Summary

Owners of a commercial building claimed for storm and water damage after roof corrosion allowed water into the upstairs flat and downstairs shop. AFCA found roof damage excluded for lack of maintenance, ordered a $1,378.40 settlement for the front wall, and required the FSP to repair or reimburse the shop damage with interest.

Water entering through a roof past its serviceable life was excluded as lack of maintenance, but the FSP failed to properly assess the separate shop damage.

Issues

Subjects and remedies

home or building damagesmall businesspay claimpay interestrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 320186 Determination Page 1 of 9 Case number: 320186 General Insurance - Small Business/Farm Insurance - Commercial Property - FSP Decision - Denial of Claim 29 January 2014 Summary Description  A claim under a Commercial Insurance Policy which provides building cover, following water damage. Basis of Determination  A question of the extent of coverage provided by the terms, conditions and exclusion under the policy. Determination On the basis of the available information I determine that:  The FSP is not liable for the replacement or maintenance of the roof to the building.  The FSP is not liable for the water damage to the upstairs flat from water which entered through the roof.  The FSP is only required to pay the Applicants $1,378.40, as settlement for the damage to the front wall of the upstairs flat.  The FSP is liable for the damage to the downstairs shop and is required to either repair the damage or – subject to provision of evidence by the Applicants – reimburse them for the reasonable repair costs they have incurred.  The FSP is not required to pay loss of rent benefit to the Applicants.  Pursuant to Section 57 of the Insurance Contracts Act 1984 (the Act), the FSP is required to pay the Applicants interest at the statutory rate on any amounts it cash settles, calculated from 5 April 2013 (being the date of its final decision letter), until the date of settlement. Determination Determination Case No: 320186 Determination Page 2 of 9 Background 1. The Applicants held a commercial insurance property with the Financial Services Provider (FSP). The policy provided building property cover over a two storey building in rural Queensland. 2. In November 2012, a storm caused damage to the corrugated iron roof of the Applicants‟ building. Then in January 2013, the tenant of the flat on the upper storey of the building reported that water had entered the residence and the Applicants lodged a claim with the FSP for the damage. 3. The FSP denied liability for most of the water damage on the basis tha t it was due to lack of maintenance, which is excluded from cover under the policy. 4. The Applicants disagree with the decision and want the FSP to pay their claim. Summary of Applicants ’ position 5. The Applicants say the building has two roofs. The primary bituminised roof sustained damage but was not inspected by the FSP‟s assessor. The secondary iron roof, which was erected over the top of the primary roof, had sheets ripped off during the November 2012, supercell event, which comprised heavy rain and high winds followed by a hail storm. 6. They say that in January 2013, their real estate agent reported that the heavy and continuous rain entered the premises, running down the light fittings and the walls and blowing in through the windows on the verandah. 7. The A pplicants reject the FSP‟s contentions that water entered through the roof sheeting and that lack of maintenance caused the damage. They say that the supercell storm ripped roof sheets off and there is photographic evidence that sheets of roof iron have been replaced. 8. They also say that the flat on the upper storey of the building was uninhabitable because of the damage and they want the FSP to pay for the loss of rent they suffered as a result. Summary of FSP’s position 9. The FSP says the evidence indicates that the Applicants‟ building‟s roof was rusted at the lapping of the iron sheets and the water ingress to the kitchen, lounge, bedroom one and bathroom areas of the upstairs residence, is consistent with rainwater leaking through the corroded holes in the roof. 10. The FSP also says that damage arising from lack of maintenance is excluded from cover and it is entitled to deny this part of the Applicants‟ claim. Case No: 320186 Determination Page 3 of 9 11. It agreed to pay for damage to the front room wall of the upstairs flat, which was caused by water entering through a window. However, as the flat was not rendered uninhabitable by the damage to the front room wall, the loss of rent policy benefit does not apply. 12. The FSP relies on the following policy provisions: “ The events You are insured against This policy insures You against physical loss of or damage to:  A Building, if „Bulidings‟ is shown on the certificate of insurance ... This policy only insures You if the loss or damage is directly caused by an event listed below and occurs during the Period of Insurance and in the case of:  Buildings, Stock and Other Property, occurs at the Business Premises ... 1 accident but not for:  Loss or damage directly or indirectly caused by or arising out of ... o ... wind, rain, hail, snow ... ... o wear, tear fading, rust, corrosion, oxidation, gradual deterioration or exposure to light or darkness ... o lack of maintenance ... 6 wind, rain, hail, snow or escape of liquid: but not for: ...  loss or damage directly or indirectly caused by or arising out of: ... o lack of maintenance (for example failure to clean out gutters) ... Additional benefits ... Loss of rent If We have paid or agreed to pay a claim for damage to a Building, We pay the rental income You lose if: ...  the Building is uninhabitable as a direct result of the damage.” Case No: 320186 Determination Page 4 of 9 Issues 13. Whether the FSP is liable for the damage to the Applicants‟ building. 14. Whether loss of rent is payable to the Applicants. Reasons for decision 15. Due to the nature of the dispute, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. Thus, this dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. The parties have been previously advised that a Determination will be issued in this case. 16. There has been an exchange of information between the parties and I am satisfied that each party has had the opportunity to address any issues raised by the other. Damage to building 17. The Applicants say that the building‟s primary ro of is bitumen and has a parapet wall about 1 metre high, with a secondary roof of iron sheeting over the top of the primary roof. 18. They say that it was roof sheeting from the secondary roof that was ripped off during a “supercell” storm in November 2012, ex posing the primary roof to rainwater and hail. 19. In January 2013, another storm with heavy rain affected the building, with water dribbling down the light fitting in the kitchen and the fan/light fitting in the lounge-room. 20. The Applicants say that the primary roof was in excellent condition and is now damaged and water is seeping through to the residence and causing damage. They believe that the primary roof needs to be inspected to facilitate the claim and that neither the FSP‟s assessor nor the building co nsultant it engaged (“S”), accessed the primary roof. 21. The Applicants contend that the secondary roof has been maintained, saying that three sheets of roofing iron have been replaced since they purchased the property in 2005, as evidenced by photographs tak en by the FSP‟s building consultant “S”. 22. The FSP‟s assessor “C”, inspected the property on 5 February 2013 and provided a report dated 13 February 2013. 23. The report by C included a summary of discussions with the building‟s Property Manager, with the plumber engaged by the Applicants to inspect Case No: 320186 Determination Page 5 of 9 the roof and with the handyman who was engaged to re -attach the one roof sheet which had blown off during the November 2012 event. 24. C also engaged S to report on the cause of the damage. The report by S, dated 6 February 2013, was produced after an inspection of the building on 5 February 2013 by “SL” and provided the following information:  The building is a freestanding, two storey, concrete panel clad, corrugated galvanised sheet metal roof constructed on timber bearer and joist upper floor and concrete slab on the ground floor.  The building is estimated to be approximately 90 years old and generally considered to be in poor condition for its age. 25. During the inspection, SL was taken to the upstairs flat by the Property Manager. 26. SL reported that the Property Manager advised that during the November 2012 event, three roof sheets had blown off in strong winds and that a local handyman was engaged to replace the roof sheets. The subsequent weather event in January 2013, resulted in water leaking into the kitchen, lounge, bedroom one and the bathroom area. 27. SL reported that in these areas, he observed square of light brown water staining to various parts of the building, including to the ceiling linings and the painted surface of the VJ timber panel wall linings. 28. SL also reported that he accessed the roof surface and after removing the tarpaulin (which had been placed there to prevent further water ingress) he observed the galvanised corrugated roof sheeting which was secured to the roof frame with hex headed roofing screws, which he noted has replaced the majority of the old roofing nails. 29. SL opined that the overall condition of the roof cover was poor. He observed surface corrosion to the entire end of the lap joints of the roof cover consistent with rain and moisture being trapped between the end lap joints of the roof sheeting over an extended period of time. 30. According to SL, the corrosion to the roof surface was significant in some areas and this has resulted in corrosion holes extending though the entire thickness of the roof sheets, allowing water to penetrate into the roof space. 31. SL also noted that the corrosion holes o f the roof cover were located directly above the water affected areas of the kitchen, lounge-room, bedroom one and bathroom of the upstairs flat. 32. Further, SL noted that three roof sheets had been replaced on the southern end of the roof cover. 33. However, SL reported that he observed no evidence of storm damage or storm created opening to the roof cover that would suggest that the roof cover had been damaged or compromised by storm activity. Case No: 320186 Determination Page 6 of 9 34. In the report, SL stated that: “I am of the opinion that the rainwa ter ingress entering the kitchen, lounge, bedroom 1 and bathroom areas of the residence is consistent with being caused by rainwater leaking via the corroded holes in the galvanised sheet metal roof cover allowing the water to enter the roof space and disperse over the backing of the ceiling linings and inturn track down through light fittings and fan causing the subsequent damage. I also consider that from the extent of corrosion to the old corrugated galvanised sheet metal roof cover that the roof cover has passed its serviceable lifespan from exposure to normal weathering over the lifespan of the building to the present date. I therefore consider the replacement of the same to be an ongoing maintenance issue.” [sic] Damage to corrugated iron roof 35. There are different versions as to how many of the roofing sheets were torn from the roof of the building. C reported that the handyman advised that only one sheet was affected, while according to the report by S, the Property Manager advised that three sheets were affected. 36. In any event, I accept that during a storm in November 2012, at least one iron roof sheet was torn from the roof and that this sheet (or sheets) was replaced by a local handyman. 37. After examining the report by S and its accompanying photographs, I am satisfied that the corrugated iron roof to the Applicants‟ building was in poor condition and that it was past its serviceable lifespan. 38. The Applicants have claimed for the replacement of the entire roof and gutter, however, I accept that the FSP is not liable for the costs associated with the replacement or the maintenance of the roof. Water damage to the upstairs flat 39. I accept that the building has corrugated iron roof over the top of another roof which has a bitumen surface. 40. As outlined above, the corrugated iron roof was in poor condition and I am satisfied it was past its serviceable lifespan. I am also satisfied that at the time of the storm events in November 2012 and January 2013, the corrosion was extensive enough to allow water to enter the roof space beneath. 41. Although the Applicants contend that maintenance had been performed on the roof, pointing to the replacement of three roof sheets as evidence, I am not satisfied that the level of maintenance performed was adequate, given the amount of corrosion which is evident and the age of the building. 42. I note that the Applicants have described the bitumen roof as the “primary roof” and stated that it was (prior to the November 2012 event) in excellent condition. They say that the roof sheeting f rom the “secondary roof”, was ripped off, exposing the “primary roof” to rain and hail damage. Case No: 320186 Determination Page 7 of 9 43. However, I do not accept the Applicants‟ position in this regard. In my view, the corrugated iron roof provided the building, including the bitumen roof, with primary protection from the elements and once it was compromised, water was able to enter the bui lding. I do not accept that the bitumen roof provided any significant impediment to the water ingress. 44. I am satisfied that the corrugated iron roof suffered from lack of an appropriate level of maintenance and that the damage to the building arose from this lack of maintenance. 45. The policy insured event of “accident”, excludes damage caused by or arising out of “wind, rain, hail and snow” and I accept that there is no cover available under this insured event. 46. The policy insured event of “wind, rain, hail, s now and escape of liquid”, excludes cover for damage caused by or arising out of lack of maintenance. 47. Accordingly, I find that the FSP is entitled to deny liability for damage to the building from water entering through the roof. Damage to front wall of upstairs flat 48. I note, however, that the FSP has accepted liability for damage to the front wall of the upstairs residence of the building. 49. This is because the water which caused this damage entered through the window, rather than through the roof and was not excluded from cover. 50. The FSP has obtained a quotation from builder “CI” for $1,478.40, for the damage to the front wall and offered to pay the Applicants $1,378.40 as settlement, allowing for the $100 excess applicable. 51. The Applicants have provided alternative quotation of $1,654.40, for the repair to the damage to the front wall, which they say includes the use of shellac which will stop the stains coming through the new paintwork. 52. The FSP says that as the shellac was not present before the damage occurred, it is not obliged to pay for additional costs associated with this treatment. 53. I accept that the Applicants are not entitled to payment for shellac treatment, which was not present prior to the damage and I find that the FSP is only required to pay the Applicants $1,378.40, as settlement for the damage to the front wall. Damage to downstairs shop 54. The Applicants say that the shop on the lower level of the building had forced entry of rainwater from outside the building and in May 2013, the Applicants submitted a quotation in the amount of $726 for the painting of Case No: 320186 Determination Page 8 of 9 the area. At the time, they said they were in the process of obtaining a quotation for the repairs which need to be done prior to the painting. 55. The report by the F SP‟s assessor (C), stated that at the time of the initial inspection of the building by S, neither the Applicants nor the Property Manager had keys to access the lower level shop area and no inspection of the shop took place. 56. The report by C also stated that SL was advised by the Property Manager that “water was seeping in from the front external wall of the building”. SL advised that “there was no storm damage to the external wall” and believed that “the rainwater is entering through the seals in the concr ete pre-fab slabs” and believed that “this would be a maintenance issue due to the age of the building”. 57. While at the time of the 5 February 2013 inspection, the keys to the shop were not available, there does not appear to have been any further attempt to by either C or SL to arrange another time to perform an inspection of the damage claimed by the Applicants, even though there has been ample opportunity to do so. 58. The evidence presented by the FSP with respect to the damage to the downstairs shop is a report by C, about advice C allegedly received from SL, based on advice SL allegedly received from the Property Manager. 59. In my view, the FSP has not appropriately assessed the damage claimed in this downstairs area and the evidence upon which it relies to deny the Applicants‟ claim is lacking in substance. 60. Accordingly, I find that the FSP is required to indemnify the Applicants for the damage to the downstairs shop. 61. If the repairs to the damage to the downstairs shop have not yet been performed, the FSP is required to work constructively with the Applicants to arrange for these repairs. 62. If, however, the Applicants have attended to the repairs of the damage to the downstairs shop, the FSP is required to reimburse the Applicants for the reasonable cost of those repairs, subject to the provision of appropriate evidence of expenses incurred by the Applicants. Loss of rent 63. The Applicants say that because of the damage to the upper level flat, they lost rent and want the FSP to pay them for the loss of income that resulted. 64. The FSP says that because the upper level damage for which it has accepted liability did not cause the flat to be uninhabitable, the loss of rent benefit of the policy is not payable. Case No: 320186 Determination Page 9 of 9 65. I accept that the damage to the front wall of the flat (which is the only damage to the upper level for which the FSP has agreed to pay), would not render the building uninhabitable. 66. Accordingly, I accept that the FSP is not required to pay loss of rent benefit to the Applicants. Determination 67. On the basis of the available information I determine that:  The FSP is not liable for the replacement or maintenance of the roof to the building.  The FSP is not liable for the water damage to the upstairs flat from water which entered through the roof.  The FSP is only required to pay the Applicants $1,378.40, as settlement for the damage to the front wall of the upstairs flat.  The FSP is liable for the damage to the downstairs shop and is required to either repair the damage or – subject to provision of evidence by the Applicants – reimburse them for the reasonable repair costs they have incurred.  The FSP is not required to pay loss of rent benefit to the Applicants. 68. Pursuant to Section 57 of the Act, the FSP is required to pay the Applicants interest at the statutory rate on any amounts it cash settles, calculated from 5 April 2013 (being the date of its final decision letter), until the date of settlement.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.