Text of the determination
Case No: 315930 Determination Page 1 of 8
Case number: 315930
General Insurance - Small Business/Farm Insurance - Commercial Property -
FSP Decision - Denial of Claim
11 December 2013
Summary
Description: A claim under a business policy for damage to business buildings.
Basis of Determination: A consideration of the evidence presented for an earlier
claim arising from Cyclone Yasi as compared to the evidence available in respect to
the more recent claim. Together with a consideration of whether the repairer for the
original claim was engaged by the Applicant or the FSP.
Determination: The evidence supports the fact that the original repairer was
engaged by the Applicant and therefore any failed repairs are not the concern of the
FSP. The evidence also supports that many of the ongoing problems are related to
initial construction and therefore are excluded from coverage under the terms of the
policy.
Background
1. The Applicant operates a business which sells boats and boating
accessories. The business is insured with the Financial Services Provider
(FSP). The Applicant had previously lodged a claim under the policy as a
result of damage sustained to the business premises during cyclone Yasi in
February 2011.
2. The FSP assessed the damage, noting there were signs of pre-existing
damage and/or building defects and settled the claim in November 2011, for
the amount of $25,249.60.
3. As a result of a storm on 20 March 2012, the Applicant notified the FSP that
his business premises had once again suffered damage. The FSP assessed
the damage and concluded it was due to defects present at the time the
building was constructed.
4. The FSP further concluded there were defective repairs carried out by the
Applicant‟s chosen repairer in the wake of cyclone Yasi. The FSP therefore
denied the claim on both grounds.
Determination
Case No: 315930 Determination Page 2 of 8
5. The Applicant is seeking repairs to the business premises‟ roof as water had
entered the premises during both weather events.
Summary of Applicant’s position
6. The Applicant wants the claim approved by the FSP which would mean the
roof capping is replaced as originally proposed. The Applicant says the
difference between the quote he had obtained and the FSP‟s quote is
$6,000.
7. The Applicant says there are many we t seasons in their region and there has
never been an issue with the roof prior to cyclone Yasi. The Applicant also
says there have been issues with the roof since the repairs were carried out
by the FSP‟s repairer in the wake of the cyclone. The Applicant says he did
not employ the repairer.
8. The business premises is a commercial building which was professionally
built and fully inspected and approved by the local council. As such, the
Applicant rejects the FSP‟s comments.
Summary of FSP’s position
9. The FSP says that it had noted pre-existing damage to the premises while
inspecting the premises after the Applicant lodged a claim for property
damage due to cyclone Yasi in February 2011. The FSP only settled for the
cyclone related damage.
10. The FSP says the Applicant subsequently lodged a claim on 20 March 2012,
for further water damage. An inspection of the premises by the FSP found
there was faulty construction work and some faulty repair work. The FSP
denied the claim on those two grounds.
11. The FSP relies on the following policy provisions:
“ Business Property Cover Section
…
What you are not covered for under this Section
…
(d) faulty work including:
(i) errors in, omissions from or wrong design;
(ii) faulty materials or faulty workmanship. ”
12. The FSP also says it cash settled the claim resulting from the cyclone and
therefore it was the Applicant who had arranged the repairer to carry out the
rectification work. As such, any defective repairs, is an issue between the
Applicant and the repairer.
Case No: 315930 Determination Page 3 of 8
Issue
13. Whether the FSP was entitled to deny the claim.
Reasons for decision
14. Due to the nature of the dispute, the FOS has considered it appropriate to
expedite the dispute in accordance with the Operational Guidelines to the
FOS Terms of Reference. Thus, this dispute has not been the subject of a
FOS Recommendation and has proceeded directly to Determination. The
parties have been previously advised that a Determination will be issued in
this case.
15. I am satisfied there has been a full exchange of information between the
parties and the respective parties to the dispute have had the opportunity to
comment on the other‟s submissions.
16. The Applicant has the onus of establishing that he has a prima facie claim
under the policy. Once he has achieved this, the onus then shifts to the FSP
to establish the application of a policy exclusion.
17. The Applicant lodged a claim on 20 March 2012, after heavy rain had once
again resulted in water seeping through the roof. The policy provides cover
in relation to storm damage, amongst other events and therefore, the
Applicant has established a prima facie claim. Accordingly, the FSP now has
the onus of establishing the application of a policy exclusion.
Previous claim
18. There was a previous property damage claim arising from cyclone Yasi in
February 2011. The FSP settled that claim by paying the sum of $25,249.60,
which was net of GST and the $5,000 policy excess. This amount covered
building repair costs and signage, which the FSP had assessed as storm
related damage.
19. In arriving at that amount, the FSP had arranged for “C” to act as claim
administrator in relation to the Applicant‟s claim for property damage. C
provided a number of reports during the processing of the claim. C appointed
a building consultant (“SJ”) from a specialist tech nical company to attend the
Applicant‟s business premises and report on the damage.
20. SJ carried out an inspection of the premises on 26 May 2011, in the
presence of the Applicant. He noted the premises consisted of a show room
on the lower level and offices on the first floor, with a work shop to one side.
SJ made a number of observations and concluded that:
“Much of the damage observed is due to cyclonic winds and water ingress
into the building during tropical cyclone Yasi (viz. First Floor light fittings, First
Floor ceiling tile, Ground Floor Office door, Ground Floor Office wall stains
and external fascia sign and signage on three sides of the building).”
Case No: 315930 Determination Page 4 of 8
21. SJ recommended the remedial work , listed under “ Specific
Recommendations” , should be carried out as soon as possible, including:
“Properly repair seating and fixing to roof mounted air conditioning unit
complete with all required flashings and accessories. Water test on
completion.
Properly repair and/or replace flashings and roof sheeting at the junction of
the split in roof levels. Water test on completion.”
22. However, SJ concluded that some of the damage he observed was due to
maintenance issues. These included the first floor office, store ceilings and
ground floor office ceiling. SJ provided photographs in support and estimated
the cyclone related repairs would cost approximately $25,000.
23. The Applicant had previously asked a construction company (“RC”) to supply
a quote to carry out repairs. RC‟s quote was for $16,236, while a quote from
a signage comp any was for $13,139.30. As a result of SJ‟s report, C asked
RC to review their quote based on SJ‟s repair recommendations. However,
RC was not willing to do so.
24. C indicated in its report dated 12 August 2011, that it appointed another
builder, however, C s tated the Applicant “did not want him to attend the site”.
C stated the Applicant‟s insurance broker “subsequently requested a copy of
the repair recommendation so that they may obtain their own quotation”.
25. C said the quote obtained by the Applicant‟s broker “failed to include some
repairs and included others not listed” in SJ‟s report. C also stated the quote
was too expensive. C therefore appointed another builder (“W”) to attend the
premises and provide a quote, which he did.
26. C recommended the FSP pay the insured $25,249.60, being a combination
of the signage costs and the building repair costs. C subsequently wrote to
the insured on 24 November 2011, outlining the amount it would pay upon
receipt of a signed deed of release, which was enclosed with the letter.
27. The deed of release indicated the payment was “in final satisfaction and
discharge of all claims under [the] Policy … arising from the loss or damage
which occurred at [the insured premises] on or about 3 February 2011”. The
Applicant signed the deed of release on 24 November 2011, on the insured‟s
behalf and returned the document to C.
20 March 2012 claim
28. The Applicant lodged another claim as a result of a severe high wind storm
event on 20 March 2012. He said water had once again entered the
business premises through the roof, stating this was due to defective repairs
from the earlier claim.
Case No: 315930 Determination Page 5 of 8
Building Consultant’s report dated 25 May 2012
29. C arranged for a building consultant (“BH”) from a building and engineering
consultancy company to attend the A pplicant‟s premises and provide a
report on the cause of water entry through the roof, including a revision of
the cyclone damage repairs undertaken. In addition to inspecting the
premises, BH viewed SJ‟s earlier report.
30. BH stated in his report, dated 25 May 2012, that a visual inspection of the
roof identified a number of issues where water will potentially leak:
Stepped apex roof flashing: BH said the flashing should ideally have
been installed as one piece. BH said the poor flashing detail is a result
of the initial construction of the building and not related to cyclone Yasi
or the 20 March 2012 storm or from the Yasi repairs.
Stepped apex roof flashing fixings: BH identified four loose screws that
secure the joining of this flashing. BH said these have come loose due
to wind damage sustained from either Yasi or the storm of 20 March
2012.
Flue penetrations: BH noted that the two penetrations have only had
sealant applied around them. BH said that specific collar type flashings
should be installed to prevent water ingress at those locations. BH said
this appears to be a poor detail carried out at the time of the initial
construction and not related to Yasi or the 20 March 2012 storm or the
Yasi repairs.
Apron flashing: BH said the work appears recent and he believed it was
likely to have been carried out by the contractor who performed the
Yasi damage repairs. BH concluded the repair work was carried out in
an attempt to correct poor building detail from the initial construction of
the building.
Block wall capping – roof penetration: BH subsequently amended his
comments on this matter after meeting with the builder who had carried
out the repairs. Only the fixings had been replaced and BH concluded
these were not likely to have been fit for the purpose. He concluded the
damage in this instance was due to initial defective building work and
was not sustained by a weather related event.
Apron flashing workshop area: BH said this was poor building work
from the initial construction and from the building work of the later
extension. He believed that water was still likely to penetrate through
this roof area in heavy rain.
31. BH made a number of conclusions based on his examination of the
premises. He said he had “identified several areas of poor building work”
which he concluded had occurred at the time of initial construction. He
indicated that the Applicant should:
“… engage a competent roof plumber to replace the flashings on the roof that
have been poorly designed, poorly installed and those that are missing/never
been installed.”
Case No: 315930 Determination Page 6 of 8
32. BH concluded the building will remain highly susceptible to continued water
ingress until repairs are carried out. BH identified four loose roof screws to
the stepped flashings at the apex of the roof. He said these were likely
loosened as a result of either Yasi or the 20 March 2012 storm.
33. BH said this flashing was poorly designed and should be replaced or an
over-flashing should be installed to ensure water is not able to penetrate. BH
believes this flashing “is most likely allowing water to penetrate int o the
building”. BH concluded the flashing had been installed in a defective
manner at the time of initial construction.
34. BH indicated that SJ‟s report did not include any photographic evi dence of
damage to the roof and as such, he was not able to ascertain what flashings
and/or roofing had suffered damage as a result of Yasi. However, he stated:
“We can only assume, from this heavy application of the water proof
membrane, that this flashing had sustained cyclone damage, as such we
believe it should have been replaced and not had a temporary repair to it. We
concede that this one flashing only, as described in item 5.15, would therefore
appear to not have been repaired in an appropriate manner, in relation to the
insurance rectifications following TC Yasi.”
R epairer builder’s comments
35. During June and July 2013, C obtained comment from the builder (“W”) who
had carried out the repairs in the wake of cyclone Yasi. C provided W with a
copy of BH‟s report and asked W for confirmation:
“…that cyclone repairs were f inalised to the roof. That involved removal of old
plastic fixings and re-fixing of flashings and then waterproofing any joins.
Extra waterproofing was later placed over some susceptible area, where there
had been defective flashings, not associated with c yclone damage.”
36. W responded by saying he did not believe the flashings were the problem.
He „suspected‟ there is a problem with the sealing of the screws or the
flashing that needs resealing/refixing to the „right hand side‟ of the building.
He did not believe the waterproofing was a temporary measure as the
supplier had indicated it was “uv stable”. W indicated there were signs of a
leak within the suspended ceiling to the showroom, however, he added:
“All flashing to wall was refixed and resealed with sil icon and should have
been sufficient to fix the leak without the waterproofing” (sic)
37. W had also arranged for a plumber to examine the roof and said:
“There seems to be numerous maintenance issues up on the roof that the
plumber pointed out to me, like the replacement / resealing of screws to
flashing where the roof drops down, but they are not leaking at the moment
and don‟t seem to be the cause of the major leaks. I asked the plumber his
opinion on the repaired flashing and he believes that replacing the flashing
would probably not fix the problem as the water could be tracking from
another location. I feel that if the screws are replaced and the maintenance
issues are fixed then there should be no water leak problems.”
Case No: 315930 Determination Page 7 of 8
38. W‟s comments do not advance the ma tter any further, given that he is
uncertain as to the likely cause of the water intrusion. However, he does
refer to the plumber‟s comments about the existence of „maintenance issues‟
for the roof. It would have been of greater assistance to FOS if C had
obtained comments in writing from the plumber. Nevertheless, BH‟s report
still remains persuasive with respect to the likely cause of water intrusion into
the building.
Applicant’s comments
39. The Applicant reiterated that his dispute concerns inadequate repair work in
the wake of cyclone Yasi, although he has not indicated what these are nor
has he obtained any comment from a relevant tradesperson on these
matters. He contends he never appointed W to undertake the cyclone Yasi
repair work. Instead, he said it was the FSP who had appointed the repairer.
40. The FSP denied that it appointed W and authorised the repair work to be
carried out. C did obtain a quote from W upon which C relied in calculating
the amount the FSP should pay to settle the building damage claim. The
policy provides for settlement by the FPS paying the cost of rebuilding,
replacing or repairing any damaged part of the business property. The FSP
then paid its insured upon receipt of the deed of release, which the Applicant
signed on behalf of the insured.
41. The FSP provided a note which indicates W acted on the Applicant‟s
instructions to undertake the cyclone related repair work. Given the FSP
settled the cyclone related claim by the payment of cash to its insured, it is
highly unlikely the FSP would then retain an interest in overseeing the repair
work.
42. In this respect, any issue concerning possible defective repair work will
therefore be between the Applicant and W. However, the reports provided to
FOS identify a number of defects which were present at the date of
construction or the date when the extension was built. The defects relating to
repair work after Yasi are minimal.
43. An insurance broker, acting for the insured, stated in an email to FOS, dated
1 May 2013, the Applicant is disputing that his building has never suffered
any ingress of water prior to cyclone Yasi. As such, the broker is questioning
why it is now seen as a problem. However, the broker has provided nothing
in support of this contention.
44. The broker said the amount in dispute is $1,349, although the Applicant
subsequently provided a quote (dated 14 June 2013) for $3,960 from a
plumber for roofing repairs. It is uncertain whether this amount represents
the full amount in dispute.
45. The Applicant also referred to BH‟s report and cont ended that certain parts
of the report related to areas of the building for which he had not claimed.
However, his claim following cyclone Yasi, concerned the resulting damage
to the business premises.
Case No: 315930 Determination Page 8 of 8
46. The FSP arranged for the property to be assessed following the lodging of
the Applicant‟s claim and as a result, SJ provided a report on the extent of
damage due to the cyclone. The FSP was required to verify the extent of
damage and SJ did exactly that. SJ identified those matters which resulted
from the cyclone and those which were considered to be construction
defects.
47. BH provided a comprehensive report following the Applicant‟s second claim
of 20 March 2012. This report also identified a number of construction
related defects and W confirmed during a discussion with C that a plumber
had identified a number of maintenance issues (although the plumber‟s
comments have not been corroborated).
48. W‟s comments on their own are insufficient to negate the findings in BH‟s
report, which overwhelmingly concludes there are a number of construction
related defects which were likely to have led to water intrusion. It is apparent
from BH‟s report that there are minimal items which could be categorised as
defects due to W‟s repair work. In any event, such items would be an i ssue
between the Applicant and W.
49. Accordingly, I am therefore satisfied on the balance of probabilities, the FSP
has established the application of a policy exclusion, namely, “faulty work
including: errors in, omissions from or wrong design; faulty materials or faulty
workmanship”.
Determination
50. On the basis of the available information I determine the FSP was entitled to
deny liability in relation to the Applicant‟s claim.