Text of the determination
Case No: 317155 Determination Page 1 of 12
Case number: 317155
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim - Exclusion/Condition - Claim Amount
14 February 2014
Summary
Description
This dispute concerns a claim by the Applicant for storm damage to his
home. The financial services provider (FSP) accepted liability for some
items of damage, but denied liability for other items, including damage to
the roof. The Applicant wants the FSP to indemnify him for the whole of
the claimed damage, and to provide him with temporary accommodation
benefits.
Basis of Determination
The available information establishes that the damage to the roof was not
caused by the storm but was due to wear and tear and deterioration, which
are excluded under the policy. However, the Applicant has established that
the storm did cause damage to the ceiling insulation, for which the FSP
has not accepted liability.
The Applicant has not established that he incurred any costs for temporary
accommodation and therefore is not entitled to benefits under the policy in
this regard. Further, the available information suggests that the home
remained habitable after the storm.
Determination
The FSP is to pay the Applicant an amount of $2,276 (plus interest) for the
costs of repairing additional property damage caused by the storm. The
FSP is to pay the Applicant a further amount of $500 as compensation for
non-financial loss suffered as a result of the manner in which the FSP
handled his claim.
Background
1. The Applicant held a home building and contents insurance policy with the
FSP, which was current at the time of loss.
Determination
Case No: 317155 Determination Page 2 of 12
2. On 8 February 2012, the Applicant lodged a claim under the policy for water
damage to the property sustained when his roof leaked during a storm on 11
January 2012.
3. The FSP agreed to indemnify the Applicant for some of the claimed damage
to the property, but denied liability for other parts of the Applicant’s claim ,
including the damage to the roof (on the basis that this was caused by
maintenance issues). The FSP offered the Applicant a cash settlement of
$7,139 (less the policy excess of $900) based on a quote from its builder
( “ P ” ).
4. The Applicant considers that the cash settlement offered by the FSP is
inadequate and does not fully compensate him for his loss. He wants the
FSP to increase the cash settlement by a further $5,723.30.
Summary of Applicant’s position
5. The Applicant says that the FSP should increase the cash settlement
amount to cover:
the cost of repairing the additional identified in the quote provided by
his roofer (“C”) , including damage to the roof, skylights, electrical
fittings and ceiling insulation;
the costs of hiring a bin to remove rubbish from the property; and
a buffer of 10% of the quote, to allow for movements in the Consumer
Price Index (CPI) and the introduction of the carbon tax on 1 July 2012.
6. The Applicant says that the FSP should pay for temporary accommodation
from the date of the storm, as he has been living in the damaged house,
which was uninhabitable during this period. The FSP should also:
pay for temporary accommodation while the repairs are carried out;
pay for the cost of returning his contents from storage to the insured
property; and
provide free home insurance for the period while the property is vacant.
7. The Applicant is also dissatisfied with the manner in which the FSP has
handled his claim. He says that the FSP did not offer him a cash settlement
until ten months after the insured event.
Summary of FSP’s position
8. The FSP says that:
it has indemnified the Applicant for the storm damage to the property, in
accordance with its obligations under the policy;
Case No: 317155 Determination Page 3 of 12
it is not required to indemnify the Applicant for damage which was not
caused by the storm. Its builders have confirmed that the additional
items of property damage for which the Applicant seeks indemnity were
caused by factors which are excluded under the policy;
it is not liable under the policy for the other costs claimed by the
Applicant, such as storage costs; and
the cash settlement amount was based on the quote obtained from P in
October 2012, and therefore no adjustment is required.
9. The FSP says that it is not required to fund the costs of temporary
accommodation for the Applicant, as he has continued to live at the insured
address since the storm, and accordingly the property is habitable.
10. The FSP acknowledges that the Applicant experienced delays during the
claim process and has offered to pay him a total of $2,486 as compensation
(in lieu of indemnifying him for the alleged damage to the ceiling insulation
and the costs of removing contents). It has also paid the Applicant $150 for
breaches of its customer charter.
Issues
11. Whether the cash settlement offered by the FSP is appropriate, having
regard to the terms of the policy.
12. Whether the Applicant is entitled to compensation for non-financial loss as a
result of the manner in which the FSP has handled his claim.
Reasons for decision
13. As advised to the parties, FOS has considered it appropriate to expedite this
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. Accordingly, this dispute has not been the subject of a FOS
Recommendation and has proceeded directly to Determination.
14. I am satisfied there has been a full exchange of material between the parties
and that each party has had the opportunity of clarifying any issues raised
therein.
15. The Applicant bears the onus of establishing that, on the balance of
probabilities, he has suffered a loss caused by a risk insured under the
policy. If the Applicant is able to establish this, the onus then shifts to the
FSP to show that, on the balance of probabilities, the loss falls within an
exclusion clause under the policy or it is otherwise entitled to deny liability.
16. The FSP does not dispute that the Applicant’s property sustained damage as
the result of a storm in January 2012. However, the parties dispute the
extent of the FSP’s liability for the damage to the Applicant’s property, as
well as for various other aspects of his claim.
Case No: 317155 Determination Page 4 of 12
Damage to property
Terms of policy
17. The Applicant’s policy provides cover for damage to his property caused by
certain specified events, including storm and rainwater. However, the cover
provided under this insured event is subject to exclusions for damage
caused by, arising from or involving
wear and tear, rust, deterioration or corrosion; and
mechanical, structural, electrical, electronic or other failure or
breakdown (other than under the insured event o f “Damage to electric
motors”).
Available information
18. The FSP’s claim records indicate that, when t he Applicant lodged his claim
on 8 February 2012, he advised that his roof had leaked as a result of very
heavy rain on 11 January 2012, resulting in water damage to the ceilings
and some of his belongings.
19. Following lodgement of the Applicant’s claim, the FSP appointed a builder
(“ J ”) to inspect the damage. J attended the property on 20 February 2012
and reported that:
the overall condition of the terracotta roof tiles and the pointing on the
roof over the main part of the house was poor;
the acoustic ceiling tiles in the sunroom and study were stained and
required replacement. The roof sheets above this area were rusted and
the seals around the skylights had broken down over a long period of
time. Accordingly, the water damage to the ceiling tiles was considered
to have been caused by wear and tear;
there was minor water staining of the ceiling in the bedroom. The
Applicant had replaced a cracked roof tile over this room after the
storm, but was not confident about his repair. J could not inspect the
roof because he could not walk on the terracotta roof tiles as they were
old and brittle, and there was a risk of further breakage; and
the ceiling lining boards in the garage required replacement, as water
had been entering over a long period of time. W hile the cause of the
water entry could not be determined, J felt it was due to water entering
through the roof sheet laps and flashings. The existing ceiling works
had not been carried out in a workmanlike manner and therefore this
aspect of the claim should be cash settled (if accepted).
20. Based on J’s findings , the FSP denied liability for the damage to the roo f, on
the basis that it fell within the policy exclusion for damage caused by wear
and tear, rust, deterioration and corrosion. The FSP accepted liability for the
resultant damage to the ceilings, subject to the Applicant first undertaking
Case No: 317155 Determination Page 5 of 12
the roof repairs. J provided an estimate of $5,922.95 for repairing the
resultant damage.
21. The Applicant disputed the FSP’s denial of liability for the damage to the roof
and provided a report from his roofer (“C”). C prepared a quote for repairs to
the property, in which he noted that the skylight glass and garage roof had
been damaged by a hailstorm the previous Christmas, which had resulted in
water entering through the house, causing damage to the ceiling and
insulation. C quoted an amount of $11,693 for the repairs, which included:
demolishing insulation and ceiling board ($1,980);
repairing ceiling plaster board ($2,321);
replacing insulation ($2,156);
painting roof ($1,705);
repairing skylight ($1,111);
electrical rewiring ($330);
installing replacement lighting ($330);
moving contents to and from storage ($660); and
removing rubbish ($1,100).
22. In light of the inconsistency between C and J’s findings regarding the cause
of the damage to the roof, the FSP appointed a roof specialist (“ S ”), who
attended the property on 31 May 2012. S reported that:
there was hail damage to the domed skylight, the “whirly vent” and one
terracotta roof tile, all of which were located on the terracotta roof over
the main section of the house;
rainwater had entered through small cracks in the lens of the dome
skylight, causing leaks underneath. The damaged roof tile (which had
since been replaced) had also caused leaks in the front bedroom. The
domed skylight and whirly vent required replacement;
leaks had occurred in the sunroom as a result of large cracks in the
rectangular skylight located on the iron roof at the rear of the property.
The cracks began at the centre of the glass and continued outwards
towards the perimeter of the frame. These cracks were not the result of
recent hail damage but were caused by excessive pressure to one area
of the frame work. The age of the sealants used to fill these cracks
indicated that the damage was likely to have occurred at least two
years earlier;
the leaks in the sunroom had been compounded by heavily corroded
roof sheets at the base of the skylight, which was a maintenance issue.
Roof sheets had been placed over the skylight to provide temporary
protection from the weather;
leaks had occurred in the garage, as the result of an overflowing gutter
on the roof which had failed to cope with the recent weather conditions,
Case No: 317155 Determination Page 6 of 12
allowing rainwater to build up and flow back under the roof sheets and
into the roof cavity. The gutter was also corroded;
there was no hail damage to the garage roof and the small indentations
visible on the roof were caused by foot traffic; and
the general condition of the remainder of the roof was satisfactory,
although the capping and valley mortar had cracked, the top layer of
several roof tiles had “scaled” and the roof tiles had deteriorated over a
long period of time.
23. The FSP subsequently provided S with a copy of the quote from the
Applicant’s builder (C). S reviewed C’s report and confirmed that it did not
change his findings. The FSP also sought further comment from J, who
provided an updated report stating that:
while the damage to the rectangular skylight was caused by wear and
tear, the damage to the circular skylight was most likely caused by hail
and therefore should be included in the revised scope of works;
the broken tile flange may be due to pedestrian traffic and was very
common on roofs. It did not appear to be leaking and was considered
to be a maintenance issue;
the hail marks on the roof sheets over the garage were only cosmetic
and this damage had not caused the water damage to the garage.
However, the roof sheets did need to be replaced due to the hail
damage and this should be included in the revised scope of works; and
he maintained that the water damage to the property had occurred over
a number of years due to the defects and wear and tear issues
identified in his original report.
24. J’s report attached a revised scope of works and p rovided an updated quote
of $8,593.70 for the required repairs. The FSP advised the Applicant that it
would cash settle the repairs to the garage and asked whether he wished to
be cash settled for all of the repairs. When the Applicant advised that he did,
the FSP obtained a further quote of $7,139 from another builder (“P”), based
on the same scope of works. The FSP subsequently offered to cash settle
the Applicant for $6,239 (being the amount of P’s quote, less the applicable
excess of $900).
Roof repairs
25. The Applicant says that the FSP should indemnify him for the costs of
carrying out the following additional repairs to the roof, which were not
included in the scope of works approved by the FSP:
replacing the cracked glass in the rectangular skylight;
replacing the corroded roof sheets located directly underneath the
skylight;
rebidding and repointing the roof capping tiles and resecuring the roof
valley tiles;
Case No: 317155 Determination Page 7 of 12
replacing several deteriorated roof tiles along the roof valley; and
replacing the corroded garage roof gutter and installing a roof head to
minimise the risk of future leaks.
26. The Applicant has provided a quote of $3,895 prepared by the FSP’s roof er
(S) for these repairs.
27. I have carefully reviewed the reports provided by the FSP’s builder (J), the
FSP’s roofer (S) and the Applicant’s roofer (C) in respect of the storm
damage, together with the photographs included therein. Having done so, I
am satisfied that the items referred to in S’s quote were not damaged by the
storm (or any other insured event), but as a result of wear and tear and
gradual deterioration (as identified by S in his original report).
28. I consider that S is appropriately qualified to determine the cause of the
damage to the roof and that his report provides a more detailed analysis
than that con tained in C’s quote. I n relation to the items of damage
specifically referred to in C’s quote as caused by hail, I am satisfied that:
the nature of the crack in the rectangular skylight is more consistent
with it having been caused by pressure to one area of the framework,
than by impact from hail storms. The presence of old sealant suggests
that this damage occurred prior to the storm event; and
the damage to the garage roof sheets has been caused in the manner
suggested by S (ie through corrosion and foot traffic), rather than by
hail.
29. Accordingly, I consider that the FSP is not liable to indemnify the Applicant
for the additional damage to the roof described in S’s quote.
Replacement of insulation
30. As outlined above, the quote provided by the Applicant’s builder (C) included
the replacement of 80 square metres of ceiling insulation which had
sustained water damage. Photographs of the damaged insulation were
attached to C’s quote .
31. The FSP says that its builder (P) did not make any allowance for replacing
the insulation in his quote and has subsequently confirmed that he did not
believe that the insulation was damaged when he inspected the property in
October 2012. However, I note that P was only asked to quote on the scope
of works prepared by J, which did not include replacing damaged insulation.
Further, damage to the insulation is apparent in the photographs attached to
the report which J provided in February 2012.
32. Accordingly, I am satisfied that the damage to the insulation should be
included in the resultant damage for which the FSP has accepted liability.
33. C’s quote includes an amount of $2,156 for replacing the damaged
insulation, and also includes a further amount of $1,980 for demolishing the
Case No: 317155 Determination Page 8 of 12
ceiling board and insulation. At the FSP’s request, P prov ided an estimate of
$1,820 for the cost of replacing the insulation, and indicated that it
considered the amounts quoted by C to be excessive.
34. In its submissions to FOS, the FSP agreed to offer the amount of $2,156 as
non-financial compensation for the inconvenience experienced by the
Applicant during the claim process, to cover the allegedly damaged
insulation.
35. Having regard to the estimates provided, I am satisfied that the FSP’s
proposed payment of $2,156 is sufficient to allow for the replacement of the
damaged insulation.
Electrical works
36. As outlined above, the quote provided by the Applicant’s builder (C) includes
a total amount of $660 for electrical rewiring and replacing light fittings.
37. T he FSP’s builder (P) has indicated that these costs are un necessary, as the
ply wood ceiling panels are cut around the light fittings and therefore there is
no need to remove the lights in order to replace the ceiling panels.
38. The Applicant says that four electrical fittings sustained storm damage. This
damage wa s not identified by either of the FSP’s builders (J or P). Further,
the quote prepared by the Applicant’s builder (C) does not include any
details of the damage to the light fittings or the electrical wiring, nor is this
apparent from the photographs provided.
39. In the circumstances, I am not satisfied that the Applicant has established
that electrical rewiring and/or the replacement of light fittings is required as a
result of the storm damage. Accordingly, I do not consider that the FSP
should be required to pay the Applicant any amount in this regard.
Rubbish removal
40. The quote provided by the Applicant’s builder (C) includes an amount of
$1,000 for rubbish removal, whereas the quote provided by the FSP’s builder
(P) includes an amount of $120 for this item.
41. As noted above, P’s quote contemplated the removal of the damaged ceiling
boards, but did not contemplate the removal of the damaged insulation,
which presumably will also require removal. In these circumstances, I
consider it appropriate that P’s quote for rubbish removal be increased by a
further $120 to provide for removal of the damaged insulation.
Storage
42. The quote provided by the App licant’s builder (C) includes a total amount of
$660 for the cost of moving the Applicant’s contents to and from storage.
Case No: 317155 Determination Page 9 of 12
43. The FSP says that it should not be required to indemnify the Applicant for
this amount, as its builder (P) has confirmed that the repair works can be
carried out without the need to store the Applicant’s contents, as these can
be moved around the house (if necessary) while the works are carried out.
44. The Applicant has not provided any further information in support of his
position that the removal and storage of his contents is required.
45. In these circumstances, I am not satisfied that the FSP should be required to
indemnify the Applicant for these costs. However, I note that, in its
submissions to FOS, the FSP has agreed to pay the Applicant an additional
amount of $330 as non-financial compensation for the inconvenience
experienced by the Applicant during the claim process, to cover the removal
of contents from the property.
Adjustment of 10%
46. The Applicant says that the cash settlement amount should be increased by
10%, to take account of movements in the Consumer Price Index (CPI) and
the introduction of the carbon tax, since the cash settlement amount was
determined.
47. The quote provided by P (based on which the cash settlement amount was
determined) was obtained in October 2012. Accordingly, P’s quote would
have taken into account the effect of the carbon tax (and any increase in CPI
prior to that date).
48. The cash settlement was paid to the Applicant in December 2012.
Accordingly, the Applicant has had the benefit of the funds since then, and
could have applied them to undertake the necessary repairs based on the
prices available at that time.
49. Accordingly, I do not consider that the FSP should be required to increase
the cash settlement to allow for CPI and the effect of the carbon tax.
50. However, I do consider that it is appropriate for the FSP to pay interest on
the additional amount of $2,276 for which I have found the FSP to be liable,
from the date of the FSP’s final decision letter (being 5 April 2012).
Temporary accommodation
51. The Applicant says that the FSP should pay him for the costs of temporary
accommodation during the period since the storm, on the basis that the
property was uninhabitable during this time. The Applicant says the FSP
should also pay him for temporary accommodation while the property is
being repaired.
52. The Applic ant’s policy provides that the FSP will pay the reasonable costs
incurred for temporary accommodation, in circumstances where the property
has sustained damage as the result of an insured event and:
Case No: 317155 Determination Page 10 of 12
the FSP is satisfied that the building is no longer habitable;
the insured was living permanently in the building at the time; and
a valid claim has been made under the policy.
53. The Applicant has provided a copy of a letter from his builder (C) dated 13
August 2013, which includes a photograph of the damaged insulation and
states that the property is uninhabitable due to exposed asbestos. The
letterhead indicates that C is a tiler, however his exact qualifications (and
therefore his ability to identify asbestos) are not clear.
54. T he FSP’s builder (P) confirmed in an email dated 26 April 2013 that, in his
opinion and having regard to health issues, the home was habitable despite
the water damage which, in the case of the rooms other than the garage,
was relatively minor.
55. I note that C did not refer to the presence of asbestos when he provided his
repair quote in April 2012. Further, the FSP’s claim records indicate that the
Applicant did not raise the issue of temporary accommodation until 21
December 2012, more than 10 months after the claim was lodged.
56. Under the terms of the Applicant’s policy, benefits are only payable where
the Applicant has incurred costs in obtaining temporary accommodation. The
Applicant does not dispute that he has been living in the property since the
water damage occurred. Accordingly, as the Applicant has not established
that he has incurred any expenses in respect of temporary accommodation,
the FSP is not required to pay the Applicant any amount in respect of
temporary accommodation for this period.
57. The quote provided by the FSP’s build er confirms that that there is no need
for temporary accommodation while the repairs are carried out. In my view,
this is consistent with the nature of the damage as shown in the photographs
included in the reports of the various contractors. Accordingly, I do not
consider that the FSP is required to pay the Applicant any amount in respect
of temporary accommodation while the repairs are completed.
Free home insurance cover
58. The Applicant says that the FSP should offer him a period of free insurance
cover for the property. I do not accept this. The property will continue to be
“on risk” at all times (including while the repairs are carried out) and ,
accordingly, the Applicant will receive the benefit of the premiums paid.
Compensation
59. The Applicant is dissatisfied with the manner in which the FSP has handled
his claim. He says that it took ten months before the FSP paid him the cash
settlement.
Case No: 317155 Determination Page 11 of 12
60. Under paragraph 9.3(b) of FOS’s Terms of Reference, compensation for
non-financial loss (capped at $3,000) may be awarded where there has been
an unusual degree or extent of physical inconvenience, time taken to resolve
the situation or interference with an applicant’s expectation of enjoyment or
peace of mind. However, FOS takes a conservative approach to
compensation for non-financial loss and expects an applicant to be
moderately robust and bear the normal degree of inconvenience
experienced when a problem occurs.
61. The FSP has acknowledged that the Applicant has suffered inconvenience in
the course of the claims process. In light of this, the FSP has agreed to pay
the Applicant an amount of $330 in respect of compensation for non-financial
loss to mitigate the costs of contents storage (in circumstances where I have
determined that it has no liability for these costs under the policy).
62. The FSP has advised FOS that it has also paid the Applicant $150 as
compensation for failing to comply with customer response times, in
accordance with its customer charter.
63. I have reviewed the FSP’s claim records, which outline the chronology of the
claim. In my view, the FSP’s management of the claim has resulted in the
Applicant suffering an unusual degree of delay. In particular, I note that:
the FSP appears not to have given due consideration to the damage to
the ceiling insulation, even though this was apparent from the
photographs included in J’s initial report and was subsequently raised
explicitly by C. However, the FSP did not seek specific clarification from
its builders in relation to this issue until after the Applicant had lodged
his dispute with FOS; and
the FSP did not engage a contractor to carry out a comprehensive
inspection of the roof until after the Applicant disputed the FSP’s partial
decline of his claim, despite J acknowledging in his report that he had
not been able to carry out a close inspection of the roof on his initial
visit.
64. In the circumstances, I consider that the Applicant is entitled to
compensation for non-financial loss of $500 (including the amount of $330
which the FSP has already agreed to pay, but in addition to the amount of
$150 paid for breaches of the customer charter).
Determination
65. On the basis of the available information, I determine that:
the FSP is to pay the Applicant the amount of $2,276 for the costs of
repairing additional property damage caused by the storm, plus interest
on this amount calculated in accordance with section 57 of the
Insurance Contracts Act 1984 (Cth) from 5 April 2012 to the date of
payment; and
Case No: 317155 Determination Page 12 of 12
the FSP is to pay the Applicant the amount of $500 as compensation
for non-financial loss suffered as a result of the manner in which the
FSP handled his claim.