it came from a fixed pipe or from a shower recess is immaterial to the application of the exclusion clause. Determination 40. On the basis of the available information and for the reasons stated, I determine that the FSP was entitled to deny liability for the claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.