Denial of storm damage claim for ablution block roof
Summary
The applicant claimed for storm damage to a toilet block roof on a parks business policy. The insurer accepted the awning claim but denied the roof claim as wear and tear and lack of maintenance. AFCA found the exclusions applied and the insurer was entitled to deny the claim.
Assessor and builder reports and photographs showed pre-existing rot and lack of maintenance, which the wear and tear and maintenance exclusions cover.
Issues
- Claim denial primary · not upheld
“the photographs and the reports ... support the FSP's argument that gradual deterioration, lack of maintenance and normal upkeep had contributed to the loss”
- Inadequate claim investigation secondary · not upheld
“I do not accept the Applicant's argument that [the reports] should not be relied upon”
Subjects and remedies
home or building damagenatural disastersmall businessno remedy
Text of the determination
Case No: 318246 Determination Page 1 of 5
Case number: 318246
General Insurance - Small Business/Farm Insurance - Commercial Property -
FSP Decision - Denial of Claim - Exclusion/Condition
6 December 2013
Background
1. The Applicant held a parks commercial business insurance policy with the
Financial Services Provider (FSP), which was current at the time of the
loss.
2. The Applicant lodged a claim for damage to an ablution (toilet) block and an
awning which were damaged as a result of a storm.
3. The FSP accepted the claim for the awning and has cashed settled this,
less a deduction for the policy excess. However, the FSP denied the claim
for the damage to the toilet block as the FSP says that this was as a result
of wear and tear which is excluded under the terms of the policy.
4. The dispute was considered by a Case Manager of the Service who issued
a Recommendation. In that Recommendation, the Case Manager
determined the dispute in favour of the FSP on the grounds that she was
satisfied that the exclusions within the policy applied t o the Applicant’s loss
and as a result, the FSP was entitled to deny the Applicant’s claim.
5. The Recommendation was not accepted by the Applicant. Pursuant to
clause 8.5(c) of the Terms of Reference of the Service, the Applicant
requested that the dispute proceed to determination.
Summary of Applicant’s p osition
6. The Applicant says the damage was as a direct result of a storm and
therefore cover should be afforded under the terms of the policy.
7. He denies the roof trusses were rotten as the builder who replaced the roof
used some of the original timbers which would not have been possible had
they been rotten as suggested by the FSP.
8. He further says the FSP’s assessor and builder failed to adequately inspect
his property and as such, their opinions cannot be relied upon.
Determination
Case No: 318246 Determination Page 2 of 5
9. Further, the Applicant says that the power of the “whily whily” at times can
overturn vehicles and caravans and on a previous occasion one year prior,
the Applicants had lost a fenceline in a similar event, which their insurance
at that time had covered.
Summary of FSP’ s position
10. The FSP relies upon the evidence of the assessor and the builder
appointed to inspect the property and applies the relevant exclusion
detailed within the policy.
11. The maximum wind speed on the day in question did not exceed 50kmph
and although this could be sufficient to damage the awning it would not be
strong enough to cause the damage to the roof without underlining wear
and tear.
12. The FSP relies on the following policy provisions contained within the
Product Disclosure Statement which the Applicant does not dispute
receiving:
“ General exclusions
Notwithstanding any provision to the contrary contained within the Policy or
any endorsement attached thereto and where permitted by law, the Policy
does not insure death, injury, illness, loss, damage, liability, cost or expense
of any nature directly or indirectly caused by, resulting from, in connection
with or in relation to the following exclusions:
...
9. Wear and tear and lack of maintenance
Caused by, arising from or in any way connected with wear and tear including
but not limited to, rust, corrosion, oxidization, mould, mildew, fungus, fading,
discolouration, scratching or marring, gradual deterioration, lack of
maintenance or development of flaws, normal upkeep or making good. ”
Issue
13. Whether the FSP is entitled to deny the Applicant’s claim.
Reasons for Decision
14. I reviewed all of the material provided by the parties and included within
their respective submissions.
15. The Recommendation of the Case Manager has not been accepted by the
Applicant and as such, this matter will proceed to determination in
accordance with the Terms of Reference of the Service.
Case No: 318246 Determination Page 3 of 5
“8.5 Dispute is re solved on the basi s of the Recommendation.
c) If, within 30 days of receiving the Recommendation, either:
(i) The Financial Services Provider does not accept the
Recommendation in relation to the Dispute; or
(ii) Either party requests FOS t o proceed from a Recommendation to a
Determination
FOS will proceed to a Determination by either an Ombudsman or by a FOS
Panel (as the Chief Ombudsman or his or her delegate decides is
appropriate). Before the Determination is made, the parties will be given a
reasonable opportunity to make submissions, and provide any further
information, in response to the Recommendation.”
16. Subsequent to the Case Manager’s Recommendation, the Applicant has
lodged a further submission by way of an email dated 17 October 2013,
which includes an undated letter from the owner of the adjacent motel and
a letter dated 15 October 2013, from the repairer who completed the work
on the Applicant’s damaged toilet block.
17. The FSP has provided a further submission by way of a letter of 8
November 2013.
18. I have considered all of the material as part of this determination.
19. I am satisfied that the issue for consideration is as to whether the
exclusions within the relevant policy of insurance apply to the Applicant’s
loss, so as to entitle the FSP to reject the Applicant’s claim .
20. In support of their submissions, the FSP has provided a report from an
assessor and, a building contractor . Whilst the Case Manager’s
Recommendation already details the content of those reports, for the sake
of completeness, I propose to repeat the conte nts of the reports here.
21. The assessor reported:
“While based on our observations it appears that the roof iron has been lifted
off the ablution block by winds we note that the timber trusses are not capped
and due to the design of the roof and parapet walls these are exposed to the
weather. The timber trusses appeared weather damaged and suffering from
wood rot in several places. On review of the quotations supplied by the
Insured we note that the required replacement of the entire existing roof
structure is largely due to the poor condition of the existing timber trusses and
battens rather than the direct result of storm damage.
...
On review we note that on 13 November 2012 wind speed reached gusts up
to 50km/h...We note that under Bureau of Meteorology guidelines damaging
wind speeds refers to speeds in excess of 90km/h. We would suggest that in
order for the roof to be damaged by 50km/h winds the roof would have had to
have been in a pre-existing poor condition.
...
Case No: 318246 Determination Page 4 of 5
We noted that the damage to the ablution block appeared to be confined to
approximately 15 square metres of corrugated iron roof sheets which had
been partially lifted of[f] the timber trusses. The damage to the permanent
onsite tour bus was confined to a torn and damaged awning.
During our attendance the Insured informed our office of water damage to a
demountable cabin. On inspection we noted that this demountable building is
very badly damaged by termites and requires replacing.
...
As discussed above it appears that the storm damage to the roof of the
ablution block resulted because of pre- existing lack of maintenance.”
22. The building contractor reported:
“A full and detailed inspection of the damage was conducted and we have
confirmed that the listed items have been damaged as a result of wear and
tear/maintenance.
The resultant damage has been caused by a servre lack of mantenance over
many years, if we were required to repairs these roofs there is not alot to fix
new timbers too which would necessitate the complete removal of the timber
roof frame amd starting from there.
There has been no mantenance to the metal roofing and no cappings on the
paraphat fascias which allows water to enter the eaves causing rotting to all
the timber ends, there also appears to be no apron flashings to the ends of
the roof sheets which allows water to enter the building and because there is
no ceilings that water would just fall onto the concrete floors There are
maintenance repairs to be carried out at the property (as per scope) at the
owners expense and the insured has not been informed of the maintanance
repairs to be carried out on the property. The maintenance and/or pre existing
conditions are described below:
Roof frame to two main buildings need complete replacing including roof
sheeting and eaves linning s, the dong’s are eaten out by termites and are
uninhabitable” (sic)
23. The Applicant has not provided any expert material which specifically
challenges the reports or conclusions of the assessor or building contractor.
24. In my view, the two reports are thoroug h and logical and I do not accept the
Applicant’s argument that they should not be relied upon.
25. The letter from the owner of the motel which is adjacent to the Applicant’s
premises, simply confirms a weather event which occurred on 13
November 2012.
26. In this regard, I note that the FSP does not challenge the occurrence of the
weather event. In fact the FSP has made payment of that part of the loss
the FSP says arose from the relevant weather event.
27. In respect to the letter from the repairer of the roof to th e Applicant’s toilet
block, I note that this letter is unfortunately brief.
Case No: 318246 Determination Page 5 of 5
28. The author of the letter refers to the toilet roof “which had suffered some
storm damage”.
29. Unfortunately, the author does not detail the extent of the damage which
was storm related nor does the author comment on the assertions from the
FSP that the roof was in a poor state of repair prior to the relevant weather
event.
30. The author of the letter does say that he used some of the existing material
to restore the roof to a safe and reasonable state but again unfortunately,
he does not say how much.
31. Given that the specific allegation of the FSP was that the roof to the toilet
block was in a poor state of repair prior to the weather event, I would have
thought that the author of the letter regarding the repair, could have and
should have made comment as to his view as to the condition of the roof
prior to the weather event.
32. In my view, the absence of this commentary does not assist the Applicant’s
submission.
33. In addition to the two reports referred to above, I have had the opportunity
of viewing a number of photographs of the roof of the relevant toilet block
and the surrounding area.
34. The result is that I am satisfied that both the photographs and the reports
from the assessor and the building contractor, support the FSP’s argument
that the roof was in a poor state of repair and importantly that gradual
deterioration, lack of maintenance and normal upkeep had contributed to
the loss suffered by the Applicant.
35. In my view the exclusions within the relevant insurance policy apply to the
Applicant’s loss and on the basis of those exclusions, the FSP is entitled to
deny the Applicant’s claim.
Determination
36. I determine that the FSP is entitled to deny the Applicant’s claim.