Home / Financial Firm (Unknown - Insurer) / Determination 318874

Determination 318874

Partial denial of flood-damage home claim, stormwater versus flood characterisation

FirmFinancial Firm (Unknown - Insurer)
Decided2013-09-11
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicants' Charlton home was damaged in the January 2011 floods, and the FSP cash settled $19,850 under the flood cover but declined the balance on the basis the damage was flood. AFCA held the home damage was flood, but ordered the FSP to pay for stormwater damage to outbuildings and contents up to 150mm above ground, with statutory interest from 7 March 2011.

Under the Wayne Tank principle, all water was treated as flood because flood was a concurrent cause, but stormwater damage to ground-level outbuildings and contents before the river reached major flood level was covered.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 318874 Determination Page 1 of 10 Case number: 318874 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim 1 August 2013 Background 1. The Applicants held a Home Buildings and Contents Insurance Policy (the policy) with the Financial Services Provider (FSP), which provides cover for Accidental Damage subject to the relevant policy limitations. 2. The insured property in Charlton sustained extensive damage when inundated by water on 14 and 15 January 2011, following the significant weather events experienced in Victoria in January 2011. 3. The FSP partially accepted the Applicants‟ claim in so far as the policy allows for an „Additional benefit‟ of „flood‟ up to applicable sub -limits). It has declined indemnity for the balance of the Applicant s‟ claim on the basis it was due to the event „flood‟, which is otherwise excluded under the policy. 4. The Applicants remain dissatisfied with the FSP‟s decision to decline to provide indemnity for a major portion of their loss. Summary of Applicants ’ position 5. The Applicants in disputing the FSP‟s decision to decline the claim have sought the assistance of a representative. In the interest of brevity both the Applicants, and their representative will be referred to as the “the Applicants” for the purpose of this determination. 6. The FSP has accepted their claim under the limited cover available for flood damage under the policy and for which it has cash settled them in the amount of $20,000, less the applicable excess. 7. The Applicants are seeking for the FSP to cover their claim in full on the basis the insured property was inundated by stormwater run-off rather than flood and therefore is covered under the policy. 8. Their evidence as to the events that transpired is as follows:  They tried to prevent their home from being inundated by surrounding it with a sandbag levee and plastic and sealing the weepholes and windows with silicone. Determination Case No: 318874 Determination Page 2 of 10  They decided to move their cars to higher ground at about 4.00pm on 14 January 2011. At that time, the water was to the level of the vehicles‟ rims.  They set up a water pump inside the levee at about 4.30pm, because water was rising quickly and was already in their sheds and outdoor area.  They moved the water pump towards the rear doors at about 5.00pm, because water was starting to i nfiltrate the levee rapidly.  The pump could not cope with the rising water level.  Water could not enter their home prior to 6.00pm, because the levee that was built around it was successful in keeping the water out.  They evacuated at about 6.00pm, as the water was about to enter the doorways. The water was almost knee deep when they walked down the driveway. Summary of FSP’s position 9. The Applicants‟ home was inundated by flood because:  The available hydrology evidence confirms that Avoca River rose rapidly from 5.00pm on 14 January 2011 and that from 6.00pm onwards, houses were inundated by waters from the Avoca River.  FOS has previously determined that there may be inundation by stormwater run-off in respect of properties being inundated prior to approximately 5.15pm, on 14 January 2011.  The Applicants have consistently maintained that their home was not yet inundated when they evacuated at 6.00pm, on 14 January 2011. 10. Even if stormwater run- off caused the damage to the Applicants‟ home, the combination of stormwater run-off and flood water still entitles it to decline liability based on the Wayne Tank principle. 11. The policy provides the Applicants with a maximum of $20,000 for loss or damage caused by flood. It has paid the Applicants $19,850 (net of $150 policy excess) and as such, has discharged its policy obligation. 12. In light of FOS‟ previous determinations in respect of the Charlton January 2011 event, it is prepared to consider any water inundation of outbuildings (located on the Applicants‟ property), pr ior to 5.15pm on 14 January 2011. 13. It has acted in a reasonable and fair manner at all times, therefore, even if FOS determines that it is to indemnify the Applicants, interest should not be payable. 14. The FSP relies on the following policy provisions: “ Flood means the escape or release of water from the normal confines of a pond, lake, reservoir, canal, dam or uncovered watercourse. Case No: 318874 Determination Page 3 of 10 … What you are insured against This policy insures You against accidental damage, burglary and theft occurring during the Period of Insurance. … What is not insured This policy does not insure You against: 1 damage directly caused by: …  Flood, except as described under the additional benefit „Flood cover‟ … Additional benefits … Flood cover If „Building‟ is shown on the certificate of insurance, We pay up to $20,000 for damage to Your Home directly caused by Flood during the Period of Insurance arising out of one event. If „Contents‟ is shown on the certificate of insurance, We pay up to $10,000 for damage to Contents in Your Home directly caused by Flood during the Period of Insurance arising out of one event. We pay up to $20,000 for all damage to your Home and Contents at any one location arising out of the one event.” Issues 15. Whether the inundation of the Applicants‟ property was c aused by stormwater run-off and/or flood as defined by the policy. 16. Whether the FSP is required to pay statutory interest on the claim in the event FOS determines that the Applicants are entitled to indemnity. Reasons for decision 17. Due to the nature and complexity of the dispute, it has been directly referred to the Panel for Determination in accordance with the Operational Guidelines to the Financial Ombudsman Service‟s (FOS) Terms of Reference. 18. The Panel consists of an Ombudsman and two Panel members with extensive experience in the insurance industry and consumer claims. 19. The Panel is satisfied that the material has been exchanged and the parties have had the opportunity to respond to the issues raised. Case No: 318874 Determination Page 4 of 10 20. Prior to arriving at a determination the Panel has read and considered all the material submitted by the parties to FOS. 21. The Panel notes that the parties do not dispute the following:  The Applicants held an active home building and contents insurance policy with the FSP at the time of loss.  The FSP provided and the Applicants received the relevant policy documentation including the Product Disclosure Statement (PDS).  The insured property suffered significant damage arising from the weather events experienced in the area during January 2011.  The Applicants evacuated the property at approximately 6.00pm on 14 January 2011, at which time water had not yet inundated the dwelling.  The policy covers accidental loss or damage to the insured property subject to the specified policy exclusions and limitations. 22. The Panel having reviewed the available evidence is satisfied that the main issue in contention between the parties relates to whether the insured property was initially inundated by stormwater, which would give rise to a degree of indemnity under the policy. The Panel is satisfied that the property was ultimately inundated by floodwater to the maximum level; however, consideration as to whether there was an extent of initial stormwater inundation will be addressed below. Cause of the Loss 23. The Panel has been provi ded with multiple consultants‟ reports obtained and relied upon by the parties. The Panel notes that this information has been exchanged between the parties, each having had the opportunity to comment. Accordingly, in the interest of brevity, the Panel will only restate information from these reports if found necessary in providing this Determination. Consultant’s Reports C’ s Report (loss assessor) dated 22 February 2011  The premises is a private dwelling of approximately 15 years, in sound condition and constructed of brick veneer over timber frame walls, with a tiled roof and concrete slab floor.  The Applicants were at the property between 3.00pm and 6.00pm on 14 January 2011. At that time, water was apparently coming from the east of the home at a fast rate.  Water had not yet inundated the home when the Applicants evacuated.  The water from the road side was initially clear whereas the water running from the east was muddy and dirty.  Water had inundated the home to a height of 600mm.  The assessor noted extensive damage to the insured building and contents, suggesting that the total costs would far exceed $50,000. Case No: 318874 Determination Page 5 of 10  The Applicants suggested that the loss was due to stormwater inundation. W’s Flood Assessment Report 31 January 2011  An inspection of the Charlton area was undertaken on 24 January 2011.  The average rainfall records for the upper regions of the Avoca River catchment are about 600mm per annum.  The Avoca River has flooded the town of Charlton a number of times in the past due to high rainfalls.  The Avoca River catchment soaked from previous rainfalls resulted in a higher than average conversion of rainfall to runoff, increasing the water flowing directly into watercourses and resulting in flooding across Victoria.  Flood warnings were issued for a number of rivers including the Avoca River with the one of the towns affected by the flooding being Charlton.  Historically Charlton has been flooded from two directions in a north south plain with an area remaining flood free through the centre of town along the St Arnaud – Charlton Road.  The most intense rainfalls periods in Charlton were experienced in the morning of 11 January 2011 and early morning 13 January, with the maximum flood level in Avoca River reaching its peak early morning 15 January 2011.  Flooding of the township was similar to the September 2010 event, however, a much greater volume of water has been experienced in the eastern end of town on this occasion (January 2011).  Given the timing of the flooding of the eastern edge is similar to that o f the gauge readings it is suggested that the Yeungroon Creek and Avoca River flows merged to become one system. W’s Flood Assessment Report dated 20 May 2013 (Site Specific)  The major tributary relevant to Charlton is Yeungroon Creek (the creek), located 1.5km east of the township within the broader Avoca River (the river) floodplain. Between the creek and the river are two unnamed tributaries or drainage lines.  The first unnamed tributary crossing the Charlton – St Arnaud Road whilst the other flows through town under the Calder Highway and they are defined waterways on Vic maps (1:250,000).  There are two rainfall gauges located in Charlton that record daily totals. Data reveals Charlton received its largest rainfall total on 13 January (2011) with 66mm recorded to 9.00am on 14 January.  River levels at Charlton began to rise steeply from about midday on 12 January continuing to rise throughout the afternoon and reaching minor flood level of 5m at 4.00am on 13 January. Levels reached their peak of 8.05m at 1.15am on 15 January, after which there was a steady decline in the levels. Case No: 318874 Determination Page 6 of 10  There is no separate stream flow data available for the creek, the Charlton-St Arnaud Road tributary or the Calder Highway tributary.  Terrain modelling shows the western and northern parts of the town would be expected to drain directly to the river while the main central and eastern parts would be expected to drain to the Calder Highway tributary and directly to the creek.  An analysis of the data shows that locally delivered stormwa ter flows could not have caused significant flooding in Charlton after 7.00am- 8.00am on 14 January.  The continuing flows in the tributaries and other depressions leading into Charlton from after 8.00am on 14 January would have been caused by overland flows resulting from breakouts from Charlton-St Arnaud Road tributary, the creek and later also from the river further upstream.  The Charlton-St Arnaud Road tributary would have contributed flows prior to flows from the creek and river.  Stream flow data indicat es that the river reached “major” flood level at around 5.00pm on 14 January 2011. The Bureau of Meteorology describes “major flooding” as situations involving inundation of extensive rural and/or urban areas, isolation of properties and towns, closure of major traffic routes and evacuation of people from flood affected areas.  According to observations, houses in the township were inundated directly by overflows from the river from around 6.00pm on 14 January 2011. Properties flooded by the river would initially be those located on the western and southern side of Charlton, expanding out towards the east and south.  The last burst of rainfall occurred between 6.21am and 6.24am on 14 January 2011, where some 81.4mm of rain fell.  The Applicants‟ property consis ts of a dwelling and a shed, and is located at the south western part of the township. Based on discussions with the Applicants:  Flooding of the river side of the roads (W Street) began to occur early on 14 January 2011. As the road crest is higher than the Applicants‟ property site, this prevented water flowing into the site until much later in the afternoon.  The Applicants had sandbagged their property, creating an approximately 400mm high levee.  Water began to flow onto the property site in the late afte rnoon of 14 January 2011 and began undermining the levee.  The Applicants commenced pumping which continued until about 4.00pm when the water level began to overwhelm the pump.  The Applicants believe the levee had delayed the inundation of their home for several hours. Case No: 318874 Determination Page 7 of 10  The Applicants evacuated at about 6.00pm (on 14 January 2011) and at that time, water was overtopping W Street and running down D Street.  The peak inundation of the home was approximately 400mm above the flood level.  Based on information provided by the Applicants, rainfall and stream flow data for Charlton, and the relative size of the contributing catchments, W concluded: “Given the location of the property and its proximity to the Avoca River it is our belief that the property was flooded directly from breakouts from the Avoca River. The timing of inundation as described by the insured correlates to anecdotal reports and gauge records of flooding in the Avoca River which indicate that the river began to rise significantly on the afternoon of January 14 th and reached major flood level at approximately 5pm. The property lies approximately 130m south-east of the Avoca River at its nearest point. Inundation of the streets surrounding the property earlier in the day may have emanated from the Charlton-St Arnaud Road tributary to the south which was known to flow into Charlton overland from that direction. Flows from Yeungroon Creek, and also from the Avoca River further upstream contributed to flow in the Charlton-St Arnaud Road tributary. By late afternoon the Avoca River near Charlton had overtopped and was inundating properties directly. We note that the insured property lies inside the LSIO associated with the Avoca River. This layer is likely based on a historic event which was exceeded in January 2011. The property was likely protected by adjacent roads initially as they have a higher elevation and acted as a levee. As river levels rose the nearby roads were overtopped and the property was inundated. It is likely that the construction of a sandbag levee around the home delayed the onset of inundation of the building.” 24. The Panel has carefully reviewed all of the evidence. The Panel notes that the hydrology company retained by the FSP is appropriately qualified and experienced to provide expert analysis and opinion in respect of flood matters. 25. In considering this dispute, the Panel notes that the policy provides cover for accidental loss or damage, subject to various exclusions. In this instance there is no doubt that the Applicants‟ property suff ered damage on 14 January 2011 and so a prima facie claim under the policy has been established. The onus shifts to the FSP to prove an exclusion/limitation contained within its policy, should it wish to rely on such to refuse the claim, in this instance, flood. 26. The Panel also notes that the FSP has partially settled the Applicants‟ claim in line with the maximum level of cover available for flood damage and has also indicated acceptance of some storm and/or accidental damage to other property outside of the home building. The dispute before the Service is in respect to whether there was any loss or damage due to stormwater run- off/inundation or accidental damage to other property, most particularly within the home, prior to the damage caused by floodwaters. Case No: 318874 Determination Page 8 of 10 27. The Panel is also informed about the events in Charlton in January 2011, as a result of a number of visits to the area. The Panel Chair Ombudsman, together with other Panel, FOS and FSP representatives and a number of local residents attended the area as part of a number of site inspections. 28. Of particular interest is the Charlton-St Arnaud Road which had a significant effect on the inundation of Charlton. The road has been raised to allow access to the airport during floods. In doing so, it dissects the natural floodplain. Although, a number of pipes/culverts had been positioned under the road they were not sufficient to cope with the overland flow and according to locals the flow was diverted initially east of Armstrong Road and eventually through the town. When the road was dug up by machinery on 15 January 2011, the level of inundation within Charlton started to drop. 29. This information was provided by a number of local residents independently of the Applicants to the Ombudsman and FOS representatives in the presence of the insurance representatives. The site visits undertaken by the Panel representatives of the Charlton area and more specifically individual properties (not including the Applicants‟ address) have assisted the Panel in gaining a greater understanding of the topography and impact of the stormwater runoff in the area prior to the arrival of floodwater from Avoca River. 30. Given the evidence gathered from these other site visits, the Panel has determined in a number of previous disputes before it, that water flow from the south and east of Charlton in the afternoon of 14 January 2011 can be properly characterised as stormwater runoff (refer disputes numbers 238492 and 279236) at least until about 5.15pm on 14 January 2011, following which the Avoca River reached its major flood level and floodwater from the river started to inundate properties in the town. 31. The extent to which individual properties would have been inundated after that time by stormwater and then floodwater would depend on each propert y‟s location, topography and timing. 32. Having reviewed this evidence in this dispute, the Panel notes:  The Applicants‟ property is located on the western side of Charlton, about 130m to 150m away from the river (at its nearest point). According to the available hydrology evidence, the inundation of properties on this side of Charlton was generally caused by overflows from the river, which runs to the west of Charlton.  It is not particularly clear when the river actually broke its bank. Nonetheless, there is consistent evidence to the effect that the river reached “major” flood levels by 5.15pm, 14 January 2011, from which time water escaped the confines of the river.  There was already water surrounding the Applicants‟ home prior to 5.15pm on 14 January; that i s, before the river reached its “major” flood level. This is shown in the photographs (and explanations of the photos) provided by the Applicants which the FSP has not disputed. Case No: 318874 Determination Page 9 of 10  Although the water surrounding the home before 5.15pm could arguably be stormwater run-off, it did not inundate the home because it was surrounded by a 400mm sandbag levee and a pump was deployed to keep the water out.  The water had not yet inundated the Applicants‟ home when they evacuated at about 6.00pm. 33. Having regard to these matters, the Panel is, on the balance of probabilities, inclined to the view that by the time the Applicants‟ home was first inundated, the water was likely to be a mixture of water that was already present around the home prior to 5.15pm and water from the river. That is to say, the home was likely to have been first inundated by a mixture of stormwater run-off and flood water. 34. The Wayne Tank principle entitles an insurer to decline a claim for a loss where the loss is caused by a number of concurrent events and at least one of such concurrent events is an excluded cause. As one concurrent cause of the damage to the Applicants‟ home and contents inside the home was flood water (as defined by the policy), then all such water is properly considered to be floodwater. 35. As flood is excluded from the accidental damage cover provided by the policy, the FSP was entitled to refuse the claim under that section. However, given the policy also provided limited cover under the additional benefit of „flood‟ the FSP correctly settled that benefit for the Applicants‟ claim with a payment of $20,000 (less the applicable excess), in respect of the damage caused to the home building and contents. 36. Be that as it may, the Panel notes that there is a shed on the Applicants‟ property at ground level and there may also be some contents items located in the shed and around the property which were not protected by the sandbag levee constructed by the Applicants. 37. As there was already storm water on the property prior to 5.15pm on 14 January 2011 and given the history of events provided, it is likely that such items would have been damaged before flood water from the river came. 38. In the Panel‟s view, the hydrology evidence is consistent with initial inundation of such structures located at ground level being due to stormwater runoff. Any damage to such structures at ground level (including contents stored within) would be covered. 39. The Applicants reported that as they left the premises at about 6.00pm on 14 January 2011, the water in their driveway was almost at their knees. However, in the absence of eye witness information as to level of the initial storm water inundation from 5.15pm onwards and having regard to the Panel‟s previous experience of events in Charlton, the Panel considers it fair in all the circumstances to determine that an inundation up to 150mm above ground level was due to stormwater runoff. Therefore, any damage arising from inundation to a level of 150mm above ground level, to outbuilding or Case No: 318874 Determination Page 10 of 10 contents (but excluding the interior of the home) wo uld fall within cover available under the policy. 40. The Panel notes that the FSP has, in any case, agreed to consider such damage subject to the Applicants confirming if any of these items have been damaged, so the Panel would encourage the Applicants to submit an inventory list of such items for the FSP‟s consideration. 41. Accordingly, the Panel urges the parties to work cooperatively together to reasonably establish whether and if so to what extent, damage may have been occasioned to outbuildings (and their co ntents) at ground level up to a level of inundation of 150mm. Determination 42. The Panel determines:  Damage to the Applicants‟ home building and contents at floor level and above was caused by flood, as defined under the policy and as such the FSP was entitled to limit payment for flood damage to the dwelling (above floor level) and its contents to $20,000 (less excess) being the total sum payable according to the Additional benefits “Flood cover”.  The FSP is liable to meet the loss and damage sustained to outbuildings and contents caused as a result of stormwater runoff to a level of 150mm above ground height.  The FSP is to cash settle any such liability and pay to the Applicants interest at the statutory rate, in line with the Insurance Contracts Act 1984, upon the final settlement figure agreed between the parties, from 7 March 2011 (being the date of its rejection of the Applicants‟ claim) to final settlement of the claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.