Home / Financial Firm (Unknown - Insurer) / Determination 318312
Determination 318312
Denial of storm damage claim for swimming pool and deck
Summary
The applicant claimed for a pool and deck that sank after rain and sought about $32,800 for repairs and an assessment. AFCA found the damage was caused by a construction defect and corrosion, which are excluded, so the claim denial was upheld. The insurer was ordered to reimburse the $495 engineer's report cost.
The applicant's rainfall was too small to cause the damage, and the structural defect and corrosion made the loss inevitable and excluded under the policy.
Subjects and remedies
home or building damagenatural disasterpay compensation
Text of the determination
Case No: 318312 Determination Page 1 of 6
Case number: 318312
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim
10 December 2013
Summary
Description: This dispute concerns a claim by the Applicant under an accidental
damage policy for storm damage to a pool.
Basis for Determination: The damage was caused by events which are excluded
from cover under the policy.
Determination: The FSP is entitled to deny the claim.
Background
1. The Applicant holds an accidental damage policy with the Financial Services
Provider (FSP) with sums insured of $618,000 for the building and $79,000
for contents. There is a $400 excess for both.
2. The Applicant has a fibre glass swimming pool, which has a wooden deck
surrounding it and attached to it. The deck is supported by stanchions which
are hollow galvanised steel and are set into the ground.
3. On 30 September 2012 the Applicant noticed that his swimming pool was
“two inches lower on one side”. He believes the rainfall on the previous night
had undermined the support structure for the pool.
4. The FSP denied the Applicant‟s claim on the basis the damage was
excluded from cover as it was due to inadequate reinforcing of the pool
support pillars and gradual corrosion of the stumps supporting the pool deck.
Summary of Applicant’s position
5. The Applicant says that heavy rain caused the damage to the pool‟s support
structure. The deluge of rain undermined the outer edge footings, which in
turn placed significant pressure on the deck‟s support stanchions. This
resulted in the top edge of his swimming pool dropping on one side.
Determination
Case No: 318312 Determination Page 2 of 6
6. The Applicant asked the original pool builder and an engineer to examine the
damage. The report supports his contention the damage resulted from heavy
rain.
7. The Applicant is seeking the following payment from the FSP:
Assessment cost: $495
Pool repair cost: $7,324
Deck repair cost: $25,000.
Summary of FSP’s position
8. The FSP says the proximate or effective cause of the damage to the pool
was a pre-existing defect in the construction of the poo l deck. In addition, the
FSP also contends the damage was due to gradual deterioration and wear
and tear.
9. The FSP says there was only a small amount of rain in the days leading up
to the Applicant noticing the damage to his pool.
10. The FSP obtained a report from a structural engineer who supports the
FSP‟s position.
11. The damage was caused by events which are excluded under the policy and
the FSP relies on the following policy provisions :
“ What we will not pay for
We will not cover your buildings and your contents for any accidental damage
caused by:
…
● Settling, shrinkage or any movement of earth.
…
● Rust, corrosion, gradual deterioration, depreciation, wear or tear.
…
● A defect in an item, faulty workmanship, structural defects or faulty
design.
… ”
Issue
12. Whether the FSP was entitled to deny the Applicant‟s claim.
Case No: 318312 Determination Page 3 of 6
Reasons for decision
13. Due to the nature of the dispute, the FOS has considered it appropriate to
expedite the dispute in accordance with the Operational Guidelines to the
FOS Terms of Reference. Thus, this dispute has not been the subject of a
FOS Recommendation and has proceeded directly to Determination. The
parties have been previously advised that a Determination will be issued in
this case.
14. I am satisfied there has been a full exchange of information between the
parties to the dispute and that each party has had the opportunity to
comment on the other‟s submissions.
15. The Applicant has the onus of establishing that he has a prima facie claim
under the policy. Once he has achieved this, the onus then shifts to the FSP
to establish the application of an exclusion clause.
16. On 30 September 2012 the Applicant noticed that his pool on the eastern
side had sunk. The policy provides cover in relation to loss or accidental
damage to an insured ‟s buildings and contents.
17. The Applicant contends the damage resulted from a “deluge of rain”. If this is
so, then the Applicant has a prima facie claim under the policy as the policy
provides damage for accidental loss or accidental damage.
18. The onus then shifts to the FSP to establish the application of a policy
exclusion such as those set out above.
19. The FSP arranged for a company (“C”) to carry out an assessment of the
damage at the Applicant‟s property. An adjuster (“SK”) employed by C
attended the property on 13 December 2012 and provided a report.
FSP’s first assessment report dated 13 December 2012
20. SK said there had only been 12mm of rainfall on 29 September 2012
(although the Bureau of Meteorology daily rainfall record, provided by the
FSP, indicated the rainfall level was 13mm). He also made a number of
other observations about the condition of the decking and the stanchions
supporting the decking. In addition, he provided a summary of the nature
and extent of the loss.
21. SK referred to the Applicant‟s engineer who had already inspected the
property. The assessor recommended the FSP obtain a report from its own
engineer.
FSP’s second report dated 22 January 2013
22. C provided a second report dated 22 January 2013 (with a different author
from the first report, IP). The report summarised an accompanying report
from a structural engineer (“PD”) of the same date. The instructions to the
Case No: 318312 Determination Page 4 of 6
structural engineer were to establish whether the cause of damage could be
attributable to one event or whether it could have occurred over time.
MCS Report (PD) dated 22 January 2013 .
23. PD inspected the property on 14 January 2013 and produced a report dated
22 January 2013. He made a number of observations, in addition to
providing photographs and indicated the pool:
is a maxi rib pool with 16 ribs;
was installed with its lower half in-ground;
was set into rock on its upper side, with the lower side set into soil;
had stabilised sand (sand with a low cement content so that it hardens)
installed around the buried portion of the pool between the pool and the
earth;
is surrounded by a timber deck that is fixed to the pool around the pool
lip and is supported on posts elsewhere.
24. PD said the ribs are hollow and have been filled with stabilised sand to just
above their mid-height. There was no cracking noted to the pool shell or to
its ribs. However, the lower outer edge of the deck has been pushed out
laterally. It is this area that corresponds with the greatest lateral movement
of the deck.
25. PD stated that the lower long edge of the pool had been pushed outwards by
the water pressure. This resulted in the outward movement of the attached
deck and also resulted in the simultaneous dip in the edge of the pool. He
stated:
“The failure has occurred because the ribs are not fully buried in t he ground
and they have not been reinforced with concrete and anchored into a base
concrete footing. In other words, there is a defect in the construction that has
caused the pool to be structurally inadequate. That is the underlying and
primary cause of t he pool wall movement/failure.”
26. PD made a number of conclusions including:
The primary cause of movement of the pool was the inadequate
construction of the pool ribs / embedment of the pool in the ground.
The storm contributed to the movement and damage a s the “final
straw”, not the primary cause.
The deck has moved because it is attached to the pool.
This inadequacy stemmed from the time of construction while the
movement most likely occurred over a short space of time.
The snapping of the steel deck columns is due to the same causes as
the pool movement together with long-term corrosion of the posts.
If the post had not snapped then another failure of the deck
connections or of the posts‟ footings would have ultimately occurred.
Case No: 318312 Determination Page 5 of 6
27. PD referred to a „storm‟, although the amount of rain which fell on 29
September 2012 was 13mm and it appears that PD has taken it as read
there was actually a storm on that date.
Applicant’s structural engineer’s report dated 9 November 2012
28. The Applicant obtained a report fr om a structural engineer (“CR”). CR visited
the property on 7 November 2012, along with a representative from the pool
company, which, according to the Applicant, had built the pool.
29. CR noted the pool was in “excellent condition”, with the timber deck arou nd
the pool showing evidence of its age and stated:
“Five of the downhill piers to the long side of the pool have rotated outwards.
Severe stressing of the timber deck has led to rupture of a number of the
outside steel posts. We note that they were already significantly rusted due to
partial burial in the soil.
The “maxi” ribs to the pool were not filled with concrete. This means that the
stability of the long side of the pool was dependent upon the timber deck to
prop the “maxi” ribs.”
30. CR explained there were two ways these pools could be designed and built.
The ribs can be filled with concrete with an enlarged base. Then the deck is
useful but not essential. Or the alternative is to provide a minimal localised
pad to the maxi rib, not fill the rib with co ncrete but utilise the timber coping
to brace the top of the pool.
31. He then concluded on the cause of the damage:
“Our diagnosis of failure is that the pool filled with water to the maximum level,
there after excess water inundated the deck and the combination of the two
was sufficient to cause failure of the ageing deck.”
Analysis
32. CR noted the “maxi” ribs had not been filled with concrete and therefore the
long side of the pool relied on the timber deck as a prop. He said this was
one of the ways a pool could be designed and built.
33. PD provided a more detailed analysis of the pool and deck structure. He also
had the benefit of viewing CR‟s report; although he incorrectly referred to the
report‟s date as 26 November 2012 (it was in fact 9 November 2012).
34. PD identified a deficiency in the design and building of the pool and the
decking surrounding the pool. PD indicated that it was the inadequate
construction of the pool ribs / embedment of the pool in the ground of the
pool ribs that was the primary cause of the damage to the pool.
35. Further, the “prop” referred to by CR that may have been provided by the
decking, failed as the steel deck columns had severely corroded.
Case No: 318312 Determination Page 6 of 6
36. The Bureau of Meteorology daily rainfall chart indicated there was only
13mm of rain on 29 September 2012 and minimal rain for the preceding
weeks during that month. I note there were much heavier falls within the
months of January to April 2012 inclusive, without any resulting damage to
the deck and support structure.
37. Accordingly, I am not satisfied that this amount of rainfall would have caused
such damage to the decking and support structure.
38. I am satisfied on the balance of probabilities that the damage was inevitable
because of the combination of the structural deficiency and underlying
inadequacy in the reinforcement of the ribs, which had been present from the
day of construction and the corrosion of the steel deck columns.
39. As such, I am satisfied that the FSP has established the application of policy
exclusions to defeat the claim.
40. The Applicant claims $495 for the cost of the report from CR. I accept that
paragraph 9.4 of the Terms of Reference applies to this part of the claim.
41. Paragraph 9.4 of the Terms of Reference says:
“ Applicant’s costs in pursuing the matter
FOS may decide that the FSP contribute to the legal or other professional
costs or travel costs incurred by the Applicant in the course of the Dispute.
Unless exceptional circumstances apply, FOS will not require the FSP to
contribute more than $3,000 to these costs.”
42. The Applicant must, however, provide proof that the cost has been incurred
in the form (for example) of an invoice from CR or otherwise.
Determination
43. On the basis of the available information and for the reasons stated, I
determine the FSP was entitled to deny the Applicant‟s claim.
44. Upon being satisfied of the cost of CR‟s report, the FSP is to reimburse the
Applicant for the cost of the report claimed at $495.