Text of the determination
Case No: 317503 Determination Page 1 of 9
Case number: 317503
General Insurance - Domestic Insurance - Home Building - FSP Decision –
Flood - Denial of claim-Exclusion / condition
7 August 2013
Background
1. The Applicants held a Home Building Insurance Policy (the policy) with the
Financial Services Provider (FSP).
2. The insured property in Chelmer was damaged due to the significant
weather events experienced in Queensland (Qld) during January 2011.
3. The FSP on concluding its investigation into the circumstances of the loss,
determined that a significant portion of damage claimed was due to the
event “Flood”, which is specifically excluded under the policy.
4. The Applicants remains dissatisfied with the FSP‟s decision to decline the
major portion of their claim and are seeking complete indemnity under the
policy.
Summary of Applicants ’ position
5. The Applicants‟ claim for damage to their home was partially declined by the
FSP on the basis that subsequent to some initial stormwater inundation
damage to their home, the remaining loss was due to the excluded event
„Flood‟ and therefore excluded from cover.
6. The Applicants‟ contents insurance cover was held with a different insurer
and arising from their dissatisfaction with the outcome of their contents
claim, they referred the matter to FOS for a determination. FOS ruled the
dispute in their favour determining the contents insurer was liable for a
portion of their loss under their contents policy.
7. On the basis of this determination, the Applicants approached the FSP
seeking a review of its decision to limit its liability under their claim, ie only
accepting liability for damage arising from inundation 40cm above the lower
floor level of their split level home. The Applicants are of the opinion, the
FSP should increase the level of indemnity to include damage arising from
the inundation up to 20cm above the upper floor level of the dwelling.
Determination
Case No: 317503 Determination Page 2 of 9
8. The Applicants acknowledge that the policy does not make reference to
and/or does not cover loss or damage arising from „Flash flood‟ as is the
case w ith the contents insurer‟s policy. However, the policy does provide
cover for loss or damage arising from rain/stormwater run-off and it is their
opinion that flash flood and rain/stormwater run-off is the same thing.
9. Therefore, the Applicants maintain that although the FSP continues to hold
the opinion that their home was only inundated up to 40cm above the lower
floor level, it is their position that the rain/stormwater inundation was up to
20cm above the upper floor level in line with FOS‟s determination (267218).
10. The Applicants are seeking cover for the cost to re-building the upper level of
their home, as the 20cm inundation of this level would have damaged the
entire flooring and plasterboard floors. The upper level was ultimately
inundated to 50cm below the ceiling. They have obtained two quotes for the
required repairs (all repairs upper and lower levels) at $136,086 and
$143,500, and advise the FSP had already offered $30,000 under the claim
for inundation up to 40cm of the lower floor level.
Sum mary of FSP’s position
11. The policy is a defined events insurance contract between the parties that
does not provide cover for all types of risks and specifically excludes cover
for flood damage. It does however, provide cover for loss or damage arising
from Storm and Rainwater including stormwater run-off from areas
surrounding the site or water escaping from any water main, drain, pipe,
street gutter, guttering or surface.
12. The policy clearly within the insured events section of the Product Disclosure
Statement (PDS) excludes from cover, loss or damage arising from flood
and also provides that flood does not mean stormwater run-off. Further,
noted within the General Exclusions provided in the policy is the exclusion
from cover of the event „flood‟.
13. The policy wording is clear and drafted in a manner that clearly defines what
the term flood means, and conversely what it does not mean. The definition
of flood is necessarily broad to ensure it covers the phenomenon consistent
with overland floodwater flow, including circumstances when ordinarily dry
land is flooded by water which cannot enter a watercourse since that
watercourse is already full or overflowing.
14. In the instance a property is inundated by water from an overflowing river at
the same time as rainwater run-off from a second source, then the FSP
would be entitled to refuse a claim in line with the Wayne Tank principle.
15. The mere occurrence of high rainfall in an area of an insured home is not in
itself evidence of water inundating the home due to an insured event. Other
factors such as topography of the area, information from customers, rainfall
data, together with information provided to the FSP by its assessors and/or
Case No: 317503 Determination Page 3 of 9
hydrological engineers, is considered when determining the nature of water
which resulted in the inundation damage.
16. In the absence of evidence to the contrary, the FSP maintains that it is
entitled to rely upon the available information to determine whether the
damage claimed is covered or excluded under the policy. The available
information establishes that the property, to a height above 0.4m, was
inundated by both backflow through the stormwater drainage pipe system in
Faulkner Park to the rear, as well as by floodwaters from the Brisbane River,
which would then mean pursuant to the Wayne Tank principle, that the
resultant inundation was classified as flood.
17. The FSP partially accepted the claim for inundation of the rear lower level up
to 0.4m above ground level as its hydrologist had submitted that „localised
inundation as a result of floodwaters backing up through the piped
stormwater network‟ may have occurred. Payment of $29,719.51 by way of
cash settlement was made to the Applicants on or about 29 June 2011.
Further, cash settlements were also made to the Applicants for other items
including pool equipment and air conditioner.
18. The FSP maintains that the inundation of the Applicants‟ property above the
accepted level (level accepted under the claim by the FSP) can reasonably
be concluded as having arisen from the flooding of the Brisbane River and
resultant overland flows from the river.
19. The FSP relies on the following policy provisions:
“ Page 8 – 13 What we cover – insured events
This section describes under the heading:
Yes – the insured events you are covered for,
No – the conditions and exclusions that specifically apply to particular insured
events.
Yes
Storm and rainwater including stormwater runoff from areas surrounding the site,
or water escaping from any water main, drain, pipe, street gutter, guttering or
surface.
Storm means violent wind (including a cyclone or tornado), thunderstorm or a
heavy fall of rain, snow or hail.
NO
Damage or loss caused by flood. Flood means the inundation or covering of
normally dry land by water which:
escapes or overflows from, or
cannot enter, because it is full or had overflowed, or
is prevented from entering, because other water has already escaped or been
released from it,
the normal confines of any watercourse or lake, including any that may have been
modified by human intervention, or reservoir, canal, dam or stormwater channel.
Case No: 317503 Determination Page 4 of 9
Flood does not mean stormwater runoff from areas surrounding the site, or water
escaping from any water main, drain, pipe, street gutter, guttering or surface.
The cost of cleaning or clearing debris from any pool or spa.
…
Page 14 We do not cover – general exclusions
You are not covered under any section of the policy for damage, loss, cost
or liability caused by or arising from or involving:
flood,”
Issues
20. Whether the additional damage claimed was due to stormwater run-off,
flood, or a combination of both events.
21. Whether the FSP was entitled to decline further indemnity to the Applicants
in line with the provisions of the policy.
Reasons for decision
22. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the complex nature of the issues. This dispute
has not been the subject of a FOS Recommendation and has proceeded
directly to Determination.
23. This decision has been made by a Panel consisting of an Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
24. There has been an exchange of material between the parties. Each party
therefore, is aware of the issues and has had the opportunity to comment. In
these circumstances the details contained in the relevant hydrological
reports will not be recited in this determination except where considered
relevant.
25. The Panel is satisfied the parties do not dispute the following:
The Applicants held an active home building insurance policy with the
FSP at the time of loss.
The FSP provided and the Applicants received the relevant policy
documentation prior to the loss ie Certificate of Insurance, PDS etc.
The insured property sustained extensive damage during the significant
weather events experienced in Queensland in January 2011.
The Applicants‟ contents were insured with a different insurer to the
FSP and for which a claim was lodged. The contents claim has been
Case No: 317503 Determination Page 5 of 9
before FOS for which a determination was issued in favour of the
Applicants.
The FSP has partially covered the Applicants‟ claim , accepting some
stormwater inundation did occur up to 40cm within the lower rear level
of the dwelling.
The FSP in maintaining its decision to decline the remainder of the loss
has relied upon evidence obtained from consultants appointed to the
claim.
The insured property was, on the balance of probabilities, inundated in
the late hours of 11 January 2011 (rear section) and early hours of 12
January 2011 (upper level).
The home was evacuated before the inundation of the building began
on 11January 2011.
The insured property is in close proximity to Brisbane River.
26. The Panel notes that the Applicants are essentially seeking a review of the
FSP‟s decision to limit its liability under the claim on the basis of the previous
determination by FOS. The FSP relies upon information made available by
consultants‟ commissioned to the claim to maintain its entitlement to limit its
liability to the Applicants. The information relied upon by the parties has
been exchanged and in the interests of brevity, the Panel will only reiterate
information it finds relevant in providing this determination.
Consultants’ Reports
“C’s” First and Final Report dated 8 February 2011
The date of loss was noted as 12 January 2011.
An inspection of the property was completed on 30 January 2011.
The dwelling is a single storey split level construction with bedrooms
two and three, a laundry and a toilet constructed on a concrete slab on
the lower level.
The Applicants believe the flooding of their home was caused by an
overflow of the nearby stormwater drains. The inundation occurred to a
height of 3m above the living room floor level.
C considered floodwaters were the principle cause of inundation with
the Brisbane River approximately 250m from the home.
The questionnaire providing responses by the Applicants attached to
the report provides:
The house stands on stumps with the habitable floor level 840mm
above surrounding ground levels.
The ground level of the house is higher than street level.
The house was inundated on 12 January 2011, the dwelling was
evacuated before inundation of any section of the property.
Case No: 317503 Determination Page 6 of 9
The water that inundated the home was dirty.
“W’s” Water Damage Assessment Report (hydrology) dated 8 June 2011
Date of inspection 26 May 2011.
Inundation above floor level at rear of dwelling occurred on 11 January,
sometime soon after 7.00pm.
The property was inundated up to a maximum depth of 2.5m above
main (upper) floor level and 3.7m above the rear lower floor level.
Female Applicant left property around 7.00pm on 11 January at which
time water was about 150mm below the level of the patio and lower
floor level at rear of the house.
Rainfall totals for the 24hrs to 9.00am of 68.2mm (10 January), 19.5mm
(11 January) and 37.3mm (12 January) were recorded at the Corinda
High Alert rainfall station, located 3.6km south of the property.
43mm of rainfall was recorded between 4.00am and 5.00pm on 11
January, with peak one hour rainfall intensity of (14.8mm/hr) occurring
at approximately 11:00hrs.
Peak stormwater would have occurred 10 to 30 minutes after peak
rainfall. There was very little rainfall recorded after 5.00pm on 11
January.
The estimated threshold level for Brisbane River overbank flooding is
approximately 5.8mAHD (in the vicinity of the property). Floodwater
overtopping the banks of the river would have begun to inundate
Faulkner Park to the south of the property sometime after 11.00pm on
11 January.
Faulkner Park may have experienced localised inundation as a result of
floodwaters backing up through the piped stormwater network
sometime after 12:00hrs on 10 January.
More widespread inundation of the park occurred early on the morning
of 12 January due to rising floodwaters in the river and rainfall in the
local catchment.
The estimated floor level of the property‟s front section is approximately
6.7mAHD and the lower rear level is 1.2m lower at 5.5mAHD.
The property would have been inundated above the lower floor level at
around 9.30pm on 11 January and above the main floor level (upper) at
around 3.00am on 12 January.
W concluded that inundation of the property above floor level was
caused by floodwaters from the river.
The lower floor level (rear) is lower than the estimated level for direct
overflow of floodwaters from the river (5.8mAHD). It is possible that the
lower floor level was inundated by floodwaters backing up through the
stormwater pipe drainage system, prior to subsequent inundation by
direct overflow of floodwaters.
Case No: 317503 Determination Page 7 of 9
The maximum inundation by water from the stormwater drainage
system would have been approximately 0.3-0.4m above the lower floor
levels.
27. The Panel has considered the available evidence and is satisfied it does
establish, on the balance of probabilities, that the insured property was
inundated by two separate events of water ingress.
28. The earlier inundation of the lower level, occurring in the late hours of 11
January 2011, as a result of water which escaped the stormwater drainage
infrastructure present in Faulkner Park at the rear of the property, whilst the
upper level of the home was inundated, in the early hours of 12 January
2011, after the Brisbane River had broken its banks.
29. The policy extends cover for loss or damage arising from stormwater run-off
as well as water from areas surrounding the site or water escaping from any
water main, drain, pipe, street gutter, guttering or surface. However, it
excludes from cover, loss or damage arising from the event flood. It is not in
dispute that the initial inundation of the lower level of the property up to 40cm
was due to water escaping stormwater drainage system and therefore is
covered under the policy.
30. The issue in contention between the parties relates to whether the damage
caused by water rising above the 40cm mark of the lower level was also
caused by stormwater run-off or whether by this time the FSP was correct in
determining the water ingress would be considered floodwaters and
therefore excluded from cover under the policy.
31. The Applicants rely upon a determination issued by FOS in respect to their
contents claim and maintains in their opinion flash flood and stormwater run-
off are the same event and the FSP should be obliged to cover the damage
arising from the inundation of the upper level of their home to a height of
20cm above the floor level of the second storey, as well.
Flash flood and stormwater run-off
32. The Panel acknowledges the FSP‟s position that the terms o f the policy are
clear and provide that cover is available for loss or damage due to
stormwater run-off and that damage arising from flood, is specifically
excluded from cover under the policy.
33. The policy does not extend to cover “flash flood or flash flo od within 24 hours
of heavy rainfall” as did the contents policy held with a different Insurer. The
Panel notes, when considering the current dispute with the earlier
determination 267218 that:
The cover available under each separate policy held by the Applicants
differs from the other.
Other than the initial level of inundation from the stormwater drains, the
experts are at one in considering that the major damage was caused by
water which is properly characterised as floodwater.
Case No: 317503 Determination Page 8 of 9
That the other policy did not provide cover for loss arising from
floodwater escaping drains, as this policy held with the FSP does,
however, the other policy did provide cover for loss arising from the
event flash flood, which the Panel notes this policy does not.
34. The building policy defines the term flood as:
“Damage or loss caused by flood. Flood means the inundation or covering of
normally dry land by water which:
escapes or overflows from, or
cannot enter, because it is full or has overflowed, or
is prevented from entering, because other water has already escaped or been
released from it,
the normal confines of any watercourse or lake, including any that may
have been modified by human intervention, or reservoir, canal, dam or
stormwater channel.
Flood does not mean stormwater runoff from areas surrounding the
site or water escaping from any water main, pipe, street gutter, guttering
or surface.”
35. The Panel is satisfied that the PDS clearly establishes the FSP‟s intention to
separate the two events ie stormwater run-off and/or stormwater escaping
from a pipe, gutter and water main etc and flood which the policy defines as
water covering normally dry land which escapes/overflows from or cannot
enter the normal confines of any watercourse or lake, including any that may
have been modified by human intervention, or reservoir, canal, dam or
stormwater channel.
36. Accordingly, as noted above, the Panel is satisfied that the first instance of
inundation of the lower level arising from water escaping the stormwa ter
drainage system is covered under the policy, whilst the subsequent
inundation of the upper level arising from water escaping the banks of
Brisbane River is accurately determined to be due to the event flood and
therefore excluded from cover under the policy. To the extent that both these
sources of water combined, causing inundation above 40cm of the lower
level of the house, then pursuant to the Wayne Tank principle of insurance
law, the FSP is entitled to treat all of those waters as excluded from policy
coverage.
37. In the interest of completeness, the Panel has also considered the
Applicants‟ view that flash flooding and stormwater run -off is the same thing
and therefore the FSP should be obliged to extend indemnity under the
policy for the cost to repair the upper level of their home.
38. Flash flood as defined within the other insurer‟s policy includes:
Stormwater run-off;
a sudden flood caused by heavy rain that fell no more than 24 hours
prior to the flash flood event and/or damage arising from it;
Case No: 317503 Determination Page 9 of 9
water that that escapes a watercourse/river as well as a mixture of
stormwater and water that escapes a watercourse .
39. The Panel accepts that whilst stormwater run-off will normally occur within a
short period after heavy rainfall, the latter two circumstances described
under the definition, do not necessarily occur within a short time after intense
periods of rain; therefore, for the purposes of the FSP‟s policy relevant to this
dispute, those two latter events would be considered flood and therefore
excluded from cover.
40. The Panel, in the determination 267218, formed the view that the Applicants
were entitled to indemnity arising from the fact that policy allowed for flash
flood cover, which covered loss or damage that arose from water ingress up
until 4.00am on 12 January 2011, that is within 24 hours of the
commencement of the heavy rainfall which is different to the cover which the
Applicants are entitled to under their building insurance policy held with the
FSP.
Determination
41. On the basis of the available information and the above reasons the Panel
determines that:
the Applicants were clearly informed of the terms of the policy which
specifically exclude from cover, loss or damage arising from the event
flood;
the damage to the insured property above 40cm of the lower level
including the inundation of the upper level of the Applicants‟ property
was caused by flood;
The FSP is entitled to decline indemnity to the Applicants for the
damage caused to the insured property above what the FSP has
already settled them for under the claim.