Keel damage claim denied under design or construction exclusion
Summary
The applicant claimed for keel damage to his yacht during a delivery voyage and was represented by his insurance broker. AFCA determined the FSP was entitled to deny the claim under the design or construction exclusion.
The keel failure was on balance caused by a fault or error in design or construction following the 2007 and 2012 modifications, and section 46 of the Insurance Contracts Act did not give relief because the exclusion does not refer to the pre-contract condition of the yacht.
Issues
- Claim denial primary · not upheld
“The FSP is entitled to rely on the terms of the policy to deny liability for the claim.”
- Product terms interpretation secondary · not upheld
“Section 46 of the Act does not apply to an exclusion of an event which makes no reference to when the event occurs.”
Subjects and remedies
no remedy
Text of the determination
Case No: 316427 Determination Page 1 of 7
Case number: 316427
General Insurance - Domestic Insurance - Personal and Domestic Property -
Pleasure Craft - FSP Decision - Denial of Claim
3 March 2014
Summary
Description
Claim under a Pleasurecraft Insurance policy following damage to the
keel during a delivery of the yacht from Hamilton Island to Brisbane on
8 October 2012. The FSP denied liability relying on an exclusion within
the terms of the policy.
Basis of Determination
The yacht underwent modifications to the keel structure in 2007 and 2012.
The modifications identified were not done to the design specifications.
The damage sustained was on balance due to a fault or error in design or
construction.
Section 46(2) of the Insurance Contracts Act 1984 does not apply to the
damage.
Determination
The FSP is entitled to rely on the terms of the policy to deny liability for the
claim.
Background
1. The Applicant holds a pleasurecraft insurance policy with the Financial
Services Provider (FSP) providing cover for his 2004 15.2m Cookson yacht.
The policy started on 4 March 2010 and was current at the time of loss.
2. On 8 October 2012 the yacht sustained damage to the keel whilst at sea.
The Applicant lodged a claim with the FSP. The FSP subsequently denied
the claim on the ground that the damage occurred as a result of a fault or
error in design or construction.
3. The Applicant disputes the denial of the claim.
Determination
Case No: 316427 Determination Page 2 of 7
Summary of Applicant’s position
4. Throughout the course of this dispute, the Applicant has been represented
by his insurance broker. For the sake of clarity and brevity, the Panel will
refer hereafter to the Applicant and his representative as “the Applicant”.
5. The Applicant says:
the damage to the yacht was the result of an insured event; and
he has relief under Section 46 of the Insurance Contracts Act 1984
(Cth) (the Act) as he was not aware of any defect with the yacht prior to
insuring it with the FSP.
6. The Applicant seeks to have his claim accepted and to be reimbursed for his
cost in repairing the yacht.
Summary of FSP’s position
7. The FSP says:
the Applicant’s yacht should have been able to withstand the event of 8
October 2012;
the cause of the damage to the yacht was due to modifications to the
yacht, which weakened the structure of the area damaged; and
the Applicant has no relief under Section 46 of the Act.
8. The FSP relies on the following policy provisions of the Product Disclosure
Statement (PDS):
“ What we don’t cover
We will not cover You:
...
13. for the cost of repairing or replacing any part of Your Boat due to fault or
error in design or construction; ”
Issue
9. Whether the FSP is entitled to deny the Applicant’s claim.
Reasons for decision
10. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This dispute has not been the subject of a FOS
Recommendation and has proceeded directly to Determination.
Case No: 316427 Determination Page 3 of 7
11. This decision has been made by a Panel consisting of an Ombudsman and
two Panel members with extensive experience in insurance industry matters
and consumer claims.
12. The Panel is satisfied there has been a full exchange of material between
the parties and each party has had the opportunity of clarifying the issues
which arise from the material.
Law Involved
13. Section 46 of the Act provides that if a claim is made in respect of a loss that
occurred in whole or in part as a result of a defect or imperfection in a thing
and the insured was not aware of the defect or a reasonable person in the
circumstances could not be expected to have been aware of the defect or
imperfection, the insurer may not rely on an exclusion clause that refers to
the condition of the thing before the contract was entered into.
The Claim
14. The Applicant says the damage sustained to his yacht occurred in a
confused sea, when the yacht fell off a backless two metre wave at a 45
angle. A loud cracking sound was heard and upon inspection, damage to the
keel floors was found. The FSP does not dispute this event occurred.
15. The policy provides cover for accidental damage. In this instance the
Applicant says the accident was falling off a backless wave. The Panel is
therefore satisfied the Applicant has a prime facie claim. The onus of
responsibility now shifts to the FSP to prove, on the balance of probabilities
that an exclusion applies.
Expert Evidence
16. In denying the Applicant’s claim, the FSP relies on the evidence provided by
its experts and experts appointed by the Applicant. The Panel is satisfied
these experts are suitably qualified to provide opinions on the construction of
the yacht and the damage sustained. The Panel is persuaded by the
evidence provided by these experts.
17. The yacht was originally assessed by the FSP’s appointed marine assessor,
MA. During the course of MA’s enquiries it was found that the yacht had
undergone modifications in 2007, prior to the Applicant’s purchase of the
yacht. Further modifications were undertaken by the Applicant in 2012. Both
modification projects were in the general area of where the damage occurred
in the incident of 8 October 2012.
18. For ease of reference, the Panel notes the following parties having been
involved in either the modifications undertaken or the inspection of the
damage:
IC – repairer engaged to provide a quotation for repairs;
Case No: 316427 Determination Page 4 of 7
JC – skipper of the yacht at the time of the incident and representative
of BM who undertook the 2012 modifications;
FY – the designer of the 2012 modifications;
WM and DL – representatives of CG, the company appointed by FY to
inspect and report on the cause of the damage;
HI – composite engineers appointed for the 2007 modifications; and
RH – representative of HM, the company who undertook the 2007
modifications.
19. In his original report to the FSP, MA provided the following summary of his
investigations:
“After our inspections and having reviewed the report from [DL] and [WM] of
[CG] we make the following comments for your review and further
considerations;
2005; the vessel was built by Cookson Yachts in New Zealand as a canting
keel racing yacht. The composite engineering for the vessel was
undertaken by [HI].
2007; the yacht was converted by [RH] of [HM] from a canting keel to a
fixed keel yacht, again the composite engineering was undertaken by [HI]
of New Zealand.
2012; the keel floors were reduced in height by [BM] for the insured [the
Applicant], the design and engineering were undertaken by [FY] after
receiving a copy of the [HI] Plans from the previous works.
October 2012 the keel floors failed due to bad weather off the Queensland
Coast whilst the vessel was being delivered south.
The comments from the structural engineers that have been involved in the
investigations cannot conclusively advise why the structure failed, they note
that there was some laminate omitted from the “as built” when compared to
the [FD] Drawings and that there was some latent problems with the laminate
on the existing keel grid prior to the modifications taking place. They also note
that without a full analysis of the [HI] and [FY] Composite Structures they
could not define a specific reason for the failure.
We note the vessel has not suffered the loss from a collision but failed on its
own accord whilst sailing, either from a flaw in its design / engineering or a
flaw with the workmanship from various contractors which have modified the
vessel over the past 3- 4 years.” [sic]
20. A more detailed opinion on the cause of the keel floor failure was provided in
CG’s report, referred to by MA (above). The Panel notes DL of CG provided
details of a number of inconsistencies found in the FY drawings, however
concluded that despite the inconsistencies, the drawings were interpreted
correctly and built correctly. DL also noted an apparent error in the
construction undertaken in 2007 which did not appear to match the HI
drawings. On this point, DL, in his report of 2 November 2012, says:
“ [HI] Drawings – Appendix C
Drawing V
Case No: 316427 Determination Page 5 of 7
1. [JC] has a piece of cut-off structure that measures 90-95mm for
the 11 x CDB400 tapes to bulkheads (actually frames D and E)
rather than the 150mm width Specified. Shear area reduction.
Latent problem. ”
21. DL also made the following comments:
“ Other Observations;
(a) The total number of shear plies at each intersection of the
longitudinal/transverse floors (4 intersections) was meant to originally be
(11-inboard +11-outboard+5-over foam wedge outboard only) = 27 x
CDB400 based on [HI] drawing (Drawing V). The keel structure was cut in
half height-wise (Drawings II and III) and only 1 x CDB400 shear-effective
+/-45 ply (see Drawing IV note 2. Above) appears to have been applied
(which was part of the L-former) plus 5 plies of CDB400 (see para (b)
below). [JC] said that he applied 8 additional plies of CDB400 on the
forward face of Frame E which were not on the [F Y] drawing but we’re not
sure whether these were lapped onto the “tray” between the longitudinal.
(b) The [FY] drawing shows a total possible addition of 6 x CDB400 plies in
these 4 inboard corners of the 4 intersections depending on how drawing
is read – i.e. The CDB400 @ +/-45 (see Drawing IV note 2.) plus the 5 x
CDB400 described on Drawing IV note 3. if they lapped onto the fwd face
of E and the aft face of D. This would give a maximum total of 33 (27+6)
plies at the corners or a minimum of 28 (21+1). If [FY] were engineering to
equivalent strength to the [HI] drawing, the total number of plies would
have needed to be 27 x 2= 54 per corner. However this is an assumption
based was well over what was needed (we cannot check as we don’t
know what the [HI] transverse bulkhead laminate was) and [FY] probably
did shear (and other) checks independent of what was there from [HI] to
start with – to be confirmed. We do not have the laminate schedule for the
original transverse webs so we cannot verify whether or not the new cut
down floors are equivalent strength and stiffness to the original ones or
whether or not the modified webs meet the shear requirements for the
boat irrespective of what [HI] did. ” [sic]
22. DL’s concluding remarks are:
“ When combining the remarks in (b) above with the short CDB400 tape leg
length described above in Drawing V note 1. and the omission of the 100mm
lower flange and web as described in Drawing IV note 3. above (which let the
port longitudinal flange break off), we have an overall picture that suggests
shear inadequacy at the intersections of the longitudinal and transverses and
a broken structure which is evidence of an overall shear problem. Yachting
Australia Special Regulations Amendment No.7 effective 29 Oct 2010 require
the modification work to have been designed and built in accordance with
either ISO12215 Category A or ABS (see regulation at Appendix D). We have
not performed these checks. ” [sic]
23. DL submitted a summary statement of CG’s opinion on the cause of the
damage to the Appli cant’s yacht. In this email communication to the
Applicant dated 20 November 2012 DL says:
“...
Case No: 316427 Determination Page 6 of 7
The primary structural failure was in shear at the connections between
the fore and aft ends of the port longitudinal girder web to the transverse
floor webs.
The source of that shear failure had its origins in two identified causes:
1. A problem with the as-built shear adequacy of the connection laminates
between the longitudinal and transverse floor webs.
2. A problem caused by the actual length of the connection laminate leg
onto the transverse webs being closer to 90mm as-built rather than the
specified 150mm.
We are unable to apportion the cause between 1. and 2. as they are
indeterminately interdependent and arise from two sources of design and
incomplete documentation of all pre-existing laminate information. It was not
within our scope to purse a full retrospective design and build analysis, rather
to report on the state of the failed structure so that the design of a repair could
be specified by others.
The absence of the 100mm lower flange from the longitudinal cap down
the web onto the hull between the longitudinal girders did not lead to the
primary failure described above but contributed to the subsequent
separation of the port longitudinal cap from its web which followed as a
result of the primary shear failure.” [sic]
24. The Applicant, via JC, does not dispute the incorrect length of the connection
laminate leg, as described above. JC has offered the following information
on this point and his opinion on the cause of the damage in an email to the
Service on 23 December 2013:
“As the skipper/repairer, I believe the conditions encountered when the failure
occurred, were extreme. I sailed the vessel in the 2010 Sydney Hobart where
we registered 65 knots of wind but the sea conditions were far worse during
the incident that caused the damage.
The failure of the keel structure accorded within works that were undertaken
in 2007. Specifically, the length of a join was not as long as it should have
been.
This defect was discovered after the failure of the structure.
During the 2012 mods, the quality of the workmanship and integrity of the
2007 structure was inspected and passed but, as we did not have plans of the
2007 mods, the discrepancy in the length of this particular bond (the failure)
went unrecognized. The length of the bond was not recognizable as wrong.”
[sic]
25. The Panel accepts JC’s advice that the sea conditions at the time of the
incident on 8 October 2012 were extreme. The Panel also accepts that the
relevant area of failure as detailed by DL and acknowledged by JC was not
recognizable during the course of the 2012 modifications. The Panel is
satisfied that the suspect length of the connection laminate leg, on the
balance of probabilities, was as a result of either the design or construction
of the modifications undertaken in 2007.
26. However, the policy exclusion is quite clear. The policy does not provide
cover if damage to any part of the yacht has been caused by a fault or error
Case No: 316427 Determination Page 7 of 7
in design or construction. The evidence establishes that the failure of the
keel structure was on balance due to fault or error in design or construction
following the modifications in 2007 and 2012.
27. The Panel is therefore satisfied the FSP has discharged its onus of proving,
on the balance of probabilities that the exclusion applies.
Section 46
28. The exclusion on which the FSP relies makes no clear reference to the
condition of the Applicant’s yacht prior to the policy being entered into. The
Panel considers in this instance, Section 46 of the Act does not apply.
29. The Panel notes that for Section 46 of the Act to be applied, the FSP is
required to rely on a provision in the contract that has the effect of limiting or
excluding the FSP’s liability under the contract by reference to the co ndition,
at a time before the contract was entered into, of the thing.
30. The subject clause relied on by the FSP in this instance, applied generally to
faults or errors in design or construction and is not directed to pre-existing
faults, errors, designs or construction.
31. The decided case of Nelson v The Hollard Insurance Company Pty Ltd
[2010] NSWSC 199, states that Section 46 of the Act does not apply to an
exclusion of an event which makes no reference to when the event occurs.
Therefore, only those exclusions which refer to a condition existing before
entry into the contract are affected by Section 46 of the Act.
32. The Applicant suggests that as he was not aware of the relevant design or
construction fault or error, he is entitled to rely on Section 46.2 of the Act.
Whilst the Panel agrees the Applicant may not have been aware of the
relevant fault, it does not automatically entitle him to relief under Section
46.2 of the Act. Relief can only be afforded to the Applicant where the FSP
makes reference to the condition of a thing prior to the contract being
entered into, when denying the claim. In this instance, the FSP’s policy
exclusion does not do so.
Determination
33. On the basis of the available information the Panel determines the FSP is
entitled to deny the Applicant’s claim.