The applicant's home was inundated by the Brisbane River flood in January 2011 and she claimed under her home policy. AFCA found the flood was excluded and the initial inundation occurred after the 24-hour flash flood window, so the decline was upheld.
Flash flood cover applies only where inundation occurs within 24 hours of the heavy rain, and objective hydrology showed the home was first inundated after sunrise.
Issues
- Claim denial primary · not upheld
“The Panel determines that the FSP is entitled to decline liability in response to the claim.”
- Failure to disclose secondary · not upheld
“the Panel is not persuaded that the FSP has failed to clearly inform the Applicant of the relevant policy limitations”
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Case No: 315508 Determination Page 1 of 9
Case number: 315508
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim-Exclusion/ condition
25 July 2013
Background
1. The Applicant‟s home (located in Riverhills, Queensland) and contents were
insured with the Financial Services Provider (FSP) under a home building
and contents insurance policy.
2. Her property was damaged as a result of water inundation on the morning of
12 January 2011 following severe weather events.
3. A claim was lodged with the FSP who declined liability on the basis the
damage was caused by flood which the policy excluded.
4. The Applicant maintains she is entitled to indemnity because:
The FSP has not complied with sections 13 and 35 of the Insurance
Contracts Act, 1984 (the Act); and
Part of her loss was caused by rains that fell within 24 hours of her home
being inundated.
Summary of Applicant’s position
5. As the Applicant is represented, reference to the “Applicant” will jointly refer
to her and her representative unless otherwise indicated.
6. The FSP did not comply with sections 13 and 35 of the Act because it failed
to clearly inform her of the policy limitations with respect to loss and damage
caused by flash flood. It is accordingly estopped from relying on such
limitations pursuant to section 14 of the Act.
7. She is entitled to indemnity for so much of her loss that was caused by water
inundating her home as at 4.00am 12 January 2011. These losses would be
regarded as losses caused by stormwater run-off and flash flood because:
Her home was first inundated sometime between 3.30am and 3.45am on
12 January 2011.
This was within 24 hours of the rain event that commenced at 4.00am on
11 January 2011 and led to the adoption of the W4 release strategy at
Determination
Case No: 315508 Determination Page 2 of 9
the Wivenhoe Dam, which was ultimately the main cause of the flooding
downstream of the dam.
8. The Applicant‟s evidence as to the events that transpired is as follows:
She lives at home with her mother “EB”.
Her neighbour “J” woke her and EB at about 3.30am on 12 January
2011, asking them to evacuate because “[the] water is coming in”.
She helped her mother to the car and then went back into the home to
grab a few things.
By then, the water was already on the step of the front door and was
“creeping into the house through the front and back side door”.
The water was “ankle deep” by the time they left and she believes the
carpet, furniture, curtains and plaster would have already been damaged
by this time”.
They left at about 3.45am and drove to her sister‟s home in Brookfield.
They arrived there at about 4.00am to 4.15am.
She dropped EB off and went back to her home together with her
brother-in-law.
They would have reached her home at about 5.30am but by this time,
the water was too high (about knee height) to enable them to get into the
home.
9. Her position as to the timing of the initial inundation should be preferred over
the FSP‟s evidence because it is supported by eye witness evidence. The
FSP‟s position on the matter is based on estimations.
10. She is entitled to statutory interest pursuant to section 57 of the Act and
$3,000 compensation for non-financial loss pursuant to clause 9.3(b)(i) of the
FOS Terms of Reference.
Summary of FSP’s position
11. It had clearly informed the Applicant of the limitations with respect to flood,
flash flood and stormwater run-off because:
She was sent the PDS and Certificate of Insurance.
The PDS clearly sets out that:
i. Flood damage was not covered by the policy and that cover for
such damage was available as an option.
ii. The FSP would only cover “flash flood”, which is a specific form of
flood.
iii. Cover for damage arising from a “flash flood” was monetarily
limited.
Case No: 315508 Determination Page 3 of 9
The format and structure of its PDS is clear and well indexed.
The Certificate of Insurance also clearly sets out that the policy does not
cover flood damage.
FOS has previously determined that its policy documentation satisfies its
obligation to clearly inform policyholders of the terms of cover
(Determination 239722).
12. The Applicant‟s property was not damaged by flash flood or stormwater run -
off, but by flood (as defined in the policy) because:
Its hydrological evidence shows that the proximate cause of the loss was
the rains which fell in the Wivenhoe Dam catchment from 9 January
2011 or earlier. Releases from the dam caused the Brisbane and Bremer
River levels to rise and subsequently inundate the Applicant ‟s residence.
The Applicant ‟s property was therefore partly damaged by rain which fell
more than 24 hours earlier.
Her property was damaged after 4.00am on 12 January 2011, that is –
more than 24 hours after 4.00am to 8.00am, 11 January 2011 rains.
As the damage to the Applicant‟s property was at least partly caused by
rains that fell more than 24 hours prior to the inundation, the whole loss
is excluded on the basis of the Wayne Tank principle.
13. The Applicant‟ s evidence as to the timing of the initial inundation is:
Unreliable; and
Inconsistent with available objective evidence.
14. It is not required to pay interest on the Applicant‟s claim (if payable) because
it had not acted unreasonably for purposes of section 57 of the Act. In any
case, it is entitled to a reduction on the interest payable to account for delays
that were not its fault. In this case, the Applicant took 22 months to lodge her
dispute with FOS.
15. The FSP relies on the following policy provisions contained in its PDS:
“ Words / terms with special meanings
Word / term Meaning
…
Flood Rising water which enters your home as a result of it running off
or overflowing from any origin or cause.
This policy does not cover flood unless we have agreed and it
is shown on your certificate of insurance
Flash flood and
stormwater run - off
A sudden flood caused by heavy rain that fell no more than 24
hours prior to the flash flood or stormwater run - off.
…
Case No: 315508 Determination Page 4 of 9
Storm A violent disturbance of the atmosphere associated with strong
winds including a cyclone, lightning, heavy rain, hail or snow
but not continuous bad weather by itself.
…
Insured events you are covered for
Damage caused by the weather ….
What is covered Wh at is not covered
Storm …
…
Flash flood and
stormwater run-off
A sudden flood caused by
heavy rain that fell no
more than 24 hours prior
to the flash flood or
stormwater run - off
Loss or damage caused:
by flood;
…
…
Your home
…
The most we will pay for home claims
What is covered What is not covered
…
Flash flood and stormwater
run-off
We will pay up to 50% of your
home sum insured or $25,000,
whichever is higher.
…
Your contents
…
The most we will pay for contents claims
What is covered What is not covered
…
Flash flood and stormwater
run-off
We will pay up to 50% of your
contents sum insured or
Case No: 315508 Determination Page 5 of 9
$25,000, whichever is higher. ”
16. The FSP refers to sections 35, 57 and 69 of the Act.
Issues
17. Whether the Applicant was clearly informed of the limitations with respect to
flood damage and damage arising from stormwater run-off and flash flood.
18. Whether the Applicant‟s loss was caused by rain or storm water run -off, flash
flood and/or flood (as defined in the policy).
19. Whether the FSP is required to pay interest and if so, is it entitled to a
reduction in the amount payable.
Reasons for decision
Preliminaries
20. Due to the nature and complexity of the dispute, it has been directly referred
to the Panel for Determination in accordance with the Operationa l Guidelines
to the Financial Ombudsman Service‟s (FOS) Terms of Reference.
21. The Panel consists of an Ombudsman and two Panel members with
extensive experience in the insurance industry and consumer claims.
22. The Panel is satisfied that the material has been exchanged and the parties
have had the opportunity to respond to the issues raised.
23. The Applicant is legally represented and the various statutory provisions
referred to by the parties have been set out in their respective submissions.
For the sake of brevity, the Panel will not repeat these provisions here.
Lack of awareness of policy limitations
24. The Panel notes that the Applicant does not base her claim of being
unaware of the relevant policy limitations on an expressed suggestion that
she did not receive the FSP‟s product disc losure statement (PDS) and her
Certificate of Insurance, but on a suggestion that the relevant terms were not
clearly set out in the PDS.
25. The Panel has previously reviewed the FSP‟s PDS and policy
documentation (which were no differe nt to the ones the Applicant received)
and is satisfied that:
They were clearly indexed;
The monetary caps for damage caused by flash flood and stormwater
run-off have been clearly set out; and
Case No: 315508 Determination Page 6 of 9
The flood exclusion is not only clearly defined within the policy, but also
referenced in the Certificate of Insurance forwarded to the Applicant in
the following terms:
“Flood and storm surge – not included ”
26. The Panel is satisfied that if the Applicant had read the policy she would
have been informed of the nature and extent of the exclusions and
limitations.
27. In any event, the Certificate of Insurance (which she does not deny
receiving) clearly confirms that the flood cover option has not been selected
and cover is not provided.
28. In the circumstances, the Panel is not persuaded that the FSP has failed to
clearly inform the Applicant of the relevant policy limitations (pursuant to
section 35 of the Act), or failed to act with utmost good faith in respect of the
matter. The Panel is satisfied that the FSP is entitled to rely on the terms of
its policy.
Proximate cause of damage
29. There is no dispute that the Applicant‟s home was not inundated by localised
stormwater run-off but by the rising level of the Brisbane River.
30. It is plain from the available hydrology information (see rainfall data at the
Wacol Alert, reportedly 1.9km from the Applicant‟s location) that rain in her
local area:
reached peak intensities between 10.00am and 11.00am and between
3.00pm and 4.00pm on 11 January 2011; and
had ceased by 4.00pm on 11 January 2011.
31. The Applicant‟s case is that her home was initially inundated between
3.30am and 3.45am on 12 January 2011. As the rain events occurred at
least 11 hours prior to the Applicant‟s reported timing of the initial inundation,
it is unlikely that localised stormwater run-off was the cause of the
inundation. In this regard, it is a generally accepted hydrological principle
that inundations by localised stormwater run-off occur shortly after a
significant rain event.
32. In any case, the Applicant‟s case is t hat the initial inundation occurred before
4.00am on 12 January 2011. This meant that the damage caused by water
that had inundated the home as at 4.00am on 12 January 2011, occurred
within 24 hours of the significant rainfall event that occurred it the upper
catchment areas of the Brisbane River and Wivenhoe Dam leading to a
change in the dam operators‟ strategy to W4 and as such, the damage is
covered under the FSP‟s „flash flood‟ provisions.
33. To support her position as to the timing of the initial inundation, the Applicant
has provided her own account of the events that had transpired as well as
Case No: 315508 Determination Page 7 of 9
statements from a number of witnesses, all of whom suggest that water had
begun entering the Applicant‟s property sometime after 3.30am on 12
January 2011.
34. The FSP challenges the reliability of the Applicant‟s evidence on the matter,
contending that it is inconsistent with available objective evidence. It
maintains that the initial inundation of her home would have occurred at
about 7.51am on 12 January 2011.
35. The FSP principally relies on the following to support its position on the
matter:
The Applicant‟s property is elevated between 12.9m AHD (Australian
Height Datum) and 13.7m AHD, with the homes on ground slab
estimated to be at 13.2m AHD (“benchmark level”).
Interpolating the Brisbane River levels at the Moggill and Jindalee alert
gauges, hydrologist “ SC ” estimated that the Brisbane River level at the
Applicant‟s location:
i. only reached a level sufficient to clear the benchmark level (ie
13.2m AHD) at about 7.51am on 12 January 2011.
ii. was only at about 10.6m AHD (ie 2.6m below the benchmark level)
at 4.00am on 12 January 2011.
Sunrise occurred at 5.04am on 12 January 2011.
Three photographs showing water levels at areas near to but lower than
the Applicant‟s property show that the water level had not yet reached a
height sufficient to inundate the Applicant‟s home after day break had
occurred.
36. For her part, the Applicant maintains her evidence consists of eye witness
accounts and accordingly, should take prece dence over the FSP‟s evidence
which is essentially mere estimations. The Applicant also disputes the
reliability of the three photographs provided, contending that it has not been
established when they were taken.
37. The policy excludes damage caused by flood but provides limited cover for
“flash flood”. I n order for the Applicant to be entitled to this limited cover, the
following elements must be established:
there was a sudden flood;
there was a heavy rain that occurred within 24 hours prior to that flood;
the sudden flood was caused by that heavy rain.
38. FOS has determined in other disputes, following consideration of all material
exchanged, that the heavy rainfall commencing around 4.00am on 11
January 2011 was a proximate or effective cause of the adoption of the W4
release strategy. The Panel has previously determined that this, combined
with the heavy rain over the Brisbane River from about 4.00am that day and
the heavy rain that commenced falling over the Bremer River was the
Case No: 315508 Determination Page 8 of 9
proximate cause of inundation of many properties downstream of the
Wivenhoe Dam.
39. Given the wording of the FSP‟s policy in respect to flash flood, the Panel has
determined that the inundation in these earlier Determinations is properly
categorised as flash flood providing the inundation occurs within 24 hours of
the commencement of the heavy rainfall.
40. The Panel has considered the further evidence and submissions and the
additional material provided by the FSP in this dispute. The Panel is not
satisfied that the evidence which led to the earlier determinations, in respect
of „flash flood‟ has been significantly challenged in any material way.
41. The Panel is satisfied on the balance of probabilities, that notwithstanding
the rain which had fallen prior to 11 January 2011, it was the rain which fell
over the Wivenhoe Dam between 4.00am and 8.00am on 11 January 2011
which led to the decision to change the release strategy from W3 to W4. This
combined with the heavy rain that fell over the Brisbane River from that time
and the heavy rain that commenced falling over the Bremer River was in the
Panel‟s view the proximate or effective cause of the inundation of the
Applicant‟s property.
42. However, f or the Applicant‟s claim to succeed and fall within the definition of
“flash flood” within the terms of the policy, it is necessary for the Applicant to
establish the property was inundated within 24 hours of this heavy rainfall.
As the Panel accepts the heavy rainfall commenced at approximately
4.00am on 11 January 2011 the inundation would have to occur prior to
4.00am on 12 January 2011.
43. Having carefully considered the matter, the Panel is of the view that the
initial inundation of the Applicant‟s home was unlikely to have occurred
before 4.00am on 12 January 2011 for the following reasons:
The Panel has compared the three photographs provided by SC with
street view photographs of the locations identified in exhibit “SCQ009” of
his 29 May 2013 statement currently available on Google maps.
The Panel notes that although the Google maps photos were taken in
December 2009 and they show some features that do not seem to
appear in the photographs provided by SC, there were nonetheless
other similar and identical features between the photographs. This
establishes that the three photographs were likely taken at the locations
identified by SC in exhibit “SQC009” of his 29 May 2013 statement.
The Panel further notes that based on the topographical map shown in
exhibit “SQC009”, these areas are generally on lower elevations than the
Applicant‟s home; between 12.5m AHD a nd 13m AHD.
Importantly, whilst it is unclear when the photographs were taken, it is
plain that they were taken after daybreak.
Case No: 315508 Determination Page 9 of 9
As sunrise occurred at 5.04am on 12 January 2011, given the water
levels shown in these lower lying areas, it is unlikely that t he Applicant‟s
home could have been inundated before 4.00am, as suggested by her.
Interpolating the Brisbane River levels at the Moggill and Jindalee alert
gauges, SC had estimated that the Brisbane River level at the
Applicant‟s location was only at about 10.6m AHD (ie 2.6m below the
benchmark level) at 4.00am on 12 January 2011.
At sunrise (ie 5.04am), the river level would have been still under 13m
AHD, which is consistent with the water levels in the areas shown in the
three photographs.
The Panel notes that w hilst the Applicant‟s neighbour “AT” says “water
was entering her property” by 3.30am, it is unclear if he was referring to
the land site or the residence.
44. Having carefully considered all of the submissions in this dispute, the Panel
is of the view that the objective hydrological evidence leads to the conclusion
that on the balance of probabilities, the Applicant‟s home was likely to have
been first inundated after sunrise (ie which is after 5.04am on 12 January
2011), this is outside the relevant 24 hour period to fall within the flash flood
definition of the policy.
45. Accordingly, the Panel is satisfied the policy does not extend to cover the
Applicant‟s loss and it is unnecessary to consider the other issues that arise
in this dispute.
Determination
46. The Panel determines that the FSP is entitled to decline liability in response
to the claim.