Home / Financial Firm (Unknown - Insurer) / Determination 315413

Determination 315413

Liability and cash settlement for stormwater damage to home

FirmFinancial Firm (Unknown - Insurer)
Decided2014-02-17
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$43,219
Non-financial loss—
Amount claimed$79,000
SourceAFCA PDF

Summary

The insureds claimed for stormwater damage to their home, and the FSP offered $23,540 on the basis that most damage was wear, tear and defects. AFCA accepted that external and non-storm items were excluded but found the internal storm damage covered and ordered a cash settlement of $43,218.80 plus interest.

The FSP's expert evidence of wear and defects was not sufficiently substantiated for the internal damage, and the itemised TKM quotation was the more reliable basis for a cash settlement.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 315413 Determination Page 1 of 8 Case number: 315413 General Insurance - Domestic Insurance - Home Building - FSP Decision - Claim amount 6 February 2014 Summary Description  Dispute as to liability and quantum following a claim under a Home Building and Contents Policy for damage following stormwater inundation in March 2012. Basis of Determination  The property suffered both internal and external damage due to the storm water.  On balance, the evidence establishes a 30% to 40% contribution to the damage to the piers and stumps.  On balance, the internal damage was caused by stormwater. Determination  The FSP is to cash settle the Applicants’ claim for $43,218.80 plus interest pursuant to Section 57 of the Insurance Contract Act 1984 (the Act).  The FSP is to pay the make safe repairs and contents claim if it has not already done so. Background 1. The Applicants’ home and contents were insured with the Financial Services Provider (FSP) under a home and contents policy. 2. They claimed for water damage to their property, said to have been caused by stormwater inundating their home in early March 2012. 3. The FSP partially accepted liability and offered a cash settlement of $22,125, contending that only 35% of the damage to their home damage may be attributed to the storm event. It later revised its offer to $23,540. 4. The Applicants maintain they are entitled to full indemnity for the damage to their property. Determination Case No: 315413 Determination Page 2 of 8 Summary of Applicants ’ position 5. Their home sustained damage as a result of two severe storms in two years, however:  They did not lodge a claim following the first storm as that storm only caused minor damage.  They decided to lodge a claim after the second storm because it had caused more visible damage. 6. Whilst their home is about 50 years old, there is no basis for the FSP’s conclusions that:  Only 35% of the damage to the sub floor area was caused by storm; and  The remaining 65% of the damage was due to a long standing problem that has been occurring over a long period of time. 7. Their sons have had to sleep in the lounge as a result of mould and damp developing from the storm event. 8. The FSP’s assessor “CL” verbally informed them that builder “SWB” had quoted $79,000 to repair the damage. Summary of FSP’s position 9. Its building consultant “S” reported:  The majority of the damage is due to wear and tear and building defects, and has been occurring for an extended period of time.  60% to 70% of the damage was not related to the storm event.  The storm event may have exacerbated “existing maintenance and defect issues”. 10. The $80,000 quo te referred to by the Applicants “includes maintenance and defect related items which are not covered by the policy”. 11. It has reassessed the “resultant damage” to $58,850 and offered $23,540, which is 40% of the assessed loss. 12. In its letter of denial dated 9 January 2013, relied on the following policy provisions: “ We will not cover loss or damage caused by:  Wear and tear and lack of maintenance, including rust, corrosion, deterioration, except in the case of escape of liquid (refer page 21), or legal liability claims;  Gradual loss or damage of any kind  Erosion or earth movement including shrinkage…” Case No: 315413 Determination Page 3 of 8 Issues 13. Whether the FSP’s cash settlement offer is fair in all the circumstances, and sufficient to discharge its obligation under the policy. 14. Whether the Applicants are entitled to compensation for the manner in which their claim had been handled. Reasons for decision 15. Due to the nature and complexity of the dispute, it has been referred to the Panel for Determination in accordance with the Operational Guidelines to the Financial Ombudsman Service’s (FOS) Terms of Reference. 16. The Panel consists of an Ombudsman and two Panel members with extensive experience in the insurance industry and consumer claims. 17. The Panel is satisfied that the parties have exchanged the material they rely upon and have had the opportunity to respond to the issues raised. Sub-Floor Damage 18. In its 9 January 2013 letter to the Applicants, the FSP indicates 35% of the sub-floor damage to the Applicants’ property was caused by storm. 19. In the F SP’s submissions to the Service, the FSP submits 30% to 40% of the total damage to the Applicants’ property (that is not just the sub floor damage) may be attributable to the storm event. In fact, according to the FSP, it has reassessed the resultant damage to a total of $58,850 and has offered $23,540 which represents 40% of the total damage sustained. 20. There is no evidence from the building consultant S that it ever provided an opinion that only 30% to 40% of the damage to the Applicants’ property (whether as a whole or with respect to the sub-floor only) could be attributable to a storm event, let alone an explanation for such a conclusion. 21. The suggestion that 30% to 40% of the damage to the Applicants’ property could be attributable to a storm event was made by assessor CL. CL contacted S who apparently advised that 60% to 70% of the damage is maintenance related. 22. According to S, the property was in good condition for its age. He identified areas of water ingress and considered that water entering the unde r-floor space was unable to drain away. It was evident that movement to the foundation was due to the moisture. Although the movement had occurred generally over an extended period of time, S considered the movement was exacerbated by the floods. 23. It is unclear from the report exactly why S considered that the movement had occurred over an extended period of time. S identified down pipes that were discharging water directly into the soil and identified that the sub-soil directly Case No: 315413 Determination Page 4 of 8 beneath the home may have been lower than the ground level soil outside the home. This of itself does not necessarily establish that the movement related damage to the Applicants’ home in fact occurred over an extended period of time. 24. The Panel notes the comments by the assessor CL following inspection of the property on 2 April 2012 as follows: “From our own inspection of the premises we can confirm there is evidence of the floors in the areas described above having settled. As that settling is more felt than seen, it was not possible to provide visual representation in the way of photographs” 25. The Applicants however, despite the limited evidence presented by the FSP have not provided any evidence of their own, to dispute these findings. In these circumstances, the Panel must be guided by the expert opinion as presented by the FSP. The only expert opinion is that provided by CL and S. 26. On balance, the reports establish that most likely there would have been pre - existing movement to the floor but this has been exacerbated as a result of the floods. Evidence in respect of roof construction defects and faulty construction 27. S noted: “I observed that the installation of the sheets and cappings generally is poor. I observed capping junctions that would allow water ingress and also sheets with nail holes and nails in down corrugations along the eastern roof plane directly above the boys (sic) bedroom. Water ingress is also likely to have occurred at these locations. I observed an air-conditioning unit above the lounge room area where water staining has occurred. I also observed that the roof sheets over this area have limited screws . As a result there are loose sheet laps where wind driven rain could enter. I also observed a patch over an old roof penetration with silicone that appeared deteriorated. I am on the opinion that the water ingress to the ceilings of the residence has been the result of incorrect screw fixings in accordance with the Building Code of Australia – Volume Two. Hole left in the sheets and nails to down corrugations is not an acceptable practice and is likely to allow water ingress.” [Panel emphasis] 28. However, photographs provided in support of S’s report show:  There is only one area with a poorly finished capping joint.  There is only one roof sheet with an exposed nail hole.  There is only one roof sheet where a nail has been driven into the “down corrugation”. 29. The suggestion that an area of the roof had “limited screws” is also vague and in the Panel’s view, does not establish that that section of the roof was Case No: 315413 Determination Page 5 of 8 defectively installed. Ultimately, no evidence has been provided to demonstrate:  How many screws the relevant section of the roof actually required as a minimum (by reference to either, the manufacturer’s installation requirements or whatever building standard that may have been applicable at the time of installation); and  That the number screws which were actually used on that section of the roof were in fact less than such requirement or standard. 30. Further:  No evidence has been led to demonstrate that water (or at least a substantial portion of it) had in fact entered the home through the areas S claimed to have been defectively installed or constructed.  There is nothing in S’s report to suggest that the alleged leaking areas were ever water tested. In the absence of such evidence, it appears plain to the Panel that S was merely speculating on these matters.  Apart from a bare reference to the Australian Building Code, neither the FSP nor S provided any information relating to the building codes that were allegedly breached, nor demonstrated that they were in fact breached.  Whilst the Panel accepts there is no flashing at the meeting point between the verandah roof and the weatherboard wall, no evidence has been provided to demonstrate that this was in fact a construction or installation defect by reference to any building standard in force or in practice at the time of the roof’s construction. In this respect, the Panel notes that the relevant area is actually covered by another roof. Therefore, in the absence of evidence demonstrating that it was a building requirement or practice for the area to be flashed (at the time of the roof’s construction), the Panel is not in a position to assume that the area required flashing. 31. Accordingly, whilst S seemed to have provided a fairly extensive report, the report has in effect offered little to substantiate the conclusions insofar as it relates to the internal damage. 32. Further, the Panel notes the assessor CL identified rainfall ingress into the roof cavity as a source of the internal damage. 33. In the circumstances, the Panel is not satisfied the evidence is sufficient to establish the internal damage was due to construction or roof defects. Scope of Works 34. There are a number of items in the Scope of Works identified by S that are clearly not storm related. These items include items 1.1, 1.2, 1.3, 1.4. These items relate to external damage not related to the storm. The Panel also Case No: 315413 Determination Page 6 of 8 accepts item 2.1 is not storm related as it deals with the replacement of kitchen drawer units not damaged by the storm. 35. Insofar as the balance of the damage identified, that is the damage to the “Boys Bedroom”, “Lounge Room” and General, the Panel accepts this is storm related and covered under the policy. 36. The Scope of Works does not extend to cover all damage identified by the assessor CL. It does not cover damage identified to the ceilings of the lounge room, kitchen bedroom 2, bedroom 3 or replacement of the vinyl on the kitchen floor. CL identified rainfall ingress into the roof cavity as a source of damage. The Panel accepts in the absence of any evidence to the contrary that it is reasonable to accept that this damage should be included in any Scope of Works. Quantum 37. The Panel has considered quotations from TKM building contractors who provided a quotation to the assessor in the sum of $82,234.24 with respect to the external damage, damage to the kitchen drawer units, boys bedroom and lounge room. The quotation has an additional amount for maintenance repairs for the dining room, master bedroom and replacement of the kitchen flooring totalling $13,160.40. Based on this, for the full repair of the property, the quotation is $95,394.64. 38. A second quotation has been obtained from S P in the sum of $63,500. This quotation is not itemised and simply refers to the repair of flood damage as per the Scope of Works. It is clear that this quotation does not include quotation for the repair of the dining room, master bedroom or kitchen. 39. The Panel accepts that the majority of the costs associated with the external damage are not related to the actual flood, but that the balance of the internal damage is in the absence of alternative information related to the storm damage due to rain water entering the property. 40. The Panel accepts that this dispute has been ongoing for some time and despite efforts made by the FSP and the Applicants to reach a compromise of the dispute, the parties have been unable to do so. The Panel is also mindful of the fact that due to the location of the Applicants’ property, there are difficulties in arranging for the repairs of the property. 41. Given these circumstances the Panel considers it would be preferable for this matter to be cash settled. In assessing an appropriate cash settlement figure, the Panel considers the itemised quotation from TKM to be more reliable, in particular given the FSP’s comments as to the reluctance of builders attending the property to quote given its remoteness and the limits on the availability of tradesmen. 42. TKM provided the following quotation: External:  Supply install new roof Case No: 315413 Determination Page 7 of 8  Supply install new flashing  Stormwater drains, connect downpipes  Prepare and pack existing pier supports to sub-floor - $21,876. The Panel considers the FSP should only be liable for the preparation and packing of the pier supports. In the absence of a precise breakdown of this cost, the Panel believes $5,000 to be fair and reasonable in the circumstances. Complete removal and reinstatement of floor to allow access to sub floor - $44,000. The Panel accepts the assessment by S that of a 30% to 40% contribution by the storm to this damage and determines that it would be fair and reasonable to allocate a 40% allowance. Accordingly, the Panel considers $17,790 to be fair and reasonable. Repairs to the bedrooms, kitchen (less kitchen drawers) lounge room and dining room - $20,428.80. The Panel accepts the FSP is liable for these repairs and considers an allowance in the full amount of $20,428.80. 43. Based on the above calculations, the Panel determines the appropriate cash settlement in this dispute at $43,218.80. Make safe repairs and contents claim 44. The Panel notes from the material exchanged the recommendation of the loss adjustor for payment of the sum of $1,044.50 to P building with respect to the make safe repairs. It is unclear whether the FSP has actually attended to payment of this although this issue has not been raised by the Applicants. In the event that the FSP has not made payment of this amount, then the Panel determines that the FSP should make payment of this amount without delay. 45. The Panel also notes comment from the assessor with respect to the contents claim. Instructions were sought from the FSP with respect to whether the contents claim is to be decli ned. It is unclear from the information exchanged whether the FSP has now accepted the Applicants’ contents claim. 46. According to the assessor the damage caused by the roof leak, required the replacement of carpets to the lounge room and living room and replacement of the Acer computer. Damage caused by stormwater runoff require the replacement of the Frigidaire Custom Deluxe Cyclamatic 2 door refrigerator, replacement of the Hoover 370 Cyclic Defrost 2 door refrigerator and replacement of the spoiled food in the fridge and freezer. 47. In the absence of any information from the FSP to dispute liability with respect to the Ap plicants’ claim for the damage to the contents, the Panel Case No: 315413 Determination Page 8 of 8 determines in the event that the FSP has not already done so, that the FSP meet its liability with respect to the contents claim and damage as identified by the FSP’s loss adjustor CL in their repor t of 22 December 2012 to the FSP. Compensation 48. In view of the nature of this dispute, the Panel has considered whether or not compensation is payable to the Applicants given the delay. 49. Paragraph 9.3 of the Terms of Reference provides that compensation may be awarded by the Service where an Applicant suffers an unusual degree of inconvenience in the resolution of the claim. The Applicants have indicated that they have been inconvenienced in particular because of the mould that has developed in the house and the impact on their two sons. 50. The Panel accepts that this would be quite distressing for the family however the Panel notes that the FSP has at all times acted on the basis of available information. The FSP’s loss adjustors have responded quickly and the F SP has attempted to settle the Applicants’ claim. 51. In the circumstances and given the determination that has been reached in this matter, the Panel considers it would be inappropriate to make an order of compensation. 52. In determining not to award compensation, the Panel acknowledges the delays that have existed in this claim but as interest is payable, considers an award of compensation would be unnecessary. Determination 53. Accordingly, the Panel determines that the FSP cash settle the Applicants’ claim for the sum of $43,218.80 in accordance with the terms of the policy. 54. The FSP is to attend to the payment of the Applicants’ make safe repairs and contents claim without further delay if it has not already resolved these claims. 55. As the dispute is to be cash settled, the Panel determines the FSP is to pay interest in accordance with Section 57 of the Insurance Contracts Act 1984 (the Act) from 9 January 2013 being the date of the FSP’s decision in this dispute to date of payment of the claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.