Roof damage claim denied; cash settlement based on trade quote; make-safe asbestos exposure
Text of the determination
Case No: 319066 Determination Page 1 of 21
Case number: 319066
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Claim amount
General Insurance - Domestic Insurance - Home Building - Service - Service
quality
27 February 2014
Summary
Description
This dispute concerns a claim by the Applicants for damage to their
property caused by a storm. The FSP cash settled the Applicants for some
of the claimed damage, but denied liability for the remainder (including
damage to the roof) on the basis that this was not caused by the storm.
The Applicants dispute the FSP’s decision in relation to the roof. They are
also dissatisfied with the amount of the cash settlement and the manner in
which the FSP has handled their claim.
Basis of Determination
The available information establishes that the damage to the roof was not
caused by the storm but by factors such as wear and tear, gradual
deterioration and lack of maintenance, which are excluded under the
policy.
In circumstances where the cash settlement was based on trade prices
and the FSP’s builder had refused to undertake the works for the
Applicants directly, the cash settlement was insufficient to fully indemnify
the Applicants.
The FSP and the Applicants share responsibility for any additional damage
which has occurred to the property since the insured event – the
Applicants, because they have not taken any steps to mitigate further
damage and the FSP, because the cash settlement was insufficient to
allow the repairs to be fully completed.
The Applicants have suffered stress and anxiety as a result of being
exposed to asbestos due to the manner in which the FSP’s contractor
undertook the make safe works. However, in all other respects, the FSP
has managed their claim appropriately.
Determination
Case No: 319066 Determination Page 2 of 21
Determination
The FSP is to i ncrease the cash settlement to reflect, among other things:
a. its liability for 50% of the additional damage to the property which has
arisen since the insured event;
b. an uplift of 25% to ensure that the Applicants have sufficient funds to
complete the necessary repairs; and
c. an amount of $1,000 to compensate the Applicants for stress caused
as a result of being exposed to asbestos.
Background
1. The Applicants held a home building and contents insurance policy with the
FSP which provided cover for their residential property. The policy was
current at the time of the loss.
2. On 29 January 2013, the Applicants lodged a claim under the policy for
damage sustained to their home when water leaked through the roof during
a State wide storm several days earlier.
3. After assessing the damage, the FSP paid the Applicants a cash settlement
for the costs of repairing water damage to the interior of their property.
However, the FSP denied liability for the costs of repairing the roof, on the
basis that the damage to the roof was not caused by the storm, but was due
to wear and tear and lack of maintenance.
4. The Applicants are dissatisfied with the cash settlement offered by the FSP
and are also unhappy with the manner in which the FSP has handled their
claim.
Summary of Applicants ’ position
5. The Applicants say that the FSP should indemnify them for the costs of
repairing the roof because they have obtained their own report from a
qualified roofer which confirms that the roof was damaged by the storm and
also shows hail damage. The roof suffered further damage as a result of the
actions by the FSP’s contractors.
6. The Applicants say that the cash settlement offered by the FSP for the water
damage to the interior of their property is insufficient because:
the settlement amount is based on a quotation provided by the FSP’s
builder (“C”) which is a trade price, not a retail price. The Applicants are
unable to get the work done for the same price and should not have to
pay extra for the repairs;
Case No: 319066 Determination Page 3 of 21
the scope of works prepared by C omits certain items which were
damaged in the storm and as a result of the FSP’s actions during the
claim process; and
they do not believe the scope of works and quotation adequately cover
the cost of removing asbestos, which cannot be mixed with general
waste and needs to be disposed of separately.
7. The Applicants acknowledge that the FSP has paid them the sum of $13,950
for temporary accommodation. However, the Applicants feel that the FSP did
not provide appropriate assistance to help them obtain long term rental
accommodation. Given their financial situation, they were unable to obtain
appropriate accommodation and have had to crowd into a relative’s house
for the last eight months.
8. The Applicants are also unhappy with the make safe works carried out by
the FSP’s contractors on various occasions. In particular, the Applicants say
that the FSP has not appropriately compensated them for exposure to
asbestos due to the actions of one of its contractors. They also want the FSP
to indemnify them for furniture which was broken during the course of the
make safe repairs.
9. The Applicants are dissatisfied with the manner in which the FSP has
managed their claim as a whole. They say that the FSP failed to appoint a
dedicated client manager, which meant that they have had to repeatedly
explain their story to new people. The FSP also failed to return their calls
and did not settle their claim in a timely manner, which has caused them
financial distress.
10. The Applicants say that the FSP has committed multiple breaches of the
General Insurance Code of Practice (the Code) and has possibly also
breached its obligation to act with utmost good faith under section 13 of the
Insurance Contracts Act 1984 (the Act).
Summary of FSP’s position
11. The FSP says that the roof of the Appl icants’ property was not damaged by
the storm or any other insured event. The roof is aged and shows signs of
deterioration. Accordingly, the damage to the roof falls within the policy
exclusions for damage caused by lack of maintenance and/or wear and tea r.
12. In relation to the cash settlement, the FSP says that:
under the terms of the policy, it is entitled to choose how to settle the
Applicants’ claim. In the circumstances, it considered that it was
appropriate to cash settle the Applicants’ claim for th e resultant
damage to the interior of their home, due to difficulties in dealing with
the Applicants and because the property was undergoing renovations
at the time of the storm;
Case No: 319066 Determination Page 4 of 21
where the FSP decides to cash settle, the policy says that the
settlement amount will be based on the amount it would have cost the
FSP to undertake the repairs. In this case, it has shown that it could
have undertaken the repairs for the amount quoted by C; and
accordingly, the cash settlement is sufficient to fully discharge its
liability under the policy.
13. The FSP says that it provided the Applicants with an appropriate cash
settlement for temporary accommodation. The cash settlement was
equivalent to thirty weeks of temporary accommodation, even though the
repairs were estimated to take only eight weeks. The FSP says that, as this
aspect of the claim was cash settled, it was not responsible for arranging
accommodation for the Applicants.
14. The FSP believes that it has managed the Applicants’ claim appropriately
and in a timely manner. The FSP says that:
the Applicants had unrealistic expectations as to how quickly their claim
would be progressed and how frequently they would be provided with
updates. Further, the Applicants were difficult to deal with and behaved
poorly to the FSP’s staff; and
it acted appropriately to deal with the unfortunate incident where its
contractor drilled into an asbestos sheet. It has also offered the
Applicants an ex-gratia payment of $500 towards the costs of medical
tests to confirm that they were not affected by exposure to asbestos.
Issues
15. Whether the cash settlement provided by the FSP satisfies its obligations
under the policy in relation to the Applicants’ claim.
16. Whether the Applicants are entitled to compensation for the manner in which
the FSP has managed their claim.
Reasons for decision
17. I am satisfied that there has been a full exchange of information between the
parties and that each party has had an opportunity to address any issues
raised therein.
18. The Applicants’ policy provides c over for loss or damage caused by certain
specified insured events, including the insured event of “storm, lightning, hail
or rainwater”. This cover is provided subject to any applicable exclusions.
19. The FSP does not dispute that the Applicants’ home was d amaged in a
storm on or around 26 January 2013 and has accepted liability for certain
aspects of their claim. However, a number of other items remain in dispute.
Case No: 319066 Determination Page 5 of 21
Roof repairs
20. The Applicants say that the FSP should indemnify them for the damage to
their roof, on the basis that this damage was caused by the storm. They say
that the fact that the roof allowed water to enter the property during the storm
means that it was effectively damaged by the storm. There is also hail
damage to the roof which proves that it was damaged in the storm.
21. The FSP says that the damage to the roof was not caused by the storm or
by any other insured event. The FSP says that the roof was in a deteriorated
state prior to the storm with evidence of holes and rust and some lifted roof
sheets. It believes that the roof has been in place since the residence was
originally constructed and therefore is over 80 years old and has simply
reached the end of its serviceable life.
22. Accordingly, the FSP says that the damage to the roof falls within exclusions
under the policy for:
wear and tear, lack of maintenance or inherent defect, including
gradual deterioration; and/or
rust, corrosion, mould, mildew, wet or dry rot, rising damp and damage
caused by the Applicants’ failure to keep their home in good order and
repair.
23. In support of its position, the FSP relies on reports prepared by two of its
contractors (R and C). After the Applicants lodged their claim, the FSP
appointed R to inspect the damage and undertake make safe repairs. R
attended the property on 1 February 2013 and reported that:
high winds and rain during the storm had caused water to blow up and
under the roof flashings and leak into the roof cavity; and
the bitumen stick on the flashings on the flat colour bond area of the
roof required maintenance repairs or replacement prior to internal
repairs commencing.
24. The annotated photographs attached to R’s report indicate that R considered
that rainwater had blown under the roof flashings in both the old (corrugated
iron) and new (colour bond) sections of the roof.
25. After the Applicants disputed R’s findings, the FSP arranged for its builder
(C) to attend the property and provide a second report in relation to the
damage to the roof. C’s report dated 9 March 2013 states that:
an inspection of the roof above the water damaged entry, kitchen and
lounge room revealed an attached lower level bull nose roof section
and an attached lower roof;
the roof sheeting was believed to be the original roof installed when the
house was constructed approximately 80 to 90 years earlier (except for
the lowest section, where corrugated roof sheeting had been used
more recently);
Case No: 319066 Determination Page 6 of 21
the areas of concern in the section of the roof that had leaked included
rusted roof sheets, lifted roof sheets, loose fixings and sleeve roof
sheeting. Other areas of the roof that had not leaked showed similar
signs of age and wear and tear. These sections also had rusted and
lifted roof sheets, with fixings that had “let go”;
the Applicants should seek the services of a qualified roof plumber to
have the bull nosed section of the roof replaced to prevent water entry
during future storms. The roof sheets in this area were showing
considerable age and wear and tear and required replacement;
the area of the lower roof where water entry had occurred to the
entry/bathroom areas required maintenance to the flashings to prevent
water entry during future storms; and
the Applicants had advised that water had not entered the property
during normal rainfall conditions. Accordingly, the maintenance
recommendations were intended to prevent the entry of water under
conditions similar to the recent storm event.
26. The Applicants have provided a report from their own roofer (“B”) dated
29 June 2013, which states that:
the sheets on the main section of the roof were in fair condition for their
age. However, due to the roof having being painted many years ago,
the hail storms had caused dents which have rusted and caused the
paint to flake off which made the roof appear to be in worse condition
than it was;
the whirly birds had hail dents and there was also damage to the ridge
capping, satellite dish and flashings;
the heavy wind and rain had pulled nails up and pulled the timber
battens away from the rafters causing a spongy effect. Water had
entered the ceiling cavity due to high winds and rain;
the flashing over the entry was in good condition with hail dents which
had caused the silicone to pull away from the wall. The flashing was
undersealed and should be replaced with metal;
the roof should be “reroofed” to fix the spongy effect on the battens and
rafters, by screwing timber battens to the main rafters; and
the damage had been caused through storms a nd some age as shown
in the attached photographs.
27. The Applicants have also provided a quote for the roof repairs from a second
roofer (“A”) for replacing the roof sheeting of the curved roof at the rear of
the property. The quote states that this is requi red to repair “storm damage”
but does not provide any indication of how or on what basis A determined
that the relevant damage had been caused by a storm. Accordingly, it is of
little assistance in determining the cause of the damage to the roof.
28. The Appl icants say that B’s report should be preferred over the reports of the
FSP’s contractors, as B is a qualified roofer, whereas the FSP’s contractors
Case No: 319066 Determination Page 7 of 21
are not. While I accept that B is adequately qualified to provide an opinion as
to the cause of the damage to the roof, I consider that it is also appropriate
to have regard to the views expressed by the FSP’s contractors. The FSP
has confirmed that the contractor (C) who inspected the roof is a qualified
site supervisor who holds a trade certificate in carpentry including roof
framing and roof cladding systems.
29. I have carefully considered the reports provided by the parties, together with
the photographs of the damage to the roof included therein. I note that:
t he reports provided by the FSP’s contractors (R and C) clearly state
that the roof was in poor condition prior to the storm, with evidence of
gradual deterioration and wear and tear (including rusted and lifting roof
sheets) and a need for maintenance to ensure that the roof was
watertight. C also considered that the older sections of the roof required
replacement; and
the report provided by the Applicants ’ roofer (B) identifies the cause of
the damage to the roof as “storms and a bit of age”. B also refers to the
roof having been painted many years ago and suffering subsequent
hail damage. However, it is not clear to what extent B attributed the
damage to the specific storm events of January 2013 (as opposed to
other weather events over the years).
30. At law, the Applicants bear the onus of establishing that, on the balance of
probabilities, the damage to the roof has been caused by a risk insured
under the policy. If the Applicants are able to establish this, the onus then
shifts to the FSP to show that, on the balance of probabilities, the loss falls
within an exclusion clause under the policy.
31. Having reviewed the various photograp hs of the damage to the roof, I
consider that this damage is more consistent with having occurred gradually
over the life of the roof, than having been caused by the storms of January
2013. The photographs depict an aged roof, with gaps in the roof sheeting
and flashing, flaking paint and a number of holes and rusted areas.
32. While the Applicants dispute the FSP’s statement that the roof is over 80
years old, even if I accept their position that the house was not constructed
until the 1940’s this would still mean that the roof is at least 60 to 70 years
old. While the Applicants have stated that bull nose roofs were not
constructed before 1967, they have not provided any independent
information to support this, or to otherwise disprove C’s opinion that the roof
was part of the original construction.
33. The Applicants say that the fact that the roof allowed water to enter the
property during the storm establishes that the damage to the roof was due to
the storm. I do not accept that this is the case. In order for the damage to the
roof to be covered under the policy, the Applicants must establish that the
proximate or underlying cause of the damage was the wind or rain itself (for
example, if roof sheets which were previously firmly secured became
detached as a result of the wind).
Case No: 319066 Determination Page 8 of 21
34. As outlined above, I consider that the available information indicates that the
storm merely highlighted existing problems with the roof, when the heavy
winds blew rain through areas of the roof which were not watertight.
Accordingly, the storm itself was not the proximate or underlying cause of
the damage.
35. The Applicants say that R caused further damage to the roof by walking on it
during the make safe - in particular, they say that they saw the ceiling flexing
when R “bounced” on the roof to test its integrity. The Applicants also say
that C damaged the roof by drilling into it from the inside.
36. There is no independent information to support the Applicant s’ belief that R
caused further damage to the roof. I note that the report provided by the
Applicants’ own roofer (B) does not identify any damage to the roof caused
by foot traffic or drilling, nor do the photographs included with B’s report
reflect any damage of this nature.
37. For the reasons outlined above, I consider that the Applicants have failed to
establish that, on the balance of probabilities, the damage to their roof was
caused by the storms which occurred on or around 26 January 2013. The
available information suggests that the condition of the roof had significantly
deteriorated to the extent that it was no longer watertight prior to the storm
(whether or not any leaks were evident at that stage). Accordingly, I consider
that the FSP was entitled to deny the Applicants ’ claim for the roof repairs on
the basis that the claimed damage was not caused by the storms (or any
other insured event) and/or fell within the policy exclusions for wear and tear,
gradual deterioration and lack of maintenance.
38. The report provided by the Applicants’ roofer identified hail damage to the
whirly bird and other parts of the roof. I note that reports of the heavy storms
in the area of the Applicants’ property on or around 26 January 2013 do not
refer to any significant hail events.
39. Since the Applicants lodged their dispute with FOS, they have lodged a
separate claim with the FSP for hail damage to the roof. In order to assess
this claim, the FSP appointed an experienced roofing expert (“MR”) to
inspect the roof and assess the damage. The Applicants have provided
video and audio footage of this inspection.
40. In his report dated 14 January 2014, MR noted that the purpose of his
inspection was to assess the condition of the pitch roof on the main part of
the house, and the Applicants had asked him not to make any comments in
relation to the rest of the roof, including the front skillion roof over the entry
and the bull nose skillion roof at the rear. In his report, MR identified some
hail damage to the roof, but also noted maintenance and design issues.
41. The Applicants’ claim for hail damage is subject to ongoing consideration by
the FSP, and therefore is outside the scope of this Determination. In relation
to the current dispute, I note that there is nothing i n MR’s report which alters
my findings (although the utility of the report in this respect is somewhat
Case No: 319066 Determination Page 9 of 21
limited, given the restrictions which the Applicants appear to have placed on
MR’s inspection).
Cash settlement
42. The FSP says that it elected to cash se ttle the Applicants’ claim (rather than
undertake repairs), due to advice from its builder (C) that the Applicants
were in the process of carrying out renovations when the storm occurred. C’s
report states that, when he attended the property on 6 March 2013,
renovations to the bathroom, second living room and second kitchen
remained partially complete.
43. The FSP also says that it was appropriate to cash settle the Applicants ’
claim as they had been unco-operative throughout the claim process and
had made various allegations about the integrity and expertise of the FSP
and its contractors. Accordingly, the FSP considered that there was likely to
be further conflict should it attempt to undertake repairs.
44. The Applicants initially disputed the FSP’s decision to c ash settle their claim,
but have subsequently confirmed that they no longer dispute this aspect of
the claim. However, they remain dissatisfied with the amount of the cash
settlement, as they consider that it is not sufficient to enable them to
undertake the necessary repairs. Further, they say that the scope of works
prepared by the FSP’s builder (C) does not include all items which were
damaged by the storm.
Terms of policy
45. The Applicants’ policy includes the following wording in relation to the
manner in which the FSP will settle claims for property damage:
“... we decide whether we will:
• repair damage; or
• replace your home [or] contents ...; or
• pay you what it would cost us to repair or replace your home [or] contents
...; or
• pay you the relevant sum insured.
If we agree to pay you the cost of repair or replacement, we will reduce the
amount we pay by an amount equal to any trade discount that we would have
obtained from a supplier, had we chosen to repair or replace your items. ”
46. While this as pect of the claim is no longer disputed, I note that the FSP’s
decision to cash settle the claim was in accordance with the terms of the
policy, which provide the FSP with the discretion to determine which of the
approaches outlined in the policy will be used to settle a claim in any
particular case.
Case No: 319066 Determination Page 10 of 21
Amount of cash settlement
47. The FSP paid the Applicants a cash settlement of $29,278.28 on 4 April
2013. The amount of the cash settlement paid to the Applicants was
determined based on a quotation provided by t he FSP’s builder (C) for the
costs of repairing the storm damage to the interior of the property, for which
the FSP had accepted liability. The cash settlement was subsequently
increased by:
an additional amount of $2,069.10 for the costs of replacing vinyl
flooring in the lounge room which had been inadvertently omitted from
the original quote; and
an additional amount of $1,582.90 for the costs of removing and storing
the Applicants’ contents while the repairs were carried out.
48. The FSP has advised that the initial cash settlement of $29,278.28
inadvertently included an amount of $5,837.04 for the replacement of floor
tiles in the second living and second kitchen areas. Although C had
confirmed that these tiles did not show any signs of damage, the releva nt
repairs were included as an additional item in the scope of works, on the
basis that the tiles may lift in the future. The FSP has advised that this
amount was mistakenly included in the cash settlement paid on 4 April 2013,
which should only have covered items with confirmed damage. The FSP has
previously advised the Applicants that it will not seek a refund of this amount,
as it has already been paid.
49. The Applicants say that:
the quotation provided by C is a “trade price”, which is not available to
them as retail consumers;
C has refused to undertake the works for the Applicants and they are
unable to get the work done by another builder for the same price; and
they cannot afford to pay extra for the repairs, nor should they have to.
50. The FSP says that:
the terms of the policy provide that, where it decides to cash settle a
claim, it is entitled to determine the cash settlement based on the
amount which it would have been required to pay to undertake the
repairs (which in this case, is the amount quoted b y C); and
the terms of the policy clearly and unambiguously state that the amount
of the cash settlement may be reduced to reflect any trade discounts
available to the FSP.
51. The FSP has confirmed that C will not undertake the works for the
Applicants as C i s an “insurance - only” builder and furthermore, does not
wish to deal with the Applicants due to the manner in which they have
behaved during the claim process.
Case No: 319066 Determination Page 11 of 21
52. I note that the Applicants have not provided any information to support their
position that they are unable to have the repairs completed by another
builder for the cash settlement amount. While they have provided their own
quotes for certain limited aspects of the repairs (for example, the kitchen),
they have not provided quotes for the whole of the repairs.
53. However, in the circumstances, I am prepared to accept that, on the balance
of probabilities, the Applicants will be unable to find another builder to
complete the repairs for the cash settlement amount, having regard to the
substantial discounts and rebates available to insurers from their contractors,
due to the significant volume of work provided.
54. I accept that the terms of the policy state that the FSP is entitled to reduce
the cash settlement by the amount of any trade discounts. However, in
circumstances where the FSP’s builder has refused to carry out the works
for the Applicants, I consider that it would be unfair in all the circumstances
to allow the FSP to rely on this provision. The fundamental purpose of a
policy of insurance is to indemnify the insured for loss or damage caused by
an insured event. The FSP has accepted liability for the storm damage to the
interior of the Applicants’ property and is therefore obliged to ensure that the
Applicants are appropriately indemnified by being put back in the position
they were in prior to the insured event. Accordingly, it would be inconsistent
with the fundamental purpose of the policy to allow the FSP to settle the
Applicants’ claim for an amount which is insufficient to enable them to full y
repair the damage, in circumstances where the FSP’s contractor is not
willing to carry out the repairs.
55. I note that, as C is an insurance-only builder and therefore does not
ordinarily accept work from retail consumers, it is possible that the
Applicants would have been in the same position regardless of their alleged
behaviour during the course of the claim.
56. Accordingly, I consider that the FSP should not be entitled to rely on the
quotation provided by C for the purpose of determining the cash settlement
amount.
57. It is clear from the history of this claim that the relationship between the
parties has irrevocably broken down and that the Applicants are extremely
distrustful of the FSP’s panel contractors. Accordingly, I do not consider that
it is practical to require the FSP to arrange a quote from a builder who is
prepared to carry out the repairs for the Applicants directly.
58. Accordingly, in order to ensure that the Applicants are appropriately
indemnified under the policy, I consider that it is fair i n all the circumstances
for the cash settlement paid to the Applicants to be increased to allow for the
Applicants’ inability to access trade prices and to provide a buffer for any
additional work required. I consider that an increase of 25% should be
sufficient in this regard.
59. However, prior to applying this uplift, I consider that the FSP should be
entitled to deduct the amount of $5,837.04 included in the initial cash
Case No: 319066 Determination Page 12 of 21
settlement for replacing the tiles in the second living and second kitchen
areas. Based on the reports provided by the FSP’s builder (C), I am satisfied
that the FSP was not obliged to indemnify the Applicants in relation to these
tiles.
60. The Applicants also say that the existing scope of works is inadequate and
does not cover all the works required to repair their property. Accordingly, I
will now consider whether the existing scope of works needs to be expanded
to address the Applicants’ concerns.
Scope of works
61. During a discussion with the FOS Case Manager on 28 November 2013, the
Applicants advised that their main concerns in relation to the scope of works
are that:
some items at the property have become contaminated with mould, as
the FSP did not undertake adequate mould remediation. These items
will require repair/replacement, which is not currently provided for in the
scope of works;
due to the delay in repairs commencing, many of the items listed by C
as suitable for re-use (such as the kitchen cabinets) have now
deteriorated to the point that they are no longer salvageable and will
need to be replaced; and
it does not adequately provide for the cost of removing asbestos from
the property.
62. I have reviewed the available information to determine what measures have
been taken to date to address mould issues at the property. In this regard, I
note that:
when the FSP’s assessor attended the property on 20 February 2013,
he reported that it would be necessary for a builder to attend and
remove the mould affected ceilings downstairs, because the female
Applicant was highly allergic to penicilli n. It appears that these ceilings
were subsequently removed;
when the male Applicant advised the FSP on 5 March 2013 that his
wife was suffering from breathing problems as a result of ongoing
mould issues, the FSP advised that it could arrange for mould
remediation;
when the FSP’s builder (C) attended the property on 9 March 2013, he
reported that there was mould growth evident in the downstairs area;
on or around 1 April 2013, the FSP’s restorer (F) re -attended the home
on the FSP’s instructions to repo rt on the mould and air quality and
advise whether the property was in a liveable condition. F advised the
FSP that the property could not be made liveable;
in a letter to the Applicants dated 26 April 2013, the FSP advised that C
had confirmed that the mould growth was not significant enough to
Case No: 319066 Determination Page 13 of 21
have an impact on any of the furniture on the second level of the
property and that the minor mould growth on the lower level would die
down as the area dried out, and any remaining concerns could be
treated with a ntimicrobial spray (as provided for in C’s scope of works);
and
in a letter to the Applicants dated 13 May 2013, the FSP advised that,
in the event that further mould remediation was required at the end of
the repair process, the FSP will reassess this issue at the relevant time.
63. I consider that the available information clearly establishes that the FSP
accepted that there were mould issues at the property as a result of the
insured event and was advised by its contractor (F) that the property was not
habitable on this basis. It is not clear what measures (if any) were taken to
address the issue of mould in the interim period before repairs commenced.
Further, while it appears that the FSP considers that the measures proposed
in the current scope of works should be adequate to address the mould
issue, it has also acknowledged that further works may be required.
64. The Applicants say that the mould situation has continued to worsen over
time, but have not provided any photographs to confirm this. They have
provided a copy of a report dated 13 May 2013 from a mould specialist (“M”)
which refers to the ongoing presence of visible mould and a musty odour in
the Applicants’ property and outlines steps which should be taken to
investigate the problem further. However, the FSP says that M (who is one
of its panel contractors) has since confirmed that he based his report solely
on information provided by the Applicants and did not actually inspect the
property.
65. In its Additional Notice of Response dated 24 October 2013, the FSP
acknowledges that it is not clear whether mould is present and if so, whether
this is as a result of the insured event or is due to the Applicants ’ failure to
mitigate their loss by undertaking the necessary repairs to their property. The
FSP has offered to arrange for an independent hygienist to inspect the
property in order to determine these issues.
66. The Applicants also say that the kitchen cabinets have deteriorated to the
extent that they can no longer be reused as part of the repair process. While
the Applicants have not provided any information to support this, I accept
that this is certainly possible, in circumstances where it appears that no
repairs (other than the make safe works authorised by the FSP) have been
undertaken since the insured event occurred in January 2013.
67. In their submissions, the Applicants also say that their property has been
infested by vermin (rats or mice) since the insured event.
68. In the circumstances, I consider that it is appropriate for the FSP to appoint
suitably qualified independent contractors to determine the extent of further
damage to the Applicants’ property from mould, deterioration of kitchen
cabinetry and vermin. In doing so, the contractors should have regard to the
reports and photographs prepared when the damage was initially assessed.
Case No: 319066 Determination Page 14 of 21
69. As part of this process, the contractors should prepare a scope of works and
a quotation for the repair of the additional damage and should also provide
their opinion as the extent to which the additional damage has bee n caused
by:
any inadequacies in the make safe repairs (including mould
remediation) authorised by the FSP; and
the passage of time (and the absence of repairs) since the insured
event occurred.
70. To the extent that it is identified that any additional damage has arisen as a
result of inadequacies in the make safe works authorised by the FSP, I
consider that the FSP should bear the full costs of repairing any such
damage.
71. To the extent that it is identified that a ny additional damage has arisen as a
result of the passage of time since the insured event occurred, I consider
that liability for the costs of repairing such damage should be shared
between the Applicants and the FSP. In this regard, I note that:
the Applicants have failed to commence repairs during the nine month
period since the FSP paid them the cash settlement in April 2013
(some nine weeks after the claim was lodged). It appears that this was
due to their belief that, if they did so, they would be deemed to have
accepted the FSP’s cash settlemen t in full and final settlement of their
claim;
the policy clearly states that the Applicants have an obligation to
prevent any further damage to their property and also provides that any
cash settlement will not be increased to reflect increased costs arising
from the passage of time, where repairs are not commenced within a
six month period; and
while the Applicants appear to have acted under a genuine belief that
they should not commence repairs until their dispute had been
resolved, the FSP’s letter date d 4 April 2013 (which enclosed the
settlement cheque) clearly stated that the Applicants were entitled to
bank the cheque even if they wanted to dispute the FSP’s decis ion and
confirmed that the FSP would not be responsible for further costs if
they failed to do so.
72. In these circumstances, I consider that the Applicants should bear some
responsibility for any additional damage which has occurred as a result of
the passage of time since the insured event occurred (noting that they were
not in a position to undertake repairs until the FSP paid them the cash
settlement).
73. However, I consider that the FSP should also bear some responsibility for
this damage, in circumstances where I have determined that the cash
settlement paid by the FSP was unlikely to have been sufficient to enable the
Applicants to have the necessary repairs completed.
Case No: 319066 Determination Page 15 of 21
74. Having regard to what is fair in all the circumstances, I determine that the
cost of any additional damage to the property from mould, deterioration of
kitchen cabinetry and vermin (and which is due to the passage of time),
should be borne by the FSP and the Applicants equally.
75. Once the assessment process outlined above has been completed, the FSP
should arrange for the scope of works prepared by C to be updated to
include any additional repairs required, and the cash settlement amount
adjusted accordingly.
76. I note that the Applicants say that the existing scope of works does not
adequately provide for the removal and disposal of asbestos at the property.
However, the FSP has confirmed with the builder (C) who prepared the
scope of works that this was appropriately taken into account. The
Applicants have not provided any independent information to support their
claim and in the circumstances, I consider that it is appropriate to rely on C’s
views on this matter. Accordingly, I do not consider that the scope of works
requires revision in this respect.
Make safe works
Asbestos contamination
77. The Applicants say that, in the course of carrying out the make safe works,
one of C’s contractors drilled holes in sheeting that contained asbestos,
despite being warned by the Applicants not to do so. This resulted in
asbestos fibres being released into the air. The Applicants are concerned
about the long term health implications of being exposed to asbestos and
seek further compensation from the FSP.
78. The FSP acknowledges that its contractor inadvertently drilled a screw
through a beam into a sheet of asbestos and has apologised to the
Applicants for this event and any resulting distress. However, the FSP
considers that it has adequately addressed the issue by:
immediately placing the Applicants in temporary accommodation;
arranging for the property home to be treated by a licensed asbestos
removal contractor;
arranging for scientific testi ng of the Applicants’ home for airborne
asbestos following the decontamination treatment, which confirmed
that no asbestos fibres were present;
offering to cover the cost of further testing using a laboratory of the
Applicants’ choice; and
offering the Applicants $500 to offset the costs of consulting a
respiratory specialist and obtaining advice in relation to asbestos
exposure.
79. I have reviewed the report/s provided by the scientific laboratory (“O”) which
the FSP engaged to test the property for asbestos both before and after the
Case No: 319066 Determination Page 16 of 21
decontamination process. O’s report confirms that samples taken when it
first attended the property on 28 February 2013 detected asbestos fibres in
the living room and in the Applicants’ vacuum cleaner (which they had used
to clean up the debris). However, tests conducted on 4 March 2013 (after the
decontamination process) showed no traces of asbestos. A representative
from the Queensland Department of Workplace Health and Safety has also
inspected the property and confirmed that the decontamination measures
adopted were appropriate.
80. While the Applicants remain apprehensive of potential asbestos fibres in the
home, they have not provided any information to suggest that the measures
taken by the FSP were inadequate or that the property remains
contaminated by asbestos. The Applicants have rejected the FSP’s offer of
further testing.
81. The asbestos contamination was an extremely unfortunate occurrence which
occurred solely as a result of actions by the FSP’s contractors. However, in
the circumstances, I am satisfied that the FSP acted quickly and decisively
to address the issue and that its response was appropriate in the
circumstances.
82. However, I am satisfied that the Applicants and their family were potentially
exposed to asbestos for several days and that they have suffered
considerable stress and anxiety as a result. In the circumstances, I consider
that it is appropriate that the FSP compensate the Applicants for the non-
financial loss they suffered.
83. While the cover provided under the Applicants’ policy excludes
consequential loss arising from an insured event, I do not consider that this
prevents the award of compensation as a result of non-financial loss suffered
by the Applicants due to the actions of the FSP or its contractors in the
course of managing their claim. In the present circumstances, I consider that
an award of compensation in the amount of $1,000 is appropriate.
84. Finally, I note that the laboratory testing carried out on 28 February 2013
revealed contamination of the Applicants’ vacuum cleaner. It is not clear
from the available information whether the vacuum cleaner has been
appropriately treated or replaced. To the extent that this has not been
addressed, the FSP should arrange for the decontamination or replacement
of the vacuum cleaner.
Damaged glass items
85. The Applicants say that a glass dining table and glass door cabinet were
broken after they were being moved out of the way to provide access for C
to install acrow props to hold up the sagging ceiling, as part of the make safe
repairs. They have provided quotes for $440 for the replacement of the glass
in the table and $275 for the repair of the cabinet.
86. The available information does not establish that the FSP or its contractors
were responsible for the damage to the table and cabinet. Further, I do not
Case No: 319066 Determination Page 17 of 21
consider that this damage should be regarded as having been caused by the
storm event (noti ng that the Applicants’ policy expressly excludes
consequential loss).
87. However, the Applicants’ policy does provide cover for the accidental
breakage of glass in furniture (as a separate insured event). Accordingly, I
consider that the FSP should indemnify the Applicants for the repair costs,
based on the quotes provided. In this respect, I consider that one excess of
$200 should be applied, with the effect that the FSP is required to pay the
Applicants a net amount of $515.
Temporary accommodation
88. The App licants have confirmed that they do not dispute the FSP’s decision
to cash settle them for the temporary accommodation component of their
claim, or the basis on which the amount of the cash settlement was
calculated.
89. However, the Applicants remain concern ed about the FSP’s failure to assist
them to obtain appropriate long term rental accommodation and feel that the
FSP effectively abandoned them. The Applicants say that they were rejected
by real estate agents when they applied for rental properties, as their only
income is the male Applicant’s disability pension and the insured property is
subject to a mortgage. They feel that the FSP should have provided them
with a written reference or acted as guarantor to help them secure a rental
property. They were ultimately unable to find an appropriate property and
were forced to stay with relatives in cramped conditions.
90. The terms of the Applicants’ policy provide that the FSP is obliged to pay
them temporary accommodation benefits (based on the weekly market rental
of their property) for the period while the property is uninhabitable. However,
the terms of the policy do not require the FSP to arrange temporary
accommodation for the Applicants in circumstances where a cash settlement
is provided.
91. It is unclear from the information provided by the parties whether the
Applicants raised with the FSP, their difficulties in obtaining appropriate
rental accommodation or asked the FSP for assistance in relation to this
issue. Had they done so, it is possible that the FSP may have been able to
assist. However, in the absence of any evidence that the Applicants raised
this issue, I do not consider that they have established that the FSP acted
inappropriately.
92. I note that the FSP paid the Applicants a cash settlement equivalent to thirty
weeks of accommodation, in circumstances where the repairs were
estimated to take only eight weeks. The FSP also provided temporary
accommodation for the Applicants from the time their property was
considered to be uninhabitable until their IDR claim was resolved. In the
circumstances, I consider that the cash settlement provided to the Applicants
more than satisfies the FSP’s obligations in relation to this aspect of their
claim
Case No: 319066 Determination Page 18 of 21
Loss of food
93. The Applicants say that the FSP should indemnify them for food valued at
$600 which spoiled when the Applicants were unable to consume it by the
use by dates, due to the storm damage to their property. The FSP has
declined to cover this aspect of the Applicants’ claim on the basis that the
policy does not cover loss of food in these circumstances.
94. The contents cover provided under the Applicants’ policy specifically
includes the replacement of spoiled food up to a value of $1,000. However,
the policy expressly states that this cover is only available where food spoils
because of the breakdown of a fridge or freezer in certain specified
circumstances, such as following electrical or electronic failure or
malfunction or a power outage.
95. Accordingly, the cover provided under this section of the policy does not
apply where food spoils in the circumstances described by the Applicants.
Further, I consider that the spoilage of food claimed by the Applicants is too
remote to be subject to cover under the insured event of “storm, lightning,
hail or rainwater”.
Claim handling
96. The Applicants say that the FSP acted towards them in a manner which was
inconsistent with its duty under section13 of the Act, which requires each
party to a contract of insurance to act towards the other party with utmost
good faith. In particular, the Applicants say that the FSP:
refused to speak with them and insisted that all dealings be in writing;
and
colluded with its contractors to deny liability for some of the claimed
damage and to ensure that the quotation for the repairs was as low as
possible.
97. The FSP says that the Applicants had unrealistic expectations regarding the
handling of their claim and were verbally abusive and threatening to its staff
on a number of occasions. The FSP says that it was for these reasons (and
to ensure a safe working environment) that it took the unusual step of
requiring that all further communications be in writing.
98. The FSP strongly denies that it colluded with its contractors,and says that its
contractors are independent professionals who have acted in a fair and
transparent manner.
99. I have reviewed the FSP’s claim notes which provide a contemporaneous
record of the claims process, together with copies of correspondence
provided by both parties. It is clear from the information provided that the
relationship between the parties broke down relatively early on in the
process and from that point onwards, the Applicants showed a significant
level of distrust and hostility in their dealings with the FSP.
Case No: 319066 Determination Page 19 of 21
100. In my view, the Applicants had somewhat unrealistic expectations in their
dealings with the FSP. Whilst I appreciate that the Applicants were frustrated
with what they saw as the FSP’s inaction, I am mindful of the large volume of
claims received by the FSP at the time and I consider that the FSP’s conduct
was appropriate in the circumstances. The available information indicates
that certain of the FSP’s staff members made considerable efforts to try and
address the Applicants’ concerns.
101. I consider that the available information supports the FSP’s position that the
Applicants were aggressive to its staff on various occasions. In these
circumstances, I accept that the FSP was entitled to request that the
Applicants communicate with it in writing. I note that the FSP did not take
this step until mid-May 2013, when it had already been handling the claim for
over three months.
102. The Applicants have not provided any information to support their position
that the FSP colluded with its contractors to reduce the cash settlement
amount. I note that it is standard industry practice for an insurer to negotiate
favourable rates with preferred suppliers, in order to reduce costs. In my
view, this is an acceptable practice which is in the interest of policyholders
as a whole. Further, there is no information to suggest that the FSP
improperly influenced the reports provided by its contractors or instructed
them to wrongly exclude claim related damages from the quotation or scope
of works.
103. Accordingly, I do not consider that the Applicants have established that the
FSP breached its duty of utmost good faith under section 13 of the Act.
104. The Applicants say that the FSP has generally failed to manage their claim
appropriately or to deal with it in a timely manner.
105. I carefully reviewed the FSP’s management of the Applicants’ claim, as
reflected in the information provided by the parties. In my view, the FSP’s
management of the claim was reasonable in the circumstances.
106. I note that the available information indicates that the Applicants lodged their
claim on 29 January 2013 and were provided with an initial cash settlement
on or around 4 April 2013. In my view, this represents a reasonable
timeframe, given the need for the FSP to assess the damage to the property
and obtain appropriate expert reports, and in light of the high number of
claims which the FSP was managing at the time.
107. Accordingly, while I appreciate that the claims process has been very
stressful for the Applicants, I do not consider that they should be entitled to
compensation for non-financial loss as a result of the manner in which the
FSP has handled their claim (other than in respect of their exposure to
asbestos, as outlined above).
108. For completeness, I note that the Applicants’ claims that the FSP has
breached the provisions of the Code are outside the scope of the
Case No: 319066 Determination Page 20 of 21
Determination but will be referred for consideration by the Code Compliance
Manager.
Determination
109. On the basis of the available information I determine that:
the FSP is to appoint (at its cost) suitably qualified independent
contractors who have not been involved in the claim to date, to:
i. determine the extent of further damage to the Applicants’ property
from mould, deterioration of kitchen cabinetry and vermin which
has arisen subsequent to the insured event; and
ii. provide their opinion regarding the extent to which the additional
damage has been caused by (a) any inadequacies in the make
safe repairs (including mould remediation) authorised by the FSP
and (b) the passage of time since the insured event occurred;
the Applicants are to fully co-operate with the FSP and the appointed
contractors in order to enable the above process to be completed;
once this process has been completed, the FSP is to arrange for the
scope of works and quotation prepared by C to be revised to include
the repair of any additional damage identified (on the basis that the
FSP will be liable for 100% of any additional damage due to inadequate
make safe repairs and 50% of any additional damage due to the
passage of time);
once the revised scope of works and quotation has been prepared, the
FSP is to recalculate the cash settlement amount by:
i. reducing the cash settlement amount of $31,347.38 paid in respect
of the repairs (ie excluding contents removal and storage) by the
amount of $5,837.04 (which was mistakenly paid in respect of the
replacement of floor tiles);
ii. increasing the resulting amount to reflect the quoted costs of
repairing any additional damage from mould, deterioration of
kitchen cabinetry and vermin for which the FSP is liable (as
determined in accordance with the process o utlined above), at
trade prices;
iii. increasing the resulting amount by 25%;
iv. increasing the resulting amount by $1,515 (comprising $515 in
respect of the damage to the Applicants’ glass furniture and $1,000
as compensation for non-financial loss; and
v. increasing the resulting amount by the amount necessary to
decontaminate or replace the Applicants’ vacuum cleaner (in the
event that this has not already been addressed); and
Case No: 319066 Determination Page 21 of 21
the FSP is not required to pay the Applicants any additional amount in
settlement of their claim.