Determination 322988
Denial of claim - flood exclusion versus flash flood cover
Summary
The applicant's contents were damaged when Brisbane River flooding inundated her unit after Wivenhoe Dam releases, and the FSP denied the claim as flood. AFCA decided the policy responded to inundation up to 1.1m above the benchmark level within 24 hours of the heavy rain, and ordered the FSP to meet the replacement cost of those contents with interest from the date of rejection.
Flash flood cover applies to inundation caused by rain falling no more than 24 hours earlier, so loss within that window is covered while later flood inundation is excluded.
Subjects and remedies
natural disasterpay claimpay interest
Text of the determination
Case No: 322988 Determination Page 1 of 7
Case number: 322988
General Insurance - Domestic Insurance - Home Contents - FSP Decision -
Denial of claim
22 August 2013
Background
1. The Applicant insured her home contents with the Financial Services
Provider (FSP). The relevant period of insurance operated for twelve months
beginning from 11 November 2010. During this period, the contents located
in her unit in Graceville, were insured up to a sum of $25,000.
2. On 10 February 2011, the Applicant lodged a claim under the policy due to
extensive water inundation following severe weather events in Queensland.
3. The FSP denied the claim on the basis the damage was due to “flood”. The
Applicant, through her solicitors, has disputed this.
Summary of Applicant’s position
4. I n response to the FSP‟s decision , the Applicant submits that the damage to
her contents was due to “Flash flood and stormwater run - off”, which is an
insured event. In particular, the inundation was due to heavy rain that fell
from 4.00am on 11 January 2011 which resulted in the Wivenhoe Dam
operators elevating their strategy to W4. This decision resulted in massive
discharges of water into the Brisbane River that ultimately inundated her
property.
5. The Applicant seeks to be indemnified for her claim.
Summary of FSP’s position
6. In response to the Applicant ‟ s arguments, the FSP has provided a number of
hydrology reports produced by hydrology firm “WT” and relies on the
follow ing policy provisions to deny the Applicant‟s claim :
Page 3 of the Certificate of Insurance (COI)
“ What optional covers are included and not included
Contents
Determination
Case No: 322988 Determination Page 2 of 7
...
Flood and storm surge not included...”
Pages 10-12 of the PDS
“ Words / terms with special meanings
Word / term Meaning
...
Flood Rising water which enters your home as a result of it
running off or overflowing from any origin or cause.
This policy does not cover flood unless we have
agreed and it is shown on your certificate of insurance.
Flash flood and
stormwater run - off
A sudden flood caused by heavy rain that fell no more
than 24 hours prior to the flash flood or stormwater
run - off.
...
Storm A violent disturbance of the atmosphere associated
with strong w inds including a cyclone, light ning, heavy
rain, hail or snow, but not continuous bad weather by
itself.
...”
Pages 17-18 of the PDS
“ Insured events you are covered for
Damage caused by weather...
What is covered What is not covered
Storm Loss or damage:
caused by rain, hail or snow
after it has reached the
ground...
...
Flash flood and stormwater run-off
A sudden flood caused by heavy rain
that fell no more than 24 hours prior to
the flash flood or stormwater run - off
Loss or damage caused:
by flood...
...”
Page 32 of the PDS
“ Your contents
The most we will pay you for contents claims
Case No: 322988 Determination Page 3 of 7
What is covered What is not covered
... ...
Flash flood and stormwater run - off
We will pay up to 50% of your contents
sum insured or $25,000, whichever is
higher , but not exceeding your contents
sum insured .
...
...”
Issue
7. Whether the cause of the Applicant‟s loss was covered under the policy.
Reasons for decision
8. Due to the nature of the dispute, the parties have been informed that the
matter has been referred to the Panel for Determination in line with the
Operational Guidelines to FOS‟s Terms of Reference. This dispute has not
been the subject of a FOS Recommenda tion and has proceeded directly to
Determination.
9. This decision has been made by a Panel of three decision makers including
an Ombudsman and two decision makers with extensive experience in the
insurance industry matters and in consumer claims.
10. There has been an exchange of information and the Panel is satisfied that
each party has had the opportunity to respond to any issues raised by the
other.
11. The Panel, having reviewed the submissions of the parties is satisfied the
parties do not dispute the following:
The Applicant held a policy of insurance for loss or damage arising
from the listed insured events at the time of loss.
“Flash flood and stormwater run - off” is listed as one of the insured
events for which the policy provides indemnity. Whilst the loss or
damage arising from the event „flood‟, is excluded from cover under the
policy.
The Applicant‟s home was initially inundated late on 11 January 2011
which continued to rise to higher levels within the home until 4.00am on
12 January 2012 and reaching peak levels later in the day.
Case No: 322988 Determination Page 4 of 7
The inundation of the property has resulted in significant damage/loss
of the insured property.
The FSP fulfilled its obligations under the Act in terms of providing the
Applicant with the relevant policy documentation and wording .
The policy, limits the obligation to provide indemnity for loss arising
from the event of flash flood to $25,000 or 50% of the property (building
and contents) sum insured, whichever is higher.
Water Inundation
The Evidence
12. The Panel accepts that the F SP‟s policy does not extend cover to
circumstances where a loss is caused by a flood. The policy also
distinguishes between flood, flash flood and stormwater run-off (the latter
two of which are covered). It extends cover to damage from sudden flood
events “caused by heavy rain that fell no more than 24 hours prior” to the
flash flood.
13. The Applicant submits that it was raining on 11 January 2011 and her
property was affected. Although the Applicant had left the property and was
not present when it was first affected, she further submits that it is likely that
it would have been affected well before 4 .00am on 12 January 2011 and that
the inundation was likely to have begun in the evening of 11 January 2011.
14. After the lodgement of the claim, the FSP appointed a loss adjuster, “ MY ”, to
investigate and report on the damage caused to the Applicant ‟s property. MY
inspected the property on 1 February 2011 and its report dated 4 February
2011, indicated that the reserve for the claim was $25,000, being the full
contents sum-insured. MY indicated that the scope of the damage would be
addressed in “the next report”, however , the FSP did not provide FOS with a
copy of any subsequent assessment report.
15. MY noted the date of loss was 11 January 2011, with type of loss bei ng
“storm” related to “rainwater”, although the cause of the damage was
reported to be “flood - river”.
16. The FSP later engaged hydrology firm, WT, to provide a report as to the
damage.
17. “ DC ” , from WT, provided a sworn statement dated 25 June 2013 with
respect to his evaluation of the cause of the loss in the region surrounding
and specifically affecting the Applicant ‟s home. He found that:
the Applicant‟s property is a two storey townhouse in a townhouse
complex and the ground levels of the property vary from approximately
5.6m AHD to 6m AHD;
Case No: 322988 Determination Page 5 of 7
the terrain data for the Applicant‟s home suggested that it was unlikely
that the Applicant would have experienced significant stormwater or run-
off problems during the period;
the Applicant‟s property backs onto a local high point and there is little
catchment leading to the property apart from the blocks to the west of the
property and the property itself;
Inundation from stormwater run- off requires “intense levels of rain” which
is sufficient to overcome the stormwater drainage system. Any such run-
off generally occurs during or very shortly after such an intense period of
rainfall;
a review of the rainwater gauge at Corinda High Alert, approximately
2.5km from the Applicant ‟s property and representative of its rainfall in
the expert‟s opinion, revealed that 85mm of rain fell over 9 and 10
January 2011, with a further 43mm falling on 11 January 2011. The most
intense rainfall on 11 January 2011 fell between 10.00am and 11.00am,
during which 15mm of rain fell;
the overall intensity of the rainfall was very low and unlikely to result in
run-off or stormwater inundation to the property;
Based on data recorded at the Oxley Creek Mouth Alert gauge, the water
level in the Brisbane River would have reached the “Benchmark level” o f
the Applicant‟s home (the lowest point in the structure of the building on
the property) of 5.9m AHD by 11.29pm on 11 January 2011. This is
consistent with the submission made by the Applicant with respect to the
timing of the initial inundation of her p roperty.
18. DC concluded that the Applicant‟s property was inundated by the rising level
of the Brisbane River and not stormwater run-off or flash flooding (as defined
in the policy).
Releases from Wivenhoe Dam & Proximate Cause
19. The central issue for Determination in this dispute is whether the inundation
of the Applicant‟s home on 11 January 2011 was due to flash flood as
defined within the terms of the policy, that is, whether rain that fell no more
than 24 hours prior to the inundation of the Applicant‟s p roperty was the
proximate cause of the inundation.
20. Having carefully reviewed the material exchanged, the Panel does not
consider it strictly necessary to determine whether the Applicant‟s home was
initially inundated by localised stormwater run-off or flash flood. The
Applicant‟s entitlement to indemnity would be the same irrespective of
whether the loss was caused by localised stormwater run-off or flash flood
so long as it arose within 24 hours of the causative heavy rain.
21. FOS has determined in other disputes, following consideration of all material
exchanged, that the heavy rainfall commencing around 4.00am on 11
Case No: 322988 Determination Page 6 of 7
January 2011 was a proximate or effective cause of the inundation of the
properties downstream from the Wivenhoe Dam.
22. Although each dispute is determined on its merits and in this dispute,
detailed further submissions have been made by the parties, in particular by
the FSP, the Panel is not satisfied that the evidence substantially changes
the position adopted in earlier Determinations.
23. The evidence supports the view that the flooding downstream of the
Wivenhoe Dam is attributable to the particularly intense rainfall over the dam
that commenced at approximately 4.00am on 11 January 2011. This rainfall
event caused a sharp rise in the dam‟s level, ultimately leading the dam‟s
operating engineers to move from a W3 release strategy (which had been
working well up to then) to adopt a W4 release strategy from 8.00am on 11
January 2011.
24. The Panel is satisfied having considered all of the evidence presented and in
particular the further submissions and hydrology reports provided by the
FSP, that it was the heavy rainfall commencing at approximately 4.00am on
11 January 2011 that was the proximate, that is, the effective or dominant
cause, of the inundati on of the Applicant‟s property.
25. “ SC ” , a Director of WT, provided a Key Conclusions statement which
indicates the effect of the W4 releases first reached the vicinity of the
Applicant‟s property at 2.39pm on 11 January 2011. He estimated that the
property was first inundated by the Brisbane River at 11.29pm on 11 January
2011 and by 4.00am on 12 January 2011, the property was inundated up to
1.1m above the relevant benchmark level.
26. The Panel notes that the ultimate inundation of the Applicant‟s property was
3.3m above the benchmark level. SC identified this peak inundation occurred
at approximately 11.41pm on 12 January 2011.
27. Consistent with the earlier findings and hydrology reports , in particular the
Key Conclusions statements, the Panel is satisfied that the inundation of the
Applicant ‟ s property to the level of 1.1 metres above benchmark was caused
by flash flood that occurred within 24 hours of the heavy rainfall and as such,
the policy responds to the loss to that extent. Any inundation after
approximately 4.00am on 12 January 2011 would be outside the relevant 24
hour period for flash flood, and excluded from cover as flood under the terms
of the policy.
Quantum
28. The Renewal Certificate of Insurance for the relevant period provides a
contents sum insured of $25,000. Pursuant to the policy cap for the insured
event of “Flash flood and stormwater run - off”, the FSP is liable up to the
entire sum insured amount of $25,000 for the contents.
29. Given the scope of the damage was not included on the assessment report
by MY and the time which has elapsed since the loss was sustained, the
Case No: 322988 Determination Page 7 of 7
Panel accepts that the parties may be unable to provide an exact estimate of
the total loss sustained, or a breakdown of that loss.
30. The Applicant and the FSP are asked to work cooperatively together to
establish the extent of the loss sustained and to reach an agreement as to
cost of replacement of the various contents.
31. Insofar as the FSP may have made payment of a compassionate sum to the
Applicant, FOS does not have jurisdiction to deal with this payment but
acknowledges that the FSP, given the terms on which the compassionate
payment was made, may be entitled to deduct this payment from any
settlement sum.
Determination
32. The FSP is to meet the cost of the replacement of contents items damaged
or lost as a result of the inundation of the property to a level of 1.1m above
the benchmark level. Any payment is subject to the limitations contained
within the policy.
33. Insofar as the FSP is to cash settle the claim, the FSP is to pay interest from
14 March 2011 (being the date of rejection of the claim) to date of payment
of the claim, in accordance with Section 57 of the Act.