Home / Financial Firm (Unknown - Insurer) / Determination 319244
Determination 319244
Flood exclusion applied to water inundation claim
Summary
The Applicant's home was inundated after ex-Cyclone Oswald rain and the FSP declined the claim under the flood exclusion. AFCA accepted the hydrology report that the water came from an overflowing creek, so the flood exclusion applied and nothing was ordered.
Water that overflows a watercourse onto normally dry land is flood under the policy definition, and the policy terms were clearly communicated and sent to the Applicant.
Issues
- Claim denial primary · not upheld
“The FSP is entitled to rely on the exclusion from flood cover to deny liability for the claim.”
- Failure to disclose secondary · not upheld
“The Panel is satisfied the FSP has fulfilled its obligations pursuant to the Act to clearly inform the Applicant of the terms of the policy.”
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Case No: 319244 Determination Page 1 of 7
Case number: 319244
General Insurance - Domestic Insurance – Home Building - Home Contents -
FSP Decision - Denial of Claim - Exclusion/Condition - Flood
26 February 2014
Summary
Description
Claim under a Home and Contents Policy for water inundation of the
property in the wake of ex Cyclone Oswald. The FSP relied on a flood
exclusion to reject the claim.
Basis of Determination
The Applicant‟s home was inundated on or about 25 January 2013.
The inundation was due to heavy rainfall from ex tropical Cyclone
Oswald.
The heavy rainfall caused the nearby creek to overflow, flooding the
Applicant‟s property.
Determination
The FSP is entitled to rely on the exclusion from flood cover to deny
liability for the claim.
Background
1. The Applicant holds a home contents and building insurance policy
underwritten by the Financial Services Provider (FSP). The policy was
incepted on 27 June 2012 and was current at the time of the loss occurring.
2. On 25 January 2013 the Applicant lodged a claim with the FSP for water
damage sustained to the lower level of his home. After considering the
cause and extent of the loss, the FSP declined the claim on the basis that
the loss had arisen from flood, which is specifically excluded from cover
under the terms of the policy.
3. The Applicant is seeking a review of the FSP‟s decision to decline his claim.
Determination
Case No: 319244 Determination Page 2 of 7
Summary of Applicant’s position
4. The Applicant says the water which inundated his home was from
stormwater from a stormwater drain which blocked and then overflowed. The
water had all dissipated within a couple of hours which is not consistent with
flooding, but more consistent with stormwater back flow.
5. He does not live in a flood prone area and there was a huge amount of rain
in the hours immediately preceding the damage, which caused the
stormwater drain to fail.
6. At the time of policy inception, he did not receive a copy of the Product
Disclosure Statement (PDS). He rang on 12 August 2012 to request a copy
of this be supplied to him however it was not and he never received it. His
mail box is locked and no one else has access therefore it is doubtful the
FSP sent the documents.
7. The report relied on by the FSP contains factual errors. The creek nearby is
not Thozets Creek, it is Frenchman‟s Creek catchment. Further, the water
flowed from the front of the property not the rear as detailed in the FSP‟s
report. He has a letter from the local council confirming the rain was from ex-
tropical Cyclone Oswald.
8. He cannot afford to pay for the damaged rooms of the house or the contents
items that were lost in the event. His children‟s bedrooms were in the
damaged area and now his children are all cramped into the upper level of
the home and sharing rooms.
Summary of FSP’s position
9. The FSP says its policy is a defined events policy which does not cover all
risks. It only covers the events listed in the policy, subject to any exclusions.
One of the specific exclusions from cover is loss or damage arising from
flood.
10. The FSP commissioned hydrologist firm “W” to prepare a site speci fic
hydrology report. W inspected the premises and considered weather data
from publicly available information sources in reaching their conclusion that
the water which inundated the premises was floodwater escaping from the
nearby creek.
11. As loss or damage arising from flood is specifically excluded from cover, the
FSP has correctly declined the claim.
12. The Applicant has not presented any contradictory evidence from an expert
to refute the W report and therefore the FSP is entitled to rely on those
findings.
13. At the time of policy inception, the Applicant was verbally advised that flood
was not covered under the terms of the policy. The Applicant was also sent a
Case No: 319244 Determination Page 3 of 7
copy of the PDS which set out in detail the level of cover afforded by the
policy. The FSP has provided confirmation from its mailing house that the
documents were sent to the Applicant as required.
14. Accordingly, the FSP considers it has complied with its obligations pursuant
to Section 35 of the Insurance Contracts Act 1984 (the Act) to clearly inform
the Applicant of the terms of cover prior to entering into the contract. In the
circumstances, the FSP is entitled to rely on the policy terms to decline the
claim.
15. The FSP relies on the following policy provisions contained within the PDS:
“ DEFINITIONS – THE MEANING OF CERTAIN WORDS USED IN THIS
PRODUCT DISCLOSURE STATEMENT
...
Flood - is the covering of normally dry land by water which has overflowed,
escaped or been released from the confines of any natural or artificial
watercourse, lake, reservoir, canal or dam.
...
COVER PART 1 – INSURED EVENTS
This section describes the insured events you are covered for, and the
conditions and exclusions that specifically apply to each insured event. They
should be read with the general exclusions on pages 27-29.
...
Insured event We will NOT cover
6. Storm and rainwater
Including loss or damage from
the escape of rainwater from any
water pipe, drain or gutter
surface run - off rainwater from
surrounding areas that occurs within
24 hours of a storm or heavy rain .
...
...
loss or damage caused by flood.
...
GENERAL EXCLUSIONS APPLYING TO THE WHOLE POLICY
We will not cover:
Action of the sea, high water or underground water
loss or damage caused by flood. ”
Case No: 319244 Determination Page 4 of 7
Issues
16. Whether the FSP clearly informed the Applicant of the terms of the policy
prior to the contract being entered into.
17. Whether the FSP was entitled to decline the claim pursuant to the terms of
the policy.
Reasons for decision
18. As advised to the parties, FOS has considered it appropriate to refer this
dispute directly to a Panel in accordance with the FOS Terms of Reference.
This is due to the circumstances of the dispute. This dispute has not been
the subject of a FOS Recommendation and has proceeded directly to
Determination.
19. This decision has been made by a Panel consisting of an Ombudsman and
two Panel members with extensive experience in the insurance industry and
consumer claims.
20. A full exchange of information has taken place between each party and each
party has had the opportunity to address any issues raised.
21. There are two separate issues involved in this dispute, the first being
whether the FSP clearly informed the Applicant of the policy terms before the
contract was entered into and the second being whether the cause of the
loss has been correctly classed as flood and therefore excluded from cover.
The Panel proposes to deal with each issue separately below.
Sections 35 of the Act
22. To satisfy the provisions of Section 35 of the Act to clearly inform, the policy
wording must be clear and unambiguous such that a person of average
education and intelligence is likely to have little difficulty in finding and
understanding the relevant policy provisions.
23. It is generally accepted it is not reasonably practical to verbally inform an
insured of all of the policy terms and conditions where the policy is incepted
via telephone, and provision of the PDS within 14 days is deemed to have
satisfi ed the requirements of the Act to „clearly inform‟ of the terms of cover
before the contract was entered into.
24. The FSP has provided confirmation including a transcript and call recording
of the initial sales call, to show that whilst it does not detail all of the policy
terms during the inception conversation, it does highlight the particular
exclusion for flood in the terms of the policy.
25. The Applicant has not commented on the policy inception call recording
although he has denied he was ever provided with a copy of the PDS.
Case No: 319244 Determination Page 5 of 7
26. The FSP has provided a detailed summary of its mailing procedures and
documentation that explains the process for sending the policy documents
and evidence that certain documentation was sent in connection with the
Applicant‟s policy .
27. After reviewing the material provided, the Panel is persuaded on the balance
of probabilities that the FSP had a process in place for sending the policy
documentation and that it did send the documents to the Applicant‟s last
known address at the time the policy was taken out.
28. The material provided indicates there were no issues with processing of the
Applicant‟s policy documentation, meaning there is no evidence that a
system failure occurred during the process. Further, the FSP has no
evidence of any of the documentation it sent to the Applicant being returned
to it.
29. On the basis of the available information, the Panel accepts that the FSP did
meet its obligations under the Act to send the policy documentation to the
Applicant‟s last known address.
30. Further, the Panel accepts the policy terms are clear and unambiguous in
that the policy clearly excludes loss or damage arising from flood under both
the storm event specific exclusions and the general exclusions.
31. On this basis, the Panel is satisfied the FSP has fulfilled its obligations
pursuant to the Act to clearly inform the Applicant of the terms of the policy
and it is therefore entitled to rely on those terms when assessing the
Applicant‟s claim.
W’s report
32. The FSP bases its decision to decline the cla im on W‟s report. W‟s report of
15 March 2013 provides the following relevant information:
The risk house is located on the southern side of the road and slopes
down from front to rear, being approximately a 0.4metre slope;
The lower level of the premises has a floor level similar to surrounding
ground level and was inundated to a depth of approximately 0.8metre
above floor level;
The house is located approximately 100 metres to the west of Thozets
Creek, which is a minor tributary of the Fitzroy River;
Thozets Creek has a defined bed with banks and would be considered
to be a watercourse, which flows in a south-westerly direction from the
head of the catchment and there is no defined local catchment draining
at the subject property;
The closest rainfall stations to the subject premises are located 7.3km
(Rockhampton) and 24.1km (South Yaamba) respectively;
During the period 23 January – 4 February 2013, the total rainfall
recorded at Rockhampton was 546.6mm and 421.2 at South Yaamba;
Case No: 319244 Determination Page 6 of 7
However the recorded data was incomplete as there is no hourly data
recorded for the period from 1300 on 25 January to 0900 on 26
January at Rockhampton although there is a cumulative total for this
period of 32.6mm;
The cumulative total for South Yaamba for the same period was
22.6mm;
Rainfall effectively ceased at between 2300 and 0200 on 26 January
2013 at both stations;
Examination of the rainfall data for the Rockhampton station shows the
rainfall for the 24 and 48 hour storm durations were a greater than 100
years storm;
The water level in the Fitzroy River reached a peak level of 7.15mAHD
(8.6mGH) at approximately 0900 hours on 2 February 2013 and
remained at this height until 0300 hours on 3 February 2013;
According to the Bureau of Meteorology (BoM) the peak of the January
2013 flood event exceeded the „major‟ flood trigger level of 8.5mGH in
Rockhampton;
Waters in the Fitzroy River reached the „moderate‟ flood trigger level
(7.5mGH) at 0200 on 27 January 2013;
No significant rainfall was recorded in the Rockhampton area after
2300 hours on 26 January 2013;
The Applicant‟s version of events is generally consistent with the
rainfall and weather data for the Rockhampton region;
The peak hourly rainfall intensity of 34.6mm/hr was recorded at
Rockhampton in the hour to 2015 on 24 January 2013, and therefore
the peak stormwater runoff at the subject property would have occurred
within about 60 minutes of the peak rainfall intensity;
The subject property was not inundated until approximately 0930 hours
on 25 January 2013 – more than 12 hours after the peak rainfall was
recorded;
There is no defined local catchment draining to the subject property
therefore the property could not have been inundated by stormwater
runoff;
The inundation of the property was caused by floodwaters fro m
Thozets Creek which overflowed into the rear of the subject property.
33. Accordingly, W‟s report is clear in stating the cause of the damage to the
property was due to floodwaters from Thozets Creek inundating the property,
after the creek broke its banks and water from it flowed over normally dry
land.
Applicant’s evidence
34. The Applicant disputes the findings of W‟s report, stating the report contains
a number of factual errors and does not account for the drains that became
blocked. The Applicant has provided a number of photographs of the
inundation of the premises in support of his case.
Case No: 319244 Determination Page 7 of 7
35. The Panel has considered the photographs provided by the Applicant and
accepts these accurately depict the inundation event at the Applicant‟s
property. However, they do not provide evidence to support the Applicant‟s
assertion that the water originated from stormwater runoff nor do they depict
the drainage outlet the water is alleged to have originated from.
36. The Applicant has also argued that W incorrectly identified the watercourse
as „Thozets Creek‟ when it is actually known as „Frenchman‟s Creek
catchment‟. Irrespective of the actual name, it is clear to the Panel that W
has clearly and correctly identified the watercourse which overflowed and as
such his report can be relied upon.
37. The street view photograph taken at 10.09am on 25 January 2013 facing
towards Thozets Creek clearly shows the creek overtopping its banks, and
the water flowing into the immediate area, which is the lowest part of the
road. It is noted the App licant‟s property is situated in the lowest part of the
street.
38. The Panel accepts W is appropriately qualified to comment on the cause of
the damage and in the absence of any conflicting information, the Panel
considers it can accept W‟s evidence.
39. Cruciall y, W‟s evidence does not support the Applicant‟s contention that the
water inundating the property originated either wholly or partially from
stormwater runoff from a blocked drain.
40. Accordingly, after considering all of the available evidence before it, the
Panel concludes the water which inundated the Applicant‟s premises
originated from Thozets Creek. The water has flowed across normally dry
land as a result of Thozets Creek breaking its banks, a situation which meets
the policy definition of „flood‟. As loss or damage arising from flood is
specifically excluded from the terms of the policy, the Panel finds the FSP is
entitled to rely on the policy exclusion to defeat the claim.
Determination
41. On the basis of the available information the Panel determines the FSP was
entitled to decline the claim, pursuant to the terms of the policy.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.