Keel damage claim denied under design or construction exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2014-03-11
ProductGeneral Insurance · Other general
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant claimed for keel damage to his yacht during a delivery voyage and was represented by his insurance broker. AFCA determined the FSP was entitled to deny the claim under the design or construction exclusion.

The keel failure was on balance caused by a fault or error in design or construction following the 2007 and 2012 modifications, and section 46 of the Insurance Contracts Act did not give relief because the exclusion does not refer to the pre-contract condition of the yacht.

Issues

Subjects and remedies

no remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 316427 Determination Page 1 of 7 Case number: 316427 General Insurance - Domestic Insurance - Personal and Domestic Property - Pleasure Craft - FSP Decision - Denial of Claim 3 March 2014 Summary Description  Claim under a Pleasurecraft Insurance policy following damage to the keel during a delivery of the yacht from Hamilton Island to Brisbane on 8 October 2012. The FSP denied liability relying on an exclusion within the terms of the policy. Basis of Determination  The yacht underwent modifications to the keel structure in 2007 and 2012.  The modifications identified were not done to the design specifications.  The damage sustained was on balance due to a fault or error in design or construction.  Section 46(2) of the Insurance Contracts Act 1984 does not apply to the damage. Determination  The FSP is entitled to rely on the terms of the policy to deny liability for the claim. Background 1. The Applicant holds a pleasurecraft insurance policy with the Financial Services Provider (FSP) providing cover for his 2004 15.2m Cookson yacht. The policy started on 4 March 2010 and was current at the time of loss. 2. On 8 October 2012 the yacht sustained damage to the keel whilst at sea. The Applicant lodged a claim with the FSP. The FSP subsequently denied the claim on the ground that the damage occurred as a result of a fault or error in design or construction. 3. The Applicant disputes the denial of the claim. Determination Case No: 316427 Determination Page 2 of 7 Summary of Applicant’s position 4. Throughout the course of this dispute, the Applicant has been represented by his insurance broker. For the sake of clarity and brevity, the Panel will refer hereafter to the Applicant and his representative as “the Applicant”. 5. The Applicant says:  the damage to the yacht was the result of an insured event; and  he has relief under Section 46 of the Insurance Contracts Act 1984 (Cth) (the Act) as he was not aware of any defect with the yacht prior to insuring it with the FSP. 6. The Applicant seeks to have his claim accepted and to be reimbursed for his cost in repairing the yacht. Summary of FSP’s position 7. The FSP says:  the Applicant’s yacht should have been able to withstand the event of 8 October 2012;  the cause of the damage to the yacht was due to modifications to the yacht, which weakened the structure of the area damaged; and  the Applicant has no relief under Section 46 of the Act. 8. The FSP relies on the following policy provisions of the Product Disclosure Statement (PDS): “ What we don’t cover We will not cover You: ... 13. for the cost of repairing or replacing any part of Your Boat due to fault or error in design or construction; ” Issue 9. Whether the FSP is entitled to deny the Applicant’s claim. Reasons for decision 10. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. Case No: 316427 Determination Page 3 of 7 11. This decision has been made by a Panel consisting of an Ombudsman and two Panel members with extensive experience in insurance industry matters and consumer claims. 12. The Panel is satisfied there has been a full exchange of material between the parties and each party has had the opportunity of clarifying the issues which arise from the material. Law Involved 13. Section 46 of the Act provides that if a claim is made in respect of a loss that occurred in whole or in part as a result of a defect or imperfection in a thing and the insured was not aware of the defect or a reasonable person in the circumstances could not be expected to have been aware of the defect or imperfection, the insurer may not rely on an exclusion clause that refers to the condition of the thing before the contract was entered into. The Claim 14. The Applicant says the damage sustained to his yacht occurred in a confused sea, when the yacht fell off a backless two metre wave at a 45  angle. A loud cracking sound was heard and upon inspection, damage to the keel floors was found. The FSP does not dispute this event occurred. 15. The policy provides cover for accidental damage. In this instance the Applicant says the accident was falling off a backless wave. The Panel is therefore satisfied the Applicant has a prime facie claim. The onus of responsibility now shifts to the FSP to prove, on the balance of probabilities that an exclusion applies. Expert Evidence 16. In denying the Applicant’s claim, the FSP relies on the evidence provided by its experts and experts appointed by the Applicant. The Panel is satisfied these experts are suitably qualified to provide opinions on the construction of the yacht and the damage sustained. The Panel is persuaded by the evidence provided by these experts. 17. The yacht was originally assessed by the FSP’s appointed marine assessor, MA. During the course of MA’s enquiries it was found that the yacht had undergone modifications in 2007, prior to the Applicant’s purchase of the yacht. Further modifications were undertaken by the Applicant in 2012. Both modification projects were in the general area of where the damage occurred in the incident of 8 October 2012. 18. For ease of reference, the Panel notes the following parties having been involved in either the modifications undertaken or the inspection of the damage:  IC – repairer engaged to provide a quotation for repairs; Case No: 316427 Determination Page 4 of 7  JC – skipper of the yacht at the time of the incident and representative of BM who undertook the 2012 modifications;  FY – the designer of the 2012 modifications;  WM and DL – representatives of CG, the company appointed by FY to inspect and report on the cause of the damage;  HI – composite engineers appointed for the 2007 modifications; and  RH – representative of HM, the company who undertook the 2007 modifications. 19. In his original report to the FSP, MA provided the following summary of his investigations: “After our inspections and having reviewed the report from [DL] and [WM] of [CG] we make the following comments for your review and further considerations;  2005; the vessel was built by Cookson Yachts in New Zealand as a canting keel racing yacht. The composite engineering for the vessel was undertaken by [HI].  2007; the yacht was converted by [RH] of [HM] from a canting keel to a fixed keel yacht, again the composite engineering was undertaken by [HI] of New Zealand.  2012; the keel floors were reduced in height by [BM] for the insured [the Applicant], the design and engineering were undertaken by [FY] after receiving a copy of the [HI] Plans from the previous works.  October 2012 the keel floors failed due to bad weather off the Queensland Coast whilst the vessel was being delivered south. The comments from the structural engineers that have been involved in the investigations cannot conclusively advise why the structure failed, they note that there was some laminate omitted from the “as built” when compared to the [FD] Drawings and that there was some latent problems with the laminate on the existing keel grid prior to the modifications taking place. They also note that without a full analysis of the [HI] and [FY] Composite Structures they could not define a specific reason for the failure. We note the vessel has not suffered the loss from a collision but failed on its own accord whilst sailing, either from a flaw in its design / engineering or a flaw with the workmanship from various contractors which have modified the vessel over the past 3- 4 years.” [sic] 20. A more detailed opinion on the cause of the keel floor failure was provided in CG’s report, referred to by MA (above). The Panel notes DL of CG provided details of a number of inconsistencies found in the FY drawings, however concluded that despite the inconsistencies, the drawings were interpreted correctly and built correctly. DL also noted an apparent error in the construction undertaken in 2007 which did not appear to match the HI drawings. On this point, DL, in his report of 2 November 2012, says: “ [HI] Drawings – Appendix C Drawing V Case No: 316427 Determination Page 5 of 7 1. [JC] has a piece of cut-off structure that measures 90-95mm for the 11 x CDB400 tapes to bulkheads (actually frames D and E) rather than the 150mm width Specified. Shear area reduction. Latent problem. ” 21. DL also made the following comments: “ Other Observations; (a) The total number of shear plies at each intersection of the longitudinal/transverse floors (4 intersections) was meant to originally be (11-inboard +11-outboard+5-over foam wedge outboard only) = 27 x CDB400 based on [HI] drawing (Drawing V). The keel structure was cut in half height-wise (Drawings II and III) and only 1 x CDB400 shear-effective +/-45 ply (see Drawing IV note 2. Above) appears to have been applied (which was part of the L-former) plus 5 plies of CDB400 (see para (b) below). [JC] said that he applied 8 additional plies of CDB400 on the forward face of Frame E which were not on the [F Y] drawing but we’re not sure whether these were lapped onto the “tray” between the longitudinal. (b) The [FY] drawing shows a total possible addition of 6 x CDB400 plies in these 4 inboard corners of the 4 intersections depending on how drawing is read – i.e. The CDB400 @ +/-45 (see Drawing IV note 2.) plus the 5 x CDB400 described on Drawing IV note 3. if they lapped onto the fwd face of E and the aft face of D. This would give a maximum total of 33 (27+6) plies at the corners or a minimum of 28 (21+1). If [FY] were engineering to equivalent strength to the [HI] drawing, the total number of plies would have needed to be 27 x 2= 54 per corner. However this is an assumption based was well over what was needed (we cannot check as we don’t know what the [HI] transverse bulkhead laminate was) and [FY] probably did shear (and other) checks independent of what was there from [HI] to start with – to be confirmed. We do not have the laminate schedule for the original transverse webs so we cannot verify whether or not the new cut down floors are equivalent strength and stiffness to the original ones or whether or not the modified webs meet the shear requirements for the boat irrespective of what [HI] did. ” [sic] 22. DL’s concluding remarks are: “ When combining the remarks in (b) above with the short CDB400 tape leg length described above in Drawing V note 1. and the omission of the 100mm lower flange and web as described in Drawing IV note 3. above (which let the port longitudinal flange break off), we have an overall picture that suggests shear inadequacy at the intersections of the longitudinal and transverses and a broken structure which is evidence of an overall shear problem. Yachting Australia Special Regulations Amendment No.7 effective 29 Oct 2010 require the modification work to have been designed and built in accordance with either ISO12215 Category A or ABS (see regulation at Appendix D). We have not performed these checks. ” [sic] 23. DL submitted a summary statement of CG’s opinion on the cause of the damage to the Appli cant’s yacht. In this email communication to the Applicant dated 20 November 2012 DL says: “... Case No: 316427 Determination Page 6 of 7  The primary structural failure was in shear at the connections between the fore and aft ends of the port longitudinal girder web to the transverse floor webs.  The source of that shear failure had its origins in two identified causes: 1. A problem with the as-built shear adequacy of the connection laminates between the longitudinal and transverse floor webs. 2. A problem caused by the actual length of the connection laminate leg onto the transverse webs being closer to 90mm as-built rather than the specified 150mm. We are unable to apportion the cause between 1. and 2. as they are indeterminately interdependent and arise from two sources of design and incomplete documentation of all pre-existing laminate information. It was not within our scope to purse a full retrospective design and build analysis, rather to report on the state of the failed structure so that the design of a repair could be specified by others.  The absence of the 100mm lower flange from the longitudinal cap down the web onto the hull between the longitudinal girders did not lead to the primary failure described above but contributed to the subsequent separation of the port longitudinal cap from its web which followed as a result of the primary shear failure.” [sic] 24. The Applicant, via JC, does not dispute the incorrect length of the connection laminate leg, as described above. JC has offered the following information on this point and his opinion on the cause of the damage in an email to the Service on 23 December 2013: “As the skipper/repairer, I believe the conditions encountered when the failure occurred, were extreme. I sailed the vessel in the 2010 Sydney Hobart where we registered 65 knots of wind but the sea conditions were far worse during the incident that caused the damage. The failure of the keel structure accorded within works that were undertaken in 2007. Specifically, the length of a join was not as long as it should have been. This defect was discovered after the failure of the structure. During the 2012 mods, the quality of the workmanship and integrity of the 2007 structure was inspected and passed but, as we did not have plans of the 2007 mods, the discrepancy in the length of this particular bond (the failure) went unrecognized. The length of the bond was not recognizable as wrong.” [sic] 25. The Panel accepts JC’s advice that the sea conditions at the time of the incident on 8 October 2012 were extreme. The Panel also accepts that the relevant area of failure as detailed by DL and acknowledged by JC was not recognizable during the course of the 2012 modifications. The Panel is satisfied that the suspect length of the connection laminate leg, on the balance of probabilities, was as a result of either the design or construction of the modifications undertaken in 2007. 26. However, the policy exclusion is quite clear. The policy does not provide cover if damage to any part of the yacht has been caused by a fault or error Case No: 316427 Determination Page 7 of 7 in design or construction. The evidence establishes that the failure of the keel structure was on balance due to fault or error in design or construction following the modifications in 2007 and 2012. 27. The Panel is therefore satisfied the FSP has discharged its onus of proving, on the balance of probabilities that the exclusion applies. Section 46 28. The exclusion on which the FSP relies makes no clear reference to the condition of the Applicant’s yacht prior to the policy being entered into. The Panel considers in this instance, Section 46 of the Act does not apply. 29. The Panel notes that for Section 46 of the Act to be applied, the FSP is required to rely on a provision in the contract that has the effect of limiting or excluding the FSP’s liability under the contract by reference to the co ndition, at a time before the contract was entered into, of the thing. 30. The subject clause relied on by the FSP in this instance, applied generally to faults or errors in design or construction and is not directed to pre-existing faults, errors, designs or construction. 31. The decided case of Nelson v The Hollard Insurance Company Pty Ltd [2010] NSWSC 199, states that Section 46 of the Act does not apply to an exclusion of an event which makes no reference to when the event occurs. Therefore, only those exclusions which refer to a condition existing before entry into the contract are affected by Section 46 of the Act. 32. The Applicant suggests that as he was not aware of the relevant design or construction fault or error, he is entitled to rely on Section 46.2 of the Act. Whilst the Panel agrees the Applicant may not have been aware of the relevant fault, it does not automatically entitle him to relief under Section 46.2 of the Act. Relief can only be afforded to the Applicant where the FSP makes reference to the condition of a thing prior to the contract being entered into, when denying the claim. In this instance, the FSP’s policy exclusion does not do so. Determination 33. On the basis of the available information the Panel determines the FSP is entitled to deny the Applicant’s claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.