Text of the determination
Case No: 319324 Determination Page 1 of 9
Case number: 319324
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim - Exclusion/Condition - Pool Damage
25 September 2013
Background
1. The Applicant held a home and contents insurance policy with the Financial
Services Provider (FSP) from 9 June 2010. After the renewal of the policy in
2012, it provided building cover for $438,148 and contents cover for
$125,317.
2. On 18 September 2012, the Applicant lodged a claim with the FSP for
accidental damage to his pool. He had earlier lodged a claim for damage to
his pool on 15 January 2011 and accepted the FSP‟s rejection of it on the
grounds the FSP considered a number of policy exclusions applied as
detailed in its letter to the Applicant dated 22 February 2011.
3. The FSP reviewed and denied the second claim, on the grounds the damage
was pre-existing from the previous claim in 2011 and the Applicant, despite
being aware of that damage and then not repairing it, had failed to mitigate
his loss and that in any event, policy exclusions applied to defeat the second
claim.
4. The Applicant disagrees and seeks indemnity for the loss, estimated at
$59,462.
Summary of Applicant’s position
5. The Applicant says that the pool was accidentally damaged as areas of its
structure buckled after he emptied it of water to investigate a leak. He was
not aware of the correct procedure to brace the fibreglass pool before doing
this, as subsequently advised to him by the FSP‟s experts.
6. As the action of the Applicant dropping the pool‟s water level caused the
pool to implode and as this is an accident, the FSP, by reference to its policy
should fix the pool as per his cover.
7. Further, he had personally effected repairs to the pool after the February
2011 damage claim. In so doing, he was entitled to respond positively in that
respect at policy renewal in June 2011. If the FSP, at policy renewal had
doubts about his workmanship, or did not believe the Applicant, they should
Determination
Case No: 319324 Determination Page 2 of 9
have checked for themselves. At no time did the FSP ask for any evidence
or send anyone out to check the Applicant‟s work; this led the Applicant to
believe his repair work was of standard.
Summary of FSP’s position
8. The FSP says that the Applicant assured it prior to policy renewal in June
2011, that the pool repairs had been effected and based on this information,
the FSP allowed policy renewal. On investigation of the September 2012
pool claim, its assessors reported that no repairs had been carried out to the
pool. The FSP maintains the Applicant had not acted i n utmost good faith by
lying to the FSP.
9. The Applicant has not established that a single one off insured event has
caused the damage to his pool. The Applicant attempted maintenance work
to the light of the pool without abiding by the manufacturer‟s
recommendations and this is considered faulty workmanship.
10. The FSP‟s building consultants „SE‟ reported that the sand around the pool
was not adequately compacted. This is considered to be faulty workmanship
and a structural defect.
11. Policy exclusions apply to defeat the claim – i.e. wear and tear and lack of
maintenance, gradual loss, faulty workmanship, earth movement.
12. The FSP relies on the following policy provisions:
“ This policy provides cover for:
the insured events listed on pages 21 to 24, unless you have chosen
to remove the optional events of theft, accidental glass breakage or
fusion and power surge;
...
The policy does not cover everything. There are exclusions and limits on what
we pay:
1. There are general exclusions which apply to the overall policy.
...
4. There are exclusions that are specific to the insured events and benefits.
Let us know if you are doing any construction work
If you have building cover, you must let us know as soon as possible about
any structural improvements, alterations or other renovations you plan to
make to the building or at the insured address. We will advise you of any
special conditions that we may apply to your policy while the work is being
conducted or once the work is completed. These conditions will be listed on
your policy schedule or may be advised to you in separate correspondence. If
you don‟t tell us about these changes, we may reduce or deny any claim you
make or cancel your policy.
...
Case No: 319324 Determination Page 3 of 9
Take good care of your building and contents
Wear and tear, poor workmanship and lack of maintenance are not covered
under this policy, so it is important to always maintain your building and
contents in good repair and protect them by always using any security devices
installed on the building.”
Pages 14-16 of the PDS
“ Glossary of words with special meaning
...
event A single occurrence.
...
insured events The events listed on pages 21 to 24.”
Page 18 of the PDS
“ The policy doesn’t cover everything
General exclusions – apply to the overall policy
Unless included in additional cover, we will not cover loss, damage or legal
liability caused by:
• ...
• wear and tear and lack of maintenance, including rust, corrosion,
deterioration, except in the case of escape of liquid (refer page 21), or
legal liability claims;
• gradual loss or damage of any kind;
• structural defects and faulty workmanship in the construction of the
building or lack of maintenance to the building and/or contents;
...
• erosion or earth movement including shrinkage... ”
Pages 21-24 of the PDS
“ Events you are covered for
...
The following insured events apply to both building and contents cover...
subject to the exclusions set out on pages 18 to 20 and any additional
exclusions set out below.
Insured events
We will cover you for loss or damage to your building and/or contents caused
by the events detailed in this section. The loss or damage must occur at the
insured address. ”
Issues
13. Whether the damage caused to the Applicant‟s pool occurred as a result of
an insured event for either or both of the two claims.
Case No: 319324 Determination Page 4 of 9
14. If so, whether the FSP is entitled to rely upon any exclusion(s) to avoid the
claims.
Reasons for decision
15. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the nature and complexity of the matter. This
dispute has not been the subject of a FOS Recommendation and has
proceeded directly to Determination.
16. The Panel is satisfied that a full exchange of the relevant information has
taken place between the respective parties and that each party has had the
opportunity of addressing any issues raised.
17. To be entitled to cover from the FSP, the onus rests with the Applicant to
establish that his loss fits within the scope of what is covered by the FSP‟s
policy.
18. The policy provides cover for a series of defined events as outlined in the
PDS. It does not provide blanket cover for all types of loss but does have an
accidental damage option. It is not in dispute that the Applicant chose this
option under the policy, which relevantly provides:
“ Optional cover you can pay more to have
You can choose to add the following cover to your policy. If you have selected
an option and paid the extra premium, the cover will be shown on your policy
schedule.
Accidental damage
In addition to the cover provided by the insured events detailed on pages 21
to 24, the accidental damage option covers damage to the building that is
caused unintentionally. We will cover the cost of repairing or replacing that
part of the building which suffers physical loss or damage caused by an
accident at the insured address. ”
19. An earlier claim was reported by the Applicant on or about 15 January 2011
for accidental damage caused to the pool as a result of work he had
conducted in the surrounding area. The report lodged with the FSP noted
that the Applicant informed it that:
“We have been doing some landscaping in our backyard and in the process
our pool have become [uneven], with a ridge forming on the bottom of the
pool and the difference in [height] between the highest and lowest point being
80mm. The pool also looks bowed on the side which is highest...”
20. The FSP retained an expert (SE) to inspect the pool and provide a report. An
inspection was conducted on 27 January 2011 and SE noted that the
Applicant‟s wife informed him of the work being conducted in and around the
pool area. The Applicant and his wife had been living at the premise for less
than a year at that time and had noticed that the water level in the pool had
been “extremely low” at times and the edges of the fibreglass pool had
Case No: 319324 Determination Page 5 of 9
become uneven. They had removed the paving bricks which originally
surrounded the pool about two or three months earlier and had constructed a
new limestone block wall in the area. They had obtained a mini bobcat to
prepare the ground levels for the limestone wall.
21. The expert at SE confirmed that the pool appeared to be uneven and that
there was:
“... mainly just loose sand around the pool and that the norther n edge of the
pool was approximately 2.5m away from the new limestone block wall. I also
observed that on the northern side of the pool there are several bulges in the
pool wall below the current water level, which were approximately 200mm
below the top edge of the pool. The rest of the pool did not appear to have
any of these bulges in the walls...
I am of the opinion that the unevenness of the pool edge, the ridge on the
bottom of the pool and the bulging of the northern pool wall have resulted
from the forces applied to the soil surrounding the pool by the mini bobcat
during the removal of the old pavers and the construction of the new
limestone brick wall, combined with the low water levels of the pool.”
22. SE considered that the problem was a “maintenance related issue”. The FSP
rejected this first claim based on the report from SE and informed the
Applicant that the loss was excluded as the policy did not extend to include:
„gra dual loss or damage of any kind; wear and tear and lack of maintenance,
including rust, corrosion, deterioration; erosion or earth movement including
shrinkage, structural defects and faulty workmanship in the construction of
the building and/or contents.‟
23. The Applicant appears to have accepted this decision and undertook to
attend to the repair himself on the basis that the pool remained at risk.
24. The second claim was reported to the FSP on or about 19 September 2012
(more than 20 months after the first claim). The FSP recorded the
Applicant‟s report of the second claim as follows:
“ [The Applicant] has noticed water leaking from his pool. He found a hole in
the area where the light is situated and tried to repair it. [He] drained water out
of the pool and left it for a day and noticed the pool is now warped. [He]
advised sand area around the pool is very wet. He feels the sandy area
around the pool may have caused the pool to warp.”
25. Again, as with the first claim, the Applicant lodged the claim for damage to
the pool but was unsure as to the exact cause of this damage.
26. When the second claim was reported, the FSP retained (BA), a builder, to
inspect and report. BA‟s report of 21 September 2012 suggested that the
pool was about 15 years old (though SE had suggested the property was
only about seven years old in 2011) and generally in good condition. BA
noted that the Applicant had identified a water leak from behind one of the
pool‟s internal light fittings. The report further identified that:
“[The Applicant] lowered the water level in the pool by approx 800mm to
access the light [.] In doing this [he] has not braced the edges of the pool...
[and] the external ground forces have begun to push in the top of the pool
Case No: 319324 Determination Page 6 of 9
allowing a gap to appear between the pool paving headers and the liquid
limestone paving.”
27. BA further suggested that the Applicant left the balance of the water to
evaporate and this allowed the external ground force pressure to buckle the
base of the pool.
28. The FSP later retained SE again to inspect the damage. His second report at
the premises, dated 31 October 2012, noted that the Applicant had partly
emptied the pool to gain access to the leaking pool light. He noticed after
doing this that:
“... the pool‟s shell had started to bulge and distort when the pool was partly
emptied.
29. SE confirmed that the sides of the pool had bulged on the northern, southern
and eastern sides and there were undulations through the floor of the pool
and cracks on the gel coat finish. SE used a penetrometer and determined
that the compaction of the sandy soil layers in the vicinity of the pool were
“inadequate”.
30. SE further identified that a fibreglass pool is “meant to be full of water at all
times” and that draining it, without taking adequate bracing precautions,
places the shell at risk. The amount and type of bracing required depends on
the design of the pool. SE concluded that:
“I am also of the opinion that in the absence of any bracing being in place
prior to and during the period of time that the pool was emptied has caused
the sides of the pool shell to “implode”. This then caused the walls an d floor to
bulge and distort and crack the gel- coated finish.”
31. Considering the level of damage, SE formed the view that the pool would
have to be removed and in all likelihood could not be repaired.
32. The FSP is of the view that the Applicant failed to attend to the promised
repair work between the time of the first and second claims. The
photographs provided and taken at the respective times attest to the change
in the area over time, suggesting that the Applicant continued with his work
at the property, in and around the vicinity of the pool.
33. Whilst the work conducted by the Applicant might not have (ultimately) been
sufficient to properly rectify the issues identified in the first claim, there is no
evidence in the second report from SE to suggest that the Applicant had not
at least attempted the promised repairs. Certainly a lot of work had been
attempted.
34. The Applicant further submits that the pool had been filled and in use for a
year between the two claims. In the Panel‟s view, this would not have been
likely if no repair work had been done.
35. Whilst the Panel accepts that the pool was (at least to some extent) repaired
by the Applicant between the first and second claims, it appears that the
Case No: 319324 Determination Page 7 of 9
problems which occurred likely stemmed from the work conducted b y the
Applicant in the first place.
36. The first claim almost certainly arose as a result of the work done by the
Applicant to remove the original surrounds for the pool and to install the
limestone wall and pavers around this area. The use of the bobcat to move
earth likely disturbed the surrounding areas.
37. Similarly, with the second claim, the investigation of a possible leak and the
draining of the pool without taking adequate steps to brace it, appears to
have affected the integrity of the fibreglass pool‟s structure.
38. Whilst the Applicant suggests that it makes no sense that the FSP
simultaneously argues that there was insufficient compaction of the soil and
a collapse of same to cause the damage to the fibreglass pool, the Panel
accepts that this is logical. Without sufficient compacting of the soil, it was
able to move and collapse in the absence of water pressure in the pool itself.
39. The Applicant‟s policy provides both home and contents cover and includes
cover for accidental damage. Accidental damage is not clearly defined in the
policy but the concept and meaning of an accident has being considered at
length by the Courts and means something that happens without intention or
design, something that is an unexpected and unintended mishap. There is
no doubt that when performing the repairs to the pool, the Applicant did not
intend for the pool to implode. He had, as part of his repair process
intentionally removed the water from the pool but had not intended the
damage to occur.
40. Whilst the FSP through its expert has stated that the fibreglass pool is meant
to be full of water at all times and draining it improperly can cause the
lightweight shell to pop out of the ground, the expert notes the Applicant
stated he was not aware that fibreglass pools had to be braced when
emptied and was therefore not aware at the time that he needed to brace the
pool.
41. If the Panel accept the experts‟ opinion, then the imploding of the pool would
not be unexpected. However, the test is not a test of what the expert would
think. The High Court in Australian Casualty Vs Federico 160 CLR 513 ,
although not defining what was meant by the words “unexpected”, did say
that words were to be given their plain meaning in the contemporary
language of “a reasonable non -expert in this country ”.
42. It is unlikely that a reasonable non-expert would have expected the pool to
implode having been emptied for the purpose of conducting the repair. If the
Applicant were a pool expert, then the Panel would accept in those
circumstances, the implosion could be expected and therefore would not fit
within the definition of accidental damage. In this event, however, the Panel
is satisfied that the circumstances that led to the claim were due to
accidental damage and accepts that the Applicant has established a prima
facie claim under the terms of the policy.
Case No: 319324 Determination Page 8 of 9
43. It is therefore necessary to consider whether the general exclusions provided
under the terms of the policy act to defeat the Applicant‟s claim.
44. The FSP relied upon several exclusions for the first claim, including:
gradual loss or damage of any kind;
wear and tear and lack of maintenance…. including deterioration;
erosion or earth movement;
structural defects and faulty workmanship in the construction of the
building or lack of maintenance to the building and/or contents.
45. Looking at the exclusions, there is no evidence to suggest that the accidental
damage occurred gradually or is due to a lack of maintenance, deterioration
or erosion. Each of these exclusions can be dismissed easily.
46. Arguably the damage did arise, as a result of the Applicant‟s faulty
workmanship by failing to adequately brace the pool. The evidence
presented by the FSP‟s expert would support such a finding.
47. However, the policy wording does not appear to be intended to catch „faulty
wor kmanship‟ alone. The exclusion does not permit of that limited reading.
The exclusion applies to:
“structural defects and faulty workmanship in the construction of the building
or lack of maintenance to the building and/or contents.”
48. There is no evidence that the damage sustained to the pool was due to
faulty workmanship in the construction of the pool. In this regard, the
exclusion cannot apply with respect to „faulty workmanship‟ of and by itself.
49. Whilst the pool imploded in the absence of bracing due to the subsequent
earth movement, in the Panel‟s view, the earth movement was not the
proximate cause of the implosion of the pool but rather it was the emptying
of the pool and the failure to brace the pool that properly constitutes the
proximate cause. Such damage would fall under faulty workmanship but
would not amount to faulty workmanship in the construction of the building.
50. In the Panel‟s view, the information exchanged does not establish that the
Applicant had failed to maintain the pool or that the Applicant had not
conducted adequate repairs prior to this latest accident.
51. In the circumstances, the Panel is of the view that as the damage sustained
was accidental and that as the FSP has not established the application of a
relevant exclusion, the FSP is liable to meet the Applicant‟s claim in
accordance with the terms of the policy.
Case No: 319324 Determination Page 9 of 9
Determination
52. Accordingly the Panel determines that the FSP is liable to meet the
Applicant‟s claim in accordance with the terms of the policy.
53. Insofar as the FSP determines t o cash settle the Applicant‟s claim, the FSP
is to pay interest in accordance with Section 57 of the Insurance Contracts
Act from 4 December 2012 being the date of rejection of the Applicant‟s
claim.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.