Home / Financial Firm (Unknown - Insurer) / Determination 317155

Determination 317155

Storm roof damage partly declined; cash settlement amount and handling disputed

FirmFinancial Firm (Unknown - Insurer)
Decided2014-04-30
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$2,276
Non-financial loss$500
Amount claimed$5,723
SourceAFCA PDF

Summary

The applicant's storm damage claim was partly accepted and cash settled at $6,239, but the FSP declined roof and other items. AFCA found roof damage excluded as wear and tear, but ordered $2,276 for storm-damaged insulation plus interest, and $500 for non-financial loss from the claim handling.

Wear and tear and deterioration are excluded, but storm damage to ceiling insulation shown in the insurer's own inspection photographs was covered.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interestpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 317155 Determination Page 1 of 12 Case number: 317155 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of Claim - Exclusion/Condition - Claim Amount 14 February 2014 Summary Description  This dispute concerns a claim by the Applicant for storm damage to his home. The financial services provider (FSP) accepted liability for some items of damage, but denied liability for other items, including damage to the roof. The Applicant wants the FSP to indemnify him for the whole of the claimed damage, and to provide him with temporary accommodation benefits. Basis of Determination  The available information establishes that the damage to the roof was not caused by the storm but was due to wear and tear and deterioration, which are excluded under the policy. However, the Applicant has established that the storm did cause damage to the ceiling insulation, for which the FSP has not accepted liability.  The Applicant has not established that he incurred any costs for temporary accommodation and therefore is not entitled to benefits under the policy in this regard. Further, the available information suggests that the home remained habitable after the storm. Determination  The FSP is to pay the Applicant an amount of $2,276 (plus interest) for the costs of repairing additional property damage caused by the storm. The FSP is to pay the Applicant a further amount of $500 as compensation for non-financial loss suffered as a result of the manner in which the FSP handled his claim. Background 1. The Applicant held a home building and contents insurance policy with the FSP, which was current at the time of loss. Determination Case No: 317155 Determination Page 2 of 12 2. On 8 February 2012, the Applicant lodged a claim under the policy for water damage to the property sustained when his roof leaked during a storm on 11 January 2012. 3. The FSP agreed to indemnify the Applicant for some of the claimed damage to the property, but denied liability for other parts of the Applicant’s claim , including the damage to the roof (on the basis that this was caused by maintenance issues). The FSP offered the Applicant a cash settlement of $7,139 (less the policy excess of $900) based on a quote from its builder ( “ P ” ). 4. The Applicant considers that the cash settlement offered by the FSP is inadequate and does not fully compensate him for his loss. He wants the FSP to increase the cash settlement by a further $5,723.30. Summary of Applicant’s position 5. The Applicant says that the FSP should increase the cash settlement amount to cover:  the cost of repairing the additional identified in the quote provided by his roofer (“C”) , including damage to the roof, skylights, electrical fittings and ceiling insulation;  the costs of hiring a bin to remove rubbish from the property; and  a buffer of 10% of the quote, to allow for movements in the Consumer Price Index (CPI) and the introduction of the carbon tax on 1 July 2012. 6. The Applicant says that the FSP should pay for temporary accommodation from the date of the storm, as he has been living in the damaged house, which was uninhabitable during this period. The FSP should also:  pay for temporary accommodation while the repairs are carried out;  pay for the cost of returning his contents from storage to the insured property; and  provide free home insurance for the period while the property is vacant. 7. The Applicant is also dissatisfied with the manner in which the FSP has handled his claim. He says that the FSP did not offer him a cash settlement until ten months after the insured event. Summary of FSP’s position 8. The FSP says that:  it has indemnified the Applicant for the storm damage to the property, in accordance with its obligations under the policy; Case No: 317155 Determination Page 3 of 12  it is not required to indemnify the Applicant for damage which was not caused by the storm. Its builders have confirmed that the additional items of property damage for which the Applicant seeks indemnity were caused by factors which are excluded under the policy;  it is not liable under the policy for the other costs claimed by the Applicant, such as storage costs; and  the cash settlement amount was based on the quote obtained from P in October 2012, and therefore no adjustment is required. 9. The FSP says that it is not required to fund the costs of temporary accommodation for the Applicant, as he has continued to live at the insured address since the storm, and accordingly the property is habitable. 10. The FSP acknowledges that the Applicant experienced delays during the claim process and has offered to pay him a total of $2,486 as compensation (in lieu of indemnifying him for the alleged damage to the ceiling insulation and the costs of removing contents). It has also paid the Applicant $150 for breaches of its customer charter. Issues 11. Whether the cash settlement offered by the FSP is appropriate, having regard to the terms of the policy. 12. Whether the Applicant is entitled to compensation for non-financial loss as a result of the manner in which the FSP has handled his claim. Reasons for decision 13. As advised to the parties, FOS has considered it appropriate to expedite this dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. Accordingly, this dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 14. I am satisfied there has been a full exchange of material between the parties and that each party has had the opportunity of clarifying any issues raised therein. 15. The Applicant bears the onus of establishing that, on the balance of probabilities, he has suffered a loss caused by a risk insured under the policy. If the Applicant is able to establish this, the onus then shifts to the FSP to show that, on the balance of probabilities, the loss falls within an exclusion clause under the policy or it is otherwise entitled to deny liability. 16. The FSP does not dispute that the Applicant’s property sustained damage as the result of a storm in January 2012. However, the parties dispute the extent of the FSP’s liability for the damage to the Applicant’s property, as well as for various other aspects of his claim. Case No: 317155 Determination Page 4 of 12 Damage to property Terms of policy 17. The Applicant’s policy provides cover for damage to his property caused by certain specified events, including storm and rainwater. However, the cover provided under this insured event is subject to exclusions for damage caused by, arising from or involving  wear and tear, rust, deterioration or corrosion; and  mechanical, structural, electrical, electronic or other failure or breakdown (other than under the insured event o f “Damage to electric motors”). Available information 18. The FSP’s claim records indicate that, when t he Applicant lodged his claim on 8 February 2012, he advised that his roof had leaked as a result of very heavy rain on 11 January 2012, resulting in water damage to the ceilings and some of his belongings. 19. Following lodgement of the Applicant’s claim, the FSP appointed a builder (“ J ”) to inspect the damage. J attended the property on 20 February 2012 and reported that:  the overall condition of the terracotta roof tiles and the pointing on the roof over the main part of the house was poor;  the acoustic ceiling tiles in the sunroom and study were stained and required replacement. The roof sheets above this area were rusted and the seals around the skylights had broken down over a long period of time. Accordingly, the water damage to the ceiling tiles was considered to have been caused by wear and tear;  there was minor water staining of the ceiling in the bedroom. The Applicant had replaced a cracked roof tile over this room after the storm, but was not confident about his repair. J could not inspect the roof because he could not walk on the terracotta roof tiles as they were old and brittle, and there was a risk of further breakage; and  the ceiling lining boards in the garage required replacement, as water had been entering over a long period of time. W hile the cause of the water entry could not be determined, J felt it was due to water entering through the roof sheet laps and flashings. The existing ceiling works had not been carried out in a workmanlike manner and therefore this aspect of the claim should be cash settled (if accepted). 20. Based on J’s findings , the FSP denied liability for the damage to the roo f, on the basis that it fell within the policy exclusion for damage caused by wear and tear, rust, deterioration and corrosion. The FSP accepted liability for the resultant damage to the ceilings, subject to the Applicant first undertaking Case No: 317155 Determination Page 5 of 12 the roof repairs. J provided an estimate of $5,922.95 for repairing the resultant damage. 21. The Applicant disputed the FSP’s denial of liability for the damage to the roof and provided a report from his roofer (“C”). C prepared a quote for repairs to the property, in which he noted that the skylight glass and garage roof had been damaged by a hailstorm the previous Christmas, which had resulted in water entering through the house, causing damage to the ceiling and insulation. C quoted an amount of $11,693 for the repairs, which included:  demolishing insulation and ceiling board ($1,980);  repairing ceiling plaster board ($2,321);  replacing insulation ($2,156);  painting roof ($1,705);  repairing skylight ($1,111);  electrical rewiring ($330);  installing replacement lighting ($330);  moving contents to and from storage ($660); and  removing rubbish ($1,100). 22. In light of the inconsistency between C and J’s findings regarding the cause of the damage to the roof, the FSP appointed a roof specialist (“ S ”), who attended the property on 31 May 2012. S reported that:  there was hail damage to the domed skylight, the “whirly vent” and one terracotta roof tile, all of which were located on the terracotta roof over the main section of the house;  rainwater had entered through small cracks in the lens of the dome skylight, causing leaks underneath. The damaged roof tile (which had since been replaced) had also caused leaks in the front bedroom. The domed skylight and whirly vent required replacement;  leaks had occurred in the sunroom as a result of large cracks in the rectangular skylight located on the iron roof at the rear of the property. The cracks began at the centre of the glass and continued outwards towards the perimeter of the frame. These cracks were not the result of recent hail damage but were caused by excessive pressure to one area of the frame work. The age of the sealants used to fill these cracks indicated that the damage was likely to have occurred at least two years earlier;  the leaks in the sunroom had been compounded by heavily corroded roof sheets at the base of the skylight, which was a maintenance issue. Roof sheets had been placed over the skylight to provide temporary protection from the weather;  leaks had occurred in the garage, as the result of an overflowing gutter on the roof which had failed to cope with the recent weather conditions, Case No: 317155 Determination Page 6 of 12 allowing rainwater to build up and flow back under the roof sheets and into the roof cavity. The gutter was also corroded;  there was no hail damage to the garage roof and the small indentations visible on the roof were caused by foot traffic; and  the general condition of the remainder of the roof was satisfactory, although the capping and valley mortar had cracked, the top layer of several roof tiles had “scaled” and the roof tiles had deteriorated over a long period of time. 23. The FSP subsequently provided S with a copy of the quote from the Applicant’s builder (C). S reviewed C’s report and confirmed that it did not change his findings. The FSP also sought further comment from J, who provided an updated report stating that:  while the damage to the rectangular skylight was caused by wear and tear, the damage to the circular skylight was most likely caused by hail and therefore should be included in the revised scope of works;  the broken tile flange may be due to pedestrian traffic and was very common on roofs. It did not appear to be leaking and was considered to be a maintenance issue;  the hail marks on the roof sheets over the garage were only cosmetic and this damage had not caused the water damage to the garage. However, the roof sheets did need to be replaced due to the hail damage and this should be included in the revised scope of works; and  he maintained that the water damage to the property had occurred over a number of years due to the defects and wear and tear issues identified in his original report. 24. J’s report attached a revised scope of works and p rovided an updated quote of $8,593.70 for the required repairs. The FSP advised the Applicant that it would cash settle the repairs to the garage and asked whether he wished to be cash settled for all of the repairs. When the Applicant advised that he did, the FSP obtained a further quote of $7,139 from another builder (“P”), based on the same scope of works. The FSP subsequently offered to cash settle the Applicant for $6,239 (being the amount of P’s quote, less the applicable excess of $900). Roof repairs 25. The Applicant says that the FSP should indemnify him for the costs of carrying out the following additional repairs to the roof, which were not included in the scope of works approved by the FSP:  replacing the cracked glass in the rectangular skylight;  replacing the corroded roof sheets located directly underneath the skylight;  rebidding and repointing the roof capping tiles and resecuring the roof valley tiles; Case No: 317155 Determination Page 7 of 12  replacing several deteriorated roof tiles along the roof valley; and  replacing the corroded garage roof gutter and installing a roof head to minimise the risk of future leaks. 26. The Applicant has provided a quote of $3,895 prepared by the FSP’s roof er (S) for these repairs. 27. I have carefully reviewed the reports provided by the FSP’s builder (J), the FSP’s roofer (S) and the Applicant’s roofer (C) in respect of the storm damage, together with the photographs included therein. Having done so, I am satisfied that the items referred to in S’s quote were not damaged by the storm (or any other insured event), but as a result of wear and tear and gradual deterioration (as identified by S in his original report). 28. I consider that S is appropriately qualified to determine the cause of the damage to the roof and that his report provides a more detailed analysis than that con tained in C’s quote. I n relation to the items of damage specifically referred to in C’s quote as caused by hail, I am satisfied that:  the nature of the crack in the rectangular skylight is more consistent with it having been caused by pressure to one area of the framework, than by impact from hail storms. The presence of old sealant suggests that this damage occurred prior to the storm event; and  the damage to the garage roof sheets has been caused in the manner suggested by S (ie through corrosion and foot traffic), rather than by hail. 29. Accordingly, I consider that the FSP is not liable to indemnify the Applicant for the additional damage to the roof described in S’s quote. Replacement of insulation 30. As outlined above, the quote provided by the Applicant’s builder (C) included the replacement of 80 square metres of ceiling insulation which had sustained water damage. Photographs of the damaged insulation were attached to C’s quote . 31. The FSP says that its builder (P) did not make any allowance for replacing the insulation in his quote and has subsequently confirmed that he did not believe that the insulation was damaged when he inspected the property in October 2012. However, I note that P was only asked to quote on the scope of works prepared by J, which did not include replacing damaged insulation. Further, damage to the insulation is apparent in the photographs attached to the report which J provided in February 2012. 32. Accordingly, I am satisfied that the damage to the insulation should be included in the resultant damage for which the FSP has accepted liability. 33. C’s quote includes an amount of $2,156 for replacing the damaged insulation, and also includes a further amount of $1,980 for demolishing the Case No: 317155 Determination Page 8 of 12 ceiling board and insulation. At the FSP’s request, P prov ided an estimate of $1,820 for the cost of replacing the insulation, and indicated that it considered the amounts quoted by C to be excessive. 34. In its submissions to FOS, the FSP agreed to offer the amount of $2,156 as non-financial compensation for the inconvenience experienced by the Applicant during the claim process, to cover the allegedly damaged insulation. 35. Having regard to the estimates provided, I am satisfied that the FSP’s proposed payment of $2,156 is sufficient to allow for the replacement of the damaged insulation. Electrical works 36. As outlined above, the quote provided by the Applicant’s builder (C) includes a total amount of $660 for electrical rewiring and replacing light fittings. 37. T he FSP’s builder (P) has indicated that these costs are un necessary, as the ply wood ceiling panels are cut around the light fittings and therefore there is no need to remove the lights in order to replace the ceiling panels. 38. The Applicant says that four electrical fittings sustained storm damage. This damage wa s not identified by either of the FSP’s builders (J or P). Further, the quote prepared by the Applicant’s builder (C) does not include any details of the damage to the light fittings or the electrical wiring, nor is this apparent from the photographs provided. 39. In the circumstances, I am not satisfied that the Applicant has established that electrical rewiring and/or the replacement of light fittings is required as a result of the storm damage. Accordingly, I do not consider that the FSP should be required to pay the Applicant any amount in this regard. Rubbish removal 40. The quote provided by the Applicant’s builder (C) includes an amount of $1,000 for rubbish removal, whereas the quote provided by the FSP’s builder (P) includes an amount of $120 for this item. 41. As noted above, P’s quote contemplated the removal of the damaged ceiling boards, but did not contemplate the removal of the damaged insulation, which presumably will also require removal. In these circumstances, I consider it appropriate that P’s quote for rubbish removal be increased by a further $120 to provide for removal of the damaged insulation. Storage 42. The quote provided by the App licant’s builder (C) includes a total amount of $660 for the cost of moving the Applicant’s contents to and from storage. Case No: 317155 Determination Page 9 of 12 43. The FSP says that it should not be required to indemnify the Applicant for this amount, as its builder (P) has confirmed that the repair works can be carried out without the need to store the Applicant’s contents, as these can be moved around the house (if necessary) while the works are carried out. 44. The Applicant has not provided any further information in support of his position that the removal and storage of his contents is required. 45. In these circumstances, I am not satisfied that the FSP should be required to indemnify the Applicant for these costs. However, I note that, in its submissions to FOS, the FSP has agreed to pay the Applicant an additional amount of $330 as non-financial compensation for the inconvenience experienced by the Applicant during the claim process, to cover the removal of contents from the property. Adjustment of 10% 46. The Applicant says that the cash settlement amount should be increased by 10%, to take account of movements in the Consumer Price Index (CPI) and the introduction of the carbon tax, since the cash settlement amount was determined. 47. The quote provided by P (based on which the cash settlement amount was determined) was obtained in October 2012. Accordingly, P’s quote would have taken into account the effect of the carbon tax (and any increase in CPI prior to that date). 48. The cash settlement was paid to the Applicant in December 2012. Accordingly, the Applicant has had the benefit of the funds since then, and could have applied them to undertake the necessary repairs based on the prices available at that time. 49. Accordingly, I do not consider that the FSP should be required to increase the cash settlement to allow for CPI and the effect of the carbon tax. 50. However, I do consider that it is appropriate for the FSP to pay interest on the additional amount of $2,276 for which I have found the FSP to be liable, from the date of the FSP’s final decision letter (being 5 April 2012). Temporary accommodation 51. The Applicant says that the FSP should pay him for the costs of temporary accommodation during the period since the storm, on the basis that the property was uninhabitable during this time. The Applicant says the FSP should also pay him for temporary accommodation while the property is being repaired. 52. The Applic ant’s policy provides that the FSP will pay the reasonable costs incurred for temporary accommodation, in circumstances where the property has sustained damage as the result of an insured event and: Case No: 317155 Determination Page 10 of 12  the FSP is satisfied that the building is no longer habitable;  the insured was living permanently in the building at the time; and  a valid claim has been made under the policy. 53. The Applicant has provided a copy of a letter from his builder (C) dated 13 August 2013, which includes a photograph of the damaged insulation and states that the property is uninhabitable due to exposed asbestos. The letterhead indicates that C is a tiler, however his exact qualifications (and therefore his ability to identify asbestos) are not clear. 54. T he FSP’s builder (P) confirmed in an email dated 26 April 2013 that, in his opinion and having regard to health issues, the home was habitable despite the water damage which, in the case of the rooms other than the garage, was relatively minor. 55. I note that C did not refer to the presence of asbestos when he provided his repair quote in April 2012. Further, the FSP’s claim records indicate that the Applicant did not raise the issue of temporary accommodation until 21 December 2012, more than 10 months after the claim was lodged. 56. Under the terms of the Applicant’s policy, benefits are only payable where the Applicant has incurred costs in obtaining temporary accommodation. The Applicant does not dispute that he has been living in the property since the water damage occurred. Accordingly, as the Applicant has not established that he has incurred any expenses in respect of temporary accommodation, the FSP is not required to pay the Applicant any amount in respect of temporary accommodation for this period. 57. The quote provided by the FSP’s build er confirms that that there is no need for temporary accommodation while the repairs are carried out. In my view, this is consistent with the nature of the damage as shown in the photographs included in the reports of the various contractors. Accordingly, I do not consider that the FSP is required to pay the Applicant any amount in respect of temporary accommodation while the repairs are completed. Free home insurance cover 58. The Applicant says that the FSP should offer him a period of free insurance cover for the property. I do not accept this. The property will continue to be “on risk” at all times (including while the repairs are carried out) and , accordingly, the Applicant will receive the benefit of the premiums paid. Compensation 59. The Applicant is dissatisfied with the manner in which the FSP has handled his claim. He says that it took ten months before the FSP paid him the cash settlement. Case No: 317155 Determination Page 11 of 12 60. Under paragraph 9.3(b) of FOS’s Terms of Reference, compensation for non-financial loss (capped at $3,000) may be awarded where there has been an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with an applicant’s expectation of enjoyment or peace of mind. However, FOS takes a conservative approach to compensation for non-financial loss and expects an applicant to be moderately robust and bear the normal degree of inconvenience experienced when a problem occurs. 61. The FSP has acknowledged that the Applicant has suffered inconvenience in the course of the claims process. In light of this, the FSP has agreed to pay the Applicant an amount of $330 in respect of compensation for non-financial loss to mitigate the costs of contents storage (in circumstances where I have determined that it has no liability for these costs under the policy). 62. The FSP has advised FOS that it has also paid the Applicant $150 as compensation for failing to comply with customer response times, in accordance with its customer charter. 63. I have reviewed the FSP’s claim records, which outline the chronology of the claim. In my view, the FSP’s management of the claim has resulted in the Applicant suffering an unusual degree of delay. In particular, I note that:  the FSP appears not to have given due consideration to the damage to the ceiling insulation, even though this was apparent from the photographs included in J’s initial report and was subsequently raised explicitly by C. However, the FSP did not seek specific clarification from its builders in relation to this issue until after the Applicant had lodged his dispute with FOS; and  the FSP did not engage a contractor to carry out a comprehensive inspection of the roof until after the Applicant disputed the FSP’s partial decline of his claim, despite J acknowledging in his report that he had not been able to carry out a close inspection of the roof on his initial visit. 64. In the circumstances, I consider that the Applicant is entitled to compensation for non-financial loss of $500 (including the amount of $330 which the FSP has already agreed to pay, but in addition to the amount of $150 paid for breaches of the customer charter). Determination 65. On the basis of the available information, I determine that:  the FSP is to pay the Applicant the amount of $2,276 for the costs of repairing additional property damage caused by the storm, plus interest on this amount calculated in accordance with section 57 of the Insurance Contracts Act 1984 (Cth) from 5 April 2012 to the date of payment; and Case No: 317155 Determination Page 12 of 12  the FSP is to pay the Applicant the amount of $500 as compensation for non-financial loss suffered as a result of the manner in which the FSP handled his claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.