The represented applicant sought $208,472 for home damage he attributed to a neighbour's burst stormwater pipe or water saturation after the FSP declined. AFCA found the applicant had not proven an insured event and the FSP is entitled to decline the claim.
The applicant bore the onus of proving loss from an insured event, and the expert evidence and the demolition of the home left that onus unmet.
Issues
- Claim denial primary · not upheld“The Panel accept the FSP is entitled to decline the claim.”
- Product terms interpretation secondary · unclear“The Applicant says the soil movement and seepage exclusions must be construed to have their ordinary meaning, creating an ambiguity.”
Subjects and remedies
home or building damageno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case No: 315081 Determination Page 1 of 10
Case number: 315081
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of Claim - No Insured Event - Exclusion/Condition
6 August 2013
Background
1. The Applicant holds a home insurance policy with the Financial Services
Provider (FSP) covering the premises for a sum insured of $194,834 for the
policy period beginning 14 September 2009. The policy was incepted on 14
September 2001, renewed annually and was current at the time of the loss.
2. On 23 October 2010 the Applicant lodged a claim for damage sustained to
the home which the Applicant suspected had arisen as a result of a storm
earlier in the year. The FSP appointed an engineer „DW‟ to inspect the
damage and after considering DW‟s report, advised the Applicant his claim
was not for acceptance as the damage had not arisen as a result of an
insured event, but had arisen from causes specifically excluded from cover.
3. The Applicant is seeking a review of the FSP‟s decision to decline his claim.
Summary of A pplicant’s position
4. The Applicant is represented in this matter by his solicitor. For the sake of
brevity, both will be referred to as „the Applicant‟ where necessary.
5. The Applicant says the damage was caused by storm water runoff and/or a
burst pipe, incidences for which his policy provides cover. Therefore he
expects the FSP to cover his claim.
6. The Applicant says due to the FSP declining his claim the home became so
unsafe he chose to demolish it rather than attempt repairs. He is therefore
seeking the amount of $208,472 which represents the sum insured as at the
policy period beginning 14 September 2010.
7. The Applicant sourced his own engineers‟ reports which have contradicted
the findings of DW. They believe the cause of the damage was attributable
to water saturation of the soil. The Applicant says the evidence of his experts
should be preferred to that of the FSP and says DW did not inspect the
foundations or footings of his home.
Determination
Case No: 315081 Determination Page 2 of 10
8. The Applicant says he has provided evidence from his immediate neighbour
of the burst pipe at his property, which the Applicant believes has caused the
damage. As the policy covers water from a burst pipe, the Applicant says the
FSP should accept his claim.
9. The Applicant says as part of building a new residence on the site, he has
had a geotechnical survey undertaken by „GE‟ who concluded the soil at the
site was not naturally reactive. Therefore an „event‟ must have precipitated
the soil and foundation movement at the property.
10. The Applicant says the policy exclusions of soil movement etc must be
construed to have their ordinary and accepted meaning, that is, natural
movement at the site. To apply them otherwise when „an event‟ has occurred
would be an ambiguity in the terms of the contract. The Applicant seeks to
rely on the rule of „contra proferentum‟ whereby the ambiguity is construed
against the party who wrote the terms. Further the Applicant is concerned
the FSP has altered its reasons for declining the claim.
11. Further, the Applicant says the FSP has not proven one or more policy
exclusions which would defeat his claim. As he has established a claim
under the terms of the policy he does not consider the FSP has proven one
or more exclusions apply.
Summary of FSP’s position
12. The FSP says its policy is a defined events policy and it does not consider
the Applicant has discharged the onus on him to establish a prima facie
claim under the terms of the policy. Further, even if the Applicant had
discharged this onus, it considers there are several policy exclusions that
operate to defeat the claim.
13. The FSP has considered the reports supplied by the Applicant. However, it
says the three engineers are largely in agreement as to the cause of the
damage to the home. Whilst one has raised a burst pipe as a potential
causative factor in the foundation movement, it does not consider the
Applicant has provided sufficient evidence to support this contention.
Accordingly, it considers the damage has arisen independently of any
insured event and therefore the exclusions apply.
14. The FSP relies on the following policy provisions, which the Applicant does
not dispute receiving:
“ Insured events we will pay
9. Storm, rainwater or run-off
We will pay for loss or damage caused by storm, rainwater or runoff.
‘storm’ means violent wind (including cyclones and tornadoes),
thunderstorms and hail which may be accompanied by rain or snow.
‘rainwater’ means rain falling naturally from the sky onto the buildings
and/or ground.
Case No: 315081 Determination Page 3 of 10
‘run - off’ means rainwater that has collected on or has flowed across
normally dry ground or has overflowed from swimming pools or spas.
We will not pay for loss or damage:
...
c. caused by:
Soil movement including erosion, landslide, mudslide or
subsidence,
Shrinkage or expansion of earth or land, or
Hydrostatic pressure.
g. caused by water seeping, percolating or otherwise penetrating into
the buildings as a result of:
Structural defects,
Faulty design of the buildings,
Faulty workmanship in the construction of the buildings, or
Your failure to adequately maintain the buildings.
...
11. Water or other liquid damage
We will pay for loss or damage which results directly from the
bursting, leaking, discharging or overflowing of:
Fixed pipes.
...
We will not pay:
a. for loss or damage caused as a result of the gradual escape
of liquid over a period of time:
Where you or a reasonable person in the
circumstances could be expected to have been aware
of such gradual escape of liquid,
Due to lack of maintenance, wear and tear, or neglect.
...
Parts A and B
When we will not pay a claim under your policy
1 This policy does not cover loss, liability, injury or damage:
f. Wear and tear
Arising out of depreciation, gradual deterioration, wear
and tear;
g. Inherent defects
Caused directly or indirectly through inherent defects,
faulty design, structural defects or poor workmanship. ”
Case No: 315081 Determination Page 4 of 10
Issue
15. Whether the FSP was entitled to decline the claim.
Reasons for decision
16. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the FOS Terms of Reference. This is due to the
circumstances of the dispute. This dispute has not been the subject of a
FOS Recommendation and has proceeded directly to Determination.
17. This decision has been made by a Panel consisting of an Ombudsman and
two Panel members with extensive experience in the insurance industry and
consumer claims.
18. The Panel is satisfied a full exchange of information has taken place
between each party and each party has had the opportunity to address any
issues raised.
19. The onus of proof rests with the Applicant to establish that, on the balance of
probabilities, he has suffered a loss caused by an insured risk. Once the
Applicant has established the loss was caused by a risk insured under the
policy, the onus then shifts to the FSP to show the loss falls within an
exclusion clause in the policy or is otherwise excluded from cover under the
contract.
20. The following is not disputed between the parties:
Claim lodged by Applicant on 23 October 2010.
The FSP appointed builder „JLG‟ to inspect the home, who could not
locate any storm created opening or determine the precise cause of
the loss. JLG recommended an engineer be appointed.
Engineer DW subsequently inspected the home on 5 November 2010
and considered the cause of the loss was due to the failure of timber
roof fixings which had caused the supporting wall to displace
outwardly.
On 28 November 2010 the Applicant obtained a quotation for repairs
from builder „F‟ in the amount of $127,420.14.
On 9 December 2010 the FSP wrote to the Applicant to advise his
claim was declined on the basis the loss had not arisen as a result of
an insured event.
On 4 January 2011 the Applicant‟s engineer „C‟ inspected the
property.
Sometime in April 2011 the Applicant vacated the premises.
On 16 September 2011 the Applicant‟s engineer „M‟ inspected the
property.
On or around 12 December 2011 GE conducted a geotechnical survey
at the site.
Case No: 315081 Determination Page 5 of 10
On 13 May 2012 the Applicant sought an internal dispute resolution
(IDR) review of the decision to decline his claim.
On 23 May 2012 the Applicant supplied the reports from C and M to
the FSP for consideration. The Applicant advised the house had been
demolished in late 2011 as it was too badly damaged to be repaired.
The Applicant was sent a letter on 12 June 2012 from the IDR
representative advising it had considered his reports however the FSP
did not intend to alter its decision.
21. The Panel notes that initially, the Applicant believed the damage had arisen
as a result of a storm event in August 2010. However, no evidence to
suggest storm damage was presented or found and this appears to have
been abandoned as a possible causation factor in the damage.
22. However in his submission to the Service, the Applicant contends that the
loss arose as a result of a stormwater pipe erupting (burst pipe) which
occurred at his immediate neighbour‟s residence approximately nine years
earlier. Accordingly, the Panel will confine its review on whether the
Applicant has established a valid claim under the insured event of water
escaping from a fixed pipe.
Expert reports
23. The Panel notes the FSP appointed DW to inspect the Applicant‟s home and
det ermine the cause and extent of the damage. DW‟s report of 8 November
2010 provides, in part:
“In line with our observations and in the absence of further information, it is
our opinion that the noted distress is due to the failure of one of more timber
connections due to poor or inadequate fixings. The distress is due to long
term loading and does not appear to be due to a single event.
In order for the subject wall to displace outward laterally, connections between
the top of wall and rafters/ceilings joists would have failed. As a result of this
failure, extra load would be transferred to the collar ties causing them to also
fail. We noted that there were a number of collar ties resting on the ceiling
members. In addition, the underpurlin directly above the subject area has also
exhibited significant lateral shift. This distress may have existed for a period of
time undetected.”
24. The Panel is satisfied that DW is appropriately qualified and experienced to
comment in this matter. DW‟s report is clear in conc luding that he believed
the damage to the roof to have arisen as a result of the failure of the roof
timber fixings which has caused outward lateral movement of the supporting
wall. DW considered the roof trusses had failed first, which had led to the
outward lateral deflection of the south wall.
25. The Applicant disputes the findings of DW and says DW did not inspect the
foundations or footings of the home and is not able to determine the cause of
the damage without inspecting same. Further, the Applicant say s DW‟s
report is qualified with the statement of „in the absence of further
Case No: 315081 Determination Page 6 of 10
information‟. The Applicant says he has now provided further information
which calls into doubt DW‟s conclusions.
26. The report from C provides:
“It appears that the north western wall has been severely damaged and has
substantially tilted due to the result of settled footings along the length of the
wall. Further to my discussion with [Applicant], he has advised that the
neighbouring property has previously had a burst pipe some few years back. I
strongly believe that this may be the cause of the damage to the wall.
As the heavy build up of water beside the footings remains for a long period of
time, the end result causes the founding material below the footings to soften.
As the material softens, the footings displace slightly and pivot toward the
direction of the softer material. For foundations to remain stable, they must
undergo consistent bearing conditions of the founding material. In this case,
one area has softened and reduced its bearing capacity, whilst the remainder
of the footings are at a higher (dryer) bearing capacity. This behaviour is
commonly known as differential settlement and is quite common when water
builds up beneath foundations occur.
[Applicant] has provided an agg-line in front of the wall which will prevent any
further entry of water. I however, recommend that the wall be repaired as
soon as possible and may possibly require underpinning. Further investigation
of the remaining foundations must also be carried out as the flow of water has
seeped through the footings of the entire dwelling.” (sic)
27. Accordingly, C concluded the damage had arisen as a result of differential
settlement of the footings along the western wall which has then caused
problems with the roof framework. C considers this may have arisen as a
result of a burst pipe a few years earlier, where the heavy flow of water
caused the founding material to soften and reduce its load bearing capacity,
causing the foundations to sink. C noted an agg-line had been installed and
was of the view the wall would require underpinning to fix the problem. C
further considered the remainder of the footings should be inspected as
water had seeped through the entire dwelling.
28. M‟s report provides:
“The main reason for al this defects is due to un-equal settlement (differential
Settlement) in the western wall, It appears that the wall has been severely
damaged and has substantially tilted due to the result of settled footings along
the length of the wall. I believe that the reason for this damage is due to water
seepage under part of the wall footing, cause of damage to the wall.
1. An agg-line to be installed at the along the boundary line posit to
the subject wall to prevent any further entry of water.
2. The wall be repaired, and may possibly require underpinning.
3. Further investigation of the remaining footings must also be carried
out as the flow of water has seeped through the footings of the
entire dwelling.” (sic)
29. Accordingly, M concluded the damage had arisen as a result of water
seepage to the foundations causing differential settlement to the footings. M
recommended an agg-line be installed along the boundary line to prevent
Case No: 315081 Determination Page 7 of 10
further water entry. M considered the damaged wall would require
underpinning to repair and the remainder the footings should be inspected
as water had seeped through the entire dwelling.
Applicant’s declarations
30. In further support of his claim, the Applicant has provided statutory
declarations from himself and his former neighbour „K‟ regardin g the burst
pipe event that occurred in K‟s yard in 2001. In addition, the Applicant says
he did not inform M of the burst pipe event and M reached his conclusions
independently of C‟s conclusions or the knowledge of the burst pipe. The
Applicant has also provided the geotechnical report from GE.
31. The Panel has considered the contents of the declarations from the
Applicant and K. The Panel notes both the Applicant and K state there was a
large storm sometime in 2001, and during this storm a pipe in K‟s fron t yard
burst causing water to flow into the Applicant‟s property and under the
house. The Panel notes the following from the Applicant‟s declaration:
“5. During the storm I went outside and noticed that there was a huge volume
of water gushing out from under my house. The water was coming from the
right side of my house near my garage. My property slopes from left to right
and the water was running downhill from left to right.
6. The water gushing out from under my house was like a river and it kept on
gushing until the storm stopped.
7. When I noticed the water gushing out from under the house I walked
around the perimeter of my house to see if I could determine where the water
was entering. I could not see any particular entry point for the water. It was as
if the water was coming from underground, at some point under my house.
8. After the storm finished I spoke with my neighbour [K] who was living next
door at [address]. [K] said to me with words to the effect “The storm caused a
storm water pipe to burst in my front yard. Water was gushing up from
underground in my front yard. It caused a big sinkhole in my yard and water
flooded from the broken pipe into my house.”
9. I said to [K] with words to the effect “The water from the storm pipe also
flooded into my property. I saw it flowing from under my house like a river.”
10. I know that at the time [K] arranged for the storm water pipe to be repaired
and he filled the sinkhole.
11. The water that had been gushing out from under my house did not appear
to hav e caused any damage to my property at the time and I didn‟t look under
my house at that time.
12. Shortly after the water pipe burst I installed an ag pipe alongside my
house to prevent any water from entering under my house.”
32. K‟s declaration provides, in part:
“3. In about 2001 an asbestos storm water pipe in my front yard erupted
during a big storm. The storm lasted for about two hours and consisted of very
heavy rain and hail.
Case No: 315081 Determination Page 8 of 10
4. During the storm, water gushing down [avenue] gushed back into the storm
water pipe which led from my property to the street. The water gushed back
into the pipe with such force that it caused the pipe to erupt at a point
underground, in my front yard.
5. When the pipe erupted water surged from the pipe into my yard and under
my house. The water also poured into [Applicant‟s] house at [address].
6. The volume of water was so great that it pushed up through the floorboards
of my home and flooded my sunroom.
7. The water gushing from the pipe caused the soil in my yard to wash away
and it left a large sinkhole about two feet deep. The gushing water also
washed out my roses and a tree in my front yard.
8. When the rain stopped and the water stopped gushing out of the pipe, I
called a local handyman/plumber who came around to my house within a day
or two and repaired the pipe. I recall I paid this plumber $70.00 to fix the pipe.
9. After the pipe was fixed, I filled the hole with soil. I repaired all of the
damage to my property myself and did not make an insurance claim.
10. Also after the rain stopped and the water stopped gushing out of the pipe,
I spoke with [Applicant] and he said to me with words to the effect “The water
from the broken pipe poured into my property like a river. An enormous
amount of water flowed under my house.”
11. Shortly after the incident I know that [Applicant] installed an ag pipe
alongside his house.”
33. The Panel notes there has been no other corroborating evidence of the burst
pipe supplied, such as the invoice from the plumber who reportedly fixed the
pipe, nor did K lodge an insurance claim as a result of this event. K stated he
fixed the damage to his home himself but has not provided any evidence of
repairs such as receipts for materials etc.
34. In the Panel‟s view, whilst the statutory declarations support the Applicant‟s
contention that a neighbour‟s stormwater pipe burst in 2001 resulting in
inundation of his property, there is no clear evidence that the event caused
any damage at that time.
35. Furthermore, in the Panel‟s view, even if it were to accept that the inundation
in 2001 was substantial, it is not sufficient just to establish that there was a
burst pipe and subsequent inundation; it is incumbent on the Applicant to
establish the loss for which he is now claiming was caused as a result of that
event.
Conclusions
36. It is always difficult when faced with conflicting information and expert
opinion and the Panel must now determine which version of events it
prefers.
37. The Panel does have some reservations regarding how much weight it can
place on the evidence provided by the Applicant and his experts.
Case No: 315081 Determination Page 9 of 10
38. The Panel notes the Applicant ‟ s statement that M was not made aware of
the burst pipe event or C‟s prior conclusions. However, in comparing the two
reports, the Panel notes the concluding line in both reports is identical.
Whilst the Panel accepts it is possible for two experts to reach the same
conclusion independently, it is highly unusual they would each use the exact
same words in closing. In the Panel‟s view, such a coincidence is unlikely
and suggests M wa s made aware of the contents of C‟s earlier report.
39. Further, the Panel notes C stated an agg-line had already been installed,
whereas M recommended that one be put in place. In the Panel‟s view, this
contradiction is concerning. Further, the Panel notes th e Applicant‟s
declaration in which he stated an agg-line was installed sometime in 2001. In
the Panel‟s view, M should have been in a position to observe the line was
already in place, which does call into question the thoroughness of his
inspection.
40. Although both M and C have opined the cause of the damage is differential
foundation movement due to water saturation or seepage, neither have
provided photographs of the subfloor area or foundations, nor has either
detailed any inspection of same. It also appears neither has undertaken any
soil moisture tests to support their contentions. In the Panel‟s view, it would
be incumbent on both engineers to include supporting evidence in order to
demonstrate how they formed their conclusions.
41. Although the Applicant‟ s expert C has stated that a burst pipe some few
years previously may have caused damage, he simply refers to „ a burst pipe’
and it having occurred ‘a fe w years back’ . The expert‟s commentary lacks
any specific analysis of the nature and extent of the escape of water from the
burst pipe, or exactly when or where this occurred. Further his report does
not address why the effects of the bursting would have only been felt (in the
form of failed roofing) some 9 years later.
42. In addition to this, although the GE report is not overly relevant in this matter
as it has been commissioned in order to assist in the construction of the new
home at the site rather than comment specifically on the cause of the
damage, the Panel notes the GE report does not make mention of any areas
of high moisture content to suggest a water inundation event. Further, GE
notes the soil at the site has a medium to high potential for movement with
moisture changes which is particularly relevant considering the recent
drought.
43. The Panel has carefully examined the photographs supplied of the premises
and notes there is no visible evidence of cracking to the brickwork, which the
Panel would expect to see were there foundation movement or settlement of
the founding material beneath the home. Rather, the western wall has
displaced laterally, which in the Panel‟s view is not usual where settlement
has occurred.
44. Further, the Panel has noted from the Applicant‟s declaration that when the
water was running under his house, this was observed coming from under
the garage. The Panel notes the garage is on the eastern side of the
Case No: 315081 Determination Page 10 of 10
property, in addition to being set back somewhat from the house, whereas
the damage to the home was most pronounced on the western wall and
kitchen/dining area in particular. The Panel also notes the Applicant‟s
comment that he could not see any particular entry point for the water, which
the Panel considers unusual where the water was reportedly flowing
overland from K‟s property.
45. K has stated the pipe burst in his „front‟ yard which raises the question of
why the water was reportedly running out from under the garage, toward the
rear of the property. Neither the Applicant or K has provided any diagrams or
plans of the property to demonstrate the location of either the burst pipe, the
sinkhole or the movement and direction of the water flow, which the Panel
considers would have been useful in order to determine if the burst pipe
could reasonably be considered to have caused or contributed to the
claimed damage.
46. Accordingly, the Pa nel is not persuaded the Applicant and K‟s declarations
are indicative of the claimed damage having arisen as a result of any burst
pipe event.
47. In addition to this, the Panel notes the home has been demolished which
was undertaken prior to the Applicant‟s request for an IDR review or his
provision of the reports from M or C to the FSP, leaving the FSP with no
available avenue to reinspect the house or undertake any further enquiries.
48. The Panel notes the Applicant has lodged plans with the council on 26
February 2011 for a new dwelling. These plans were first drawn up on 9
December 2010 which suggests that irrespective of the engineers‟ findings,
the Applicant intended to demolish the home regardless . In the Panel‟s view,
this action by the Applicant has not assisted in determining the cause of the
damage to the home and has deprived the FSP of the opportunity to
undertake further enquiries to test his experts‟ findings .
49. After considering all of the available evidence, the Panel prefers the
evidence presented by DW and accepts, on balance, the roof framings failed
first, which has led to the lateral displacement of the western wall.
50. In the circumstances the Panel is of the view the Applicant has not
discharged the onus on him to establish the loss arose as a result of a burst
pipe or any other insured event. On this basis, the Panel accept the FSP is
entitled to decline the claim.
Determination
51. On the basis of the available information the Panel determines the FSP is
entitled to decline the Applicant‟s claim.