Home / Financial Firm (Unknown - Insurer) / Determination 320443
Determination 320443
Cash settlement offer for cyclone-damaged external walls and repair method
Summary
Applicants' cyclone-damaged external walls were offered a cash settlement based on a builder's quote. AFCA found the quote incomplete and ordered the FSP to organise the wall, window and electrical repairs itself rather than cash settle.
The policy lets the insurer choose the settlement method, but where its cash quote is incomplete it is fair in all the circumstances for the insurer to arrange the repairs.
Issues
- Claim amount dispute primary · upheld
“C's quote dated 25 April 2011 is limited to the replacement of 25 sheets and repainting the wall; it is incomplete and not adequate to complete the necessary repairs.”
- Poor communication secondary · upheld
“The FSP has not explained why the windows and electrical repairs were excluded from the revised quote.”
- Repairs or contractors secondary · upheld
“Since C did not requote for the repairs based on S's repair method, I am satisfied C's quote is incomplete.”
Subjects and remedies
home or building damagenatural disasterrepair or rectify
Text of the determination
Case No: 320443 Determination Page 1 of 7
Case number: 320443
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Claim amount
18 December 2013
Summary
Description: A claim under a home building insurance policy.
Basis of Determination: Consideration of the evidence presented as to the best
method of repairing a damaged wall.
Determination: The FSP’s quotation is incomplete and the FSP is therefore not
entitled to cash settle the Applicants but rather should arrange for the wall to be
repaired in accordance with the advice of their expert engineer, S.
Background
1. The Applicants held a home building insurance policy with the Financial
Services Provider (FSP) from 16 August 2010 and the policy was current at
the time of loss.
2. The Applicants lodged a claim with the FSP for storm damage sustained to
the property as a result of Cyclone Yasi.
3. The FSP initially accepted most of the Applicants’ claim except in relation to
cracking of the external cement walls. However, upon receiving further
expert evidence, the FSP has decided to accept this part of the claim.
4. The FSP has offered $12,166, as cash settlement towards the repair of the
external walls based on its builder “C’s” quote.
5. The Applicants expect the FSP to increase the offer of settlement in line with
their builder “M’s” quote, or for the FSP to organise the repairs.
Determination
Case No: 320443 Determination Page 2 of 7
Summary of Applicants ’ position
6. The Applicants say the original assessor had indicated the walls were
required to be replaced and braced to prevent further damage. As such, the
current scope of works proposed by the FSP is inadequate and may cause
further cracking to the wall in the future.
7. They are not happy with the FSP’s proposed repair works, as sugge sted by
its engineer “ S ”, that is, to re-sheet the walls rather than demolish and
replace them as recommended by their own builder, M.
8. The Applicants say the FSP’s offer of settlement is inadequate for them to
organise repairs and as such, they request the FSP to organise the repairs
itself.
9. They say C’s quote is limited and does not cover the scope of works as
recommended by S.
10. The Applicants also expect the FSP to undertake the responsibility for any
issues that may arise out of the proposed scope of works and repair of the
walls. They expect the FSP to guarantee the repair works completed by its
authorised builder.
Summary of FSP’s position
11. The FSP relies on its expert’s engineer S’s findings the cement walls could
be repaired and do not require to be demolished and replaced. S had
confirmed the demolishing of the walls was not necessary in accordance
with the Queensland guidelines.
12. The FSP is satisfied with its amount of settlement which was based on C’s
quote and says the amount is adequate to complete the required repair
works to the cement walls. As such, it is not obliged to increase its offer of
settlement.
13. The FSP relies on the following policy provisions:
“ How we settle a buildings claim
We will decide how we will settle
your claim
If your buildings suffer damage, we will
decide whether your buildings are
repairable or a total loss.
...
If we accept your claim, we will decide
whether to:
• repair
Case No: 320443 Determination Page 3 of 7
• rebuild
• pay you the cost to repair or rebuild that
part of your buildings that suffered
damage (cash settlement).
...
What happens if we decide to repair
your buildings
If we decide to repair your building(s),
we will:
• only repair the part or parts of your
buildings that actually sustained damage,
including damaged portions of fixed
coverings to walls, floors and ceilings, in
the rooms, halls or passages where the
damage occurred, to a condition as close
as possible to when new, but not better
• try to match any material used to repair
your buildings with the original materials
or nearest equivalent available to the
original materials
• ensure the repairs to your buildings
comply with government and local
authority bylaws
...
What happens if we decide to pay
you the cost to repair or rebuild
your buildings
If we decide to pay you the cost to repair or
rebuild your building(s) we will:
• pay you the cost of repairing your
building(s) to a condition as close as
possible to when new, but not better
• pay you the full building replacement cost
of rebuilding your building(s) to a condition
as close as possible to when new, but not
better, in the event of a total loss
• deduct any:
Case No: 320443 Determination Page 4 of 7
- excess
- unpaid premium
- input
tax credit you would have
been entitled to under A New Tax
System (Goods and Services Tax) Act
1999 if you had paid to repair or
rebuild your buildings.”
Issue
14. Whether the FSP’s proposed method of repair and the offer of settlement is
fair, reasonable and in accordance with the terms and conditions of the
policy.
Reasons for decision
15. Due to the nature of this dispute, FOS has considered it appropriate to
expedite it in accordance with the Operational Guidelines to the FOS Terms
of Reference. This dispute has not been the subject of a FOS
Recommendation and has proceeded directly to Determination.
16. I am satisfied a full exchange of information has taken place between the
parties and each party has had the opportunity to address any issues raised.
17. The Applicants do not dispute receipt of the policy documents in the
circumstances, I am satisfied the FSP has met its obligations of clearly
informing them of the terms and conditions of the policy.
18. There is no dispute the Applicants ’ claim falls within the general provisions of
the policy and the issue remains whether the FSP’s offer of settlement is fair
and reasonable and is in accordance with the terms and conditions of the
policy.
19. Subsequent to the lodgement of the claim, the FSP appointed a loss
assessor (L) to investigate the circumstances surrounding the loss and to
assess the claim.
20. L requested two builders to quote on the damage to the Appli cants’ property
and it chose to rely on builder C’s quote , which was economical.
21. In relation to the damaged exterior walls, I note that C initially quoted
$12,166 to repair the damaged section only and his quote dated 25 April
2011, details the scope of works for this repair as below:
“Repair asbestos walls – many cracks at joints
Case No: 320443 Determination Page 5 of 7
...
Repair asbestos wall (NOTE – INSURED HAPPY WITH REPAINT)
...
Note: In regards to the external sheeting there are approx 25 sheets that
require removal and replacement. These are in an old style planet home with
styrafoam as well on the inside. Cladding the walls with a vinyl exterior
product is a preferred option from the owners.
This would cost $15000.
Out cost to resheet and repaint is approx $12166” (sic)
22. The Applicants’ builder , M, believed the walls had to be demolished and
rebuilt. He states:
“This quotation is to demolish and remove off site the asbestos panel house
and leave only the concrete slab... $31,254.30”
23. The FSP referred the quotes from M and C to its engineer S. S explained
how the repairs to the external walls should be conducted and suggested the
following:
“ Previous Report
...
It is important during the repair of the dwelling that the movement between
panels provided by the pliable sealing strips is maintained. The use of a
sheeting method that does not retain these pliable strips is not recommended.
Asbestos Containing Materials
...
The preferred approach to management of nonfriable (bonded) ACM is that if
it is in good condition and can be left insitu then this is the preferred approach.
...
As the wall sheeting is in good condition apart from the cracks, the conclusion
that the dwelling should be demolished provided by [M] below is not
supported by the Queensland guidelines.
...
Recommended Repair Method
The recommended repair method would be to leave the sheeting containing
asbestos in place with the provision of new fibre cement sheeting over the
damaged sheeting. This may require new sheeting on all panels on a single
wall so that a flat surface is presented.”
24. There is no evidence that S endorsed C’s repair quote for the external walls
as comprehensive, complete and adequate.
25. The FSP nevert heless says C’s quote is in accordance with the repair
method recommended by S. I do not agree. C’s quote dated 25 April 2011 , is
limited to the replacement of 25 sheets and repainting the wall. Whereas S’s
instructions were clear, indicating new sheeting for all panels was required
so that a flat surface with uniform appearance is achieved.
Case No: 320443 Determination Page 6 of 7
26. Since C did not requote for the repairs based on S’s repair method and
recommendations, I am satisfied C’s quote is incomplete and not adequate
to complete the necessary repairs works.
27. I also note the Applicants have indicated they are unable to find a builder
who would complete the works recommended by S, for the amount of
settlement offered by the FSP.
28. The Applicants also do not agree with the repair method recommended by S
and request the FSP to organise the repairs with its authorised builder so
that the responsibility of addressing any issues arising out of the repair
method, quality of materials used and workmanship would remain with the
FSP and not them.
29. I accept the policy conditions stipulate the FSP is entitled to choose a
method of claim settlement. However, considering the Applicants’ concerns
and because I am satisfied C’s quote is incomplete, it is fair in all the
circumstances that the FSP’s conducts repairs to the property rather than
make a cash settlement.
30. The Applicants should return the settlement amount received in lieu of repair
to the external walls so that the FSP could organise the repair to this section.
The FSP should request its recommended builder to complete the repair
works in accordance with S’s recommendations and suggested repair
method.
31. The FSP should also ensure the repairs are conducted in line with the
applicable building standards relating to handling asbestos material.
32. In regards to th e Applicants’ concerns regarding a leaking pipe, I am
satisfied they are entitled to lodge a separate claim for this matter for the
FSP’s consideration.
33. Finally, the Applicants’ say the FSP has not cash settled them or repaired
the damage sustained to the windows and electrical issues experienced after
Cyclone Yasi. These issues were identified by L and were part of C’s initial
quote.
34. I note C’s quote was revised at some point when the FSP decided to exclude
liability for the external walls and at that time it appears the repairs relating to
the windows and electrical issues were removed and as such do not appear
in C’s revised quote.
35. The FSP has not explained why these items have been excluded. The
description of the revised repair quote for internal repairs does not cover
repairs to the windows and electrical issues.
36. Since there is no evidence these damage were not caused by Cyclone Yasi,
I am satisfied the FSP should request its builder to attend to these repairs
whilst he undertakes repairs to the e xternal walls.
Case No: 320443 Determination Page 7 of 7
Determination
37. On the basis of the available information, I determine the FSP should
organise repairs to the external wall in accordance with S’s recommendation
and repair method.
38. The FSP should also organise repairs to the windows and electrical issues.
39. The FSP is not entitled to offer a cash settlement in relation to the above
repairs.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.