Home / Financial Firm (Unknown - Insurer) / Determination 320711

Determination 320711

Dispute over scope and amount of cash settlement for water damage claim

FirmFinancial Firm (Unknown - Insurer)
Decided2013-11-21
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$6,060
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicants disputed the FSP's cash settlement of a water damage claim, principally the scope of works for tiles, window frames, splashback, granite, laminate, accommodation and other items. AFCA rejected most of the scope claims but ordered further payments of $6,060 for laminate, accommodation and a bedside lamp, plus interest, and a conditional granite payment.

The insured bears the onus of establishing that claimed items are covered, the expert reports did not link the tile damage to the leak, and matching materials were only replaced where the 40 percent threshold in the policy was met.

Issues

Subjects and remedies

pay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 320711 Determination Page 1 of 10 Case number: 320711 General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim Amount 11 November 2013 Background 1. The Applicants held a home building and contents policy with the Financial Services Provider (FSP). 2. In October 2012, the Applicants lodged a claim for water damage to the property after it was discovered that a flexible hose failed. It is noted the Applicants were overseas at the time of the loss and a friend discovered the water in the property and took action to mitigate the loss. 3. The FSP assessed the claim and accepted liability for building and contents damage, although a dispute developed between the parties as to the appropriate scope of works. 4. The FSP has cash settled the claim, although disagreement as to the final scope of works remains. Summary of Applicant s’ position 5. The Applicants say that the FSP settlement of the claim will not return their property to the state it was in prior to the loss. 6. The scope of works the FSP is basing its settlement on does not make an allowance for the following items:  Floor tiles  Painting of window frames  Kitchen splashback (which will be damages when granite is removed)  Kitchen granite (likely to break during removal)  All new laminate for the kitchen. The FSP‟s quotations do not allow for 100% of the laminate  Architraves & skirting boards Determination Case No: 320711 Determination Page 2 of 10  Accommodation costs while repairs are undertaken  GST on the additional items  Bedside lamp 7. The tiled floor was in good condition prior to the loss with no cracked grout. Further, the tiles were flat as they were able to move furniture around the areas with no issue. 8. Engineer „I‟ did not inspect the property before the loss and is inconsistent in saying that the floor area was still wet but that this had no effect on the tiles. Further, movement joints were not a normal inclusion at the time the tiles were installed, so this should not be used as a reason to refuse to conduct repairs. 9. The FSP‟s loss adjustor claimed that both repairers‟ quotations covered the same scope of works, which is clearly incorrect. Later, they were told that repairer „JL‟ now included additional items yet the quoted sum for repairs did not increase. 10. „JL‟ initially quoted for the replacement of floor tiles; howev er, this was later changed. 11. Repairer „C‟ included an allowance for the replacement of the granite bench top in the event that it broke. The payout does not make an allowance for the replacement. The advice they have is that the granite is very likely to b reak during the repair process and this will also damage the splashback. 12. The Applicants say they increased their offer to buy back the sofa in good faith from $500 to $1,000, which the FSP has not accepted. At no stage did they ask for a payout for the sofa and to retain it. 13. They also asked the FSP to reimburse them the $260 it cost to get their own building report, noting the FSP reviewed the report in its consideration of the claim. 14. The FSP‟s communication and handling of the dispute has been exceptionally poor. For example, the FSP just deposited the cash settlement figure into their bank account without advising the claim was now being cash settled or seeking their agreement. 15. Further, the Internal Dispute Resolution took longer than was advised and on numerous occasions they had to follow up the loss adjustor and FSP for updates and to progress the claim. 16. The FSP has also changed its position from relying on one repairer‟s quotation to the other. 17. Further, the FSP has also accused them of withholding information, which is simply not the case. They have co-operated and provided information as required. Case No: 320711 Determination Page 3 of 10 18. The window frames also need to be painted as they will not match after repairs are undertaken. They note over 40% of the walls are being painted, meaning the frames should also be included. 19. The Applicants say they have been disappointed with the FSP‟s handling of the claim and they are only seeking to be fully covered for the loss incurred. Summary of FSP’s position 20. The FSP says it has settled a total of $65,188.35 for building and contents and this is the extent of its liability under the policy. 21. It has relied upon the quotation of repairer C of $34,684.23 for building repairs and then a 10% contingency was added of $3,468.42. A mistake was made and a further 10% contingency was added to this, taking the building repair figure to $41,967.92 (with a total contingency allowance of $7,283.69). 22. It appointed engineer „I‟ to inspect the home, including the tiles and the engineer reported the floor tiles were not damaged by the event. Further, the Applicants provided their own building report that also concluded the floor tiles were not damaged by the event. Repairer C has allowed for the restoration of the tile grout. 23. There is no evidence the granite bench top will be damaged and even if it was, the $4,250 allowed in the Applicants‟ own quotation is less than the contingency of $7,283.69. 24. Repairer C‟s quotation allows for repairs to the splashback and has included costs to replace the laminate in the kitchen. 25. The repairer has allowed for the repair of the architraves and skirting boards. 26. The quotation also allows for the repair and painting of the damaged window frames; however, the policy does not allow for the painting of the undamaged areas to achieve a match. 27. The FSP says it paid the Applicants $5,000 for the sofa, being its full value. The Applicants had the opportunity to buy the salvaged sofa for $2,000, which is the estimated salvage value. Given it has settled the item in full, it has the right of ownership of the salvaged sofa and may sell the item as it sees fit. However, in the circumstances it has agreed to a $1,000 salvage figure for the sofa. 28. It is not liable for the Applicants‟ building report fee of $260. T he Applicants chose to get another opinion and the report does not establish the Applicants were entitled to further indemnity. The cost is outside the scope of the policy. 29. The claim has been handled in a reasonable manner and delays have occurred as the result of the dispute in relation to aspects of the scope of works, such as the floor tiles. Case No: 320711 Determination Page 4 of 10 30. The FSP relies on the following policy provisions in the Product Disclosure Statement (PDS): “ How we will pay … (d) If part of your home is damage and we agree to pay your claim, we pay only for the part or parts of the home that actually sustained damage. We do not pay to replace any undamaged materials. However, if:  it is impossible to acquire new material to replace the damaged material that reasonably matches the undamaged portion to a similar extent as immediately prior to the damaging occurring, and  the amount of damaged material that cannot be matched to the undamaged material is more than 40% of the total material that would have to be replaced if all the matching damaged and undamaged material was replaced then we will replace both the damaged and undamaged material. ” Issue 31. Whether the FSP‟s settlement fulfils its obligations to the Applicants under the terms and conditions of the policy Reasons for decision 32. As advised to the parties, this matter has been expedited in accordance with the Operational Guidelines of the Service‟s Terms of Reference, due to the complex nature of the issues. Accordingly, this dispute has not been the subject of a Recommendation but has proceeded directly to Determination. 33. I have reviewed the material and note that there is no dispute the loss was a claimable event under the policy and that the FSP is liable for the damage caused by the leaking water. 34. Further, the majority of the claim has been settled via a cash settlement to the Applicants. Accordingly, I will only address the specific matters that remain in dispute. I will address each matter under a separate heading for clarity. 19. At law, an insured bears the onus to establish they have suffered a claimable loss under an insurance policy. 20. In practical terms as it relates to this dispute, the onus rests with the Applicants to establish, on the balance of probabilities, that the items they are claiming, are covered under the policy. Case No: 320711 Determination Page 5 of 10 Floor Tiles 35. The Applicants say the floor tiles in the property have been damaged by the water. They are now drummy, the grout has cracked and areas are raised where before the tiles were in good condition. 36. They say the tiles were included on the initial quotation from repairer JL. 37. The FSP says its builders, an engineer and the building expert appointed by the Applicants all conclude the issues with the tiles are not related to the event. 38. I have reviewed the reports from engineer I and the Applicants‟ appointed expert, „BIS‟. 39. Both reports conclude that while tile grout needs some attention, the current condition of the tiles relates to “lipping” and “warpage” (from the tile firing process when the tiles were made) a nd the installation of the tiles. 40. Engineer I, does state that there was moisture in the floor, but that the current condition of the tiles in the property was not related to the leaking water. 41. Based on the material before me, I am not persuaded that it has been established that the tiles were damaged by the leak. The experts appointed to inspect the damage, including BIS appointed by the Applicants, report that the issues do not relate to the leak and there is little evidence to the contrary. 42. The FSP has allowed for rectification of an area of grout in the tiles. On the basis of the evidence before me, I find that this fulfils the FSP‟s obligations for the tiles. Painting of window frames 43. The Applicants say that the window frames will not match after repairs to the damaged areas and taking into account the walls, this represents over 40% of the total area and thus the FSP should replace both damaged and undamaged areas. 44. The FSP says it is has allowed for the repair of the damaged window frames and that is the extent of its liability under the policy. 45. I have considered the issues and I am persuaded that the FSP‟s liability is limited to the damaged window frames. I am not persuaded that the damage to walls or other sections of the building can be included to take the frames over the 40% threshold in the policy for matching materials. 46. The evidence before me does not indicate over 40% of the window frames were damaged and therefore the FSP‟s liability is limited to the damaged items only. Case No: 320711 Determination Page 6 of 10 Kitchen splashback 47. The Applicants say the splashback is likely to be damaged when the granite bench top is moved. 48. The FSP says it has allowed for repairs to the splashback within the scope of works. 49. I have reviewed the quotation from repairer C, dated 8 January 2013, which states the following in relation to the kitchen: “3 -8-17 Strip all splashback tiles attempting not to damage wall linings. 3-8-18 Supply new splashback tiles allowing PC sum of $30 a square metre to supply only. 3-8-19 Install new splashback tiles including grout” . 50. Based on the above, I am persuaded the quotation makes an allowance for the splashback. Accordingly, I find the FSP has fulfilled its obligations for this item. Kitchen Granite 51. The Applicants say the expert opinion is that there is a very good chance the granite will break during repairs. 52. The FSP says that the cost on the Applicants‟ own quotation for this item was $4,250 and the contingency of $7,283.69 , allows for the granite if it does need to be replaced. 53. I have reviewed the kitchen quotation provided by the Applicants and note the figure of $4,250 does not include GST, meaning the actual figure is $4,675. 54. In my view, it is premature to make a decision on the outcome of this aspect of the claim, until such time as it is known whether the granite does in fact break. 55. I therefore determine that the FSP is not required to make a further contribution for the granite at this stage. However, if during the repair process the granite does need to be replaced, I determine the FSP it to settle a further $2,337.50 for this item, being 50% of the $4,675 figure. 56. I come to this figure on the basis that 50% of the granite can be taken from the contingency should it be required and the FSP will pay the other 50%. 57. In my view, it would be unfair for a large portion of the contingency to be utilised on an item that may well require replacement. 58. I therefore believe a further $2,337.50 for the granite , if it does need replacement, is a fair outcome in the circumstances. Case No: 320711 Determination Page 7 of 10 59. The Applicants would need to supply the FSP with evidence that the granite required replacement, in the event this occurs during the repair process. Kitchen laminate 60. The Applicants say the FSP is liable for all the laminate in the kitchen. 61. In its submission, the FSP says the quotation from repairer C includes an allowance for replacing laminate in the kitchen although as at 28 May 2013, the FSP said it intended to check with the repairer that this was for all the laminate in the kitchen. 62. In August 2013, the FSP stated that it agreed all the laminate needed to be replaced, although there was no further clarification on whether repairer C‟s quotation provided for this. There has been no further submission on this issue. 63. The Applicants say that the FSP‟s quotation allows $4,500 less for laminate, than their quotation. 64. On the basis of the material before me and in the interests of fairness, I find that the FSP is to make a further $3,000 contribution towards laminate costs. Any shortfall on this figure can be addressed using the contingency monies. Architraves & skirting boards 65. The Applicants say that the architraves and skirting boards need to be replaced. 66. The FSP says it has allowed for the rectification of the architraves and skirting boards. 67. I have reviewed the quotation from repairer C, dated 8 January 2013 and I am satisfied that there is an allowance to repair the architraves and skirting boards. 68. On the basis of the material before me, I am not persuaded the Applicants are entitled to a further allowance under the policy. Accommodation 69. The Applicants say they will need around two weeks accommodation while repairs take place and the FSP has made no allowance for this. 70. In the material, the FSP has said accommodation cost of $2,800 can come out of the contingency money. 71. In my view, this is unsatisfactory and accommodation costs should be settled over and above the contingency. The contingency money is for costs that are unanticipated for the main part and as the policy offers an accommodation benefit, I determine this should be paid over and above the Case No: 320711 Determination Page 8 of 10 repairs costs and contingency. I therefore find the FSP should settle $2,800 for accommodation costs. Bedside lamp 72. The Applicants claim $260 for a bedside lamp and they say the FSP has continued to ignore the item. 73. The FSP makes no submission on the lamp. 74. The first assessment report makes reference to a “1 x Mouldy Lamp” , with a reserve of $80. It is not clear if this item was settled or if it is the same lamp in question. There is another reference in the material to a lamp at a cost of $200, although it appears this has not been settled. 75. In the circumstances, I find the FSP should settle $260 for the lamp, given there is no submission on the matter from the FSP. The Applicants have raised the settlement of the lamp a number of times and in the absence of a submission to the contrary, I find the item should be included. Building report fee 76. The Applicants seek reimbursement of the $260 report fee they incurred in obtaining their own expert opinion on the tiles. 77. The FSP says the report did not change its decision, the Applicants chose to get the report and it is not liable for the cost. 78. I have reviewed the report and note that it did not change the FSP‟s settlement of the claim. 79. In the circumstances, I find the FSP is not liable for the report costs as it was commissioned by the Applicants and was a cost resulting from the Applicants‟ decision to obtain another opinion, rather than a direct loss from the leak. Other 80. I note there was an issue with the cost for the Applicants to retain the sofa. The Applicants were settled $5,000 for the item and the FSP wanted $2,000 from the Applicants for the salvaged item. The Applicant‟s offered $500 and then $1,000. 81. In its submission in August 2013, the FSP has agreed to a figure of $1,000 for the item. 82. I note that as the FSP settled the total value for the sofa, it retains the right to sell the salvaged item for any figure it sees fit. 83. In the circumstances, the Applicants can now choose to pay the $1,000 for the sofa if they wish to retain it. Case No: 320711 Determination Page 9 of 10 84. The matter is now in the hands of the Applicants to choose whether they want to retain the item for $1,000. 85. The Applicants have also raised a number of issues in relation to the FSP‟s service. 86. Unfortunately, when a dispute about a scope of works develops in building claims, this can lead to delays with further assessments, correspondence and the like. 87. In this case, there appears to have been some delays; however, the FSP did appoint an engineer to address the Applicants‟ concerns with the tiles and generally appears to have acted in good faith. 88. However, I accept the Applicants‟ submission that the FSP should have communicated an intention to cash settle the claim before depositing the funds in their account. 89. Overall, while the claim and the subsequent dispute have been somewhat difficult for the Applicants, I am not persuaded there is any entitled to compensation due to the FSP‟s handling of the claim. 90. In relation to the contingency figure, I note that even if sums need to be removed from the contingency of $7,283.69 for the laminate and granite bench top, based on the figures before me, there should still be a figure of over $3,000 for other contingency costs. Determination 91. On the basis of the available information I determine the following:  the FSP has no further liability for tiles;  the FSP has no further liability for window frames;  the FSP has no further liability for the splashback;  the FSP is to pay a further $2,337.50 for the granite bench top if during repairs, the original granite is damaged and cannot be reused. The Applicants are to provide evidence of this to the FSP in the event it transpires;  the FSP is to settle a further $3,000 for kitchen laminate;  the FSP has no further liability for architraves and skirting boards;  the FSP is to pay the Applicants $2,800 for accommodation costs;  the FSP is to pay the Applicants $260 for the bedside lamp; Case No: 320711 Determination Page 10 of 10  the FSP is not liable for the report fee of $260. 92. Further, the FSP is to pay interest at the statutory rate on the payout of $6,060 (laminate, accommodation and bedside lamp) from 9 April 2013, being the date of the final IDR letter until the payment of the additional sum.