Home / Financial Firm (Unknown - Insurer) / Determination 317423
Determination 317423
Service quality
Summary
An individual policyholder claimed for storm water damage to lounge floorboards and disputed the mismatched replacement timber. AFCA found the replacement did not match the original and samples agreed with the assessor were never shown, and ordered the firm to cash settle the current cost of replacing the floorboards, with no figure stated.
The insurer must match materials with the originals or nearest equivalent, and it was unfair to rely on the nearest equivalent when the applicant was denied the agreed chance to consider alternatives.
Issues
- Repairs or contractors primary · upheld
“It is clear to me from all of the evidence that the new floorboards are not a match and are at best expected to be a close match.”
- Poor claim handling secondary · upheld
“The work was completed without samples being shown to the Applicant or her being given the opportunity to consider an alternative.”
Subjects and remedies
home or building damagepay claim
Text of the determination
Case No: 317423 Determination Page 1 of 5
Case number: 317423
General Insurance - Domestic Insurance - Home Building - Service - Service
quality
08 January 2014
Summary
Description: A claim under a home building and contents policy for water damage
following a storm.
Basis of Determination: A consideration of whether the FSP has complied with its
obligations under the policy when matching the type of floorboard damage by water.
Determination: The FSP‟s failure to provide the Applicant with samples of the
proposed replacement floorboards means that it is fair that the FSP should cash
settle the Applicant for the cost to replace the floorboards.
Background
1. The Applicant held a home building and contents policy with the Financial
Services Provider (FSP) which was current at the time of the loss.
2. The Applicant lodged a claim with the FSP for water damage to her property
following a storm.
3. The FSP accepted the claim was one to which the policy responded. Part of
the claim related to the replacement of a sunken wooden lounge floor.
4. The Applicant remains dissatisfied with the matching of the floorboards and
seeks a review of the FSP‟s refusal to match the boards, or alternatively,
replace with carpet.
5. The dispute was considered by a Case Manager of the Service who issued a
Recommendation. In that Recommendation, the Case Manager determined
the dispute in favour of the Applicant on the basis that she was not satisfied
that the FSP had repaired the Applicant‟s property using materials matching
or the nearest equivalent available to the original materials, as required
under the terms of the policy.
Determination
Case No: 317423 Determination Page 2 of 5
6. The Recommendation was not accepted by the FSP. Pursuant to paragraph
8.5(c) of the Terms of Reference of the Service, the FSP requested that the
dispute proceed to Determination.
Summary of Applicant’s p osition
7. The Applicant acknowledges that it was always going to prove difficult to
match the new floorboards with the existing ones.
8. She says she was not provided with any samples prior to the installation of
the new floorboards. Had she known the new floorboards were so different
to the existing floorboards, she would have opted to carpet the lounge area.
Summary of FSP’ s position
9. The FSP accepts the new floorboards are different to the existing ones but
says they are the same batch number and will age over time.
10. The FSP also says it was not necessary to provide the Applicant with
samples prior to installation as the batch code obtained was the same as the
originals.
11. The FSP does not agree to the cost of putting carpet in the lounge room.
12. The FSP relies on the following policy provisions contained within the
Product Disclosure Statement (PDS) which the Applicant does not dispute
receiving:
“ What happens if we decide to repair your buildings
If we decide to repair your building(s), we will:
only repair the part or parts of your buildings that actually sustained
damage, including damaged portions of fixed coverings to walls, floors
and ceilings, in the rooms, halls or passages where the damage occurred,
to a condition as close as possible to when new, but not better
try to match any material used to repair your buildings with the original
materials or nearest equivalent available to the original materials ”
Issue
13. Whether the FSP has replaced the Applicant‟s flooring in accor dance with
the terms and conditions of the policy.
Reasons for decision
14. I have reviewed all of the material provided by the parties and included
within their respective submissions.
Case No: 317423 Determination Page 3 of 5
15. The Recommendation of the Case Manager has not been accepted by the
FSP and as such, this matter will proceed to Determination in accordance
with the Terms of Reference of this Service.
“ 8.5 Process for deciding Disputes
Unless paragraph 8.6 applies, the process for deciding a Dispute is as
follows:
...
c) If, within 30 days of receiving the Recommendation, either:
(i) the Financial Services Provider does not accept the Recommendation
in relation to the Dispute; or
(ii) either party requests FOS to proceed from a Recommendation to a
Determination,
FOS will proceed to a Determination by either an Ombudsman or by a FOS
Panel (as the Chief Ombudsman or his or her delegate decides is
appropriate). Before the Determination is made, the parties will be given a
reasonable opportunity to make submission, and provide any further
information, in response to the Recommendation.”
16. Subsequent to the Case Manager‟s Recommendation, the FSP has lodged a
further submission by way of a letter of 2 December 2013, which includes an
email from the FSP‟s building contractor of 2 December 2013.
17. Within the FSP‟s further submission, the principle concern is the Case
Manager‟s finding that she was not satisfied that the FSP had repaired the
Applicant‟s property using matching materials.
18. In this regard, the Case Manager had said that the FSP had not provided
evidence of the information the contractor relied upon to determine the
original flooring was of a particular brand with a product code of UN3318. I
note the evidence from the FSP is to the effect that the contractor relied
upon information obtained from the Applicant to establish the precise details
of the product which was previously provided.
19. Having considered all of the evidence, I am satisfied that the contractor
accurately established the particular brand and product code of the original
flooring and that to the effect that it was the same brand and product code,
the repairs were completed with the same product as the original.
20. However, it is not in dispute that the new product is not a match with the
original floorboards. This is confirmed by the appointed contractor to the
effect “we advised in our original quotation that the colour would not be an
exact match”.
21. The FSP‟s submission is to the effect, “ As further noted in the Member’s
submissions dated 6 June 2013, the original timber flooring was laid
approximately six years ago. Therefore there is a difference in the shade of
colour of the floorboards due to the batch and date of manufacture. The
Case No: 317423 Determination Page 4 of 5
replacement flooring is the nearest equivalent to the original flooring in that it
is the same product and species as the original timber however the
difference in the shade of the timber is beyond the repairer’s control.
(Contractor) have advised that as the timber ages the colour will also
change. ”
22. The FSP further says that the replacement flooring is the nearest equivalent
to the original flooring and the colour difference is beyond the repairer‟s
control.
23. The Applicant says that the difference in the flooring is significant and had
she been aware that there would be such a difference, she would ha ve
looked at alternatives to the flooring which was put into her home.
24. In this regard, the Applicant says that she had reached an agreement with
the assessor to the effect that the assessor would bring samples to try and
match the wood and if there was nothing close to the colour and style, that
the Applicant would look at carpet as an alternative.
25. The FSP does not dispute the Applicant‟s submission to the effect that she
had reached an agreement with the assessor to bring around samples.
Indeed, the FSP says: “(contractor) has advised that the Applicant may have
been advised that a sample would be provided if a match could not be found
(our emphasis added). The contractor ho wever located the same product as
the original floor boards. As this was the same product, the contract did not
require a sample as it was expected to be a close match.”
26. It is clear to me from all of the evidence that the new floorboards are not a
match and are at best “... expected to be a close match.”
27. The issue is as to whether the FSP has complied with its obligation under
the terms of the policy.
28. As stated, the FSP‟s obligation is to “try to match any material used to repair
your buildings with the original materials or nearest equivalent available to
the original materials”.
29. In my view, although the products used by the contractor is the same brand
and product number as the original material, given the passage of time
between when the floor was originally laid in 2005 and when the Applicant‟s
loss occurred in 2012, it cannot be said that the materials used by the
contractor ARE (my emphasis) the original materials. This is so given the
difference in colour, as conceded by the FSP within their submissions.
30. Put simply, I am not satisfied that the materials are „a match‟.
31. Whilst the policy provision also entitles the FSP to match any material with
the nearest equivalent available to the original materials, in my view, given
the events which unfolded in this particular matter, it would be unfair for the
FSP to rely upon this provision.
Case No: 317423 Determination Page 5 of 5
32. The Applicant says that she reached an agreement with the assessor to the
effect that he would show her samples.
33. The FSP does not dispute this submission but suggests that it does not
matter as the same product as the original floorboards was located.
34. I do no t agree with the FSP‟s submission.
35. In my view, whilst it may be the same brand and product number, it is not the
same product as the original floorboards, given the colour difference and that
colour difference is conceded by the FSP. Again, put simply, the materials
are not, „a match‟.
36. I am satisfied that the Applicant did reach an agreement with the assessor to
the effect that samples would be shown prior to completion of the work. I‟m
also satisfied that the work was completed witho ut samples being shown to
the Applicant or her being given the opportunity to consider an alternative to
the use of floorboards.
37. Given she was not given this opportunity, in my view it is not fair that she
should be simply required to accept the alternative which was forced upon
her.
38. Accordingly, I consider it fair in all the circumstances that the FSP cash
settle the Applicant the cost of replacing the floorboards in the lounge area.
Determination
39. I determine that the FSP is to cash settle the Applicant the current cost of
replacing the floorboards in the lounge area.
40. Given that the FSP‟s obligation is based upon the curr ent cost of replacing
the floorboards, I am satisfied that interest is not applicable to this dispute.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.