Determination 317341

Claim denied for foundation movement damage outside 72-hour window

FirmFinancial Firm (Unknown - Insurer)
Decided2013-10-09
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$33,000
SourceAFCA PDF

Summary

The Applicants claimed about $33,000 for foundation movement damage caused by a leaking mains water pipe. AFCA accepted the leak was the cause but held the damage did not occur within 72 hours of the leak, so the FSP's denial stood.

The policy's 72-hour limit requires resultant damage to occur within 72 hours of the leak, and expert evidence showed foundation movement from leaks develops over months or years.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 317341 Determination Page 1 of 10 Case number: 317341 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of Claim 08 October 2013 Background 1. The Applicants held a home and contents insurance policy with the Financial Services Provider (“FSP”). The policy was current at the time of the loss. 2. On 27 March 2012, the Applicants’ broker lodged a claim for damage to the property caused by differential movement of the foundation soils. The Applicants believed that the foundation movement was caused by a leaking water pipe in the nature strip at the front of their property. 3. The FSP appointed several consultants to inspect the property and determine the cause of the damage. Following receipt of the experts’ reports, the FSP initially denied the A pplicants’ claim on the basis that the damage had resulted from several factors over a prolonged period of time. 4. Following a review by its Internal Dispute Resolution (“IDR”) department, the FSP confirmed its denial of the Applicants’ claim on the basis t hat the policy only provided cover for damage from soil movement, where the damage occurred within 72 hours of the insured event (being the leaking pipe). 5. The Applicants dispute the FSP’s decision and expect it to honour their claim for the damage to the property. Summary of Applicants’ position 6. The Applicants have been assisted by a family member for the purposes of pursuing this dispute. For the sake of brevity and convenience, submissions made by the Applicants’ family member will be treated as having been made by the Applicants for the purposes of this Determination. 7. The Applicants say:  the water pipe in the nature strip at the front of their property was leaking for an extended period time until it was repaired by the water authority on 10 April 2012; Determination Case No: 317341 Determination Page 2 of 10  they have provided evidence that the amount of water leaking from the pipe was significant and not merely a “trickle” as described by the FSP; and  the leak resulted in movement of the foundations of their property, which caused structural damage. 8. The Applicants say that the insured event (being the leak of water from the pipe) was still occurring when they lodged their claim on 27 March 2012. Accordingly, the claimed damage occurred within “72 hours after the event” and therefore falls within the scope of cover under the policy. 9. The Applicants seek indemnity under the policy for the cost of repairing the damage to their property resulting from the foundation movement. They have provided copies of three quotes for the cost of repairs, with an average cost of $33,000. Summary of FSP’s position 10. The FSP acknowledges that the damage to the Applicants’ property resulted from earth movement due to excessive variation in the moisture content of the foundation materials. 11. However, the FSP says that as the damage occurred over an extended period of time, it did not occur within 72 hours of the pipe first starting to leak and therefore is excluded under the policy. 12. Accordingly, the FSP says that it is entitled to deny the Applicants’ claim. Issue 13. Whether the FSP is entitled to deny the Applicants’ claim. Reasons for decision 14. As advised to the parties, the Financial Ombudsman Service (FOS) has considered it appropriate to expedite this dispute in accordance with the Operational Guidelines to FOS’s Terms of Reference, due to the issues raised by the dispute. Accordingly, this dispute has not been the subject of a Recommendation but has proceeded directly to Determination. 15. I am satisfied that a full exchange of information has taken place between the parties and that each party has had the opportunity to address any issues raised therein. 16. The Applicants’ policy is a defined events policy which provides cover for certain defined events. Each defined event is subject to both specific and general exclusions. Case No: 317341 Determination Page 3 of 10 17. The onus is on the Applicants to establish, on the balance of probabilities, that they have suffered a loss caused by a risk insured against under the policy. This is known as a prima facie claim. If such a claim is established, the onus shifts to the FSP to show, on the balance of probabilities, that the claim falls within an exclusion under the policy. Terms of policy 18. The Applicants say that the claimed damage arose as a result of water leaking from a pipe in the nature strip at the front of their property, which resulted in foundation movement causing structural damage to their property. 19. Under the insured event “Escaping liquids”, the policy provides cover for loss resulting from; “bursting, leaking, discharging or overflowing of fixed apparatus, fixed tanks or pipes used to carry liquid of any kind.” 20. This insured event is subject to a general exclusion for loss or damage directly or indirectly caused by or arising out of: “ erosion, subsidence, landslide, settling, shrinkage, expansion, undermining, washing away or any other earth movement except where loss or damage is caused by: i. - earthquake ii. - storm or rainwater iii. - explosion or iv. - escape of liquid and occurring within 72 hours after the event” Evidence as to cause of damage 21. After noticing the damage, the Applicants engaged a re-blocking expert (“SO”), who inspected the property on 25 February 2012. SO reported that:  there was cracking damage to the kitchen, dining room, family room, bathroom and laundry areas and the floor was “de - levelled” in most areas of the house;  the ground soil in the sub-floor was quite damp and wet and there was quite a lot of water damage. There were a number of possible causes including heavy rain, broken stormwater pipes or other broken pipes under the house; and  the water damage had caused ground movement resulting in the de- levelling of the floors and the other damage observed. 22. When the claim was lodged on 27 March 2012, the Applicants’ broker advised the FSP that he had inspected the property on 23 March 2012 and observed a large puddle on the nature strip outside the house. Case No: 317341 Determination Page 4 of 10 23. Following lodgement of the Applicants’ claim, the FSP appointed a loss adjuster (“LD”) to inspect the property. LD attended the property on 3 April 2012 and reported that:  the male Applicant had advised that he had discovered movement and cracking throughout the property during the previous year or so. In mid- 2011, he had repaired some of the internal cracking and repainted the ceilings and walls, but the cracking had since re-appeared and he had also discovered additional movement and cracking;  there was a large puddle of water on the nature strip and in the gutter directly outside the property. The Applicants had advised her that they had noticed this water “for a while now” and there may be an issue with the storm water drains;  the footpath directly outside the house had completely lifted and the Applicants had to re-concrete their driveway over the last five years as this had also lifted; and  there was movement and cracking to nearly all of the rooms in the house. The worst of the damage was in the kitchen/meals area where the floor had dropped and the house appeared to be on a lean. 24. LD recommended that a plumber be engaged to investigate whether there was a leak, following which an engineer should be appointed to determine the cause of the damage. 25. The Applicants have provided a copy of a report from the local water authority which confirmed that a leak in the mains water pipe outside the Applicants’ property had been identified and repaired on 10 April 2012. The repo rt noted that a “pin hole” had been found in the copper at the ferrule bend of the pipe and categorised the leaking water as a “trickle”. 26. The Applicants have also provided a letter dated 12 March 2013 from a chemical engineer (“MS”) which attaches picture s of the ferrule (metal band) from the water pipe showing the hole through which the water leaked. In his letter, MS states that: “Based on typical water pressures experienced in Melbourne, a pipe ID of ¾” and a pipe defect of 1.5mm the approximate leakage rate that would have been experienced on the grounds of the [Applicants’] property would have been approximately 3.3 kl per day.” 27. The plumber (“BB”) engaged by the FSP investigated the pipes at the property using CCTV. BB’s report dated 24 April 2012 stat es that:  he identified a break in the bend of a downpipe at the north western corner of the property, which had caused the soil to wash away under the foundation in this area;  there was an underground clay pipe on the northern side of the property, which s hould have been replaced when the Applicants’ house was built approximately 30 years ago; and Case No: 317341 Determination Page 5 of 10  while the broken downpipe may have caused the cracking in the brick work on the rear north west corner of the property, he was unable to determine the cause of the cracking inside the house. 28. The engineer (“GD”) appointed by the FSP attended the property on 4 May 2012 and recommended further geotechnical investigations which were conducted on 7 June 2012. In his report dated 14 June 2012, GD stated:  the Applicants had advised him that excessive differential building movement had developed over last 12 months (approximately) and had progressively worsened;  there had been a recent history of water-related problems at the property which caused water to inundate the sub-floor area;  there was evidence of minor brickwork distress localised to the northern side of the house only. The cracking at the rear north western corner had been patched at some stage but had since re-opened;  there was widespread cracking to the external concrete paving (including the driveway) around the house, which the Applicants advised had developed over the previous 12 months;  there was evidence of excessive undulation in the level of the suspended timber flooring throughout the property. There was also evidence of extensive packing of the bearers and stumps under the house, indicating a history of differential footing movement and re- levelling works; and  there was minor cracking to the internal plasterboard linings and skewing of internal doorways in the house, some of which showed evidence of previous repairs. 29. Based on his observations and the results of the geotechnical tests, GD concluded that:  the differential building movement at the property resulted from excessive variation in the moisture content of the foundation clays across the property envelope;  in particular, the presence of significantly moist soil conditions throughout the property and along the total external perimeter of the house (in contrast to the consistently drier conditions within the centre of the house) had caused heave of the footings along the external perimeter of the house, while the centrally located stump footings remained relatively stable. This had caused separation of the stumps and bearers throughout the sub-floor area. The extensive packing of the stumps and bearers confirmed that such movement had also occurred in the past;  the elevated moisture conditions around the total perimeter of the house were more likely attributable to inherently poor site drainage conditions, and a significant increase in rainfall recently, following many years of dry conditions; and Case No: 317341 Determination Page 6 of 10  elevated soil moisture conditions throughout the property indicated that it was unlikely that any single event was a major contributing factor to the moisture conditions and resulting building damage. However, the brickwork cracking in the northern side of the house was considered to be the consequence of water leaking from the broken stormwater drain in this area which had been identified (and repaired) by BB. 30. The FSP’s assessor (LD) had further discussions with GD, who recommended that the FSP:  cover the cost of the damage to the northern side of the building only as the break in the downpipe may have contributed to this; and  not allow for any internal repairs as it was very difficult to apportion the influence of the broken pipe compared with the other factors identified in his report. At most, this would only be around 10%. 31. Based on GD’s report and the additional comments reported by LD above, it appears that, at this stage, both were proceeding under the mistaken belief that the Applicants’ claim was based on the break in the downpipe identified and repaired by the FSP’s plumber (BB). This is reflected in the FSP’s initial denial letter dated 27 June 2012 which refers to “a leaking storm pipe”. 32. When they queried the FSP’s denial of their claim, the Applicants emphasised that their claim related to the leak in the mains water pipe repaired by the local water authority on 10 April 2012, not the broken downpipe repaired by BB. 33. Following this, the FSP sought further comment from the engineer (GD) regarding the extent to which the leaking water pipe may have contributed to the damage to the Applicants’ property, and whether this damage would have occurred within 72 hours of the pipe beginning to leak. In an email dated 12 September 2012, GD advised that: “Similar to a leaking storm water drain (or any other source of water leakage) it is very unlikely that building damage attributable to differential foundation/footing movement would develop within a 72 hour period of a leakage via the water mains. Obviously water leakages can cause immediate damage to building elements directly exposed to water such as water damage to floorboards, plasterboard linings, electrical fittings, etc, however this type of resultant water damage is not applicable to the [Applicants’] claim – the [Applicants’] claim relates to differential foundation/footing movement that has developed over a prolonged period of time. ... A similar apportionment [as for the downpipe] could not be applied to a leakage via the water mains. Apportionment with consideration to such an event would be dependent on the volume of water that was able to penetrate and pool within the sub-floor area of the dwelling (in conjunction with some other considerations). Based on the geotechnical investigation findings we are unable to substantiate that an event has occurred or has had any influence with respect to the differential building movement claimed by the [Applicants]. Further more, no documented evidence was provided by the [Applicants] to substantiate this claim. Case No: 317341 Determination Page 7 of 10 Based on our experience with countless matters of this nature, an event of sub-floor water inundation attributable to a burst water main, can cause significant differential footing movement and resultant damage throughout the interior of a dwelling (and if this was the case could be attributable to 90%+ of resultant damage but as indicated above this could not be proven based on our scientific/geotechnical ana lysis).” 34. GD had previously advised (in relation to the downpipe) that: “leakage via a breakage to a storm water drain will cause differential footing movement and resultant damage to buildings only after a prolonged period of time (eg: many months or years depending on conditions). This occurs due to a local and excessive increase in the moisture content of the soil in the vicinity of the break (or erosion of soil where applicable) while other areas of the building remain relatively drier. Furthermore, significant building damage may not even occur until such time that the leak is actually repaired (i.e. as the soils dry out locally and equalize across the building envelope.” Analysis 35. The material provided by the parties clearly establishes that there was a leak in the mains water pipe in the nature strip outside the Applicants’ house. The Applicants say that the leak was ongoing for a number of months and the FSP has not disputed this. The Applicants’ re -blocking expert (SO), the Applicants’ broker and the FSP’s loss adjuster (LD) all attended the property before the leak was repaired and observed a large puddle of water in the nature strip/gutter outside the Applicants’ house. 36. Further, the Applicants have provided evidence from an engineer that the amount of water leaking from the pipe would have been significant. While the local water authority referred to the leak as a “trickle” this comment was made in relation to the nature strip and therefore may have referred to the amount of water visible on the surface only. 37. The courts have determined that in order to identify whether particular damage is covered by a policy of insurance, it is necessary to establish the proximate cause of the damage. This is generally done by determining the dominant or effective cause of the damage. 38. In his initial report, the FSP’s engineer (GD) concluded that it was unlikely that any single event would have contributed to the excessive moisture conditions observed at the property which caused the differential foundation movement. GD considered that this movement was caused by factors including poor site drainage and recent changes i n environmental conditions (and to a limited extent, the break in the downpipe identified by the FSP’s plumber (BB)). 39. While I accept that GD is appropriately qualified to comment on the cause of the damage to the Applicants’ property, I do not consider that his conclusions can be accepted without qualification, as it is clear from the available evidence that at the time GD carried out his investigations, he did Case No: 317341 Determination Page 8 of 10 not give sufficient consideration to the leaking water main as a possible cause of the damage (focussing instead on the broken downpipe). 40. GD subsequently confirmed that it is possible that sub-floor water inundation from the burst water main could have contributed to over 90% of the damage to the Applicants’ property. However, he said that this could not be proven based on the absence of evidence provided by the Applicants and the geotechnical testing carried out. It is not clear whether GD was provided with photographs of the broken water main and the letter from the Applicants ’ engineer regarding the volume of the leaking water. Further, it is possible that the geotechnical tests conducted may have been designed differently had GD been more concerned with investigating the effect of the leak in the mains water pipe at the front of the property. 41. Nevertheless, the evidence does establish that there may have been other factors which contributed to the foundation mov ement at the Applicants’ property. In this regard, I note that there was evidence of extensive packing of the bearers and stumps and the Applicants have themselves confirmed that the house was re-levelled approximately 10 years ago. The Applicants also confirmed that they had repaved the driveway in the last five years. It is highly unlikely that the mains water pipe had been leaking for this length of time. Accordingly, it appears that there have been ongoing movement issues at the Applicants’ property for some time. 42. Further, GD’s report indicates that there were elevated moisture conditions in the soil around the total perimeter of the house. If the leaking water from the mains water pipe was the sole contributing factor, it would be reasonable to expect that the soil at the front of the house would show a higher moisture content than the soil in other areas. 43. However, I accept the Applicants’ evidence that the water main had been leaking for a prolonged period of time and that the damage to their home had worsened significantly during this period. Given the difficulties with the expert evidence obtained by the FSP (as discussed above), I am satisfied that the Applicants have established, on the balance of probabilities, that the leaking water main was the proximate cause of the claimed damage. Application of policy 44. The FSP says that, even if it is accepted that the leaking water pipe caused the claimed damage, it does not fall within the scope of cover under the policy. 45. As outlined above, the policy contains an exclusion for damage caused by earth movement except where (relevantly) the damage occurs “within 72 hours after the event”. In this case, the relevant “event” is the leak of water from the mains water pipe. 46. The meaning of the phrase “within 72 hours after the event” is relatively straightforward where the relevant event is a one-off event which occurs at an identifiable point in time, such as an earthquake, explosion or sudden Case No: 317341 Determination Page 9 of 10 outpouring of water from a burst water main. However, the insured event “Escaping Liquid” is not confined to such situations. Where the escape of liquid occurs over a period of months or years, the interpretation of the phrase is inherently more difficult. 47. In Johnson v American Home Assurance (1998) 192 CLR 266 at 272, Kirby J outlined how a court will approach the construction of an insurance policy, as follows: “ An insurance policy is a species of commercial contract. It must be interpreted so as to give the words used their ordinary meaning. The primary duty of a court is to discern from the language, structure and apparent purpose of the document what it means. Subject to any special statutory rules governing the approach to interpretation and any interpretative rules lawfully contained in the policy itself, a court should give the words used their ordinary operation. But it should be an operation which takes into account the commercial and social purposes of an insurance policy. Wherever possible, an absurd or manifestly unjust result will be avoided upon the hypothesis that such would not have been intended by the parties. ” 48. The Applicants say that the leak of water from the pipe was ongoing and as the damage arose before the leak was fixed (and the relevant event ceased), it should be covered under the policy. 49. The FSP says t hat the damage would only be covered if it occurred “within 72 hours after the beginning of the event” (my emphasis). However, I consider that it is unnecessary to imply the additional words suggested by the FSP in order to give meaning to the phrase. 50. In my view, having regard to the ordinary meaning of the words and the purpose of the contract, the 72 hour time limit operates to impose an immediate temporal connection between the underlying event which caused the damage and the resultant damage itself. Accordingly, in order for any resultant damage to fall within the scope of cover, it must occur within 72 hours of the water leak which caused it. 51. The FSP’s engineer (GD) has confirmed that it is very unlikely that foundation movement caused by a leak of water would occur immediately or even shortly after the leak and will generally occur only after a prolonged period of time (ie months or years). I accept that GD’s views are consistent with those of other experts in his field. 52. Accordingly, I consider that, on the balance of probabilities, the leak of water from the pipe did not cause foundation movement and resulting damage to the Applicants’ property within 72 hours after the leak. Therefore, I consider that the FSP is entitled to rely on the relevant exclusion to deny the Applicants’ claim. Case No: 317341 Determination Page 10 of 10 Determination 53. On the basis of the available information I determine that the FSP is entitled to deny the Applicants’ claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.