Home / Financial Firm (Unknown - Insurer) / Determination 318092
Determination 318092
Scope of roof repair and matching materials after storm damage to tenanted home
Summary
The applicants wanted the whole asbestos roof replaced to match new materials after storm damage to one roof sheet. AFCA ordered the FSP to repair the damaged section with nearest equivalent materials, or pay a cash settlement of $1,815 if the applicants do not want the repair.
The policy excludes undamaged parts of the building and allows the FSP to use the nearest equivalent materials where existing materials cannot be matched.
Issues
- Claim amount dispute primary · not upheld
“I am satisfied from the only evidence submitted that the option offered by the FSP is the reasonable cost of repairing the roof to the nearest equivalent.”
- Product terms interpretation secondary · not upheld
“The policy terms are clear and unambiguous. The FSP does not have to pay for the portion of the building costs which relate to the undamaged parts.”
Subjects and remedies
home or building damagepay claimrepair or rectify
Text of the determination
Case No: 318092 Determination Page 1 of 5
DETERMINATION INCORPORATING A RECOMMENDATION
Case number: 318092
General Insurance - Domestic Insurance - Home Building - Roof Damage -
Dispute Over Extent of Repairs - Matching Materials
27 November 2013
Summary
Description: This dispute concerns a claim by the Applicants under a landlord
insurance policy for damage to the roof of the tenanted house.
Basis for Determination: The policy does not provide the remedy sought by the
Applicants as the FSP is not obliged to pay for the portion of the building costs which
relate to the undamaged parts of the building and the FSP has the right to pay for the
nearest equivalent or similar materials if it can’t match the existing materials.
Determination: The FSP is entitled to deny the claim.
Background
1. I have reviewed all the material submitted by the parties and save where I
make note specifically, I am satisfied the Background as set out in the
Recommendation is accurate and is as follows.
2. The Applicants held a landlord insurance policy with the Financial Services
Provider (FSP) from 15 May 2010. The policy provided building cover on the
tenanted home for $187,000.
3. On 5 July 2010, the Applicants lodged a claim with the FSP for damage
caused to the roof and ceiling of the home.
4. The FSP accepted the claim and repaired the ceiling. It obtained two quotes
for the damage to the asbestos roof: one for its replacement and one for the
repair of the damaged section only. The FSP decided to repair the damaged
section with materials sourced to match the original materials as closely as
possible.
5. The Applicants object to this resolution and believe that all or at least a
significant part of the roof should be replaced to achieve a match with the
new materials.
Determination
Case No: 318092 Determination Page 2 of 5
6. As the Applicants did not agree with t he FSP’s decision, the dispute was the
subject of a Recommendation. The Recommendation was in favour of the
FSP and was not accepted by the Applicants. The FSP accepted the
Recommendation. In the circumstances, the matter has been referred to me
for Determination. A copy of the Recommendation is attached to this
Determination.
Summary of Applicants’ p osition
7. I have reviewed all the material submitted by the parties and save where I
make note specifically, I am satisfied the Applicants’ position as set out i n
the Recommendation is accurate and is as follows .
8. The Applicants say that the proposed repair work suggested by the FSP will
not put them back into the position they were in prior to the damage being
caused. The property will be devalued if the repairs proceed as proposed.
9. The Applicants understand that the FSP doesn’t want to replace the roof
merely for the sake of uniformity and appearance but they also submit that
the iron sheeting proposed by the FSP has different weathering and
insulation properties. They submit therefore they will be in a worse position
and that is not fair.
10. As the asbestos roof cannot be replaced like-for-like, the FSP should replace
the entire section of the affected roof and use materials that ensure a
uniform appearance.
11. The Applicants rejected the Recommendation and provided no further
documentary information in support of their position but essentially reiterated
their position. The Applicants also noted that even if the metal sheet was
painted that it would fade within a short period of time and look more like a
patch.
Summary of FSP’ s position
12. I have reviewed all the material submitted by the parties and save where I
make note specifically, I am satisfied the FSP’s position as se t out in the
Recommendation is accurate and is as follows.
13. The FSP says that it is not obliged to replace the roof, noting that the
damaged area can be repaired.
14. It concedes that the materials cannot be matched exactly but contends that it
is able to achieve a reasonable match using new materials. This is the extent
of its obligation under the policy.
15. The FSP relies on the following policy provisions:
Page 36 of the Product Disclosure Statement (PDS)
Case No: 318092 Determination Page 3 of 5
“ ...
SECTION 5
HOW WE SETTLE YOUR CLAIM
...
If we accept your claim, at our option we will pay for the reasonable cost of
repairing, rebuilding or replacing your building at the site :
to its condition when new; or
to its condition when last renovated, altered or restored.
We will not pay for the portion of these building costs which relate to the
undamaged parts of your building .
When we pay to repair or rebuild your building we will match the existing
materials, however where those materials are unavailable locally or it is not
possible to match them we reserve the right to pay for the nearest equivalent
or similar materials.”
16. The FSP accepted the Recommendation and did not provide any further
documentary information in support of its position save to rebut the
Applicants’ contentions. The FSP reiterated that:
the repair method nominated and the material chosen is specifically
designed for the replacement of damaged asbestos roof sheets and to
exhibit the same or similar qualities as those roof sheets;
the Policy specifically states that the Member will not pay for repairs
relating to undamaged parts of the Applicants' building.
Issue
17. Whether the FSP should be obliged to replace all or a substantial portion of
the Applicants’ roof.
Reasons for Decision
18. There has been an exchange of material between each party, and I am
satisfied each party has had an opportunity to reply to the issues raised.
19. Each FOS case is decided on its merits, taking into account the facts of the
case. I have reviewed all the material submitted by the parties both before
and after the Recommendation was issued, in order to reach my decision. I
will only refer to the relevant submissions and materials raised.
20. I have decided this case on its merits, having regard to the relevant law,
good industry practice, codes of practice and previous FOS decisions. I have
taken into account all the material submitted by the parties, both before and
after the Recommendation. I am satisfied that the documentation I have
relied on has been provided to both parties.
Case No: 318092 Determination Page 4 of 5
21. I have carefully considered the Case Manager ’s Recommendation, together
with the pa rties’ further submissions.
22. I am satisfied that the Case M anager’s Recommendation contains an
accurate summary of the background to this dispute, the partie s’ positions,
the issues to be determined, any applicable paragraphs of the Terms of
Reference and any relevant law.
23. Save for the application of interest, I agree with the Case M anager’s reasons
for the Recommendation and the recommended outcome.
24. The post-Recommendation submissions did not add anything new to the
dispute but were essentially a reiteration of previous contentions already
made by the parties. Therefore, they did not advance the case or affect the
outcome.
25. I have considered the post-Recommendation submissions but they do not
change my view that the Case M anager’s Recommendation was correct.
26. The policy terms are clear and unambiguous. The FSP does not have to pay
for the portion of the building costs which relate to the undamaged parts of
the building. The evidence is that only one asbestos roof sheet was
damaged in the storm. The FSP has the right to pay for the nearest
equivalent or similar materials if it can’t match the existing materials.
27. I am satisfied from the only evidence submitted that the option offered by the
FSP is the reasonable cost of repairing the roof to the nearest equivalent as
asbestos material can no longer be used.
28. The FSP is not obliged to match the materials. There is no evidence that the
suggested repair will otherwise prejudice the Applicants.
29. I am also satisfied that the claim was handled in a timely manner and that a
reasonable offer to settle the dispute was made on or after IB inspected the
roof and submitted a quote on 18 August 2010. Accordingly the offer made
to repair the roof or to make a cash settlement was made in a reasonable
time frame too. Therefore, I am satisfied that the FSP has not unreasonably
withheld payment at any time or at all so as to attract an award of interest
pursuant to section 57 of the Insurance Contracts Act.
30. In conclusion, I am satisfied that the FSP should arrange for its agent to
repair the roof, unless the Applicants specify that they do not want this to be
done, in which case a cash settlement by the FSP of $1,815 is to be paid to
the Applicants.
Determination
31. On the basis of the available information and for the reasons stated, I
determine that the FSP is entitled to repair the roof as proposed. Should the
Applicants not wish for the repair, they are entitled to a cash settlement for
Case No: 318092 Determination Page 5 of 5
the damaged portion of the roof based on the quote from IB in the amount of
$1,815 and attend to the complete replacement of the roof themselves.
32. Should the parties accept this Determination and insofar as a cash
settlement is required, the FSP is to make the payment of $1,815 within 7
days of being advised the Determination is accepted.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.