Home / Financial Firm (Unknown - Insurer) / Determination 316684

Determination 316684

Cash settlement of earthquake damage to laundry extension; refusal to fund full rebuild

FirmFinancial Firm (Unknown - Insurer)
Decided2013-08-26
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$30,000
SourceAFCA PDF

Summary

After an April 2010 earthquake, the insurer cash settled $3,355 for earthquake damage to a poorly built laundry extension and refused a roughly $30,000 rebuild. AFCA found the faulty construction excluded the rebuild and upheld the cash settlement.

Where earthquake and an excluded cause such as faulty workmanship both contributed to damage, the insurer may rely on the exclusion, so only the earthquake-attributable repair cost is payable.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 316684 Determination Page 1 of 8 Case number: 316684 General Insurance - Domestic Insurance - Home Building - FSP Decision - Extent of Claimable Damage - Structural Repairs or Replacement 22 August 2013 Background 1. The Applicant held a home and contents insurance policy with the Financial Services Provider (FSP) which was current at the time of the loss. 2. The Applicant lodged a claim under the policy for damage to various parts of his home as the result of an earthquake on 20 April 2010. 3. The FSP accepted the Applicant’s claim for damage to certain parts of his home. However, the FSP advised that it would not cover the full cost of demolishing and rebuilding the laundry extension to the home, on the basis that flaws in the construction of the extension contributed to the damage sustained in the earthquake. 4. The FSP cash settled the Applicant for $3,355 being the cost of the damage to the laundry extension caused by the earthquake, based on a quotation provided by the FSP’s repairer. 5. The Applicant considers that the cash settlement is inadequate and seeks indemnity for the full cost of rebuilding the laundry extension. Summary of Applicant’s position 6. The Applicant says that the damage to his property caused by the earthquake included damage to the laundry extension. 7. The Applicant says the FSP’s repairer has recommended that the laundry extension be completely demolished and rebuilt and that the FSP had previously agreed to this. However, the FSP has subsequently decided to repair only part of the damage to the laundry extension. 8. The Applicant says that he was not aware that there were any problems with the construction of the laundry extension and when he bought the property, the real estate agent told him that the extension had been approved by the local council. The Applicant says that the FSP agreed to insure the property without requiring a structural report and therefore, the FSP should not now deny indemnity based on structural defects. Determination Case No: 316684 Determination Page 2 of 8 9. The Applicant says that the cash settlement offered by the FSP is not sufficient to repair the damage to the laundry extension. He seeks indemnity for the full cost of demolishing and rebuilding the laundry extension, estimated to be approximately $30,000. Summary of FSP’s position 10. The FSP accepts that it is responsible for repairing the damage to the laundry extension caused by the earthquake and says that it has offered a cash settlement for these repairs. However, the FSP says that it is not liable for the cost of rebuilding the laundry extension so as to satisfy current building regulations. 11. The FSP relies on the reports of its builder and engineer in support of its view, that the reason that the laundry extension needs to be replaced (rather than repaired), is because it was poorly constructed, not because of the earthquake. The FSP says that the laundry extension was not constructed in accordance with the plans submitted to the council and that this contributed to the damage claimed. Any additional damage to the laundry extension which was due to poor construction falls within an exclusion under the policy. 12. The FSP says that its records do not indicate that the Applicant was ever advised that the laundry extension would be demolished and rebuilt. 13. The FSP relies on the following policy provisions: “ What we pay Replacing, rebuilding or repairing your home Please note: although we will pay to return your home to its original condition when new or last renovated, we will not upgrade your home if you have over- insured it.  What we will pay When loss or damage occurs to the home we will at our option do one of the following:  pay the costs incurred to rebuild, replace or repair your home so that it is returned, as far as possible, to its condition and extent when new or, if it has been renovated, to its condition and extent when last renovated, or  if the home is totally destroyed and you choose to replace it with a smaller home , we will pay the reasonable costs incurred to rebuild the replacement home plus a cash settlement. The cash settlement will be limited to the market value of the land and home before the loss or damage less the market value of the land and home after the replacement home has been built. ... “ General exclusions Case No: 316684 Determination Page 3 of 8 Please note: These general exclusions below apply to all sections of this policy. We do not insure you for:  any loss or damage that is not directly caused by an insured event (applies to Home or Contents or both) ... We also do not insure you for loss or damage caused by or legal liability arising from: ...  gradual deterioration, wear and tear, lack of maintenance, faulty workmanship, or faulty design, rust, corrosion, mildew, wet or dry rot, rising damp, or seepage ...” Issue 14. Whether the cash settlement of $3,355 satisfies the FSP’s liability under the policy for the damage to the laundry extension. Reasons for decision 15. As advised to the parties, FOS has considered it appropriate to expedite this dispute in accordance with the Operational Guidelines to the FOS Terms of Reference, due to the nature and complexity of the dispute. Accordingly, this dispute has not been the subject of a FOS Recommendation but has proceeded directly to Determination. 16. I am satisfied that a full exchange of relevant information has taken place between the respective parties and that each party has had the opportunity of addressing any issues raised therein. 17. It is not disputed that the Applicant’s property (including the laundry extension) sustained damage as the result of an earthquake, which is an insured event under the policy. 18. The issue in dispute between the parties is whether:  all of the damage to the laundry extension was caused by the earthquake (and therefore the FSP should be required to fund the entire replacement cost); or  the damage is in part attributable to the poor construction of the laundry extension and therefore the FSP should only be required to fund the repair of that portion of the damage which is attributable to the earthquake. 19. As the Applicant has established a prima facie claim under the policy for damage caused by the insured event of earthquake, the onus shifts to the Case No: 316684 Determination Page 4 of 8 FSP to establish, on the balance of probabilities, that a policy exclusion applies. Evidence as to cause of damage 20. Following lodgement of the Applicant’s claim, th e FSP engaged a loss adjuster, “MY” , who attended the property on 24 April 2010. MY’s report dated 14 June 2010 states that:  most of the damage to the property occurred in the laundry / toilet / kitchen extension at the rear of the house which had sustained cracks in several walls, dislodged brickwork at the top of the west wall, movement of the south wall creating a gap between the bottom of the window and the external wall, and cracks in the mortar below the window; and  there had also been ceiling movement in the spare room and dressing room of the original house. The movement of the dressing room ceiling was suspected to have occurred sometime before the earthquake and had been aggravated by it. 21. As required by local authorities, MY subsequently appointed a structural engineer, “DJ” , to assess the extent of damage and determine whether it was structural in nature. DJ’s report dated 18 November 2010 states that:  the main part of the house was constructed of a clad frame, metal tile roofing and a predominantly timber and timber stumped sub-floor structure, whereas the laundry extension was built of bricks on a concrete slab;  he observed cracks of up to 5 millimetres in single leaf brick walls in numerous locations in the rear extension;  he observed smaller cracks of up to 1.5 millimetres in numerous locations, including in the main building;  the damage appeared to be non-structural and could be repaired by a competent builder. However, the rear brickwork in the laundry extension “should be crack stitched or suitably rebu ilt to ensure the level of damage does not increase”; and  due to the construction and location of the building, it was likely that movement had been occurring for some time and there was evidence of previous repairs. Accordingly, it was possible that movement during the earthquake had exacerbated existing issues. 22. On 17 January 2011, the FSP’s builders , “MC” , provided a quote for $19,081.10 for repairs to the whole of the property. However, it appears that repairs did not commence until early 2012. 23. In June 2012, the loss adjuster, MY, (now trading under a different name and having allocated the file to a different adjuster) prepared a further report. MY advised that: Case No: 316684 Determination Page 5 of 8  while internal repairs to the property had been completed, there was substantial additional damage to the laundry extension which had not been observed by the structural engineer, DJ, originally appointed;  although council approval had been obtained when the laundry extension was added in 1985, the extension had not been completed to a satisfacto ry standard which “had certainly contributed to the loss”; and  accordingly, MY recommended that a structural engineer be appointed to provide specifications regarding the demolition and replacement of the laundry extension. 24. In accordance with MY’s recommen dation, a structural engineer, “DW” , was appointed to re-evaluate the damage to the laundry extension and determine whether it should be demolished. DW inspected the property on 3 August 2012 and reported that:  the laundry extension was constructed of single brick leaf on three sides. Where the brick wall abutted the main house, it was unattached and the gap was covered with timber strips internally and externally;  both the ends of the western and eastern wall near the main building were not sufficiently rigid as they were not tied or keyed into the main building at all, and moved with a firm push by hand;  structurally the brick walls, particularly the freestanding and free ended eastern and western walls, were not satisfactorily framed and did not have sufficient stability. This made the structure particularly vulnerable in an area subject to earthquake activity; and  although “the cracks were very likely a result of an earthquake event, the damage was largely due to poor construction detail”. For example, cracks in the western wall above the door opening were very likely a result of the wall being insufficiently stiff to resist an east-west displacement. 25. DW’s report outlined proposed repairs to strengthen the existing structure of the laundry extension, but disclaimed responsibility for ensuring that the extension would comply with applicable building codes following completion of these repairs. 26. It is clear from DW’s report, and from the FSP’s file notes of subsequent conversations, that DW disagreed with MY ’s conclusion that the extension needed to be demolished and rebuilt. The FSP’s file notes indicate that its representatives subsequently spoke with MY, who clarified that the local council would not approve the repair of the laundry extension unless the engineer could certify compliance with the building code. 27. Accordingly, the FSP decided that it was necessary to determine what repairs would have been required if the laundry extension had been subject to the earthquake but had originally been built to the required standard. The FSP also asked its builders, MC, to prepare a scope of works, separately identifying: Case No: 316684 Determination Page 6 of 8  the repairs that would be required to bring the extension up to 1985 building standards; and  the repairs required to fix the earthquake damage and comply with current building regulations. 28. As part of this process, MC reviewed the plans submitted to the local council for the construction of the laundry extension in 1985. MC noted that:  the actual construction of the laundry extension differed greatly from the approved plans. Among other things, the plans provided for a double brick wall, whereas the actual construction was of single brick with an internal frame clad with fibre cement sheeting; and  it was unclear whether the actual construction included a footing underneath the concrete slab although this was unlikely. 29. MC agreed with the view expressed by the second structural engineer, DW, that the damage to the laundry extension was largely due to poor construction, but did not agree with the p roposed repairs outlined in DW’s report. Given that MC would be required to warrant the repairs, MC would only consider a total rebuild, on the basis that this was the only way to ensure “a structurally safe and warrantable construction”. 30. Given MC’s view t hat it was not practical to repair the damage to the laundry extension, the FSP decided to cash settle the Applicant for “the resulting damage to the laundry extension caused by the earthquake” and asked its loss adjuster, MY, and builder, MC, to provide a quote for this portion of the damage. MC provided a quote for $3,355, although the available evidence does not provide any further indication as to the basis on which this figure was determined. Analysis of evidence 31. I consider that, as a structural engineer, DW is appropriately qualified to assess the cause of damage to the laundry extension. Accordingly, I consider that it is appropriate to have regard to DW’s findings in determining the cause of the damage. 32. I have reviewed DW’s report and the photograp hs included therein, together with the additional photographs taken by the loss adjuster, MY. In his report, DW concludes that the cracks in the walls of the laundry extension were caused by the earthquake, but the “damage” (which, given the context, I tak e to refer to structural damage) was “largely due to poor construction detail”. In his report, DW identifies specific flaws in the construction of the laundry extension (primarily relating to the manner in which the brick walls were constructed) which made the laundry extension particularly susceptible to damage in the event of an earthquake. I consider that DW’s report provides a rational and logical explanation as to how the manner in which the laundry extension was constructed contributed to the damage sustained in the earthquake. Further, I note that: Case No: 316684 Determination Page 7 of 8  the FSP’s builder , MC, agreed with DW’s view that the damage to the laundry extension was largely due to poor construction;  MC identified significant differences between the construction of the laundry extension and the plans approved by the local council in 1985, which supports the conclusion that the extension was poorly constructed (having regard to the standards reasonably expected at that time); and  the initial assessment by the loss adjuster, MY, indicated that the bulk of the damage to the property occurred in the laundry extension, which arguably provides further support for the conclusion that the manner of construction of this part of the property contributed to the damage sustained. 33. I note that the Applicant disputes that the construction of the laundry extension was flawed. The Applicant says that certain of the photographs taken by the FSP’s consultants show that the extension was constructed from double brick, rather than from single brick with an internal frame and cement cladding. I have reviewed the photographs referred to by the Applicant but do not consider that these conclusively establish the method of construction of the laundry extension. However, the reports prepared by both structural engineers, DJ and DW and the builder, MC, who all inspected the property, are consistent in describing the extension as having single brick walls. In the absence of expert evidence to the contrary, I accept the opinions of DJ, DW and MC in this regard. Application of policy 34. The FSP argues that it should not be liable for all of the damage sustained to the laundry extension, on the basis that some of the damage:  was not directly caused by the earthquake; and  was due to the poor construction of the laundry e xtension and therefore is subject to the policy exclusion for damage caused by faulty workmanship or faulty design. 35. I accept that the Applicant was not aware of the flaws in the construction of the laundry extension, both at the time he purchased the property and when the earthquake occurred. However, the application of the relevant policy exclusions does not depend on the Applicant’s awareness of these flaws. 36. For the reasons outlined above, I consider that the evidence establishes, on the balance of probabilities, that the structural damage to the laundry extension was due to a combination of the earthquake and the poor construction of the laundry extension. 37. It is established law, that where there is more than one effective cause of claimed damage and any one of the causes is excluded under a policy of insurance, an insurer is entitled to rely on the exclusion clause to defeat the claim. Case No: 316684 Determination Page 8 of 8 38. Accordingly, I consider that the FSP is entitled to rely on the exclusion for damage caused by faulty workmanship to de feat the Applicant’s claim for structural damage to the laundry extension. 39. The FSP has accepted that some of the damage to the laundry extension would have occurred regardless of the flaws in its construction. The FSP has offered the Applicant a cash settlement of $3,355 for the repair of this damage, being the amount quoted by its builder, MC. While MC has not provided any explanation for this figure, it is possible that it relates to the repair of cosmetic damage only. 40. The Applicant seeks indemnity for the full cost of demolishing and rebuilding the laundry (approximately $30,000) and has not provided any evidence regarding the estimated cost of repairing the earthquake-related damage only. 41. However, in my view, the available evidence suggests that the need to demolish and rebuild the laundry extension arises from the fact that the extension was not properly constructed in the first place. Even though the FSP’s structural engineer , DW, considered that the laundry extension could be repaired, this approach is not practicable in the circumstances as no reputable engineer would certify that the repairs were compliant and no reputable builder would warrant the repairs. Therefore, I consider that even if the FSP were liable for the whole of the damage (which, for the reasons outlined above, I do not accept), then the amount of $30,000 would significantly overstate its liability under the policy to return the damaged property to its original condition. 42. In the absence of any evidence to the contrary, I accept the q uote provided by MC (a registered builder) for the repair of that part of the damage to the laundry extension which is considered to be solely attributable to the earthquake. Accordingly, I consider that the cash settlement offer of $3,355 satisfies the FS P’s liability under the policy. Determination 43. On the basis of the available information, I determine that the cash settlement of $3,355 provided by the FSP’s satisfies its liability under the policy for the damage to the laundry extension of the Applicant ’s home .

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.