Home / Financial Firm (Unknown - Insurer) / Determination 320902

Determination 320902

Claim amount - settlement and compensation for claim handling

FirmFinancial Firm (Unknown - Insurer)
Decided2014-05-28
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

After a fire, the applicant disputed the FSP's repair-based settlement, declined items and compensation for claim handling and claimed health impacts. The Panel found the FSP had fulfilled its policy obligations, the disputed items were not covered or were reasonably settled, and no compensation was warranted, so no order was made.

The sum insured is a maximum rather than an entitlement, and the insured must establish that the damage falls within an insured event and was caused by it.

Issues

Subjects and remedies

health or medicalhome or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 320902 Determination Page 1 of 15 Case number: 320902 General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim Amount - Service - Compensation 28 May 2014 Summary Description  A claim under a home and contents policy following damage by fire to the Applicant‟s home. Basis of Determination  A consideration of the policy coverage and the evidence regarding the damage to the Applicant‟s home. Determination  On the basis of the available information the Panel determines: o The FSP has fulfilled its obligations pursuant to the policy; and o The Applicant is not entitled to compensation for the manner in which the FSP managed her claim. Background 1. The Applicant holds a home and contents policy with the Financial Services Provider (FSP). The policy was incepted on 10 July 2012 and was current at the time of the loss. 2. On 26 December 2012, the property was damaged by fire and a claim lodged with the FSP. The FSP authorised building firm “E” to undertake the necessary repairs to the property. 3. The Applicant is dissatisfied with the manner in which the FSP managed her claim and is seeking a review of its conduct and compensation for her claims experience. Determination Case No: 320902 Determination Page 2 of 15 Summary of Applicant’s position 4. The Applicant says the home should never have been repaired; it should have been classed as a total loss in the beginning. That way, she could have used the funds to purchase a new house and would not have been put through all the stress of the rebuild. 5. The FSP should pay her the balance of her sum insured in compensation for the poor manner in which it handled her claim and the treatment she had to put up with from E. E was rude and abusive to her and caused her significant stress. 6. The house contained asbestos and she believes it is unsafe for habitation. This is supported by the fact the property had restricted access during the repairs due to the asbestos hazard. She does not want her children to live in the home and the FSP has refused to provide a written guarantee that the property is fit for habitation. She has reluctantly agreed to resume living at the property after the FSP provided her with a clearance certificate. 7. There are a number of fire damaged items which the FSP has refused to include in her claim. She is seeking that those items be included in the scope of works. There are also other items which were damaged during the course of repairs which need to be included. Some of the repairs undertaken by E have already failed and her home is at risk of water damage due to the poor repairs. These need to be rectified. 8. Some items which the FSP has agreed to cover such as display boxes in her lounge room, have been significantly underquoted by E. She cannot replace the items for the amount allowed by the FSP and is seeking that her quotation be the basis of settlement for these items. 9. The FSP promised to pay some costs for her such as moving her contents from the temporary accommodation back to her house. Then it reneged on that promise which was unprofessional and caused her anxiety. Her health has deteriorated as a result of this claim and she has had to seek medical treatment. She now has a number of serious medical conditions due solely to the FSP‟s management of her claim. 10. She is seeking compensation for the manner in which the FSP managed her claim. It did not progress the claim in a timely manner and refused to replace E as the builder even though he was rude and abusive toward her and undertook a poor quality repair of her home. The entire process was stressful and could have been avoided if the FSP had just written the house off in the first place. Summary of FSP’s position 11. The FSP says the terms of the policy ultimately give it the authority to determine the most appropriate method of settlement to use in the event of a Case No: 320902 Determination Page 3 of 15 claim. In this instance, the home was assessed as a repairable proposition and in accordance with the policy terms, it chose to authorise repairs. 12. The FSP acknowledges the Applicant‟s desire for the property to be treated on a total loss basis and the sum insured paid. However, it says there is no basis for this as the repair costs are significantly lower than the sum insured and the property remained structurally sound so as to allow for repairs to be undertaken. 13. The FSP has fulfilled its obligations to the Applicant in the repair of her home. It is not obliged to pay her the balance between the repair cost and her sum insured in settlement of her claim. 14. The Applicant has sought to include a number of items in her claim which were not damaged in the claimed event, such as the swimming pool, garage doors, handrails, awnings and steps. As these issues did not arise as a result of the fire or any other insured event, the FSP has correctly declined these aspects of the FSP‟s claim. 15. The FSP has offered settlement of $2,225.60 for some display cabinets which were fixtures of the insured home. It based this settlement amount on a quotation supplied by E for the supply and installation of these items. It is satisfied that amount is the extent of its liability in the matter. It does not agree the Applicant‟s qu otation represents a fair price for replacement of these items as it has been vastly inflated. 16. The FSP acknowledges there are areas of the repairs which require rectification and it has authorised E to conduct those. However, the Applicant refuses to allow E onto the premises. Until she does so, it cannot finalise the rectification. However, some of the items for which the Applicant is claiming are either not from the claimed event or relate to private works undertaken by E, on behalf of the Applicant. It has correctly declined liability for those items. 17. At the completion of the repairs, it obtained an asbestos clearance certificate which confirmed there were no harmful fibres present and the property was safe for habitation. It considers this is the extent of its liability in the matter. 18. The FSP has managed the claim in a timely and professional manner. Whilst there were delays in the repair process, these were instigated by the Applicant or her representatives. It has at all times responded promptly to issues raised and was proactive in seeking the finalisation of the claim. It does not agree the circumstances of the claim warrant an award of compensation. 19. The FSP relies on the following policy provisions contained within the Product Disclosure Statement (PDS), which the Applicant does not dispute receiving: “ What you are covered for Insured events 1 to 12 Case No: 320902 Determination Page 4 of 15 When covered under this policy, your home and contents are insured for loss or damage at the insured address by any of the 12 insured events, if they happen in the period of insurance. 3. Fire We cover Loss and damage caused by fire e.g. fires started by electrical faults, heaters, kitchen fires, bushfires and other causes . ... What you are not covered for This section details what is not covered under any part of your policy. We do not cover loss or damage: ... Failing to take care of the home or contents Caused by, or as a result of your failure to: i. Take reasonable care of your home and contents ii. Keep the home and contents in good condition and well maintained iii. Fix faults and defects as soon as you become aware of them. ... We do not cover ... Wear, tear, rust or mould Loss or damage caused by wear, tear, rust, fading, gradual deterioration, mould, rising damp, mildew, action of light, atmospheric or climatic conditions, corrosion or rot... ... Extra costs following an insured incident Consequential losses or extra costs following an insured incident including: - Loss of income or wages - Cost of your time to prove your loss or help us assess your claim - Cost of hiring appliances after yours are lost, damaged or stolen ... Unless this is covered by an additional benefit or option under the policy. ... How we settle your claim We choose how your claim is settled If we agree to pay a claim for loss, theft or damage to your home or contents, we will decide if we will: – repair damage new for old or – replace home or contents new for old or Case No: 320902 Determination Page 5 of 15 – pay you what it would cost us to repair or replace your home or contents new for old. The meaning of new for old is defined below. We will not: – pay extra to replace your home or contents to a better standard, specification or quality than it was before the loss or damage occurred except as stated in „new for old‟ below . ... When we repair or rebuild your home We will do our best to obtain new materials that are the same type, standard and specification as when new. If the same is not available, we will use new materials of a similar type, standard and specification that are commercially available and compliant with the latest building regulations. ... Terms Explained The following list explains the meaning of terms used in this PDS. When the following terms appear in this PDS, regardless of whether their first letter is a capital or in lower case, their meaning is shown on the following pages. ... Sum insured The most you can claim for any one incident. The amount is shown on the Certificate of Insurance or in this PDS. The sum insured includes GST. The sum insured on your home and contents includes any adjustment to which you are entitled under additional feature 3 (automatic adjustments to sum insured).” Issues 20. Whether the Applicant is entitled to the balance of the sum insured to be paid to her. 21. Whether the FSP has fulfilled its obligations pursuant to the terms of the policy. 22. Whether the Applicant is entitled to compensation for the manner in which the FSP managed the claim. Reasons for decision 23. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This is due to the circumstances of the dispute. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. Case No: 320902 Determination Page 6 of 15 24. This dispute has been determined by a Panel consisting of an Ombudsman and two Panel members with extensive experience in insurance matters and consumer claims. 25. An exchange of information has taken place between each party and each party has had the opportunity to address any issues raised. 26. It is not disputed between the parties the Applicant suffered a loss from a risk insured against or that the FSP has accepted her claim. However, a dispute has arisen between the parties regarding the FSP‟s settlement of the claim. As there are a number of separate disputed issues in this matter, the Panel proposes to deal with each issue separately below. Method of Settlement and Sum Insured 27. The Panel accepts the policy terms are clear in that it is the FSP and not the Applicant that holds the right to elect whether to repair or rebuild the property or settle the claim by way of cash settlement. Unless the Applicant is able to substantiate that the home cannot be repaired for safe use, the FSP was entitled to authorise repairs. 28. In this instance, in addition to seeking an itemised quotation from E which set out that the cost to repair the property fell far short of the sum insured, the FSP commissioned engineering firm “J” to inspect the home. The Panel has considered J‟s report, which confirmed the structure remained sound and was able to be safely and successfully repaired. 29. The Applicant has not provided any evidence to suggest the property could not be safely or economically repaired. In the absence of conflicting information, the Panel accepts the FSP was entitled to rely on the opinions of its experts J and E that the property was a repairable proposition. Accordingly, the Panel is satisfied that the FSP‟s decision to settle the claim by way of repairing the home was correct and in accordance with the policy terms. 30. The Panel acknowledges the Applicant had purchased cover for a sum insured of $450,000. The Panel further notes t he Applicant‟s belief that she is entitled to this amount in settlement of her claim. 31. However, the Panel notes the sum insured is the maximum entitlement to cover in the event of a claim. Therefore, any loss is assessed up to the maximum entitlement of $450,000 (Panel‟s emphasis) . It is a not a guarantee that sum will be automatically paid in settlement of a claim. Rather, the FSP is required only to indemnify the insured for the actual loss suffered, up to the sum insured. 32. In the Panel‟s view, the Applicant has not established an entitlement to any sums in excess of the amounts the FSP has paid to repair the home. Accordingly, the Panel considers the FSP has fulfilled its obligations to the Applicant pursuant to the terms of the policy. Case No: 320902 Determination Page 7 of 15 Compensation 33. Insofar as the Applicant has requested the balance of her sum insured be paid to her as compensation for her claims experience, the Panel notes this Service does not have the power to grant entitlements not provided for under the terms of the insurance contact. The FOS Terms of Reference (the Terms) also specifically excludes from the powers of the Service, the ability to award punitive, exemplary or aggravated damages. 34. On this basis, the Panel is unable to further consider the Appli cant‟s request for the balance of her sum insured. 35. However, this does not preclude the Panel from considering whether an award of compensation for non-financial loss is appropriate in the circumstances. The Applicant is seeking compensation for emotional s tress and health concerns that she states has been caused by the FSP‟s handling of the claim. 36. Whilst the Panel accepts that the FSP has, in the main, fulfilled its obligations to the Applicant pursuant to the terms of the policy, this does not preclude the Panel from considering whether the Applicant is entitled to compensation pursuant to Section 9.3b of the Terms of Reference. 37. The Panel accepts that to some degree, all insurance claims are stressful and inconvenient. In order to invoke an order of compensation under 9.3b of the Terms of Reference, the Panel must be satisfied that some action of the FSP caused the Applicant an unusual degree of inconvenience or time taken to resolve the situation. 38. After carefully considering the material provided, the Pane l is not persuaded the FSP so mishandled the claim so as to warrant an award of compensation. Whilst there was a minor delay in the FSP authorising repairs once it was in a position to, the Panel notes this did not affect the overall carriage of the claim as the Applicant then refused to allow repairs to commence and sought legal advice before consenting to E undertaking the works. 39. It is also clear from the material provided that the Applicant has instigated some of the delays and at times, has not behaved in a manner conducive to bringing her claim to a timely and expedient conclusion. In particular, it is clear that the Applicant maintained a fractured relationship with E, which in the Panel‟s view, has not assisted in the resolution of this matter. Further, although the Applicant has provided evidence of some health problems she has experienced, there is insufficient information to hand to attribute these problems either wholly or partially to the actions of the FSP. 40. In the circumstances, the Panel considers the FSP has managed the claim in an appropriate and professional manner and therefore an award of compensation is not warranted in the circumstances. Case No: 320902 Determination Page 8 of 15 Asbestos contamination 41. The Panel accepts the Applicant was concerned about the potential hazards posed by asbestos contamination at the site and acknowledges her concerns, in particular surrounding her young children being at the site. 42. The Panel notes that as part of the securing of the premises immediately post fire, F arranged for a specialised asbestos contractor to attend the site to remove all bonded asbestos as well as any contaminated contents and debris and clean the site (including the swimming pool) in order to make the property safe for the reinstatement works. 43. In the Panel‟s view, despite the works undertaken by F, it was still prudent on the part of the FSP to restrict access to the property to minimise any potential for exposure to hazardous materials and to ensure the site complied with occupational health and safety requirements for those contractors working at the site. Whilst this was no doubt inconvenient for the Applicant, the Panel considers the FSP‟s actions reasonable in the circumstances. 44. Further, the Panel notes that at the completion of repairs, E arranged for asbestos specialist firm “EH” to undertake testing and sampling of the upper level of the property. EH concluded there are no traces of asbestos contamination present at the property and the home was fit for habitation. 45. Insofar as there may still be asbestos present in the parts of the home that the FSP did not repair as part of the claim, the Panel accepts the FSP bears no liability for any part of the existing structure outside of the scope of its repairs. In the circumstances, the Panel considers the FSP‟s actions in appointing EH to undertake testing of the property post repairs to ensure there were no airborne asbestos fibres present, to be sufficient. Swimming pool 46. The FSP relies on the findings of its experts including E, restoration firm “F” and building firm “A” , to conclude there was no fire or event related damage to the swimming pool. The Applicant has provided a number of photographs of the swimming pool in support of her claim. 47. As the material has been exchanged between the parties, the Panel does not propose to recite it again in detail, save for where relevant. Having examined the reports provided by the FSP‟s experts, the Panel accepts they are unanimous in concluding there is no fire (or other claimable damage) to the swimming pool. Further, the swimming pool is not contaminated by asbestos as a result of the fire. 48. The Panel has considered the photographs supplied by the Applicant, however, do not consider these assist the Applicant‟s position. Whilst there are undoubtedly issues with the swimming pool and liner, the photographs depict damage which would more reasonably be attributable to rust and wear and tear rather than any cause for which the FSP would be responsible for. Case No: 320902 Determination Page 9 of 15 49. Whilst the Applicant disputes the findings of E, F and A, she has not provided any evidence from suitably qualified persons to support her contention that the swimming pool was damaged either as a result of the fire itself or the subsequent repairs, or by any asbestos contamination. Nor has the Applicant demonstrated the swimming pool has been damaged by any action of any of the contractors engaged in the repair of the home. 50. In the absence of any conflicting information, the Panel accepts the FSP is entitled to rely on the findings of its experts to conclude the swimming pool does not form part of the claim related repairs. Accordingly, the Panel accepts the FSP has correctly excluded this aspect from the Applicant‟s claim. 51. The Panel notes E cleaned the pool at the completion of its repairs to the home in order to remove any traces of debris or dust that remained in it as a result of the repairs undertaken. In the Panel‟s view, this course of action was reasonable in the circumstances. Garage door replacement 52. The material provided confirms that during the course of securing the premises, E drilled two holes in the garage door tracks to secure them as they were unable to be locked, due to the failed locking mechanisms. In recognition of the potential for reduced functionality of the doors due to the drilled holes, the FSP offered to settle 50% of the costs of new doors, established at $2,415.60, thus being a settlement of $1,207.80. 53. The Applicant has not challenged the cost allowed by the FSP for the replacement of the garage doors and on this basis, the Panel accepts it represents a fair settlement for the doors. 54. The FSP considers the garage doors were in need of replacement prior to the claimed event and therefore any settlement of the doors in full would constitute betterment. In a situation where replacement of goods would leave the insured property in a significantly better position than it was prior to the claimed event, an insurer is entitled to rely on the principle of betterment to seek contribution from the insured. 55. The Panel notes the Applicant does not appear to argue with the FSP‟s reliance on the principle of betterment. Rather, the Applicant seeks the entire cost of replacing the roller doors under the claim on the basis that the damage was caused to them by emergency services in their efforts to contain the fire. 56. Accordingly, as the Applicant seeks to claim a benefit under the policy, she bears the onus of establishing she is entitled to that benefit. 57. The Panel has examined the photographs of the roller doors supplied. The Panel accepts the photographs show dents to the doors and chips in the paint. However, the Panel has difficulty in envisaging how the roller doors could have been damaged by fire services in this manner. Certainly, the Case No: 320902 Determination Page 10 of 15 Applicant has provided no explanation as to how this is alleged to have occurred. 58. In the Panel‟s view, the photographs depict damage to the roller doors which is consistent with general wear and tear over the lifespan of the doors. The Panel also notes the roller doors did not lock at the time of the fire, indicating they were not in good condition or well maintained prior to the event, which in the Panel‟s view, is consistent with the appearance of the doors. 59. Accordingly, the Panel is not persuaded the Applicant has discharged the onus on her to establish a valid claim for the garage roller doors under the terms of the policy. On this basis, the Panel accepts the FSP‟s offer of $1,207.80 is reasonable in the circumstances. Veranda rails 60. The FSP relies on the report from E and a number of photographs in support of its decision to decline the veranda rails from the claimed event. The Applicant asserts the damage to the rails was done either in the claimed fire event or by E‟s contractors during the course of the repairs. 61. E‟s report is clear in stating the handrails are affected by rot, mould, p eeling paint and general wear and tear. 62. In the Panel‟s view, E‟s conclusions are supported by the photographs which show the handrails are in a poor state of maintenance and upkeep. Further, it seems clear the fire event did not extend to this part of the home making it unlikely the rails were damaged by the fire. There is no evidence presented to support the Applicant‟s assertion that the contractors caused or exacerbated any of the damage evident. 63. Accordingly, the Panel is not persuaded the Applicant has discharged the onus on her to establish a valid claim for the veranda rails under the terms of the policy. Awning blinds 64. The Panel notes the awning blinds were not damaged in the event but were removed and stored whilst repairs were undertaken, being cleaned and reinstated at the completion of works. 65. The Applicant asserts that E damaged the blinds either whilst removing or replacing them or in the manner in which they stored the blinds. 66. E inspected the blinds as a result of the Applicant‟s concerns and co nfirmed the blinds are in the same condition they were in prior to the fire event. 67. Whilst the Applicant disputes E‟s findings and suggests E‟s reports should be accorded no weight as they are biased against her, the Panel finds no reason to discount E‟s fi ndings particularly in the absence of any evidence supporting the Applicant‟s assertions. Case No: 320902 Determination Page 11 of 15 68. Whilst the Panel agrees the photographs of the blinds show minor marks and tears, there is nothing to suggest these are attributable to a lack of care taken by E when moving or storing the blinds. Rather, the damage would appear consistent with general wear and tear on the items. 69. Accordingly, the Panel is not persuaded the Applicant has discharged the onus on her to establish a valid claim for the awning blinds under the terms of the policy. External steps 70. The Applicant asserts that the peeling paint on the front steps has occurred either directly or indirectly as a result of the claimed event and should therefore be covered under the claim. The FSP relies on the report from E and photographs of the steps to deny liability for these under the policy. 71. The Panel has considered the available information and is of the view the damage to the steps is attributable to general wear and tear and lack of upkeep over their lifespan, rather than the claimed event or any actions of the FSP or its contractors. 72. Accordingly, the Panel is not persuaded the Applicant has discharged the onus on her to establish a valid claim for the front steps under the terms of the policy. Display boxes and cabinets 73. The FSP has settled the Applicant the sum of $2,225.60 for the replacement of wall hung display boxes and cabinets. The FSP considers this payment discharges its obligations pursuant to the policy terms for these items. 74. The Applicant contends the amount offered in settlement is ins ufficient and is seeking the sum of $27,115 for their replacement as quoted by her cabinet maker “M”. 75. The Panel has considered M‟s quotation. However, the Panel considers it can place little weight on M‟s prices, noting that he very clearly states he has not seen the original items and based his pricing only on what he was verbally advised by the Applicant. 76. Review of the items quoted by M reveal that the items the Applicant requested to be included in the quote are not reflective of the actual items lost in the fire, as depicted in the photographs supplied. The photographs show small wall mounted boxes and what could most appropriately be termed wall mounted false doors, none of which the Panel is persuaded could be reasonably valued at the amounts suggested by the Applicant. 77. M‟s quotation, in contrast, includes costs items far superior in both features and quality to that which it replaces. Further, many of the items included in M‟s quotation such as display units and storage boxes would more appropriately be considered to be content rather than building items. The Panel notes the Applicant‟s content sum insured has been exhausted. Case No: 320902 Determination Page 12 of 15 78. On this basis, the Panel considers the amount offered by the FSP for the display boxes and cabinets is reasonable in the circumstances and it is not required to remit further payments to the Applicant. Contents removal costs 79. The Applicant is seeking approximately $900 to move her replacement content items from the temporary accommodation back to the risk address. She says the FSP originally agreed to cover this but later reneged on this commitment. 80. The FSP says the policy does not specifically refer to removal costs for contents although such costs are generally allowed under the additional benefit of “Removal of debris and keeping contents safe”, for an amount up to 10% of the sum insured. The FSP submits this benefit was exhausted and in fact exceeded in the works required to restore, remove and store the Applicant‟s contents after the fire. 81. Although it did offer to cover the remo val fees on an ex gratia basis, it was under no obligation to do so and has now retracted this offer. Further, it considers the cost of removal for newly purchased contents to be consequential in nature, noting that consequential losses are excluded from cover under the terms of the policy. 82. The Panel has considered the policy and any additional benefits that may be payable in addition to the sums insured. However, the Panel concludes there is no other section of the policy which would bring relief to the Applicant for these expenses. 83. As the 10% benefit limit has been exhausted, the FSP is entitled to decline further claims from the Applicant under this benefit. Insofar as the FSP may have paid or offered to pay beyond this limit, the Panel is satisfied there was no obligation on the FSP to extend payments past the policy limit and it is therefore not required to cover these costs for the Applicant. Electricity costs 84. The Applicant is seeking the costs of electricity incurred whilst she resided in the temporary accommodation, on the basis that the risk address was fitted with solar panels meaning the Applicant did not have to pay for electricity consumed at the address. As the temporary accommodation is supposed to be the same quality as her home and but for the fire she would not have incurred these fees, the FSP should cover those for her. 85. The FSP considers there is no provision in the policy to cover such costs. Further, the FSP says such costs are consequential in nature which is therefore specifically excluded from cover. On this basis, it has declined to cover the electricity costs. 86. In the Panel‟s view, the policy benefit for temporary accommodation is to be read at its narrowest interpretation, that is, it covers the cost of lodging only. Case No: 320902 Determination Page 13 of 15 There is no suggestion the benefit covers ancillary costs such as food or utilities whilst at the temporary site. 87. Further, the temporary accommodation is not required to be an exact match for the risk address, but rather to be reasonably contemporaneous in size and amenities to the living arrangements to which it replaces. The Panel is not persuaded provision of lodgings with solar panels is required before it could be considered the FSP fulfilled this requirement. 88. The Panel considers that, whilst unfortunate for the Applicant that she incurred electricity expenses whilst in the temporary accommodation, such expenses are correctly classed as consequential in nature and specifically excluded from cover under the terms of the policy. Light fitting 89. The FSP submits the replacement light fitting was chosen by the Applicant and fitted by E to the same outlet and wiring in existence. The FSP submits it is not responsible for altering the existing wiring and outlets to accommodate the Applicant‟s chosen light fitting, which is larger than that which it replaced and such alterations, if required, remain the responsibility of the Applicant. 90. The Applicant says the light is a hazard as it is too low and the manner of its installation is just further evidence of the shoddy work undertaken by E in its repair of her home. It was not possible to find the same light fitting as originally existed and she was not informed there were any boundaries in choosing the light fitting she preferred. Further, the Applicant claims E billed her for the fitting of the light, despite using the same electrical fittings and wirings. 91. E says he moved the light from the existing fittings at the request of the Applicant because it was „in her way‟ and billed her for same, which she has refused to pay. The Applicant has chosen not to comment on E‟s statement. 92. The Panel notes it is not disputed the Applicant selected the light fitting and supplied it to E to install. In the circumstances, the Panel finds it was incumbent on the Applicant to ensure the light fitting she selected was a suitable size and replacement to fit to the existing surrounds. If the fitting required alteration because it was not suitable for the surrounds, then this is a cost to be borne by the Applicant. On this basis, the Panel concludes the FSP has no liability in this regard. Veranda and water ingress 93. The Applicant says that since E completed work to her front veranda, water has entered in through the front and patio doors during periods of heavy rain. 94. Whilst the FSP agrees E retiled the veranda for the Applicant, it submits these works were conducted as part of the private works undertaken by E and did not form part of the claim related repairs. On this basis, the FSP concludes it has no liability for the water ingress and suggests the Applicant should discuss this directly with E. Case No: 320902 Determination Page 14 of 15 95. In her email of 12 May 2014 to this Service, the Applicant appears to agree the works were pri vately arranged with E, however, claims she was not aware of the works until after they were completed, as the FSP and E arranged this between them. Further, the Applicant asserts that as the FSP appointed E to complete the works on her home, it is responsible for any and all of E‟s conduct, regardless if the works in question formed part of the claim related repairs. 96. However, the Panel does not share the Applicant‟s view. Private agreements entered into by the Applicant remain the Applicant‟s responsibility, regardless of whether those arrangements are made with the FSP‟s preferred builder or whether they are undertaken in conjunction with claim related repairs. 97. Having considered the scope of work s and the report from loss adjuster “C”, the Panel finds the veranda works did not form part of the claim related repairs and therefore do not attract the repair guarantee benefit offered by the FSP‟s policy. On this basis, the FSP is not responsible for e nsuring the veranda tiling is remedied, although as an aside, the Panel notes E has agreed to re-lay one row of tiles to arrest the water ingress problem, however, E has been denied access to the property by the Applicant. 98. This Service is bound by the Terms of Reference, which govern the types of disputes FOS can consider. Accordingly, FOS can only consider disputes between Applicants and FSP‟s which relate to the provision and application of financial products. FOS is unable to consider issues which relate to any private arrangements the Applicant made with E relating to building works, as such matters fall outside of this Service‟s jurisdiction. The Applicant will need to make her own enquiries in this regard. Rectification repairs 99. The Applicant raised a number of concerns with the quality of repaired items in the home. In response to her concerns, C inspected the concerns and prepared a report for the FSP. The FSP relies on the contents of C‟s report in support of its position on the rectification repairs required, save for one item raised. 100. There are eight numbered items on the report and the Panel notes C agreed that the FSP is to rectify items one, two, four, seven and eight, a position to which E has also agreed. Accordingly, the Panel considers these issues are no longer in dispute. The Panel further notes that item five refers to the veranda tiling as addressed above and accordingly the Panel will not give that issue further consideration. 101. Item three relates to the T mouldings to the lamipanel. These have been painted black instead of a black product being sourced. C has made enquiries with the manufacturer of the product who confirmed they do not manufacture black mouldings, nor are there any other readily available black products in the marketplace. Case No: 320902 Determination Page 15 of 15 102. Therefore, in the Panel‟s view, it would seem E had little option but to purchase a white moulding and paint it black to accord with the Applicant‟s wishes. The Applicant accepts the reason for the painting but is concerned regarding the potential for the paint to chip or scratch in future. 103. The Panel considers that should it be the case the mouldings display damage at some point in the future, then the FSP is entitled to assess its liability, if any, for said damage at that time. However, at this point in time there is no damage evident and C is satisfied the paintwork is of acceptable quality. 104. Item six relates to the replacement of the external cladding, particularly the join where the replaced cladding meets the existing. This has created a visible seam where the new panels meet the old. 105. The FSP‟s position is that while the replacement of the cladding with one continuous piece of moulding would have been more visually pleasing, the cut and join undertaken by E is in accordance with the scope of works as outlined by J. 106. The FSP acknowledges C‟s view that the end result could be more aesthetically pleasing, however, it functions as it should and has been repaired in accordance with J‟s scope. It is not prepared to undertake further works in this regard. 107. The Panel has given the matter careful consideration. Whilst the Panel agrees it would no doubt be more visually pleasing to have a continuous panel, the FSP is only responsible for replacing those parts of the home damaged in the claimed event. 108. It is not responsible for replacing undamaged items to achieve a matching finish or to try and mask the fact that the property has undergone repairs at some point. On this basis, the Panel concludes the FSP has no further liability in this regard. Determination 109. On the basis of the available information the Panel determines:  The FSP has fulfilled its obligations pursuant to the policy; and  The Applicant is not entitled to compensation for the manner in which the FSP managed her claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.