Text of the determination
Case No: 315467 Determination Page 1 of 11
Case number: 315467
General Insurance - Small Business/Farm Insurance - Commercial Property -
FSP Decision - Claim amount Underinsurance
28 November 2013
Summary
Description: A dispute relating to the extent of loss to a home from an earthquake.
Additional issue of whether the building was under insured. Finally, is paragraph 9.3
of the Terms of Reference applicable to the dispute.
Basis of Determination: A consideration of the adequacy of the expert reports
provided by the FSP in light of the Applicant’s challenge to those reports, together
with a consideration of the manner in which the FSP have dealt with the Applicant’s
claim.
Determination: The FSP’s expert report is inadequ ate and an independent engineer
and valuer is to be engaged to provide further reports from which a final scope of
works is to be obtained. The FSP is to pay compensation under 9.3 of the Terms of
Reference because of its claims handling leading to delay.
Background
1. The Applicant owns a building in rural New South Wales which serves jointly
as his residence and as the premises for the post office business he runs.
2. He held a business insurance policy with the Financial Services Provider
(FSP). The various covers selected by the Applicant included cover against
fire and perils (including earthquake), over the building, with a sum insured
of $400,000.
3. After two earthquake tremors on 8 June 2012, were experienced in the area,
the Applicant’s building was dama ged and he lodged a claim. This claim was
accepted by the FSP, which arranged for an assessment of the cause and
extent of the damage and the production of a scope of works and quotation
for the repairs required.
4. The Applicant disagrees that the FSP’s scop e of works adequately
addresses the damage caused by the earthquake.
Determination
Case No: 315467 Determination Page 2 of 11
5. Further, the FSP assessed the property’s value to be substantially higher
than the sum insured within the policy and it limited its liability for the
damage on the basis of an underinsurance, or averaging provision within the
policy.
6. The Applicant disagrees with the FSP’s assessment of the property’s value
at risk and wants the Service to review the matter.
Summary of Applicant’s position
7. The Applicant says that the report produced by the FSP’s engineer with
respect to the earthquake related damage, includes major discrepancies and
omissions.
8. In addition, the scope of works produced by the FSP’s building consultant ,
has been minimised by excluding all rectification on the northern wall of the
building.
9. He believes the sum insured for the property was adequate and he says that
the FSP’s “value at risk” assessment , has been grossly inflated and is based
on incorrect detail.
10. Further, he says that the FSP has extensively delayed the claim and he
wants consideration of punitive damages.
Summary of FSP’s position
11. The FSP obtained a report from an engineer with respect to the cause and
extent of the earthquake related damage. The Applicant has challenged this
engineer’s report and after reviewing the Applicant’s comments, the engineer
has responded but has not altered his opinions.
12. The Applicant has also challenged its assessment of the property’s value at
risk, but has provided no alternative.
13. The FSP says that the Applicant has disputed the scope of works for the
repairs to his building, but has not provided an alternative scope of works
from a register builder.
14. Further, the estimate of the cost of the repairs provided by the Applicant
himself, does not include any breakdown. Nevertheless, it says that its April
2013 settlement offer — which was rejected by the Applicant — took into
account the Applicant’s estimate.
15. The FSP relies on the following policy provisions:
“ Section 1
Property
...
Case No: 315467 Determination Page 3 of 11
Cover
We will indemnify You for damage caused by Fire and Perils or Accidental
Damage to Property Insured, whilst at the Situation.
...
Definitions
In this Section:
...
Full Insurable Value means the amount that would be required as the Sum
Insured, sufficient to allow Us to fully indemnify You for a total loss within the
terms of this Section.
...
Special clauses
1. Underinsurance/Average
In the event of Damage that is insured under this Section, We will not be
liable for more than that proportion of the Damage that:
(a) in respect of Buildings, contents, Stock and Specified Items,
The Sum Insured on Buildings, Contents, Stock and Specified Items
at the Situation bears to eighty per cent (80%) of the Full Insurable
Value of such Buildings, Contents, Stock and Specified Items;
...
at such Situation at the time of the Damage.
Conditions
(1) Our liability is limited to the Sum Insured at the Situation as shown in the
Schedule. ”
Issues
16. Whether it is fair in all the circumstances for the FSP to rely on its engineer’s
assessment, with respect to the cause of the damage to the property.
17. Whether it is fair in all the circumstances for the FSP to rely on its building
consultant’s value at risk assessment , in order to limit its liability for the
damage.
18. Whether the claim was delayed unreasonably by the FSP.
Reasons for decision
19. Due to the nature of the dispute, the Service has considered it appropriate to
expedite the dispute in accordance with the Operational Guidelines to the
Service’s Terms of Reference. Thus, this dispute has not been the subject of
a Recommendation and has proceeded directly to Determination. The
Case No: 315467 Determination Page 4 of 11
parties have been previously advised that a Determination will be issued in
this case.
20. There has been an exchange of information between the parties and I am
satisfied that each party has had the opportunity to address any issues
raised by the other.
21. It is not in dispute that the Applicant’s building was damaged by earthquake
on 8 June 2012, or that the FSP has accepted liability for the damage so
caused.
Cause and extent of the damage
22. Assessment firm “C” inspected the property on behalf of the FSP , on 5 July
2012. C appointed engineer “K” to provide comment with respect to the
cause of the damage to the Applicant’s building.
23. Representatives of K attended the property on 17 July 2012 and on 31 July
2012. The report by K provided the following information in its Executive
Summary section:
The building is a single storey masonry structure originally built in 1889
and has had several extensions over the centuries. It is partly used as
a residential dwelling and partly as a commercial post office.
The local site conditions are described as highly to extremely reactive
clay soils, in accordance with the Australian Standard for Residential
slabs and footings.
Cracks were noted throughout the building with the northern bedrooms
and the central hallway being the worst affected areas. The northern
wall’s inside layer of brickwork was no longer plumb and was leaning
outwards.
It was the opinion of K that some defects were primarily attributable to
the earthquake, some were pre-existing defects exacerbated by the
earthquake and others were primarily driven by external factors such as
trees and gardens, causing differentiate movement across the
building’s footings.
24. The conclusion of the report by K states that:
“The majority of the observed defects appear to be consistent with damage
arising from an earthquake event, however a portion of the defects are
consistent with a building that has been subject to footing movement over a
period of time.
In our opinion the defects are most likely attributable to, but not limited to, the
following reasons:
Possible inadequacy of footings for highly reactive founding soils.
Footing movement driven by seasonal moisture changes.
Trees and gardens located within the footing influence zone.
Case No: 315467 Determination Page 5 of 11
Leaking stormwater system discharging adjacent to footings.
Differential movement between extensions.
Earthquake action.”
25. The Applicant disputed a range of aspects of the report from K, including:
K’s claim of differential moveme nt across the building footings.
The experience of the engineer who performed the inspection.
The validity of the comments made by K, about the trees and gardens
in the vicinity of the property.
The assumptions made by K about the surface drainage and roof
drainage of the property.
The assumptions made by K about the reactivity of the soil.
The absence of the property’s northern wall in the list of the worst
affected areas.
The observation by K that particular photographs showed roof plate
movement instead of brick movement.
The observation by K that the mailroom construction is of single layer
brick construction.
The observation by K that while the tremors were felt by residents of
the township, no major damage was recorded.
The failure of K to notice the presence of drummy render on some of
the walls to the building.
26. The FSP asked K to review and comment on the Applicant’s concerns. A
copy of K’s response has been provided to the Service.
27. I have considered K’s responses to the Applicant’s concerns and in m y view,
there are several issues raised which have still not been satisfactorily
addressed. These include (but are not limited to):
Soil Reactivity and Inadequate footings.
i. K states that “although not exposed during the inspection, the
footings for the building are likely to consist of brick footings under
load bearing walls...”
ii. K has operated on the assumption that the soil on which the
Applicant’s property is built is highly to extremely reactive.
iii. This assumption has been made based on K’s experience o f
building in the area over a number of years.
iv. However, no soil testing was performed.
Internal damage accepted but external damage rejected
i. The building is of double brick construction.
Case No: 315467 Determination Page 6 of 11
ii. K has assessed damage to internal walls of the building as having
been caused by earthquake, yet K has assessed that the damage
to the corresponding external wall is not earthquake related.
Trees and gardens
i. K has commented on the location of several trees and gardens
around the property.
ii. However, the Applicant has pointed out that the northern boundary
adjacent to the building only has a rose garden; and the “several
large trees” on the neighbouring lot — to which K refers — are
actually 6m and 8.5m from the building.
iii. K maintains that in its opinion, the plants are fully capable of
achieving suction pressures sufficient to dry out the soil around the
building footings and thus contribute to local soil movements.
Surface drainage
i. K says that the northern side of the building has a paving slab with
minimal fall away from the building over about 2m.
ii. However, the Applicant has provided information which clearly
shows that the fall of the path from the front of the building to the
rear is 240mm, the fall away from the building at the front and at the
rear is 110mm and the fall of water away from the building at front
and rear is 125mm. He also notes that the path on the northern side
is 2.6m wide with a fall of about 5%.
Roof drainage
i. K states that it was “observed that two downpipes were
disconnected (refer photo 20 & 27)”. K al so states that part of the
(roof drainage) system is undersized and the wall stains indicate
that it overflows on a regular basis. K says that this can lead to soil
movements.
ii. However, the Applicant says that one of the downpipes to which K
refers, pulled away during the earthquake and was replaced by a
plumber in August 2012. He points to photographs taken by K,
which show the new downpipe, on the ground, ready to be installed.
28. I note that the Applicant has not provided any evidence from an independent
expert with respect to the concerns he has raised. However, the information
he has provided, in my view, is sufficiently robust and I am persuaded that it
casts doubt on the conclusions of the report by K , as to the contributing
causes of the building damage.
29. To the extent that the information provided by the Applicant challenges or
contradicts aspects of the report by K (and K’s response does not
satisfactorily address the concerns so raised by the Applicant), I am of the
opinion that the report by K lacks credibility with respect to the cause of the
damage to the building.
Case No: 315467 Determination Page 7 of 11
30. In this regard, I am satisfied that it would not be fair in all the circumstances
for the FSP to rely on the report by K, to establish the extent of the
earthquake related building damage.
31. Accordingly, I determine that the FSP is required to appoint, at its own
expense, another engineer — agreed to by the Applicant — to inspect the
building and provide a report as to the cause of the damage to the
Applicant’s building and the extent of the damage caused by the earthquake.
Scope of works and repair quotations
32. The FSP used the report by K as the basis for the production of the scope of
works by building consultant “S” . Building firm D provided quotations for the
costs associated with performing repairs, according to S ’s scope of works.
33. The Applicant has raised concerns about the scope of works from S and
quotations from D.
34. I note that the Applicant says that he has 35 years experience as a builder
and using this experience, he has produced an alternative quotation for the
repairs to his building, based on what he believes to be the earthquake
related damage.
35. As noted earlier, I have found that the report by K lacks credibility with
respect to the cause of the damage, or the extent of the earthquake related
damage.
36. It follows that the FSP needs to arrange for a new scope of works to be
produced, once a new report is obtained with respect to the cause of the
damage at the Applicant’s home and the extent o f the earthquake related
damage. The FSP subsequently needs to arrange for new quotations for the
repairs to the Applicant’s building, based on the new scope of works.
Total Insurable Value - Value at Risk report
37. Section 1 of the policy provides that in the event of damage to building and
contents that is insured (under Section 1), the FSP will not be liable for more
than the proportion of the damage which the sum insured bears to 80% of
the “Full Insurable Value” of the insured building and contents (the
Underinsurance provision).
38. The sums insured for the Applicant’s building and the contents , are $400,000
and $100,000 respectively.
39. The FSP’s assessor initially flagged that the sum insured for the building was
inadequate (although I note that at the time he stated that the building sum
insured was $150,000). Nevertheless, the FSP asked S to produce a value
at risk (“VAR”) report , which would estimate the Full Insurable Value of the
property, so as to establish whether the policy’s Underinsurance provision
had application and if so, to what extent.
Case No: 315467 Determination Page 8 of 11
40. S produced a VAR report dated 27 August 2012, which put the full insurable
value of the Applicant’s building at $773,491 (excluding GST) and without
factoring in demolition and removal costs and professional fees.
41. The Applicant raised concerns about the VAR report from S. These included:
The buildings floor has bearers and joists, not a suspended concrete
slab.
The ceiling height is 3.3m, not 3.6m.
The asbestos studio roof has already been replaced with sheet metal.
The studio/workshop walls are Masonite, not plaster.
The garage costs are over estimated as it is actually a shed which can
be replaced for less than $15,000.
The chain mesh fencing is a security requirement of the adjacent
Telstra premises and not the Applicant’s res ponsibility or cost.
The concrete paving is not reinforced concrete.
The garden shed cost is $2,000.
42. The Applicant estimated that the building’s full insurable value was
$573,000. I note however, that the Applicant has not provided any evidence
from independent experts to support his estimate.
43. The FSP asked S to review the Applicant’s concerns and provide comments.
44. The author of the VAR report has provided the following information:
The scope of works report from S, dated 10 October 2012, includes a
description of the premises as follows:
“The property in question is freestanding, single -storey, cavity brick, metal
roofed building constructed on a timber bearer and joist floor.”
S confirmed that the floor of the post office/residence was 80% timber
bearers and joists and 20% suspended slab and the VAR report should
have described the building as “consisting of suspended slab/timber
floor substructure.
He has consulted his site notes and confirms that the ceiling height
which he recorded with an electronic measuring device was 3.6m.
At the time he inspected the property, the roof of the studio included
corrugated asbestos cement sheets.
After reviewing his site notes, he confirms that the studio walls and
ceiling are Masonite lined.
There is no requirement to have reinforced concrete for foot traffic,
although good building practice would include it. He estimates that the
reinforced concrete of the property (for vehicular traffic) would be
approximately 65% and non-reinforced concrete would be 35%.
Case No: 315467 Determination Page 9 of 11
At the time of his inspection of the property, he recorded that there was
47m of chain wire fencing and this is what has been allowed for in the
VAR report.
45. S provided another VAR report, including adjustments to the replacement
value of the garage and to the proportion of reinforced concrete in the paving
around the building.
46. The description of the post office/residence has been changed to reflect that
the floor construction is “Slab on Ground/Timber Bearer Joists”, however , no
adjustment has been made to the replacement value of this part of the
building.
47. In addition, I note that S changed the description of the studio walls and
ceiling to reflect that they are Masonite, but has not made any change to the
replacement value for that part of the building.
48. Further, no change has been made with respect to the ceiling height, the
chain wire fencing, or the asbestos roof to the studio, or the values assigned
to these building elements.
49. I would not expect any change to the VAR report with respect to the
asbestos roof (as it formed part of the building at the time of the loss).
50. However, I would have expected that S would have allowed for some
reduction in the replacement value of the property’s external infrastructure to
take into account the Applicant’s comment that the chain wire fence is
Telstra’s requirement and at their cost. Even though the chain wire fence
was observed at the time of S’s inspection, I see no reason why the
Applicant’s confirmation about the responsibility of the fence would not be
accepted.
51. With respect to the ceiling height, I note that the author of the VAR report
reviewed his site notes and confirmed that he recorded the ceiling height,
using an electronic measuring device, to be 3.6m.
52. However, the statement of the Applicant (who has lived and worked at the
property for nine years and who is an experienced builder) to the effect that
his ceilings are actually 3.3m and not 3.6m, should have caused S (if not the
FSP) to obtain further empirical information about the building ceiling height.
53. In the circumstances, I do not consider it acceptable for S to simply refer to
the site notes of the report’s author and maintain its position that the ceilings
are 3.6m.
54. For these reasons, I find that the FSP’s reliance on the VAR report by S , in
order to establish the Full Insurance Value of the property, is not fair in all
the circumstances.
55. Accordingly, I determine that, the FSP is required to appoint at its own
expense another building consultant or other suitable building expert —
Case No: 315467 Determination Page 10 of 11
agreed to by the Applicant — to inspect the building and provide a Value at
Risk report.
56. The FSP is then entitled to use that new Value at Risk report with respect to
the application of the policy’s Underinsurance provision , which will limit its
liability for the earthquake related damage to the Applicant’s property,
subject to the terms and condition of the policy.
Excessive delays
57. The Applicant has raised concerns about the time taken with respect to the
handling of the claim.
58. He says that he only received the scope of works on 22 October 2012, four
and half months after the event and even then it did not include the external
work required.
59. After he met with the assessor and the author of the scope of works from S,
he received an amended copy of the scope of works and a copy of the VAR
report, on 10 December 2012.
60. He received a copy of the quotation from D for the repair work, based on S’s
amended scope of works, on 10 January 2013 and notes that “DS” (the
builder from D) had not at that stage been on site. The first site inspection by
DS, occurred on 14 February 2013.
61. On 25 February 2013, the revised quotation form D, was provided to him.
62. The Applicant says that because of the excessive delays and associated
stress, as well as the need to employ a replacement for his time lost running
the day to day operation of the post office, he wants consideration of punitive
damages. He estimates his costs at $19, 248, as at 1 June 2013, but says
that he would be prepared to forego any related claim for costs or damages,
subject to a satisfactory settlement by the FSP.
63. The FSP has not provided a response to this aspect of the Applicant’s
dispute, save to confirm that its offer of settlement of $95,000, is still
available.
64. Under paragraph 9.4 of the Terms of Reference (TOR), the Service may
decide that the FSP contribute to the legal or other professional costs or
travel costs incurred by the Applicant, in the course of the Dispute.
65. I have considered the Applicant’s statement that he has nee ded to employ a
replacement for his time lost in the running of the post office. However, I do
not regard this to be a cost which is covered under paragraph 9.4 of the
TOR.
66. Under paragraph 9.3 b)i) of the Terms of Reference, compensation can be
awarded for non-financial loss, but only where an unusual degree or extent
Case No: 315467 Determination Page 11 of 11
of physical inconvenience, time taken to resolve the situation or interference
with the Applicant’s expectation of enjoyment or peace of mind has occurred .
67. I have considered the Applicant’s submission with respect to the timeframes
for the handling of the claim and note that the FSP did not release a copy of
the report by K, upon which S based the Scope of Works, to the Applicant,
until 8 March 2013.
68. In my view, the time taken for the FSP to process the claim and to provide
the Applicant with reports and documents it has used to establish its liability,
has been excessive and I consider it appropriate in the circumstances to
award the Applicant $1,500 in compensation for non-financial loss.
Determination
69. On the basis of the available information I determine that the FSP:
is required to appoint at its own expense another engineer — agreed to by
the Applicant — to inspect the building and provide a report as to the
cause of the dam age to the Applicant’s building and the extent of the
damage caused by the earthquake. This can be used to develop a new
scope of works and quotation for the repairs.
is required to appoint at its own expense another building consultant or
other suitable building expert — agreed to by the Applicant — to inspect
the building and provide a new Value at Risk report which can be used to
establish the Full Insurable Value for the Applicant’s property. The FSP is
subsequently entitled to use this new Value at Risk Report with respect to
the application of the policy’s Underinsurance provision to limit its liability
for the damage to the Applicant’s property, subject to the normal
application of the terms and conditions of the policy.
is required to pay the Applicant $1,500 compensation for non-financial
loss.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.