Home / Financial Firm (Unknown - Insurer) / Determination 316573

Determination 316573

Partial denial of storm damage claim and payment of policy excess

FirmFinancial Firm (Unknown - Insurer)
Decided2014-01-06
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$2,000
SourceAFCA PDF

Summary

The FSP accepted and repaired storm damage to the awnings but denied the Applicant's claim for a jasmine tree, roof, subsidence of a security door and electrical repairs. AFCA found the denials were justified and that the Applicant must pay the $300 excess, and ordered nothing from the FSP.

The tree removal was excluded, the roof and door damage arose from maintenance and gradual ground movement, and the electrical repair was likely a separate storm requiring its own claim and excess.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 316573 Determination Page 1 of 9 Case number: 316573 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim 6 January 2014 Summary Description  This dispute concerns the denial by the Financial Services Provider (FSP) of the Applicant’s claim for various items of storm damage to his property. Basis of Determination  The Applicant had failed to establish that certain of the disputed items of damage were caused by a storm, while other items fell within specific exclusions under the policy. Determination  The FSP is entitled to deny the Applicant’s claim fo r the disputed items of damage. As the FSP accepted liability for other items and arranged repairs, the Applicant is required to pay the applicable policy excess. Background 1. This Determination follows the review of a Recommendation issued on behalf of the Financial Ombudsman Service (“FOS”) on 22 November 2013. The Recommendation was rejected by the Applicant. 2. The Applicant held a home building and contents insurance policy with the Financial Services Provider (FSP) which was current at the time of the loss. 3. On 17 November 2012, the Applicant lodged a claim under the policy for damage to his home following a storm. 4. The FSP accepted the Applicant’s claim for storm damage to the awnings of his home, subject to payment of an excess of $300. However, the FSP denied liability for the other items of damage claimed by the Applicant, on the basis that they were not caused by an insured event and /or fell within specific exclusions under the policy. Determination Case No: 316573 Determination Page 2 of 9 5. The Applicant disputes the FSP’s partial denial of liability for his claim. Summary of Applicant’s position 6. The Applicant says that the FSP should be required to indemnify him for the following:  the costs of pruning and removing a jasmine tree, which was necessary because the tree had caused damage to the gate and fence of the property and blocked the pathway to the property;  storm damage to the roof of the property, which resulted in water pouring into the dining room during the storm;  subsidence damage to the front security screen door; and  the cost of repairs to the electrical power line to the house and the replacement of the connection box, which were required as a result of damage sustained during the storm. 7. The Applicant says that he should not be required to pay the excess in order for the FSP to progress his claim. He says that the FSP should deduct the excess from the amount owing to him – otherwise, he will pay the excess only after the repairs to the property have been completed . 8. The Applicant seeks $2,000 in settlement of his claim. Summary of FSP’s position 9. In relation to each of the disputed items of damage, the FSP says that:  its builder (“J”) has c onfirmed that the jasmine tree had not caused any damage to the gate or fence of the Applicant’s property, but is merely overgrown due to poor maintenance. The policy does not provide cover for the costs of pruning of removing the jasmine tree in these circumstances;  the builder (J) has advised that the roof did not sustain any damage as a result of the storm;  its engineer (“C”) has confirmed that the subsidence damage to the front security screen door was not caused by an insured event, but occurred over a period of time due to wear and tear, poor construction and maintenance (each of which are excluded under the policy); and  it is willing to accept liability for the repairs to the electrical power line and connection box, if the Applicant is able to establish this damage was caused by the storm or another event insured under the policy. However, the Applicant has not yet done so. 10. The FSP says that the Applicant is required to pay the excess of $300, as it has completed the repairs to the awnings for which it accepted liability. Case No: 316573 Determination Page 3 of 9 Issues 11. Whether the FSP is entitled to deny liability for the disputed items claimed by the Applicant. 12. Whether the Applicant is required to pay the policy excess. Reasons for decision 13. I am satisfied that a full exchange of material information has taken place between the parties and that each party has had the opportunity to address any issues raised therein. 14. It is an accepted principle of general insurance law that the onus of proof rests on the insured to establish, on the balance of probabilities, that he or she has suffered a loss caused by an insured risk (known as a prima facie claim). Once the insured has established a prima facie claim, the onus shifts to the FSP to establish, on the balance of probabilities, that the loss falls within an exclusion clause in the policy or that it is otherwise entitled to deny liability for the claim. 15. In the current case, the Applicant disputes the FSP’s denial of liability for four items of damage to his property which he says were caused by storms. He also disputes the manner in which the FSP has sought to impose the policy excess. Payment of excess 16. Under the Applicant’s policy, an excess is payable for each incident in respect of which a claim is made. The product disclosure statement (PDS) for the policy states that: “When you make a claim we will either deduct the applicable excesses from the amount we pay you or direct you to pay the excesses to us or to the appointed repairer or supplier. We may require you to pay the excess in full before we pay your claim or provide any benefits under your policy.” 17. The Applicant says that he should not be required to pay the excess of $300 which applies to his claim because the FSP has not completed all necessary repairs. 18. I consider that the FSP is entitled to require the Applicant to pay the excess. The FSP has reviewed the Applicant’s claim, accepted liability for the damage to the awnings and completed these repairs. The fact that the FSP rejected some of the items of damage claimed does not entitle the Applicant to refuse to pay the excess. Case No: 316573 Determination Page 4 of 9 Available evidence regarding cause of damage 19. The FSP’s claim records reflect that, when the Applicant lodged his claim on 17 November 2012, he advised that:  water had entered the dining room through the roof; and  there was damage to the sun shade and awnings at the back of the house. 20. Following lodgement of the Applicant’s claim, the FSP appointed a builder (J) to inspect the damage. J attended the property on 23 November 2012 and reported that the Applicant had advised him that the damage occurred on 17 November 2012, when a heavy wind and storm blew a jasmine tree onto the front fence and gate, water appeared through a crack in the timber ceiling of the dining room and the rear deck canvas awnings were torn. 21. J’s report included the following findings in relation to the cause of the claimed damage:  the fence and gate had not been damaged by the jasmine tree. The tree was growing over the front entrance fence area and it was difficult to determine the extent to which it had been growing over the fence line prior to the storm. However, the Applicant had advised that the tree had been growing over the area for more than 30 years;  the rear patio roll down canvas awnings were in poor condition due to age and exposure and were torn and broken to varying degrees. Their condition prior to the storm could not be determined;  an inspection of the timber ceiling and floor of the dining room with a straight edge did not reveal any bulking, warping or water stains. The light fitting was inspected visually and found to be working perfectly with no evidence of water staining or corrosion; and  the roofer appointed by the builder found the roof to be in generally good condition. However, in the area directly above the leak, there was a side lap which was sitting up, allowing wind-driven rain to enter. The width of some of the batten spacings was contributing to the side lap sitting up. This was a maintenance related issue which had not caused any resultant damage, and could be addressed by sealing and pop riveting the side lap. 22. The builder (J) subsequently confirmed to the FSP that, although the awnings showed evidence of pre-existing damage, there was also some evidence of storm damage. Accordingly, the FSP agreed to cover the awnings but, based on J’s report , rejected the remainder of the Applicant’s claim. 23. After the Applicant lodged his dispute with FOS and raised the issue of subsidence to his front door, the FSP engaged an engineer (C) to report on the cause of this damage. C’s findings are discussed at paragraph 42 below. Case No: 316573 Determination Page 5 of 9 24. The FSP’s claim records reflect that it advised the Applicant on several occasions that he could obtain his own expert report as to the cause of the disputed items of damage. However, the Applicant has elected not to do so. Pruning and removal of jasmine tree 25. The Applicant says that:  the jasmine tree fell during the storm and prevented him from opening the pedestrian gate to his property or closing the carport gate, and completely blocked the public footpath;  he arranged for one of the tree-lopping crews in the area to remove it for a small gratuity; and  however, part of the tree still overhangs his garden a nd the plants in the ground are dying from lack of sun. 26. The Applicant’s policy provides cover for loss or damage to the insured building caused by certain insured events, including storm. 27. The meaning of “building” for the purposes of the policy expressly excludes “plants, trees, shrubs or hedges in the ground”. Accordingly, the policy does not provide cover for any damage to the jasmine tree itself. 28. The policy also provides cover for loss or damage to the insured building caused by a falling tree or part of a falling tree (under the insured event of “impact”) . However, the PDS clearly states that cover is not provided for the cost of removing or lopping fallen trees or branches that have not damaged the building. 29. I have reviewed the report provided by the F SP’s builder (J) which contains several photographs of the jasmine tree and the adjacent fence and gate. I consider that these photographs support the builder’s conclusion that the fence and gate did not sustain any damage as a result of the impact of the jasmine tree (or any part of it) falling down, and that the tree had simply grown over the fence over an extended period of time. The Applicant has not provided any independent information which contradicts J’s findings. 30. As outlined above, the policy expressly excludes liability for the cost of removing or lopping trees or branches which have not damaged the insured building. 31. The FSP’s claim records indicate that the Applicant advised the FSP that the jasmine tree needed to be cut back in order for the damage to the roof to be assessed. However, the report prepared by the builder (J) confirms that a roof inspection was conducted, and does not suggest that the roofer’s ability to inspect the roof was adversely affected by the presence of the jasmine tree. Case No: 316573 Determination Page 6 of 9 32. For the reasons outlined above, I consider that the FSP is entitled to deny the Applicant’s claim for the cost of pruning and/ or removing the jasmine tree. Damage to roof 33. The Applicant says that the storm damage to his roof caused water to pour through the light fitting in his dining room, at the rate of a tap on low volume. He says that he has been advised by a pest controller that possums and rats are gaining entry into the ceiling at the point which the FSP’s builder (J) said was not damaged by the storm. 34. I have reviewed J’s findings in relation to the damage to the Applicant’s roof, together with the photographs of the ceiling and light fitting in the Applicant’s dining room. 35. J’s report indicates that the Applicant’s roof was inspected by a roofer, wh o identified maintenance issues with the side lap in the area directly above the leak. I consider that J’s report provides a logical explanation for the leak reported by the Applicant. In the absence of any expert evidence to the contrary, I consider that the FSP was entitled to rely on the findings in J’s report in relation to the cause of damage to the roof. 36. As outlined above, the Applicant’s policy provides cover for loss or damage caused by one of the specified insured events. Based on the available information, I consider that the Applicant has failed to establish that, on the balance of probabilities, the damage to the roof was caused by the insured event of storm. 37. Further, the Applicant’s policy expressly excludes damage that is caused by, arises from or involves a failure by him to take reasonable care of the building, keep the building well maintained and in good condition, or fix faults and defects as soon as he became aware of them. Based on J’s report, the damage to the roof arose from a maintena nce issue and therefore would be excluded under the policy. 38. The photographs included in J’s report support his findings that there was no evidence of water damage to the dining room ceiling or light fitting. 39. Accordingly, I consider that the FSP was entitled to deny liability for the claimed damage to the roof. Subsidence damage to front security screen door 40. The Applicant says that his front security screen door will not latch or lock due to subsidence “following the December storm cells”, and he has had to “jerry - rig” it so that it barely works. 41. The FSP says that the Applicant did not mention the damage to the security screen door until he lodged his dispute with FOS in March 2013. My review of the FSP’s claim rec ords confirms that there is no indication that the Case No: 316573 Determination Page 7 of 9 Applicant raised this damage when he lodged his claim or when the FSP’s builder (J) attended his property. 42. After the Applicant raised this issue, the FSP engaged a structural engineer (C) to attend the property and report on the cause of the damage. C attended the property on 7 May 2013 and reported that:  the Applicant advised him that the damage occurred following a storm event in January 2013;  the Applicant advised that he had had to lower the strike plate for the security door approximately 10 millimetres and chisel out some timber from the door frame to allow the door to adequately close and lock;  the door was currently operating smoothly and C did not consider that any further works were required (other than possibly cosmetic works to fill and paint the old exposed screw hole);  accordingly, the issue with the screen door had been rectified by the Applicant and there were no structural concerns;  the Applicant’s property was located on reactive clay soils which are subjected to seasonal expansion and contraction due to changes in moisture content. Over time, this ongoing movement commonly causes movement in buildings;  the Applicant’s property was located on a steep slope descending from street level down to the rear. Stormwater from the small porc h roof cover and fabric sails in front of the property was diverted onto the block paved driveway and encouraged to flow under the front of the dwelling. No surface drains were observed in the area;  given the poor drainage conditions, it was fair to assume that stormwater would flow towards the timber, steel and concrete stumps in the sub floor area under the front door, exacerbating ground movement over time, which would be an ongoing issue. Some of the ends of the floor joists were deteriorating, the stumps showed evidence of packing and the Applicant had advised that some of the stumps had been replaced over the years; and  the amount of surface water and ground movement would be increased by heavy rainfall in the area, as experienced during late January 2013. 43. The Applicant has not provided any expert evidence to refute the findings of the FSP’s engineer. In the absence of any such evidence and in light of the qualifications of the FSP’s engineer, I consider that it is reasonable to rely on his findings as to the cause of damage. 44. In summary, the engineer found that the underlying cause of the minor movement of the screen door was ground movement resulting from the property being built on reactive clay soils, which was exacerbated by the drainage conditions and heavy rainfall. I consider that the deterioration in the sub-floor structure and the evidence of packing of the stumps (as shown in the photographs included in the engineer’s report) provide support for the Case No: 316573 Determination Page 8 of 9 engineer’s findings that the property was subject to ground movement on an ongoing basis. 45. Under the Applicant’s policy , the cover provided for damage caused by the insured event of storm contains an exclusion for loss or damage caused by “ erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other eart h movement” (the “subsidence exclusion”). However, the FSP will cover loss or damage caused by subsidence that occurs within 72 hours of, and directly because of, a storm and not because of erosion over time, structural fault or design fault. 46. I consider that the FSP is entitled to deny the Applicant’s claim under the subsidence exclusion. The report of the FSP’s engineer establishes, on the balance of probabilities, that the claimed damage to the screen security door arose over time rather than within 72 hours of, and directly because of, a storm event. I note that it will generally be very difficult to establish that claimed damage arose within a specified period of time after a storm event (as required for cover to be provided), in circumstances such as the present, where a claim for the relevant damage was not made until a number of months later. Further, the engineer’s report establishes that the design of the house and surrounding drainage contributed to the ground movement. Electrical repairs 47. The Applicant says that the electric power line was so severely damaged by the storm that it was hanging low across the street and the electricity distributor disconnected the power at the pole for safety reasons. He says that the connection box was ripped from the house and remained connected only by bare wires. 48. The Applicant has provided a copy of an invoice from an electrician dated 1 February 2013 for $267.58, being the cost of replacing and testing the POA box at the Applic ant’s property. 49. In discussions with the FOS Case Manager, the Applicant indicated that this damage may have been caused by a storm other than the one which was the subject of his initial claim in November 2012. Given the Applicant’s description of the damage and the urgency of having it repaired, I consider that it is highly unlikely that this damage was sustained in November 2012 (over two months before the repairs were carried out). 50. On the basis that the damage to the power lines and connection box was caused by a subsequent storm, this should be the subject of a separate claim by the Applicant, for which an additional excess of $300 would apply. As the amount of the excess payable by the Applicant in these circumstances exceeds the amount to which he would be entitled under the policy, this would result in the Applicant owing money to the FSP. 51. In these circumstances, I consider that the FSP is not required to reimburse the Applicant for the cost of the electrical repairs. Case No: 316573 Determination Page 9 of 9 Determination 52. On the basis of the available information I determine that:  the Applicant is required to pay the FSP the excess of $300 which applies to his claim for damage arising from the storm event in November 2012;  the FSP is not required to indemnify the Applicant in respect of: - the pruning and removal of the jasmine tree; - the claimed damage to the roof; - the subsidence of the front security screen door; or - the repairs to the electricity power line and connection box; and  the FSP has fully complied with its obligations under the policy in respect of the damage claimed by the Applicant.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.