Denial of western wall storm damage and inadequate cash settlement

FirmFinancial Firm (Unknown - Insurer)
Decided2014-04-17
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$1,100
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant's home suffered storm damage, and the FSP accepted part of the claim but denied damage to the western wall and disputed the cash settlement. AFCA found the western wall damage was caused by the storm, ordered a cash settlement set by three builder quotes with temporary accommodation and interest, and awarded $1,100 for the engineer's report.

Once the insured establishes a prima facie storm claim the insurer must prove an exclusion, and the outward one-off movement of the wall was more consistent with wind suction than with ongoing ground movement.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay compensationpay interestreassess claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 322232 Determination Page 1 of 9 Case number: 322232 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim 11 April 2014 Summary Description  This dispute concerns a claim by the Applicant under a home building insurance policy issued by the Financial Services Provider (FSP), for damage to his property following severe storms in the local area. The FSP accepted liability for part of the damage to the Applicant’s home but denied liability for certain damage to the western wall of the property. The Applicant disputes the FSP’s decision and the adequacy of the cash settlement provided by the FSP. Basis of Determination  The available information is sufficient to establish that, on the balance of probabilities, the damage to the wester n wall of the Applicant’s property was caused by strong winds during the storm event, rather than by ground movement. Determination  The FSP is liable to cash settle the Applicant for the cost of repairing the damage to the western wall. The FSP is to obtai n a revised quote for the required repairs for the purpose of determining the amount of the cash settlement, in accordance with the process set out in this Determination. Background 1. This Determination follows the review of a Recommendation issued on behalf of the Financial Ombudsman Service (FOS) on 21 January 2014. The Recommendation was rejected by the Applicant. 2. On 15 April 2013, the Applicant lodged a claim under his policy for damage to his property due to significant storm events which occurred in the local area during March and April 2013. The FSP initially declined the Applicant’s claim, on the basis that the claimed damage was not caused by the storm or Determination Case No: 322232 Determination Page 2 of 9 any other insured event but by ground movement which was excluded under the policy. 3. After the Applicant lodged his dispute with FOS, the FSP engaged an engineer (“X”) to inspect the property and report on the cause of the damage. Following receipt of X’s report, the FSP agreed to cash settle the Applicant for the cost of repairing the damage which X had identified as caused by strong winds during the storm. 4. However, the FSP continued to deny liability for the damage to the front (western) wall of the house, on the basis that X had found that there was insufficient evidence to conclude that this damage was caused by strong winds during the storm. 5. The Applicant disputes the FSP’s denial of liability for the damage to the western wall and says that the cash settlement offered by the FSP is otherwise inadequate. He is also dissatisfied with the manner in which the FSP has handled his claim. Issues 6. Whether the FSP is entitled to deny liability for the damage to the western wall of the Applicant’s property. 7. Whether the cash settlement offered by the FSP is appropriate, having regard to the terms and conditions of the policy. 8. Whether the Applicant is entitled to compensation for the manner in which the FSP has handled his claim. Reasons for decision 9. I am satisfied that there has been a full exchange of information between the parties and that each party has had an opportunity to address the issues raised by the other. Cause of damage to the western wall 10. The Applicant says that during March and April 2013, a number of serious storms (involving lightning, thunder, heavy rain and gale force winds) occurred in the vicinity of his property. He says that, during one of these events:  the glass sliding door in the dining room dislodged from its frame and fell onto the dining room table;  the dining room window cracked in its frame; and  a brick wall at the western side of the property moved by approximately two centimetres. Case No: 322232 Determination Page 3 of 9 11. The Applicant’s policy is a defined events policy which provides cover for loss or damage to his property caused by certain specified events, including storm. 12. However, the cover provided under the insured event of storm is subject to a number of conditions and exclusions under the policy, including a general exclusion for damage: “caused ... by hydrostatic pressure, subsidence or landslip, expansion or contraction of the earth, ground or soil, unless it was a direct result of and immediately following an earthquake or explosion”. 13. It is an accepted principle of general insurance law that an insured bears the onus of establishing that, on the balance of probabilities, they have suffered a loss caused by a risk insured under the policy. This is known as a prima facie claim. If the insured is able to establish a prima facie claim, the onus then shifts to the insurer to show that, on the balance of probabilities, the loss falls within an exclusion clause under the policy or that it is otherwise entitled to deny liability. 14. Accordingly, as the Applicant has brought the claim under the policy, he bears the onus of establishing that the disputed damage to the western wall of his property was caused by the storm events in March and April 2013. Expert reports 15. As outlined above, after the Applicant lodged his dispute with FOS, the FSP arranged for an engineer (X) to inspect the property and report on the cause and extent of the damage. In his report dated 8 October 2013, X stated that:  the property was an older dwelling, which had a brick veneer skin attached at the western side and had been extended to the north and rear with double masonry construction;  there was no doubt that the property had been hit by a severe storm in March 2013 which was known to have caused damage to buildings in other areas and had caused damage to trees in the vicinity of the property;  internal cracking of varying degrees was apparent throughout eleven rooms of the property and included both old and new cracks;  the rear sliding door had been blown in and damaged in the storm. This was capable of causing an instantaneous over pressurization of the building which “ could certainly result ” in damage to the building;  there were a number of factors that were affecting the building and which were capable of causing movement and cracking, such as the brickwork over the windows having been constructed without articulation or movement detailing; the moderately reactive clay soil; variable perimeter moisture control and possible plumbing leaks; and the area having been subject to recent drought, followed by wet conditions; and Case No: 322232 Determination Page 4 of 9  a significant amount of the cracking damage was pre-existing and had not been caused by the storm, as shown by the fact that many of the cracks were old and showed previous a ttempts at repair. However, there was also new minor cracking damage to the southern wall caused by the buffeting and internal pressurisation of the building as a result of the wind storm. The storm had also damaged the sliding door and the front office window. 16. In relation to the western wall, X noted that:  the wall had moved outwards by approximately 2 to 3 centimetres in a section from the front door to the north side of the office;  this was a large amount of movement to have happened on an instantaneous basis and would usually result in the collapse of the wall;  there was only one brick tie in both of the joins attaching the brick veneer skin to the original frame, which showed a possible lack of proper connection and was likely to cause movement of the wall;  there was movement in the brick sill and timber sill at the front door which was unrelated to the wind storm (as the wall to which the sills were attached had not moved);  there was no significant cracking internally opposite this brick wall in the office and lounge room which indicated that there had been no recent movement as a result of the storm or any other factor. Nevertheless, the cracking in the front wall was relatively new and according to the Applicant, had occurred only recently. While this was quite possible it was not necessarily the result of the storm event; and  there was insufficient evidence to conclude that the deformation of the front brick wall had been caused by the effect of high winds during the storm. 17. After the issue of the FOS Recommendation, the Applicant obtained a report from his own engineer (“S”). S disagreed with X’s view that there was insufficient evidence that the damage to the western wall had been caused by the wind storm. S stated that:  there was clear evidence that the storm had caused severe wind gusts;  the impact damage to the glass on the eastern side of the house indicated the direction of the wind gust;  the western wall would have been subjected to very high suction forces on both the wall and the connections of the veranda to the wall. This explained the separation of the external skin from the adjoining brickwork and the connections of the veranda to the wall. Photos of the damage clearly show an outward movement of the wall, consistent with a suction pressure force;  X’s comments regarding the effect of variable moisture control, possible plumbing leaks and seasonal moisture conditions are not relevant to the western wall as this is protected from water ponding against the Case No: 322232 Determination Page 5 of 9 foundations by a two metre wide veranda h which extends from the house;  most of the cases of building movement he had reviewed in his more than 25 years of reporting on building cracks were caused by inadequate drainage or variable moisture conditions near the foundations. However, this was not the cause of the movement in the western wall at the western wall. He had no doubt that this movement was caused by high suction forces as a result of the storm event. 18. The FSP has reviewed S’s report but says that it is not sufficient to establish that the damage to the western wall was caused by the storm event, on the basis that S has not commented on all of the factors identified by X as possible causes of ongoing movement at the Applicant’s house. Further, the FSP says that the other evidence relied on by X (the extent of the damage, the movement of the brick and timber sills etc) supports the finding that ongoing movement has been occurring at the property for some time. Analysis 19. I have carefully reviewed the information provided by the parties in relation to the cause of damage to the western wall, including the various photographs of the damage contained in S’s report. The FSP has also provided copies of a large number of photographs taken by its builder (D) when he first attended the property in April 2013. 20. I accept that, as engineers, both X and S are appropriately qualified to determine the cause of the damage to the western wall of the Applicant’s property. However, in the current case, they have reached conflicting views on this issue. In these circumstances, I must consider which view is more consistent with the observable facts. 21. It is clear from the photographs provided that the Applicant’s property has extensive pre-existing cracking damage, some of which shows evidence of past repairs. I accept that this damage has been caused by ground movement, which is likely to have arisen as a result of one or more of the factors identified by X in his report (ie reactive clay soils, variable perimeter moisture controls and seasonal changes in moisture co ntent). 22. However, I consider that the outward movement of the western wall which is the subject of the current dispute is of a qualitatively different nature. The photographs show that the whole of the wall from the third row of bricks upwards has moved outwards by a distance of approximately two centimetres (which appears to be consistent along the length of the wall). However, the two bottom rows of bricks do not reflect the same movement and appear to have remained in their original position. 23. In my view, this damage is not reflective of the typical effect of ongoing ground movement over time, which is evident in many areas of the Applicant’s home. The western wall itself shows some minor cracking which is consistent with ground movement. However, I consider that the outwards Case No: 322232 Determination Page 6 of 9 movement of the upper rows of the wall is more consistent with the impact of a one-off force, which has caused this section of the wall to move outwards “as one”. In these circumstances, I consider that S’s conclusion that the wall has moved as a result of the effect of suction forces provides a logical and reasonable explanation of how the damage occurred. In this respect, I note that:  the FSP does not dispute that the Appl icant’s house was subjected to strong winds during the storm event;  X’s report acknowledges that the winds were capable of causing an instantaneous over pressurization of the building which could result in damage;  there is evidence of other damage caused by the winds, including the rear sliding door being blown in and the glass in the eastern window damaged;  the FSP has accepted that the winds caused cracking damage to the wall on the southern side of the building;  it appears that the FSP has not provided a cop y of S’s report to X for review and therefore X has not had an opportunity to respond specifically to S’s views on the effect of the suction forces resulting from the wind storm; and  while X has referred to possible flaws in the design and/or construction of the western wall, this is not clear from the photographs and in my view, the evidence is not sufficient to establish this. I note that the FSP has not relied on this as a reason to deny the Applicant’s claim. 24. In the circumstances, I consider that the available information is sufficient to establish that, on the balance of probabilities, the damage to the western wall was caused by the storm, rather than by ground movement. 25. Accordingly, I consider that the FSP is required to indemnify the Applicant for the cost of repairing the outward movement of the single skin brickwork on the western wall. However, the FSP’s liability does not extend to repairing the existing cracks in the double brickwork. 26. I consider that S’s report has been of value for the purposes of determining the cause of t he damage to the Applicant’s property. Accordingly, I consider that the FSP should be required to reimburse the Applicant for the costs of $1,100 incurred by him in obtaining this report. Settlement of claim FSP’s decision to cash settle 27. The FSP has previously offered to cash settle the Applicant for the cost of repairing the damage for which it is liable rather than arranging repairs to the property. The FSP adopted this approach based on advice from its builder (D) that he would not be able to provide a guarantee of the repairs, given the Case No: 322232 Determination Page 7 of 9 extent and location of the pre-existing damage to the property and its continuing exposure to factors which made it susceptible to further cracking damage. 28. Under the terms of the Applicant’s policy, the FSP is entitled to decide to pay the Applicant “an amount equal to the reasonable cost of repair”, rather than arranging for the repair of the damage. In the circumstances, I consider that it was reasonable for the FSP to take this approach. Settlement amount 29. Where the FSP decides to cash settle the claim, it must ensure that the amount of the cash settlement is “reasonable”. In my view, this means that this amount must be sufficient to enable the insured to undertake the repairs themselves. 30. In the current case, the FSP based its cash settlement offer on a quote provided by its builder (D) for the cost of the repairs for which the FSP had accepted liability. However, D was not prepared to undertake the repairs on the Applicant’s behalf. The Applicant disputed that D’s quot e was reasonable, given that he had received a higher quote from his own builder (“G”). 31. I note that, following the Recommendation, the FSP has increased the cash settlement offer to $4,975.16 based on a revised quote from D (which included the cost of additional repairs to the kitchen which had inadvertently been omitted from the original quote), reduced by the policy excess of $575. 32. Given my findings above, the cash settlement amount will need to be increased to cover the cost of repairing the outwards mo vement of the single skin brickwork on the western wall. I note that in his report, S provided a scope of works for the damage to the western wall, items 1 and 2 of which relate to the outward movement of the wall. 33. Following the Recommendation and having regard to the concerns raised about the adequacy of D’s quote, the FSP put forward several alternative approaches for determining the amount of the settlement. One of the approaches proposed by the FSP was for the Applicant to nominate three builders (which could include his preferred builder (G)) to provide quotes based on the approved scope of works, with the FSP to select the most competitive quote. I consider that this approach is appropriate to determine the reasonable cost of repairing the damage, based on the scope of works provided by X, as amended to include items 1 and 2 of the scope of works provided by S in relation to the western wall. 34. The FSP has also offered to provide the Applicant with temporary accommodation benefits while the repairs are carried out. For the purpose of determining the extent of the benefits to be provided, I consider that the three builders nominated by the Applicant should be asked to include in their quote an estimate of the time required to complete the repairs. The FSP Case No: 322232 Determination Page 8 of 9 should then provide the Applicant with temporary accommodation benefits based on the estimate provided in the quote selected by the FSP. Claim handling 35. The Applicant has raised various concerns about the manner in which the FSP has handled his claim. In particular, he is concerned that the FSP:  pre-judged the outcome prior to appointing its builder (D) to inspect the damage;  did not appoint an engineer to determine the cause of the damage until after he had lodged his dispute with FOS (despite D’s recommend ation to do so);  did not provide all of the photographs taken by D to its engineer (X) prior to him assessing the damage; and  did not disclose that X had prepared a scope of works for all of the repairs to the property (rather than only those for which the FSP had accepted liability). 36. I have carefully considered each of the issues raised by the Applicant. However, on balance, I am satisfied that the FSP has generally handled the Applicant’s claim appropriately in the circumstances. In particular, I consid er that the FSP did not make a decision on the Applicant’s claim until it received its assessor’s report. I also accept that the fact that X prepared a scope of works for the entirety of the damage did not mean that the FSP had necessarily accepted liability in this respect. 37. While I consider that it would have been desirable for an engineer to be appointed earlier to provide an opinion as to the cause of the damage, I am satisfied that the Applicant can be adequately compensated for any prejudice which he has suffered as a result by the award of interest on the cash settlement amount payable in respect of the cost of the repairs. Determination 38. On the basis of the available information I determine that:  the FSP is required to indemnify the Applicant for the cost of repairing the outward movement of the single skin brickwork on the western wall of his property;  within 14 days of the Applicant accepting this Determination, he is to nominate three builders to provide a quotation for the repairs to the property;  within 21 days of the Applicant nominating three builders, the FSP is to obtain a quote from each builder for the costs of carrying out the repairs (based on the scope of works include d in D’s revised quote dated 16 January 2014, together with the repairs set out in items 1 and 2 of the additional scope of works contained in S’s report). Each quote Case No: 322232 Determination Page 9 of 9 should also include an estimate of the time required to complete the works;  within 7 days of the receipt of the three quotes, the FSP is to select its preferred quote and cash settle the Applicant for an amount equal to: i. the cost of repairs as specified in the quote (less the policy excess of $575), plus interest on this amount calculated in accordance with section 57 of the Insurance Contracts Act 1984 (Cth) from 24 May 2013 until the date of payment; ii. the cost of temporary accomodation for the Applicant and his family based on the estimated time to complete the repairs as specified in the quote; and iii. $1,100, being the costs incurred by the Applicant in obtai ning S’s report.