Home / Financial Firm (Unknown - Insurer) / Determination 321138
Determination 321138
Denial of part of storm-damaged fence claim under flood exclusion
Summary
The Applicant claimed the full cost of replacing storm-damaged fencing after heavy rain in January 2013. AFCA accepted that the FSP properly excluded the section of fence damaged by floodwater from Pullen Pullen Creek and ruled the FSP entitled to deny that part of the claim.
The Product Disclosure Statement clearly informed the Applicant that flood is excluded, and stormwater run-off mixed with creek overflow is classed as flood under established case law.
Issues
- Claim denial primary · not upheld
“The Panel is persuaded the water which passed through the south eastern fences was mixed with overflow from the creek, which is floodwater; the FSP is entitled to deny the additional claim.”
- Failure to disclose secondary · not upheld
“The Panel is satisfied the FSP complied with its obligation to clearly inform the Applicant of the flood limitation under Section 35 of the Act.”
- Misleading conduct secondary · not upheld
“Regardless of any representation made, there is no evidence the Applicant acted on it to his detriment.”
Subjects and remedies
natural disasterno remedy
Text of the determination
Case No: 321138 Determination Page 1 of 7
Case number: 321138
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim - Storm/Flood Damage
30 October 2013
Background
1. The Applicant held a home policy with the Financial Services Provider (FSP)
at the relevant time. The policy provided building cover for $948,150.
2. On or about 26 January 2013, the fencing on the Applicant’s property in
Pullenvale, was damaged as a result of severe weather events that affected
the Queensland area at the time.
3. The FSP accepted part of the claim for the damaged fence but declined
cover for a section of it on the basis it considered that this section was
damaged by floodwater, which is not covered under the policy.
4. The Applicant disagrees with the decision and seeks reimbursement for the
full value of replacing the fence.
Summary of Applicant’s position
5. The Applicant says the entire fence was damaged as a result of stormwater
run-off and should be covered under the policy.
6. The denied section was in a lower area than the sections the FSP covered
and its evidence that this section was affected by floodwater is unconvincing.
7. He was informed by the FSP that he would be covered before it changed its
mind.
Summary of FSP’s position
8. The FSP says that it covered some of the damage which was probably
attributable to stormwater run-off but excluded the disputed area as this was
caused by the flooding of the Pullen Pullen Creek. The policy specifically
excludes losses which occur as a result of flooding.
9. The Applicant was made aware of the flood exclusion through provision of
the Product Disclosure Statement (PDS). This document enabled the FSP to
comply with its obligations under Section 35 of the Insurance Contracts Act
Determination
Case No: 321138 Determination Page 2 of 7
1984 (the Act) and ensured the Applicant was adequately informed of the
limitations of the contract.
10. The FSP relies upon the following policy provisions:
Page 2 of Part A of the PDS
“ DEFINTIONS – THE MEANING OF CERTAIN WORDS USED IN THIS
PRODUCT DISCLOSURE STATEMENT
...
flood – is the covering of normally dry land by water which has overflowed,
escaped or been released from the confines of any natural or artificial
watercourse, lake, reservoir, canal or dam.”
Pages 7-9 of the PDS
“ COVER PART 1 – INSURED EVENTS
This section describes the insured events you are covered for, and the
conditions and exclusions that specifically apply to each insured event.
They should be read with the general exclusions on pages 27-29.
...
Insured event We will NOT cover:
6. Storm and rainwater
Including loss or damage from:
the escape of rainwater from any water
pipe, drain or gutter
surface run-off rainwater from
surrounding areas that occurs within 24
hours of heavy rain
Including loss or damage caused by erosion,
subsidence, landslide, mudslide or any other
earth movement that occurs within 72 hours of
a storm or heavy rain and as a result of that
storm or heavy rain.
loss or damage
caused by flood...
...”
Page 27 of the PDS
“ GENERAL EXCLUSIONS APPLYINGTO THE WHOLE POLICY
We will not cover:
Action of the sea, high water or underground water:
loss or damage caused by flood...”
Issues
11. Whether the Applicant was “clearly informed” that the policy did not provide
cover for flooding, as required under Section 35 of the Act.
Case No: 321138 Determination Page 3 of 7
12. Whether the disputed aspect of the Applicant’s loss was caused by a flood
event and whether it was properly excluded from cover.
Reasons for decision
13. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the potential amount of the claim and the
issues to be considered. This dispute has not been the subject of a FOS
Recommendation and has proceeded directly to Determination.
14. This matter has been determined by a Panel of decision makers, comprising
an Ombudsman and two Panel members with extensive experience in
Insurance matters and consumer claims.
15. The Panel is satisfied that a full exchange of the relevant information has
taken place between the respective parties a nd that each party has had the
opportunity of addressing any issues raised.
Whether the Applicant was “clearly informed” of the flood exclusion
16. The Applicant does not deny that he was furnished with a copy of the PDS
from the FSP.
17. Section 35 of the Act allows for an insurer to define and limit the level of
cover offered for insurance on the basis that it “clearly informs” the
policyholder(s). This requirement is required to be discharged in writing and
no obligation is on the insurer to inform a policyholder of the limitations
verbally.
18. The question of what it means to “clearly inform” was considered by the
Northern Territory Court of Appeal in the matter of Marsh v CGU Insurance
Ltd t/as Commercial Union Insurance [2004] NTCA 1 (the Marsh case).
Mildren J w rote in relation to an insurer’s obligations under Section 35(2) of
the Act that:
“... a fair reading of sec 35(2) [does] not warrant the conclusion that the result
needed to go further than providing for the relevant exclusion in the policy
wording in clear and unambiguous language and in a manner which a person
of average intelligence and education was likely to have little difficulty in
finding and understanding if that person read the policy in question.”
19. The policy is relevantly indexed, provides a clear definition of flood and
clearly states flood cover is excluded. The Panel considers that the definition
of “flood” adequately conveys that the policy does not cover events where
water has “overflowed, escaped or been released” from the confines of a
specific water body. That definition is relatively straightforward.
20. The policy does distinguish between “flood” (which is not covered) and
“surface run - off rainwater” (which is covered under certain circumstances).
Case No: 321138 Determination Page 4 of 7
21. The policy is suitably indexed and the Panel is satisfied that a reasonable
person who consulted it (on page 1) would be directed to “General
Exclusions” on page 27 of the policy to determine that flood events are not
covered by the FSP.
22. Accordingly, the Panel is satisfied that the FSP made the Applicant aware
through the provision of the PDS that the policy did not provide flood cover.
In the circumstances, the Panel is satisfied the FSP has complied with its
obligation to clearly inform the Applicant of the relevant limitation of cover
pursuant to Section 35 of the Act.
Representation regarding cover
23. The Applicant suggests that he was told at one point after the loss by a
representative of the FSP, that he would be covered. The evidence on this
point is non-specific from the Applicant and disputed b y the FSP.
24. Regardless of any representation made, there is no evidence that the
Applicant acted on this representation to his detriment. It is clear that the
policy excludes losses attributable to flooding events and the Panel is not
persuaded that the Applicant was in any way prejudiced by any alleged
representation made by or on behalf of the FSP.
25. The provided telephone call recording from the FSP notes that the Applicant
suggests that the inundation damage to the fences on the property was
caused by water from Pullen Pullen Creek. The Applicant denies this and
says that the transcription is not accurate.
26. The Panel having listened to the relevant exchange considers the transcript
to be accurate. Whilst it is not exact, the Panel is satisfied that it accurately
conveys what was said. The Panel further accepts that it might not have
been the Applicant’s intention to suggest that the inundation originated from
Pullen Pullen Creek as he initially noted that the fence had been “sort of
partly pushed over by s torm waters”.
27. The representative for the FSP noted that the matter would be investigated
and suggested that the policy did not extend to losses attributable to flooding
events. The Applicant suggests that he had previously been informed
otherwise but there is no supporting evidence of this. Based on the FSP
providing a copy of the PDS and the Panel’s conclusion above that the
Applicant had been “clearly informed”, the Panel is satisfied that he was or
should have been aware of the flood exclusion at the time of making the
claim.
28. The Panel is further of the view that the Applicant did not expressly convey
(or intend to convey) that the loss was caused by floodwater from Pullen
Pullen Creek.
29. Accordingly, the Panel is satisfied that the matter should be evaluated on its
merits.
Case No: 321138 Determination Page 5 of 7
Source and timing of the water inundation and whether the policy responds
30. There is an onus on an insured to establish on the balance of probabilities
that a claim fits the definition of an insured event. This is known as a prima
facie claim. Should this onus be discharged, it is then the responsibility of the
insurer to establish the application of any exclusion on which it relies to deny
the claim.
31. To be entitled to cover from the FSP, the onus therefore rests with the
Applicant to establish that his loss fits within the scope of what is covered by
the FSP’s policy.
32. The policy provides cover for a series of defined events as outlined in the
PDS. It does not provide blanket cover for all types of loss.
33. It is not in dispute that the Applica nt’s property was subject to stormwater
run-off during the event or that some cover was provided by the FSP for the
relevant affected areas. On this basis, the Panel accepts that a prima facie
claim for cover under the policy has been established.
34. The onus then turns to the FSP to establish that the fence damage that it
has refused to cover was caused by an excluded event. In this instance, the
FSP alleges that the relevant damaged area was subject to flooding from the
nearby Pullen Pullen Creek.
35. The FSP retained a hydrologist, “ WR ”, to inspect the Applicant’s property
and fencing on 26 February 2013. The subsequent report of 28 February
2013 revealed that:
the Applicant informed her that the fence had been built so that the
fencing wire would come loose from the base of the posts to alleviate
pressure on it “during high flow events when debris builds up against
the fencing wire”. A section of the yard accommodates water flow
during significant rainfall events and this drains towards the south
eastern boun dary of the property. This area “had a lot of water in it” on
26 January 2013 and the pressure of this water pushed over the fence;
the Applicant allegedly informed WR that the flow of water across the
yard joined up with the creek in the vicinity of the p ushed over fence
posts. At the north west fence line, the water was separated by a strip
of bank;
in looking at the drainage for the property, WR noted that the creek
flows through it and there is an overland flow path from the north west
fence boundary to the south east boundary;
the Pullenvale Alert rainfall station was closest to the property, being
1.2km north west of it. This station recorded rainfall of 430mm over a
four day period between 6.00pm on 24 January 2013 and 6.00pm on
28 January 2013;
the peak one-hour rainfall intensity was 33.5mm per hour, recorded in
the hour prior to 4.00pm on 27 January 2013;
Case No: 321138 Determination Page 6 of 7
the peak rainfall intensity is at odds with the timing of the event, which
the Applicant noted as having occurred on 26 January 2013. WR
considers that this was likely an error as the rainfall figures suggest that
27 January 2013 was the more likely day;
WR considered that the fence running along the north western
boundary of the property was “likely” damaged by stormwater run -off.
She considered that the fence line bordering on the creek was
damaged by floodwater.
36. The Applicant reviewed the evidence from WR and provided a written
response on 4 March 2013 to address issues that he had with it. Notably, he
suggested that:
the evidence of WR, highlights that there was not enough information to
determine if flood waters had breached the creek upstream and
contributed to the overland flow;
he disputed that there was a catchment area of about 1.5ha as
suggested by WR and ventured that there was a considerable
catchment that extended beyond his own property (which was about
1.3ha, of which about 0.7ha feeds into the overland flow). He estimates
the overall catchment to be about 5.7ha;
there was no evidence of debris or other factors which would suggest
an overflow of the creek at the higher level of the property suggested
by WR;
the report was contradictory as it conceded overland stormwater run-off
damaged the north western fence line but not the south eastern fence
line, being in the path of the downstream flow.
37. WR was asked to consider the further issues identified by the Applicant and
provided a second report, dated 19 March 2013. In this report, WR noted
that:
her conclusion as to the different causes of the losses at the respective
areas of the fence line remained unchanged;
it is possible that the water which passed the north western fence line
was flood water from a breach of the banks further north along the
Pullen Pullen Creek but this could not be confirmed. As a result, she
concedes that the water damage here could have been run-off. This
flow ultimately intersected with overflow from the creek which was
floodwater;
she is satisfied that the creek overflowed on the fence line of the
property and this water combined with the water which had passed the
north western fence line prior to the combined flow affecting the south
eastern fence line.
38. There is some doubt as to when the Applicant’s fences were damaged,
although the Panel is persuaded by WR’s estimation that the loss likely
occurred on 27 January 2013. The Applicant when lodging the claim was
unsure of exactly when the damage occurred and nominated the 28 January
Case No: 321138 Determination Page 7 of 7
2013. He could not nominate a time. Elsewhere , it is suggested by WR that
the Applicant thought the damage occurred on 26 January 2013.
39. Based on rainfall records and the view of WR, the Panel accepts that the
loss likely occurred on 27 January 2013.
40. Although it is reported that there had been probable stormwater run-off on
the property, the evidence from WR suggests that Pullen Pullen Creek broke
its banks at or near the eastern side of the property and that the water from
this creek joined with the possible run-off water which affected the north
western boundary of the property before the flow reached the south eastern
fenced area.
41. Established case law confirms that where stormwater run-off water mixes
with floodwater, the resultant mixture is properly classified as a “flood”.
42. Whilst there is no confirmation of when the Pullen Pullen Creek might have
broken its banks, there appears to be no dispute that it did at some point.
WR noted that the Applicant told her that the run-off water joined with the
overflow of the creek at some point.
43. It is further apparent that WR was of the view that both the north western
and south eastern fence boundaries were damaged by floodwater but she
could not verify this for the north western section. She was more confident
that the flow of water which passed the north western fences mixed with that
from the overflowing river to pass the south eastern fence line.
44. On the balance of probabilities, the Panel is persuaded by WR’s view that
the water which passed through the south eastern fences was mixed with
overflow from the creek. As stated, this would be properly classed as
floodwater and entitles the F SP to deny the Applicant’s claim for this part of
his loss.
Determination
45. On the basis of the available information, the Panel determines that the FSP
is entitled to deny the Applicant’s additional claim .
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.