Home / Financial Firm (Unknown - Insurer) / Determination 315508

Determination 315508

Flood damage claim declined; timing of inundation relative to flash flood definition

FirmFinancial Firm (Unknown - Insurer)
Decided2013-07-30
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant's home was inundated by the Brisbane River flood in January 2011 and she claimed under her home policy. AFCA found the flood was excluded and the initial inundation occurred after the 24-hour flash flood window, so the decline was upheld.

Flash flood cover applies only where inundation occurs within 24 hours of the heavy rain, and objective hydrology showed the home was first inundated after sunrise.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 315508 Determination Page 1 of 9 Case number: 315508 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim-Exclusion/ condition 25 July 2013 Background 1. The Applicant‟s home (located in Riverhills, Queensland) and contents were insured with the Financial Services Provider (FSP) under a home building and contents insurance policy. 2. Her property was damaged as a result of water inundation on the morning of 12 January 2011 following severe weather events. 3. A claim was lodged with the FSP who declined liability on the basis the damage was caused by flood which the policy excluded. 4. The Applicant maintains she is entitled to indemnity because:  The FSP has not complied with sections 13 and 35 of the Insurance Contracts Act, 1984 (the Act); and  Part of her loss was caused by rains that fell within 24 hours of her home being inundated. Summary of Applicant’s position 5. As the Applicant is represented, reference to the “Applicant” will jointly refer to her and her representative unless otherwise indicated. 6. The FSP did not comply with sections 13 and 35 of the Act because it failed to clearly inform her of the policy limitations with respect to loss and damage caused by flash flood. It is accordingly estopped from relying on such limitations pursuant to section 14 of the Act. 7. She is entitled to indemnity for so much of her loss that was caused by water inundating her home as at 4.00am 12 January 2011. These losses would be regarded as losses caused by stormwater run-off and flash flood because:  Her home was first inundated sometime between 3.30am and 3.45am on 12 January 2011.  This was within 24 hours of the rain event that commenced at 4.00am on 11 January 2011 and led to the adoption of the W4 release strategy at Determination Case No: 315508 Determination Page 2 of 9 the Wivenhoe Dam, which was ultimately the main cause of the flooding downstream of the dam. 8. The Applicant‟s evidence as to the events that transpired is as follows:  She lives at home with her mother “EB”.  Her neighbour “J” woke her and EB at about 3.30am on 12 January 2011, asking them to evacuate because “[the] water is coming in”.  She helped her mother to the car and then went back into the home to grab a few things.  By then, the water was already on the step of the front door and was “creeping into the house through the front and back side door”.  The water was “ankle deep” by the time they left and she believes the carpet, furniture, curtains and plaster would have already been damaged by this time”.  They left at about 3.45am and drove to her sister‟s home in Brookfield.  They arrived there at about 4.00am to 4.15am.  She dropped EB off and went back to her home together with her brother-in-law.  They would have reached her home at about 5.30am but by this time, the water was too high (about knee height) to enable them to get into the home. 9. Her position as to the timing of the initial inundation should be preferred over the FSP‟s evidence because it is supported by eye witness evidence. The FSP‟s position on the matter is based on estimations. 10. She is entitled to statutory interest pursuant to section 57 of the Act and $3,000 compensation for non-financial loss pursuant to clause 9.3(b)(i) of the FOS Terms of Reference. Summary of FSP’s position 11. It had clearly informed the Applicant of the limitations with respect to flood, flash flood and stormwater run-off because:  She was sent the PDS and Certificate of Insurance.  The PDS clearly sets out that: i. Flood damage was not covered by the policy and that cover for such damage was available as an option. ii. The FSP would only cover “flash flood”, which is a specific form of flood. iii. Cover for damage arising from a “flash flood” was monetarily limited. Case No: 315508 Determination Page 3 of 9  The format and structure of its PDS is clear and well indexed.  The Certificate of Insurance also clearly sets out that the policy does not cover flood damage.  FOS has previously determined that its policy documentation satisfies its obligation to clearly inform policyholders of the terms of cover (Determination 239722). 12. The Applicant‟s property was not damaged by flash flood or stormwater run - off, but by flood (as defined in the policy) because:  Its hydrological evidence shows that the proximate cause of the loss was the rains which fell in the Wivenhoe Dam catchment from 9 January 2011 or earlier. Releases from the dam caused the Brisbane and Bremer River levels to rise and subsequently inundate the Applicant ‟s residence. The Applicant ‟s property was therefore partly damaged by rain which fell more than 24 hours earlier.  Her property was damaged after 4.00am on 12 January 2011, that is – more than 24 hours after 4.00am to 8.00am, 11 January 2011 rains.  As the damage to the Applicant‟s property was at least partly caused by rains that fell more than 24 hours prior to the inundation, the whole loss is excluded on the basis of the Wayne Tank principle. 13. The Applicant‟ s evidence as to the timing of the initial inundation is:  Unreliable; and  Inconsistent with available objective evidence. 14. It is not required to pay interest on the Applicant‟s claim (if payable) because it had not acted unreasonably for purposes of section 57 of the Act. In any case, it is entitled to a reduction on the interest payable to account for delays that were not its fault. In this case, the Applicant took 22 months to lodge her dispute with FOS. 15. The FSP relies on the following policy provisions contained in its PDS: “ Words / terms with special meanings Word / term Meaning … Flood Rising water which enters your home as a result of it running off or overflowing from any origin or cause. This policy does not cover flood unless we have agreed and it is shown on your certificate of insurance Flash flood and stormwater run - off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run - off. … Case No: 315508 Determination Page 4 of 9 Storm A violent disturbance of the atmosphere associated with strong winds including a cyclone, lightning, heavy rain, hail or snow but not continuous bad weather by itself. … Insured events you are covered for Damage caused by the weather …. What is covered Wh at is not covered Storm … … Flash flood and stormwater run-off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run - off Loss or damage caused:  by flood; … … Your home … The most we will pay for home claims What is covered What is not covered … Flash flood and stormwater run-off We will pay up to 50% of your home sum insured or $25,000, whichever is higher. … Your contents … The most we will pay for contents claims What is covered What is not covered … Flash flood and stormwater run-off We will pay up to 50% of your contents sum insured or Case No: 315508 Determination Page 5 of 9 $25,000, whichever is higher. ” 16. The FSP refers to sections 35, 57 and 69 of the Act. Issues 17. Whether the Applicant was clearly informed of the limitations with respect to flood damage and damage arising from stormwater run-off and flash flood. 18. Whether the Applicant‟s loss was caused by rain or storm water run -off, flash flood and/or flood (as defined in the policy). 19. Whether the FSP is required to pay interest and if so, is it entitled to a reduction in the amount payable. Reasons for decision Preliminaries 20. Due to the nature and complexity of the dispute, it has been directly referred to the Panel for Determination in accordance with the Operationa l Guidelines to the Financial Ombudsman Service‟s (FOS) Terms of Reference. 21. The Panel consists of an Ombudsman and two Panel members with extensive experience in the insurance industry and consumer claims. 22. The Panel is satisfied that the material has been exchanged and the parties have had the opportunity to respond to the issues raised. 23. The Applicant is legally represented and the various statutory provisions referred to by the parties have been set out in their respective submissions. For the sake of brevity, the Panel will not repeat these provisions here. Lack of awareness of policy limitations 24. The Panel notes that the Applicant does not base her claim of being unaware of the relevant policy limitations on an expressed suggestion that she did not receive the FSP‟s product disc losure statement (PDS) and her Certificate of Insurance, but on a suggestion that the relevant terms were not clearly set out in the PDS. 25. The Panel has previously reviewed the FSP‟s PDS and policy documentation (which were no differe nt to the ones the Applicant received) and is satisfied that:  They were clearly indexed;  The monetary caps for damage caused by flash flood and stormwater run-off have been clearly set out; and Case No: 315508 Determination Page 6 of 9  The flood exclusion is not only clearly defined within the policy, but also referenced in the Certificate of Insurance forwarded to the Applicant in the following terms: “Flood and storm surge – not included ” 26. The Panel is satisfied that if the Applicant had read the policy she would have been informed of the nature and extent of the exclusions and limitations. 27. In any event, the Certificate of Insurance (which she does not deny receiving) clearly confirms that the flood cover option has not been selected and cover is not provided. 28. In the circumstances, the Panel is not persuaded that the FSP has failed to clearly inform the Applicant of the relevant policy limitations (pursuant to section 35 of the Act), or failed to act with utmost good faith in respect of the matter. The Panel is satisfied that the FSP is entitled to rely on the terms of its policy. Proximate cause of damage 29. There is no dispute that the Applicant‟s home was not inundated by localised stormwater run-off but by the rising level of the Brisbane River. 30. It is plain from the available hydrology information (see rainfall data at the Wacol Alert, reportedly 1.9km from the Applicant‟s location) that rain in her local area:  reached peak intensities between 10.00am and 11.00am and between 3.00pm and 4.00pm on 11 January 2011; and  had ceased by 4.00pm on 11 January 2011. 31. The Applicant‟s case is that her home was initially inundated between 3.30am and 3.45am on 12 January 2011. As the rain events occurred at least 11 hours prior to the Applicant‟s reported timing of the initial inundation, it is unlikely that localised stormwater run-off was the cause of the inundation. In this regard, it is a generally accepted hydrological principle that inundations by localised stormwater run-off occur shortly after a significant rain event. 32. In any case, the Applicant‟s case is t hat the initial inundation occurred before 4.00am on 12 January 2011. This meant that the damage caused by water that had inundated the home as at 4.00am on 12 January 2011, occurred within 24 hours of the significant rainfall event that occurred it the upper catchment areas of the Brisbane River and Wivenhoe Dam leading to a change in the dam operators‟ strategy to W4 and as such, the damage is covered under the FSP‟s „flash flood‟ provisions. 33. To support her position as to the timing of the initial inundation, the Applicant has provided her own account of the events that had transpired as well as Case No: 315508 Determination Page 7 of 9 statements from a number of witnesses, all of whom suggest that water had begun entering the Applicant‟s property sometime after 3.30am on 12 January 2011. 34. The FSP challenges the reliability of the Applicant‟s evidence on the matter, contending that it is inconsistent with available objective evidence. It maintains that the initial inundation of her home would have occurred at about 7.51am on 12 January 2011. 35. The FSP principally relies on the following to support its position on the matter:  The Applicant‟s property is elevated between 12.9m AHD (Australian Height Datum) and 13.7m AHD, with the homes on ground slab estimated to be at 13.2m AHD (“benchmark level”).  Interpolating the Brisbane River levels at the Moggill and Jindalee alert gauges, hydrologist “ SC ” estimated that the Brisbane River level at the Applicant‟s location: i. only reached a level sufficient to clear the benchmark level (ie 13.2m AHD) at about 7.51am on 12 January 2011. ii. was only at about 10.6m AHD (ie 2.6m below the benchmark level) at 4.00am on 12 January 2011.  Sunrise occurred at 5.04am on 12 January 2011.  Three photographs showing water levels at areas near to but lower than the Applicant‟s property show that the water level had not yet reached a height sufficient to inundate the Applicant‟s home after day break had occurred. 36. For her part, the Applicant maintains her evidence consists of eye witness accounts and accordingly, should take prece dence over the FSP‟s evidence which is essentially mere estimations. The Applicant also disputes the reliability of the three photographs provided, contending that it has not been established when they were taken. 37. The policy excludes damage caused by flood but provides limited cover for “flash flood”. I n order for the Applicant to be entitled to this limited cover, the following elements must be established:  there was a sudden flood;  there was a heavy rain that occurred within 24 hours prior to that flood;  the sudden flood was caused by that heavy rain. 38. FOS has determined in other disputes, following consideration of all material exchanged, that the heavy rainfall commencing around 4.00am on 11 January 2011 was a proximate or effective cause of the adoption of the W4 release strategy. The Panel has previously determined that this, combined with the heavy rain over the Brisbane River from about 4.00am that day and the heavy rain that commenced falling over the Bremer River was the Case No: 315508 Determination Page 8 of 9 proximate cause of inundation of many properties downstream of the Wivenhoe Dam. 39. Given the wording of the FSP‟s policy in respect to flash flood, the Panel has determined that the inundation in these earlier Determinations is properly categorised as flash flood providing the inundation occurs within 24 hours of the commencement of the heavy rainfall. 40. The Panel has considered the further evidence and submissions and the additional material provided by the FSP in this dispute. The Panel is not satisfied that the evidence which led to the earlier determinations, in respect of „flash flood‟ has been significantly challenged in any material way. 41. The Panel is satisfied on the balance of probabilities, that notwithstanding the rain which had fallen prior to 11 January 2011, it was the rain which fell over the Wivenhoe Dam between 4.00am and 8.00am on 11 January 2011 which led to the decision to change the release strategy from W3 to W4. This combined with the heavy rain that fell over the Brisbane River from that time and the heavy rain that commenced falling over the Bremer River was in the Panel‟s view the proximate or effective cause of the inundation of the Applicant‟s property. 42. However, f or the Applicant‟s claim to succeed and fall within the definition of “flash flood” within the terms of the policy, it is necessary for the Applicant to establish the property was inundated within 24 hours of this heavy rainfall. As the Panel accepts the heavy rainfall commenced at approximately 4.00am on 11 January 2011 the inundation would have to occur prior to 4.00am on 12 January 2011. 43. Having carefully considered the matter, the Panel is of the view that the initial inundation of the Applicant‟s home was unlikely to have occurred before 4.00am on 12 January 2011 for the following reasons:  The Panel has compared the three photographs provided by SC with street view photographs of the locations identified in exhibit “SCQ009” of his 29 May 2013 statement currently available on Google maps. The Panel notes that although the Google maps photos were taken in December 2009 and they show some features that do not seem to appear in the photographs provided by SC, there were nonetheless other similar and identical features between the photographs. This establishes that the three photographs were likely taken at the locations identified by SC in exhibit “SQC009” of his 29 May 2013 statement. The Panel further notes that based on the topographical map shown in exhibit “SQC009”, these areas are generally on lower elevations than the Applicant‟s home; between 12.5m AHD a nd 13m AHD. Importantly, whilst it is unclear when the photographs were taken, it is plain that they were taken after daybreak. Case No: 315508 Determination Page 9 of 9 As sunrise occurred at 5.04am on 12 January 2011, given the water levels shown in these lower lying areas, it is unlikely that t he Applicant‟s home could have been inundated before 4.00am, as suggested by her.  Interpolating the Brisbane River levels at the Moggill and Jindalee alert gauges, SC had estimated that the Brisbane River level at the Applicant‟s location was only at about 10.6m AHD (ie 2.6m below the benchmark level) at 4.00am on 12 January 2011. At sunrise (ie 5.04am), the river level would have been still under 13m AHD, which is consistent with the water levels in the areas shown in the three photographs.  The Panel notes that w hilst the Applicant‟s neighbour “AT” says “water was entering her property” by 3.30am, it is unclear if he was referring to the land site or the residence. 44. Having carefully considered all of the submissions in this dispute, the Panel is of the view that the objective hydrological evidence leads to the conclusion that on the balance of probabilities, the Applicant‟s home was likely to have been first inundated after sunrise (ie which is after 5.04am on 12 January 2011), this is outside the relevant 24 hour period to fall within the flash flood definition of the policy. 45. Accordingly, the Panel is satisfied the policy does not extend to cover the Applicant‟s loss and it is unnecessary to consider the other issues that arise in this dispute. Determination 46. The Panel determines that the FSP is entitled to decline liability in response to the claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.