Determination 320890

Partial denial of flood damage claim for building repairs

FirmFinancial Firm (Unknown - Insurer)
Decided2014-02-04
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$20,530
Non-financial loss—
Amount claimed$90,000
SourceAFCA PDF

Summary

A homeowner's flood-damaged building claim was partly denied by the insurer as pre-existing wear and tear. AFCA found the insurer had not met its onus to show an exclusion applied and ordered $20,530 for building damage plus interest.

Once a prima facie flood claim is established the insurer must prove an exclusion, and its engineering evidence was insufficient; the panel assessed a cash settlement from the most reliable quote less amounts already paid.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 320890 Determination Page 1 of 8 Case number: 320890 General Insurance - Domestic Insurance - Home Building - FSP Decision - Partial Denial of Claim - Exclusion/Condition 24 January 2014 Summary Description  A claim under a home building and contents insurance policy following flood damage sustained on or about 4 March 2012. The FSP, having settled the claim for damaged contents, has denied the claim for building damage as it believes the damage was unrelated to flood. Basis of Determination  There is no dispute that the Applicant‟s property was inundated by flood waters on or about 4 March 2012.  The FSP‟s engineer determined there was no structural damage to the walls or tiles of the property as a result of flood. This conclusion was based on an assessment that water had not entered the living kitchen area of the home but had entered the western bedroom.  The Applicant maintains his evidence was that water had entered approximately half the house to a level of 25mm deep before he was moved on by the authorities. He maintains that there was water to a maximum height of 75mm throughout the home.  No relevant hydrology information has been provided to assist in determining the level of inundation or dispute the applicant‟s statement.  Based on the available information, the Panel prefers builder “C‟s” quote of $28,060 for damage. The Applicant has already been reimbursed as part of the contents claim, $7,530 with respect to house carpets and vinyl and this should be deducted from the quote. Determination  The Panel determines that the FSP is to pay the Applicant the sum of $20,530 in settlement of the Applicant‟s building damages claimed in accordance with the terms of the policy. Determination Case No: 320890 Determination Page 2 of 8 Background 1. The Applicant holds a home building and contents insurance policy with the Financial Services Provider (FSP) covering his home in Hanwood NSW. The policy was incepted on 9 June 2010, renewed annually and was current at the time of the loss occurring. 2. On 4 March 2012, the Applicant lodged a claim with the FSP for damage sustained to his home and contents as a result of floodwater which had entered the property earlier that day. 3. The FSP accepted and settled the claim for the damaged contents however considered the floodwaters had not created any damage to the building itself. On this basis, the FSP declined the Applicant‟s claim for the repairs required to the building. 4. The Applicant is seeking a review of the FSP‟s decision to decline his claim. Summary of Applicant’s p osition 5. The Applicant says that although the house is an old ho me and it was not in perfect condition prior to the flood, he had undertaken extensive works to the home in recent years including a new roof, external cladding, sliding doors and gyprock and plastering work inside as well as repainting. He would not have undertaken those projects and the expense if it were the case the house was not in good condition. He spent approximately $40,000 updating the house. 6. He is unable to provide documentary evidence of the works undertaken as his ex-wife destroyed the documents and the builder who did the works has since retired and he has no way to contact him. 7. Since the floods there have been numerous cracks develop and gaps evident between the floor and walls. He considers the flood caused that damage as they have only arisen in the last few months; therefore the FSP should accept his claim. 8. The FSP‟s contractors have written their reports so that it looks as though the damage to the home is pre- existing. Further, the FSP‟s builder quoted only $28,000 to repair the home, whe reas he has sourced three builders‟ quotations, all of who state the house requires extensive repairs. Their quotes are around $90,000 which is a significant disparity. All he wants is the home to be put back in the position it was in prior to the flood. 9. T he Applicant maintains that he informed the FSP‟s assessor that there was inundation of the property to a level of 25mm above floor height at the time that he left the property. He believes the peak level of inundation was at a height of 75mm. Case No: 320890 Determination Page 3 of 8 10. The smell from the house is terrible and the draughts from the cracks are so bad he had to move out. The house is currently being tenanted whilst he resides with his sister and brother in law, which is causing him a lot of stress and putting strain on his family. Sum mary of FSP’ s position 11. The FSP says its policy is a defined events policy, which does not cover all risks. It only provides for loss or damage caused by one or more of the listed events, subject to any exclusion. 12. The policy does respond to the insured even t of „flood‟ and the FSP has accepted the Applicant‟s claim for the damaged content items from this event. However, it does not agree that any of the issues now evident with the home were caused by the flood or any other insured event. Rather, they had arisen as a result of general wear and tear on the premises, which are specifically excluded from cover. 13. It appointed builder “C” to inspect the home who considered the cracks the Applicant was concerned about pre-existed the flood. C also considered the stumps were partially decayed prior to the flood event although the stumps appeared to have sunk more post flood. 14. The FSP also appointed engineering firm “X” to inspect the damage to the home. X concluded that despite the subfloor flooding and water entering the western bedrooms, there was no structural damage to the home which could be attributed to the flood waters. 15. The FSP acknowledges the quotations submitted by the Applicant however believes its‟ experts reports should hold more weight. 16. The FSP says that even if the flood waters were accepted to have contributed to the damage occurring, where there are more than one proximate causes of the loss and one of those causes is excluded, the excluded clause is dominant and defeats the claim. The FSP seeks to rely on the case law set down in the case of Wayne Tank and Pump Co Ltd v Employers Liability Assurance Corp Ltd [1974] QB 57. 17. The FSP relies on the following policy provisions contained within the Product Disclosure Statement (PDS), which the Applicant does not dispute receiving: “ The events we cover We cover your home or contents when certain things happen. These are known as „listed events‟. You can make a claim if a listed event takes place and causes loss or damage to your home or contents during the policy period. In this section, we tell you what events you‟re covered for and any specific exclusions and conditions that apply to the event. General exclusions may also apply – see Section 5. ... Case No: 320890 Determination Page 4 of 8 Flood If loss or damage is caused by a flood. For example, heavy or sustained rainfall upriver causes a river or creek near to you to overflow. Covered Flood. Flood means ► rain which results in water pooling on, flowing from or failing to drain away from - A body of water - Land - Roads and streets ► water that escapes or is released from a body of water. A body of water can include a river, lake, dam, stormwater channel or canal, but not the sea. ... 5. General exclusions that apply to your policy. There are certain situations when we don‟t provide cover under your policy. This section outlines the general exclusions that apply to all cover we provide under the policy. This includes liability cover, unless we say it doesn‟t. Exclusions for all cover These exclusions apply to all cover under your policy. Wh at we don’t cover Loss, damage, injury or death arising from: ... ► rust, corrosion, gradual deterioration, depreciation or wear and tear ... ► the settling, shrinkage or expansion of buildings, foundations, walls or pavements. ” Issue 18. Whether the FSP has fulfilled its obligations pursuant to the terms of the policy. Reasons for Determination 19. As advised to the parties, FOS has considered it appropriate to refer the dispute directly to a Panel in accordance with the FOS Terms of Reference. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. Case No: 320890 Determination Page 5 of 8 20. This decision has been made by a Panel consisting of an Ombudsman and two Panel members with extensive experience in the insurance industry and consumer claims. 21. A full exchange of information has taken place between each party and each party has had the opportunity to address any issues raised. 22. There is no dispute that the Applicant‟s property was inundated by flood waters on 4 March 2012. The FSP has already accepted liability with respect to the contents claim and according to information provided to FOS, has paid the Applicant the sum of $27,616.80 including payment for house carpet of $5,250 and house vinyl of $2,280. 23. The FSP has relied upon a report from a builder, C, and two reports from an engineer “X” to deny the claim. 24. C‟s report of 15 March 2013 provides the following information:  Applicant advised the water rose to approximately 300mm above ground level;  The water had entered the home to the level of approximately 25mm deep;  At the time of inspection all carpet and half of the lino had been removed by Applicant;  There were cracks in the walls in bathroom, kitchen and hallway areas;  There were cracked floor tiles to the bathroom and laundry areas which appeared to have been present prior to the flood;  There were tiles missing from the bathroom/laundry floors which appeared to be missing for a long time;  The timber stumps supporting the dwelling were partially decayed prior to the flooding and appeared to have sunk more since the flood;  There did not appear to be any damage to the house except for the cracking in the walls;  An engineer‟s report was necessary once the ground had dried out. 25. X‟s report of 10 August 2012 provides the following re levant information:  Water did not enter the kitchen/living area but it did enter the western bedroom;  This indicated the floor was not level prior to the flood;  There had been no movement since the flood and no damage caused by the flood;  If the gapping evident had been caused by the flood then there would be widespread movement and cracking throughout the home, however there is none;  The tiles missing are pre-existing damage and not caused by the flood. The tiles have moved along pre-existing cracks in the slab which has caused them to become loose; Case No: 320890 Determination Page 6 of 8  There was gapping to the tiles in the kitchen which was also pre- existing, if the movement was recent then there would be corresponding movement in the walls and cornices;  The subfloor looked reasonably dry;  Despite the flooding of the subfloor and water entering the western bedroom, there was no structural damage to the walls or tiles as a result of the flood. 26. The Applicant disputes the reports and maintains the property was inundated to a level of 75mm above floor height. He had evacuated the property at a time when the level was 25mm above floor height. 27. In support of his position, the Applicant has provided a report from builder “P”. P‟s report of 9 January 2013 provides the following information:  The home is subsiding quite badly and the timber piers have sunk. There are noticeable drops in the floor level of up to 60mm throughout;  The floods had seen the water level rise to 75mm above floor level throughout the house;  The house weathered the event well with only minimal damage occurring after several months;  The damage was more substantial to the kitchen with the kick bases absorbing water causing swelling. The kitchen cupboards have an odour which may be caused by mould growing underneath;  Large gaps have appeared in the skirting boards and the doors are beginning to jam. Sections of floor are unsupported and squeaking;  The piers subsiding have caused the bathroom and laundry floors to sink and cause the tiles to pop up and dislodge and gaps to open up in the wall sheeting. 28. The Applicant has also sourced a quotation from building firm “D”, which refers to flood damage at the premises. However D does not provide any more information other than stating the damage is flood damage, which is of limited assistance when considering this dispute. 29. Accordingly, the evidence presented on behalf of the Applicant is that the damage only arose after the flood event, due to water pooling in the sub- floor area causing the piers to subside and subsequent damage to the house. 30. X provided a supplementary report on 13 May 2013. 31. In relation to kitchen cupboards absorbing water, X maintained that if the area was not flooded there would be no damage to the kitchen and if there was excessive dampness, it can come from other sources such as leaks or over splash and the like. Surprisingly, X did not comment on the likelihood of water being absorbed up through the flooring, given that there is no dispute that there would have been significant flood water in the area at the time. Case No: 320890 Determination Page 7 of 8 32. With respect to the laundry and bathroom, X commented that he believed the piers had not moved or sunk and that the damage to the tile floors was due to poor construction practices and general poor building practices. He has not identified what poor construction practices or building practices applied. He has not identified whether those building practices were applicable practices at the time of the construction of the building. 33. In respect of the pre-existing wear and damage, again X does not comment on what damage would be sustained in the event of the house being inundated to the level of 75mm above floor level. He forms the view which appears based on his original information, that the damage is not consistent with above floor flooding. Again, he has not commented on the impact that the floods in the area would have had on the property. 34. A number of photographs have been provided by both the Applicant and X. It is clear from the photographs that the property was extensively flooded. The photographs do not necessarily identify the maximum level of flooding nor do they adequately depict the extent of flooding within the house. 35. The FSP, whilst maintaining that the property was not totally flooded, has not provided any hydrology or other relevant information to assist the Panel or dispute the Applicant ‟ s statement. 36. It is clear from the information currently before the Panel, that the Applicant‟s property had been inundated above floor level. The exact height of the inundation is in dispute. The FSP, despite having the quotation from the Applicant‟s builder, P, and the second quotation from a builder “D” both of which identified damage to the kitchen with the laminex kick bases absorbing water and developing an odour smell and damage to the laundry cupboards have not reinspected those items to identify the loss. The description of the damage provided by P, in these circumstances is not challenged and is consistent with the Applicant‟s claim that there was water inundation throughout the house. 37. Once the Applicant has established a prima facie claim as the Applicant has in this case, the onus is on the FSP to establish that the claim is either excluded under a term of the policy or is not covered by the terms of the policy. 38. In this case, the information provided by the FSP , is in the Panel‟s view, not sufficient to meet the onus to establish on the balance of probabilities that the FSP is entitled to refuse payment of the claim under either an exclusion or the terms of the policy. 39. The Panel is satisfied that not all of the damage identified by the Applicant can be attributed to the floods. The Panel accepts that there should be no allowance for replacement of the bathroom tiles or laundry tiles and that most likely damage to these tiles was pre-existing. 40. In the Panel‟s view, neither of the quotations from the Applicant‟s builders, P or D, or the quotation from C adequately identifies all of the relevant Case No: 320890 Determination Page 8 of 8 damage. The Panel is of the view, however, that given the age of this dispute, it is appropriate and fair in all the circumstances to both parties that the FSP be able to cash settle this dispute, 41. The Panel having examined the quotations and allowing for the fact that there would have been some pre-existing damage considers the quotation from C to be preferable. Taking into account that the Applicant has already been compensated for the floor coverings, the Panel considers it would be fair for the FSP to cash settle the Applicant‟s claim in the sum of $20,530 being the assessment provided by, C, less the payment already paid towards the carpet and vinyl. 42. In reaching this view, the Panel is mindful that the assessment does include some repairs that would not be covered under the terms of the policy but also does not allow for replacement of the kitchen cupboards or bathroom vanity that the Panel accepts were damaged during the flood. Determination 43. The Panel determines that the FSP is liable to meet the Applicant‟s claim for damage sustained to the building in the sum of $20,530. Further, the Panel determines that the FSP pay interest on the settlement sum from 7 February 2013, being the date of the FSP‟s internal dispute resolution decision, until date of payment of the claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.