Home / Financial Firm (Unknown - Insurer) / Determination 318312

Determination 318312

Denial of storm damage claim for swimming pool and deck

FirmFinancial Firm (Unknown - Insurer)
Decided2013-12-10
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$495
Non-financial loss—
Amount claimed$32,819
SourceAFCA PDF

Summary

The applicant claimed for a pool and deck that sank after rain and sought about $32,800 for repairs and an assessment. AFCA found the damage was caused by a construction defect and corrosion, which are excluded, so the claim denial was upheld. The insurer was ordered to reimburse the $495 engineer's report cost.

The applicant's rainfall was too small to cause the damage, and the structural defect and corrosion made the loss inevitable and excluded under the policy.

Issues

Subjects and remedies

home or building damagenatural disasterpay compensation

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 318312 Determination Page 1 of 6 Case number: 318312 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of Claim 10 December 2013 Summary Description: This dispute concerns a claim by the Applicant under an accidental damage policy for storm damage to a pool. Basis for Determination: The damage was caused by events which are excluded from cover under the policy. Determination: The FSP is entitled to deny the claim. Background 1. The Applicant holds an accidental damage policy with the Financial Services Provider (FSP) with sums insured of $618,000 for the building and $79,000 for contents. There is a $400 excess for both. 2. The Applicant has a fibre glass swimming pool, which has a wooden deck surrounding it and attached to it. The deck is supported by stanchions which are hollow galvanised steel and are set into the ground. 3. On 30 September 2012 the Applicant noticed that his swimming pool was “two inches lower on one side”. He believes the rainfall on the previous night had undermined the support structure for the pool. 4. The FSP denied the Applicant‟s claim on the basis the damage was excluded from cover as it was due to inadequate reinforcing of the pool support pillars and gradual corrosion of the stumps supporting the pool deck. Summary of Applicant’s position 5. The Applicant says that heavy rain caused the damage to the pool‟s support structure. The deluge of rain undermined the outer edge footings, which in turn placed significant pressure on the deck‟s support stanchions. This resulted in the top edge of his swimming pool dropping on one side. Determination Case No: 318312 Determination Page 2 of 6 6. The Applicant asked the original pool builder and an engineer to examine the damage. The report supports his contention the damage resulted from heavy rain. 7. The Applicant is seeking the following payment from the FSP:  Assessment cost: $495  Pool repair cost: $7,324  Deck repair cost: $25,000. Summary of FSP’s position 8. The FSP says the proximate or effective cause of the damage to the pool was a pre-existing defect in the construction of the poo l deck. In addition, the FSP also contends the damage was due to gradual deterioration and wear and tear. 9. The FSP says there was only a small amount of rain in the days leading up to the Applicant noticing the damage to his pool. 10. The FSP obtained a report from a structural engineer who supports the FSP‟s position. 11. The damage was caused by events which are excluded under the policy and the FSP relies on the following policy provisions : “ What we will not pay for We will not cover your buildings and your contents for any accidental damage caused by: … ● Settling, shrinkage or any movement of earth. … ● Rust, corrosion, gradual deterioration, depreciation, wear or tear. … ● A defect in an item, faulty workmanship, structural defects or faulty design. … ” Issue 12. Whether the FSP was entitled to deny the Applicant‟s claim. Case No: 318312 Determination Page 3 of 6 Reasons for decision 13. Due to the nature of the dispute, the FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. Thus, this dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. The parties have been previously advised that a Determination will be issued in this case. 14. I am satisfied there has been a full exchange of information between the parties to the dispute and that each party has had the opportunity to comment on the other‟s submissions. 15. The Applicant has the onus of establishing that he has a prima facie claim under the policy. Once he has achieved this, the onus then shifts to the FSP to establish the application of an exclusion clause. 16. On 30 September 2012 the Applicant noticed that his pool on the eastern side had sunk. The policy provides cover in relation to loss or accidental damage to an insured ‟s buildings and contents. 17. The Applicant contends the damage resulted from a “deluge of rain”. If this is so, then the Applicant has a prima facie claim under the policy as the policy provides damage for accidental loss or accidental damage. 18. The onus then shifts to the FSP to establish the application of a policy exclusion such as those set out above. 19. The FSP arranged for a company (“C”) to carry out an assessment of the damage at the Applicant‟s property. An adjuster (“SK”) employed by C attended the property on 13 December 2012 and provided a report. FSP’s first assessment report dated 13 December 2012 20. SK said there had only been 12mm of rainfall on 29 September 2012 (although the Bureau of Meteorology daily rainfall record, provided by the FSP, indicated the rainfall level was 13mm). He also made a number of other observations about the condition of the decking and the stanchions supporting the decking. In addition, he provided a summary of the nature and extent of the loss. 21. SK referred to the Applicant‟s engineer who had already inspected the property. The assessor recommended the FSP obtain a report from its own engineer. FSP’s second report dated 22 January 2013 22. C provided a second report dated 22 January 2013 (with a different author from the first report, IP). The report summarised an accompanying report from a structural engineer (“PD”) of the same date. The instructions to the Case No: 318312 Determination Page 4 of 6 structural engineer were to establish whether the cause of damage could be attributable to one event or whether it could have occurred over time. MCS Report (PD) dated 22 January 2013 . 23. PD inspected the property on 14 January 2013 and produced a report dated 22 January 2013. He made a number of observations, in addition to providing photographs and indicated the pool:  is a maxi rib pool with 16 ribs;  was installed with its lower half in-ground;  was set into rock on its upper side, with the lower side set into soil;  had stabilised sand (sand with a low cement content so that it hardens) installed around the buried portion of the pool between the pool and the earth;  is surrounded by a timber deck that is fixed to the pool around the pool lip and is supported on posts elsewhere. 24. PD said the ribs are hollow and have been filled with stabilised sand to just above their mid-height. There was no cracking noted to the pool shell or to its ribs. However, the lower outer edge of the deck has been pushed out laterally. It is this area that corresponds with the greatest lateral movement of the deck. 25. PD stated that the lower long edge of the pool had been pushed outwards by the water pressure. This resulted in the outward movement of the attached deck and also resulted in the simultaneous dip in the edge of the pool. He stated: “The failure has occurred because the ribs are not fully buried in t he ground and they have not been reinforced with concrete and anchored into a base concrete footing. In other words, there is a defect in the construction that has caused the pool to be structurally inadequate. That is the underlying and primary cause of t he pool wall movement/failure.” 26. PD made a number of conclusions including:  The primary cause of movement of the pool was the inadequate construction of the pool ribs / embedment of the pool in the ground.  The storm contributed to the movement and damage a s the “final straw”, not the primary cause.  The deck has moved because it is attached to the pool.  This inadequacy stemmed from the time of construction while the movement most likely occurred over a short space of time.  The snapping of the steel deck columns is due to the same causes as the pool movement together with long-term corrosion of the posts.  If the post had not snapped then another failure of the deck connections or of the posts‟ footings would have ultimately occurred. Case No: 318312 Determination Page 5 of 6 27. PD referred to a „storm‟, although the amount of rain which fell on 29 September 2012 was 13mm and it appears that PD has taken it as read there was actually a storm on that date. Applicant’s structural engineer’s report dated 9 November 2012 28. The Applicant obtained a report fr om a structural engineer (“CR”). CR visited the property on 7 November 2012, along with a representative from the pool company, which, according to the Applicant, had built the pool. 29. CR noted the pool was in “excellent condition”, with the timber deck arou nd the pool showing evidence of its age and stated: “Five of the downhill piers to the long side of the pool have rotated outwards. Severe stressing of the timber deck has led to rupture of a number of the outside steel posts. We note that they were already significantly rusted due to partial burial in the soil. The “maxi” ribs to the pool were not filled with concrete. This means that the stability of the long side of the pool was dependent upon the timber deck to prop the “maxi” ribs.” 30. CR explained there were two ways these pools could be designed and built. The ribs can be filled with concrete with an enlarged base. Then the deck is useful but not essential. Or the alternative is to provide a minimal localised pad to the maxi rib, not fill the rib with co ncrete but utilise the timber coping to brace the top of the pool. 31. He then concluded on the cause of the damage: “Our diagnosis of failure is that the pool filled with water to the maximum level, there after excess water inundated the deck and the combination of the two was sufficient to cause failure of the ageing deck.” Analysis 32. CR noted the “maxi” ribs had not been filled with concrete and therefore the long side of the pool relied on the timber deck as a prop. He said this was one of the ways a pool could be designed and built. 33. PD provided a more detailed analysis of the pool and deck structure. He also had the benefit of viewing CR‟s report; although he incorrectly referred to the report‟s date as 26 November 2012 (it was in fact 9 November 2012). 34. PD identified a deficiency in the design and building of the pool and the decking surrounding the pool. PD indicated that it was the inadequate construction of the pool ribs / embedment of the pool in the ground of the pool ribs that was the primary cause of the damage to the pool. 35. Further, the “prop” referred to by CR that may have been provided by the decking, failed as the steel deck columns had severely corroded. Case No: 318312 Determination Page 6 of 6 36. The Bureau of Meteorology daily rainfall chart indicated there was only 13mm of rain on 29 September 2012 and minimal rain for the preceding weeks during that month. I note there were much heavier falls within the months of January to April 2012 inclusive, without any resulting damage to the deck and support structure. 37. Accordingly, I am not satisfied that this amount of rainfall would have caused such damage to the decking and support structure. 38. I am satisfied on the balance of probabilities that the damage was inevitable because of the combination of the structural deficiency and underlying inadequacy in the reinforcement of the ribs, which had been present from the day of construction and the corrosion of the steel deck columns. 39. As such, I am satisfied that the FSP has established the application of policy exclusions to defeat the claim. 40. The Applicant claims $495 for the cost of the report from CR. I accept that paragraph 9.4 of the Terms of Reference applies to this part of the claim. 41. Paragraph 9.4 of the Terms of Reference says: “ Applicant’s costs in pursuing the matter FOS may decide that the FSP contribute to the legal or other professional costs or travel costs incurred by the Applicant in the course of the Dispute. Unless exceptional circumstances apply, FOS will not require the FSP to contribute more than $3,000 to these costs.” 42. The Applicant must, however, provide proof that the cost has been incurred in the form (for example) of an invoice from CR or otherwise. Determination 43. On the basis of the available information and for the reasons stated, I determine the FSP was entitled to deny the Applicant‟s claim. 44. Upon being satisfied of the cost of CR‟s report, the FSP is to reimburse the Applicant for the cost of the report claimed at $495.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.