Flood claim quantum: cash settlement in lieu of repairs and claim handling compensation
Text of the determination
Case No: 320431 Determination Page 1 of 13
Case number: 320431
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Claim amount
24 January 2014
Summary
Description
Dispute under a Home Building and Contents Policy following the March
2012 Wagga Wagga floods. The FSP has accepted liability but dispute
has arisen as to quantum.
Basis of Determination
The FSP has paid the Applicant the sum of $188,321.63 by way of building
repair settlement inclusive of cost to remove debris, supporting additions
and design changes, demolition and allowing a further 26 weeks
temporary accommodation.
In addition, the FSP has paid the Applicant $2,500 by way of emergency
funds, total contents loss of $145,600 and provided rental reimbursement
for a total of 29 weeks.
The evidence establishes the property has signs of pre-existing wear and
tear, deterioration and lack of maintenance.
The settlement offered by the FSP is fair and reasonable when considered
alongside the Scope of Works provided.
Determination
The FSP is to pay the sum of $5,000 contribution to the costs of damage
to the garage otherwise the FSP has met its liability under the terms of the
policy.
Background
1. The Applicant holds a home building and contents insurance policy with the
Financial Services Provider (FSP) covering her home building for a sum
insured of $212,000 and contents for a sum of $145,600.
Determination
2. On 3 March 2012 the property was inundated by flood waters and the
Applicant subsequently lodged a claim with the FSP for the damage
sustained.
3. The FSP accepte d the claim and offered to settle the Applicant‟s claim by
way of cash settlement in lieu of repairs, for the amount of $75,321.63. After
further discussions, the FSP also offered an additional settlement amount of
$113,000, representing various components of the claim.
4. The Applicant believes the house should be demolished and seeks payment
of the total sum insured of $212,000.
Summary of Applicant’s position
5. The Applicant is being assisted by her daughter in this dispute. For the sake
of brevity, both will be referred to as „the Applicant‟ where necessary.
6. The Applicant says the amount offered by the FSP is insufficient to reinstate
the building to its pre-loss condition and is unhappy that the FSP will not
undertake the repairs to the property. The money it has offered her in
settlement has been eaten up in other expenses since the loss and she now
doesn‟t have the funds to repair the building properly.
7. She has investigated the possibility of demolishing the house and building a
prefabricated home on the site, however this will cost around $260,000 -
$300,000. Therefore the Applicant believes the FSP should settle her claim
on a total loss basis for the sum insured of $220,000, in addition to the other
allowances made by the FSP for demolition costs, debris removal and
temporary accommodation etc. She has obtained her own quotation which
says the works required to the property would cost $228,000 to undertake.
8. She has already spent money on having plans lodged with the local council
for a replacement dwelling at the site although this has been problematic as
the council will not agree to her proposed plans as the height of the
residence needs to be raised to „flood proof‟ it in future. The Applicant says
the FSP suggested this option to her, but it is now not willing to provide her
with sufficient funds to rebuild.
9. The Applicant is unhappy with the way the FSP has managed her claim. It
has been nearly two years since the event and repairs to the home are yet to
start. The house remains in an unrepaired state and is being accessed by
squatters and vandals who have caused further damage to the property. The
Applicant has been forced to move temporary accommodation on a number
of occasions which has added to her stress and ill health.
10. She has paid a premium for a sum insured of $220,000 and believes she
should not have to battle so much with the FSP simply to obtain the
entitlements she has paid for. She is seeking compensation for the manner
in which the FSP has managed her claim.
Summary of FSP’s position
11. The FSP says it is satisfied the home is a repairable proposition and it is
entitled to settle the Applicant‟s claim on that basis. It has obtained a
detailed scope of works (SOW) and quotation for the repairs from its repairer
“DW” in the amount of $75,32 1.63.
12. Due to pre-existing issues with the home, DW was not prepared to provide a
warranty on any claim related repairs. Therefore the FSP offered to settle the
claim on a cash settlement basis in lieu of repairs. The terms of the policy
ultimately give it the authority to settle the claim in this manner.
13. The FSP has agreed that if the Applicant rectifies the pre -existing issues with
the home, it is prepared to then complete the claim related repairs and
provide a warranty on those, subject to the return of the funds already paid
to the Applicant. The FSP is agreeable to the Applicant using an „overseer‟
however such an appointment would be at her cost and the overseer would
not have the authority to direct the FSP‟s contractors.
14. The Applicant has not provided any evidence to suggest the amount offered
in settlement is insufficient to repair the claim related damage. Therefore it is
entitled to rely on the information provided by its contractors when
calculating the settlement amount.
15. The FSP recognises the Applicant may not have the required funds to
undertake all of the required maintenance to the home to ensure the claim
related repairs can be safely and completely carried out. Therefore, it has
offered her an additional settlement of $113,000 to assist her in
contemplating her future options on an ex gratia basis, which comprises of:
$10,000 for clearing of debris from the site;
$58,000 for additional repairs required to the property and upgrades to
the laundry/lean to area;
$20,000 for costs to alter the current design of the home to better
enable it to cope with future inundations;
$15,000 for demolition costs in the event the Applicant chooses to
demolish and rebuild;
$10,000 for temporary accommodation costs, representing an
equivalent of 26 weeks rent.
16. The Applicant rejected the amount offered by the FSP, however it remitted
the funds to her on a without prejudice basis. The FSP is still happy to offer
the funds to the Applicant to resolve the dispute. It has also offered the
Applicant to return the funds and it will undertake repairs, however the
Applicant has declined this as she wishes the property to be demolished.
17. The FSP believes that although the claim has been extended and lengthy in
nature, it has managed the claim in a proactive manner and has made every
effort to bring the matter to a conclusion. It is satisfied its handling of the
claim has been appropriate and therefore an award of compensation is not
appropriate in the circumstances.
18. The FSP relies on the following policy provisions contained within the
product disclosure statement (PDS), which the Applicant does not dispute
receiving:
“ Home insurance cover
This cover is optional. If you have chosen to include this cover, it will be
shown on your certificate.
If your home suffers loss or damage caused by an event listed below, we will
choose to do one of the following:
• repair the damaged portion of your home,
• replace your home,
• compensate you for the amount we would have paid for repair or
replacement.
...
Home insurance - What IS covered
Flood
...
Home insurance additional benefits
The additional benefits listed below are in addition to the sum insured for your
home. These additional benefits only apply when you have insured your
home.
Home insurance - What IS covered
...
Fees associated with rebuilding
Following loss or damage insured by this policy, we will pay the reasonable
costs of the following:
Architects‟, consultants‟, surveyors‟ and solicitors‟ fees relating to the
replacement or repair of your home.
Fees incurred during discharge and reinstatement of a mortgage on
your home.
Preparation of new title deed documents for your home, when lost or
destroyed in your home or a bank safe deposit.
Any additional costs incurred in complying with government or local
authority regulations or bylaws.
Maximum benefit
$5,000
...
Removal of debris
Following loss or damage insured by this policy, we will pay the reasonable
cost of removing debris and necessary demolition.
Maximum benefit
$5,000
...
Temporary accommodation
Following loss or damage insured by this policy, if we are satisfied your home
is unliveable, we will pay any additional costs you incur for similar
accommodation until you are able to live in your home.
The amount we pay you will be based on the market‟s weekly ren tal value of
your home.
If we pay temporary accommodation for you, we will also pay for temporary
accommodation for your pets in a commercial boarding establishment for the
same period.
Maximum benefit
Up to 20% of the sum insured for your home as shown on your certificate.
...
General exclusions applicable to your policy
You are not covered under any section of this policy for damage, loss or
liability caused by, arising from or involving any of the following.
General exclusions to your policy
...
Wear and tear, lack of maintenance or inherent defect. ”
Issues
19. Whether the FSP has fulfilled its obligations pursuant to the terms of the
policy.
20. Whether the Applicant is entitled to compensation for the manner in which
the FSP managed her claim.
Reasons for decision
21. As advised to the parties, FOS has considered it appropriate to refer this
dispute directly to a Panel in accordance with the FOS Terms of Reference.
This is due to the circumstances of the dispute. This dispute has not been
the subject of a FOS Recommendation and has proceeded directly to
Determination.
22. This decision has been made by a Panel consisting of an Ombudsman and
two Panel members with extensive experience in the insurance industry and
consumer claims.
23. The Panel is satisfied a full exchange of information has taken place
between each party and each party has had the opportunity to address any
issues raised.
24. In order to clarify the precise payments made to the Applicant, the FSP has
now provided a breakdown of those payments as follows:
20/03/2012 Emergency funds $2,500.00
25/03/2012 Contents Total Loss settlement $145,600.00
01/05/2012 Reimbursement of 2 weeks rent $840.00
19/03/2013 Rental settlement (7 weeks) $2,940.00
16/04/2013 Rental settlement (4 weeks) $1,680.00
16/04/2013 Building repair settlement $75,321.63
03/06/2013 Rental settlement (4 weeks)1,680.00
27/06/2013 Rental settlement (9 weeks) $3,780.00
20/09/2013 Rental settlement (2 weeks) $840.00
20/09/2013 Further Building repair settlement $113,000.00.
25. The $113,000 can be broken down as follows:
Removal of debris reimbursement - $10,000
Additional building damages accepted as flood damage - $28,000 (DW
quote)
Upgrade quote for rear lean to/laundry - $30,000 (DW quote – Ex
gratia)
Allowance to support additions & design changes to home - $20,000
(Ex gratia)
Allowance to enable demolition of existing structure - $15,000 (Ex
gratia)
Allowance for a further 26 weeks temporary accommodation -$10,000.
26. The Applicant does not dispute receiving the settlement monies but
contends that the house is a total loss and therefore she should be paid the
sum insured of $220,000 for building repairs. The sum insured at the time of
the loss was in fact $212,000.
27. The FSP‟s contractor DW considered the property a repairable proposition
with significant non-claim related repairs required to ensure the property was
structurally sound.
28. An engineering firm MP inspected the property and reported in part:
“We have not identified any obvious or significant omissions in our review of
the [DW] SOW. Consequently we do not have any recommendations for
additional work to be incorporated in the extent of reinstatement and repairs to
the flood damage.”
29. The Panel accepts MP is a qualified engineer who has undertaken a detailed
analysis of DW‟s final SOW, and his con clusion was that the SOW
comprised all of the claim-related damage to the home and had properly
classed the property as a repairable proposition.
30. Although it is the Applicant‟s preference that the property be treated as a
total loss, and the Applicant dis putes both DW and MP‟s opinions that the
home is repairable, the Applicant has not provided any evidence supporting
her assertions.
31. In the circumstances, in the absence of any conflicting information, the Panel
considers the FSP is entitled to rely upon the expertise of its contractors to
conclude the property remains a repairable proposition.
Cash settlement amount
32. The FSP originally paid $75,321.63 based on the Statement of Works and
quotations supplied by DW. The FSP has now paid the Applicant a further
$113,000. Part of that payment includes $65,000 by way of ex gratia
payments to cover an upgrade of the rear lean to/laundry, to support design
changes to the home and to allow the entire demolition of the existing
structure should the Applicant seek to do so. The $113,000 is in addition to
the $75,321.63 paid to the Applicant, the temporary accommodation
expenses paid to the Applicant up to 20 September 2013, the contents total
loss settlement of $145,600 and the emergency funds.
33. Although the Applicant maintains the property is not repairable, she has
expressed a view in this dispute that it was the FSP who would not
undertake her repairs. The Applicant‟s position now seems to have changed
and she is amenable to the cash settlement offer, although the Panel notes
the FSP has agreed that should the Applicant be prepared to refund the
funds already paid to her, they would be agreeable to completing the claim
related repairs.
34. The Panel accepts that the policy terms and conditions are clear and
unambiguous and that the FSP has the discretion to determine whether to
settle a claim on a cash settlement basis or to conduct repairs. Such
discretion must be exercised reasonably and with utmost good faith.
35. The Panel Chair Ombudsman had the opportunity of visiting the Applicant‟s
property in May 2013. At that time, demolition works on part of the property
in particular, the rear lean to/laundry were well under way whilst internally,
most of the wall linings had been stripped. Despite the works that were
underway, it was apparent that the property was quite old and would have
been in need of maintenance prior to the flood, in particular given the
condition of the external paintwork and guttering.
36. Apart from the Panel Chair Ombudsman‟s visit to the property, the Panel has
also considered the photographic evidence provided as well as the reports
from the assessor‟s and MP. MP in partic ular had provided in his report of 22
May 2013 the following:
“Based on the visible appearance of the exterior and interior of the building
above the level of the flood, the external painting and internal finishes were
degraded by the passage of time and in poor condition before the inundation
of the site.
Prevailing policy conditions relating to maintenance expectations may
influence the Insurer‟s decision regarding the extent and nature of the
redecoration of the paint finishes to the exterior weatherboards, which
suffered “Reversible Flood Damage”, but which would have now reverted to
their pre-inundation condition.
The asbestos cement sheet cladding of the now demolished lean-to across
the rear of the house had sustained damage during the flood - several sheets
had apparently been broken during the flooding, but other sheets had
subsequently been damaged by acts of vandalism after the flood.
The areas damaged by vandalism may be covered by sections of the policy
other than flood - we presume that application of the appropriate policy
condition will determine the response to this aspect of the matter
A section of the base of the timber wall framing at the north-eastern corner of
the Bedroom 3 had rotted – we presume that repairs to this wall framing,
which would be required to reinstate the adjacent internal and external wall
linings and claddings, would not be included under the cover of the policy.
The roof gutters and downpipes were in poor condition, and a section of gutter
at the north-eastern side of the house was missing, damaged by an earlier
tree impact. There are a significant number of loosened spring-head nails
throughout the roof covering, and some nailed fixings are missing. In a
location across the rear pitch of the roof, an isolated instance of corrosion was
observed.
Since removal of the rear lean-to (the laundry, toilet and Bedroom 3) the roof
flashing to the rear chimney diverts roof water to each side of the chimney,
from where the flow passes down the exterior of the chimney and into the
kitchen area above the combustion heater.
The mortar around the bricks at the head of the kitchen chimney, which have
been laid as a “soldier course” around the combustion heater flue, has
completely degraded. The bricks appear loose, and present a hazard for
injury from falling bricks In our opinion, completion of repairs to the aspects of
building maintenance that are set out in the preceding paragraphs, none of
which are directly flood related, would be required to bring the house into
reasonable condition. The exceptions to this would be any aspect of the work
described to which any prevailing policy conditions (other than flood) would
respond.”
No evidence has been provided to dispute these findings.
37. The Panel accepts in these circumstances, give n the condition of the
property prior to the floods that the FSP was entitled to elect to settle the
claim on a cash settlement basis.
38. In the Panel‟s view, such a settlement by the FSP offers the Applicant a
greater flexibility in options as to whether she decides to repair, rebuild or
replace the home.
39. The Applicant contends the amount offered in settlement is insufficient to
properly repair the home. In support of her position, the Applicant has
provided a quotation from builder “BD” which sets out that the costs to repair
the home would be in the vicinity of $228,162 as at 1/12/2013.
40. The Panel has carefully considered the quotation from BD. The document
has a limited SOW included and it is difficult to compare this with the SOW
prepared by DW and approve d by MP to ensure it is a „like for like‟
comparison.
41. The Panel notes that BD has quoted the amount of $147,862 to „make the
home liveable‟. However, it is unclear if this figure relates only to the claim
related damage or if it includes other repairs whic h are not the subject of this
claim but are required to return the property to a watertight and structurally
sound state.
42. BD then also adds another $85,500 to the quoted amount, which is
comprised of $58,000 for the upgrades to the laundry and $20,000 for
changes to the current design not specifically related to the flood damage
(plus GST).
43. The Panel has some difficulty with BD‟s quote. Under the sub -heading within
the quote “Scope of Works – Internal” is included the laundry and toilet.
Presumably, the work required would include relevant work through the
laundry. The quote appears to include repair to the laundry within the original
estimate of $147,862 and then double up on this by allowing a further
$58,000 to upgrade the rear laundry – lean-to.
44. DW‟s qu ote allows for the sum of $28,443.47 for additional works required
for further damage that was identified at the time of the FSP‟s last
inspection. The sum of $29,361.86 is for the upgrades to the laundry, agreed
to by the FSP on an ex-gratia basis, which has been „rounded‟ to the figure
of $58,000.
45. The Panel notes that DW is an „insurance - only‟ builder and therefore their
quotation amount represents the volume discounts the FSP is able to
access, prices which are not necessarily accessible by the general p ublic.
Under normal circumstances, the Panel would have reservations in
permitting the FSP to rely on such a quotation to determine the extent of its
liability under the terms of the policy.
46. The Panel notes BD has stated that he was originally in agreement with
DW‟s quoted amount. BD states “I was present with [Applicant] when a
member from [FSP] stated they believed that the work as stated below could
be completed for $75,000. At the time I advised [Applicant] that she should
tell [FSP] to go ahead with t hat, which she did.”
47. Given the available information the Panel is of the view that the quotation
provided by DW represents a fair quotation for the costs to repair the claim
related repairs.
48. In circumstances where the FSP is prepared to conduct the repairs if
necessary, then the Panel accepts that it is reasonable for the FSP to be
able to rely upon the quotation to cash settle the dispute.
49. Insofar as the Applicant has already been cash settled, the Panel notes the
FSP is agreeable to the Applicant returning the funds paid (except the
temporary accommodation allowance) and the FSP undertaking repairs,
once the Applicant has remedied the pre-existing issues with the home. In
the Panel‟s view, such an offer does not appear to be a workable solution to
the dispute. However, if the parties are agreeable to resolving the dispute on
that basis, then this Service would encourage the parties to work together to
achieve an acceptable outcome.
Settlement by FSP
50. The FSP has now paid the Applicant $113,000, in addition to the previously
allowed amount of $75,321.63. This comprises of:
$10,000 for clearing of debris from the site;
$58,000 for additional repairs identified, namely that required to the
property ($28,000) and upgrades to the laundry/lean to area ($30,000);
$20,000 for costs to alter the current design of the home to better
enable it to cope with future inundations;
$15,000 for demolition costs in the event the Applicant chooses to
demolish and rebuild;
$10,000 for temporary accommodation costs, representing an
equivalent of 26 weeks rent.
51. The policy allows for $5,000 for removal of debris expenses under both the
building and contents section of the policy. As the Applicant claimed under
both sections of the policy, the Panel considers she is entitled to the benefit
under both sections, which would be a maximum entitlement of $10,000. The
Panel notes the FSP has paid this sum to the Applicant with the above offer
and accordingly considers the FSP has fulfilled its obligations pursuant to the
terms of the policy in this regard.
52. The FSP has made a $20,000 allowance for costs incurred by the Applicant
to alter the design of the home to better enable it to cope with future
inundations. The Panel notes the policy does not contain any allowance for
such costs, although it does include a provision for a maximum of $5,000 for
professional fees incurred in the rebuild of the home. Accordingly, in making
this offer, the FSP has gone over and above the terms of the policy. The
Panel is satisfied that such an offer on behalf of the FSP was made on an ex
gratia basis.
53. The FSP has allowed a further $15,000 for demolition costs incurred in the
event the home is demolished. Whilst the Panel notes the policy does
contain an additional benefit for demolition costs, this is included in the
benefit for removal of debris, to which the Applicant has already been settled
the maximum entitlement. Accordingly, the Panel concludes the separate
allowance for demolition costs to also be on an ex-gratia basis, and for the
reasons set out above, the Panel cannot consider this aspect further.
54. BD‟s quotation includes replacement of the free standing garage. There is no
breakdown within the quotation of the amount required to replace the free
standing garage. Whilst there is reference in the Statements of Works for a
component for garage repairs, this does not appear to have been quoted. It
is unclear from the information whether the FSP has actually costed the
replacement of the free standing garage into the quotations.
55. In the interest of fairness and in order to bring this matter to a close, the
Panel considers it would be fair in all of the circumstances for the FSP to
contribute towards the cost of replacing the garage. The Panel considers an
amount of $5,000 would be a fair contribution in these circumstances.
56. Further, the Panel notes that at least one of the reported areas of damage to
the roof guttering is allegedly the result of a tree branch impacting the home.
It appears that no claim was ever lodged by the Applicant for this damage. In
the Panel‟s view, as such damage is likely covered by the policy of insurance
in place, the FSP is required to assess their liability under the terms of the
policy for the damage occasioned to the roof gutters from the tree impact
and offer a settlement for this damage accordingly.
57. The FSP has paid for temporary accommodation throughout the duration for
the Applicant, and has to date, paid the sum of $42,760 in respect of
temporary accommodation, which exhausts the policy allowance. The FSP
has included a sum of $10,000, representative of a further 26 weeks
accommodation, in settlement of this aspect of the claim.
58. No evidence has been presented to suggest the repairs to the home would
take longer than 26 weeks to complete. The Applicant has not provided any
evidence to suggest the weekly rental amount offered by the FSP, being
roughly $385, is insufficient to achieve a similar rental property in the area.
59. After considering the available information, the Panel considers an
allowance of what equates to a further 26 weeks of temporary
accommodation is reasonable in the circumstances and the FSP is not
required to remit further funds in this regard.
60. Whilst the settlement amount offered may not be sufficient to cover all
repairs required to the property, that is not the test. The FSP is only required
to establish it has properly considered the claim-related damage and the
costs to repair those. On balance, the Panel accepts the FSP has done so in
this instance, which has been endorsed by the Applicant‟s own builder.
61. In the Panel‟s view, the payments made by the FSP not only meet its liability
under the terms of the policy but have also included substantial ex gratia
components. The Panel considers the offer and payments made to be fair in
all the circumstances.
Claims handling and compensation
62. The Applicant further contends the FSP has not managed her claim in a
timely and appropriate manner, causing her additional stress and hardship
as a result of its carriage of the claim.
63. Whilst the Panel accepts that the FSP has, in the main, fulfilled its
obligations to the Applicant pursuant to the terms of the policy, this does not
preclude the Panel from considering whether the Applicant is entitled to
compensation pursuant to the terms of paragraph 9.3b.
64. The Panel accepts that to some degree, all insurance claims are stressful
and inconvenient. In order to invoke an order of compensation under 9.3b,
the Panel must be satisfied that some action of the FSP caused the
Applicant an unusual degree of inconvenience or time taken to resolve the
situation. The Panel does not consider the simple passage of time to be a
sufficient trigger to justify an award of compensation.
65. The Panel has considered the timeline of events in this matter. The Panel
notes that whilst there were some delays in bringing this matter to a
conclusion, it is the Panel‟s view these are to be attributed to other factors
such as disagreements over the SOW and the requirement for the property
to stabilise enough in order that repairs could be undertaken, rather than any
inaction or delay instigated by the FSP.
66. The Panel notes that once the property was dried enough so that repairs
were able to commence, the FSP promptly cash settled this aspect of the
claim, and continued to pay temporary accommodation costs whilst the
Applicant considered her options. The contents claim was settled in April
2012, enabling the Applicant to replace her goods almost immediately.
67. In addition, in recognition of the Applicant‟s situation, the FSP has offered a
substantial amount of funds over and above the entitlements allowed for by
the terms of the policy, to enable the Applicant to choose the option moving
forward that best suits her needs.
68. In the Panel‟s view, these actions on behalf of the FSP have been
reasonable in an attempt to finalise the matter, and in the circumstances, the
Panel considers the FSP‟s handling of the claim to be acceptable and it is
not satisfied that it is appropriate to consider any further award of
compensation pursuant to paragraph 9.3b)(i) of the Terms of Reference in
this instance.
Determination
69. On the basis of the available information the Panel determines:
The FSP is entitled to settle the claim on a cash settlement basis;
However if the parties are agreeable to the FSP conducting the repairs
the Applicant shall return the funds to the FSP to enable it to do so, as
well as undertake whatever works are necessary to ensure the property
is structurally sound so that the FSP‟s claim repairs can commence;
The FSP‟s settlement amount for the cost of repairs to the home
adequately discharges its liability under the terms of the policy;
The FSP is to pay an additional $5,000 representing the costs for the
garage repair/replacement;
The FSP is required to assess any liability it may have under the terms
of the policy for the roof gutter damage;
The FSP is not required to make further payments for temporary
accommodation; and
The Applicant is not entitled to further compensation for the manner in
which the FSP has managed her claim.