Text of the determination
Case No: 314789 Determination Page 1 of 14
Case number: 314789
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Claim amount
25 September 2013
Background
1. The Applicant held a Home Building Insurance Policy (the policy) with the
Financial Services Provider (FSP).
2. A claim was lodged under the policy on 22 September 2010 for damage to
the insured building after a water pipe burst causing water to pool under the
building.
3. The FSP accepted the claim, however, limited its liability to 35% of the total
cost of repairs on the basis that only this portion of the assessed damage
was due to the insured event, i.e. burst water pipe.
4. The Applicant remains dissatisfied with the FSP‟s assessment of its liability
under the claim and is seeking complete indemnity for his loss.
Summary of Applicant’s position
5. The Applicant has sought the assistance of his daughter “F” in lodging this
dispute with FOS. In the interest of brevity both the Applicant and F will be
referred to as “the Applicant” for the purpose of this Determination.
6. The insured building has extensive damage due to water under the home.
The house has moved and slopes to one side, cracks in walls have
appeared, the veranda retains water, floor tiles have lifted and a fairly new
bathroom is also damaged.
7. The house has moved so much that the overhead electricity wires
disconnected from the home. The damage to his home is wide and extensive
as shown in photographs taken of the loss.
8. The policy provides for the rebuild or repair of the insured building which is
damaged due to a broken pipe. However, the FSP is only offering to cover a
small fraction of the total damage caused by the broken pipe.
9. The Applicant initially suggested that a fair and reasonable resolution would
be for the house to be demolished and rebuilt because, since lodgement of
Determination
Case No: 314789 Determination Page 2 of 14
the claim in September 2010 the building has continued to deteriorate so
much that it has become dangerous to live in.
10. The Applicant refutes the FSP‟s position that a major contributing factor for
the resultant damage was the long period of dry conditions experienced in
Melbourne over ten years followed by a very wet period in 2010-2011. He
maintains that if this was the case then the resultant damage would not have
been isolated to his home only and adjoining properties would also have
been affected.
11. The Applicant does not accept as accurate, the FSP‟s contention that the
front garden is extensive and maintains it is an average proportion for the
size of the property. There is a concrete strip between the house and
garden, with an agricultural (agri) pipe also present which drains excess
water from the garden.
12. The Applicant disagrees with the FSP‟s position that rainwater directly enters
the subfloor area via vents positioned at the veranda floor level. He
maintains the reason why rainwater enters the subfloor through the vents is
that the veranda has sunk considerably due to the damage to the
foundations because of the extensive water under the house arising from the
original water leak.
13. The Applicant does not accept the scope of works (repairs) relied upon by
the FSP (at $25,822.50) are adequate to fully repair/restore the insured
building nor does he accept that its offer of settlement at 35% in the amount
of $8,737.90 is fair or reasonable in terms of providing complete indemnity
for the damage claimed.
14. The quote from his independent builder “IH” in the amount of $87,620 would
be considered more reasonable in respect to repairing the insured building
due to damage caused by the burst water main pipe.
Summary of FSP’s position
15. After lodgement of the claim the FSP instructed “PP” to attend the insured
property and undertake an assessment of the loss which was completed on
28 September 2010. The Applicant informed PP that a plumber had been
appointed approximately four weeks earlier and the broken water main pipe
was located and repaired.
16. PP recommended that a 12 month drying out period be allowed in order for
soil conditions to re-stabilise after which a re-inspection would be arranged
and an accurate scope of works and repair quote would be arranged.
17. Several assessments of the insured property were subsequently completed
which found the subfloor area to still be wet and further drying out periods
were recommended. Arising from the further investigations during the period
of the claim the FSP maintains:
Case No: 314789 Determination Page 3 of 14
The burst main pipe had not significantly contributed to the damage
claimed i.e. the cause for the damage claimed was not 100% due to the
introduction of moisture within the subfloor area by the burst main pipe.
Rather, th e engineers‟ “IL” opinion of a 30% contribution to the total
damage only by the burst water main is a more accurate assessment.
There was no evidence to support the contention that the insured
building would need to be demolished and rebuilt.
The quote su bmitted by the Applicant‟s preferred engineer, IH, is
significantly different to the scope of works provided by PP, which the
FSP notes was prepared by PP on the basis of engineering
recommendations by IL.
The FSP does not accept the damage to the front porch should be
covered based on comments by IL in its letter dated 19 October 2013.
The existence/installation of the agri pipe under the house at the time of
original engineering inspection is an indicator of a pre -existing drainage
issue prior to the alleged leaking pipe.
All pressure tests and camera inspections of the stormwater system
failed to locate any leaks, which is why the engineer maintains the
damage is due to other factors.
The initial leak from the pipe was minimal based on the Applicant‟s
water usage records for the relevant period.
The subfloor area remained wet even after the burst water main pipe
was located and repaired, again supporting the damage being due to
other factors.
The FSP notes the Applicant initially stated the property needed to be
demolished and now seems to be seeking repair costs in line with the
quote from IH.
In offering an increase to 35%, due to the Applicant‟s initial
unhappiness with a contribution based on 30% of the costs of repairs in
line with the engineer‟s (IL) opinion, the FSP has fulfilled its obligations
under the policy.
18. The FSP relies on the following policy provisions:
“Page 4
What this policy covers
Home Insurance provides cover against loss or damage for the contents
of your home and/or all the buildings that make up your home.
What you are covered for
...
Water – leaking or escaping
Page 17
“Water – leaking or escaping
Case No: 314789 Determination Page 4 of 14
If your home or contents suffer loss or damage caused by water leaking or
escaping from
Pipes
…
House gutters or drainpipes
we will under buildings insurance
► rebuild or repair that part of your home that was damaged
however
► ...
► we will NOT repair or replace the item that the water leaked or escaped
from”
Page 35
“What you are not covered for – general exclusions
we will NOT cover
► loss, damage, injury or death that occurs as a result of
....
Subsidence or landslide unless it happens immediately following
an earthquake or explosion”.
Issue
19. Whether the FSP‟s offer of settlement to the Applicant is fair and reasonable
and in line with the relevant policy provisions.
Reasons for decision
20. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the complex nature of the issues. This dispute
has not been the subject of a FOS Recommendation and has proceeded
directly to Determination.
21. This decision has been made by a Panel consisting of an Ombudsman and
two Panel members with extensive experience in the insurance industry and
consumer claims.
22. There has been an exchange of material between the parties. Each party
therefore, is aware of the issues and has had the opportunity to comment. In
these circumstances the details contained in the relevant consultant s‟
reports will not be recited in full and will only be provided where considered
relevant for the determination.
23. The Panel is satisfied the parties do not dispute the following:
The Applicant held an active home building insurance policy with the
FSP at the time of loss.
Case No: 314789 Determination Page 5 of 14
The FSP provided and the Applicant received the relevant policy
documentation prior to the loss including the Product Disclosure
Statement (PDS) and Certificate of Insurance etc.
The insured building has sustained significant damage arising from the
introduction of moisture to the dwelling‟s foundation soils.
Both parties have obtained and rely upon evidence made available by
their preferred consultants.
A burst water pipe was discovered by a plumber in the area of the loss
which was repaired.
The policy provides cover for damage caused by water leaking from
pipes.
Evidence
24. The parties have made available numerous consultants‟ reports as part of
their submissions to FOS. These report state in part:
PP’s Assessment Report
An inspection of the insured property took place on 28 October 2010.
The Applicant advised approximately four weeks ago he noticed that
the tiled veranda and floor levels to the front door entry had dropped.
The Applicant contacted re-blocking experts who suggested a plumber
be appointed due to the dampness noted in the area.
A plumber was engaged and discovered a leaking water mains pipe in
the immediate area of the floor subsidence. The water pipe was
repaired.
Visual inspection noted cracked brick work to approximately three
areas to the front face brick wall. Internal inspection revealed between
15-20mm floor subsidence to the immediate area of the burst pipe
location.
PP was satisfied by the Applicant‟s version of events i.e. that escape of
water into the foundation soils had occurred due to the burst main pipe.
A 12 month drying out period was recommended with an estimated
cost of repairs noted as $25,822.50.
‘IL’s’ Structural Inspection Report dated 25 November 2010
The purpose of the report was to identify to what extent the movement
and cracking to the dwelling both internally and externally can be
attributed to the leaking pipe.
A visual inspection was carried out on 12 November 2010, the dwelling
was built in 1971 by the Applicant who has resided at the address since
then.
The inspection (external) noted localised cracking and movement to
brickwork around the front entry. A horizontal crack extending
Case No: 314789 Determination Page 6 of 14
approximately mid height of the wall measuring 4-5mm across five
brickwork courses and to the window frame.
Brickwork was found pulling away from the living room window frame
with approximately 5-7mm movement visible. Cracks were also visible
above the electrical box where diagonal cracking followed the mortar
joints.
Inspection showed cracking and movement to the structure internally in
a similar manner. The most notable movement internally was recorded
along the floor frame in the main entry hall and main bedroom. A 15mm
gap was noted between the flooring and underside of the skirting
boards.
Based on the visual inspection and information obtained it appeared
that the water leak, that had since been repaired, had caused water
saturation of founding soils.
IL concluded that the movement and cracking appeared synonymous
with damage arising from a burst or leaking pipe. Recommended 6-12
months drying off period in order for the foundation soils to completely
dry and settle.
IL’s Re -Visit Report dated 3 August 2011
The Applicant advised that rainwater had been pooling on the veranda
adjacent to the front door.
Water had been penetrating under the house through the house vents
adjacent to the front veranda. In order to stop this flow, the Applicant
installed a length of beading along the eastern wall of the veranda at
floor level and partially covering the vents.
The Applicant advised that the cracking and movement both inside and
outside had not reduced with the drying out and sampling of the soil in
the area showed soil to still be moist.
IL concluded drying out of the soils had not yet completely occurred
and there was no use commencing repairs until completely dried out
and suggested allowing a further drying out period.
IL’s Re -Visit Report dated 1 December 2011
The examination of the subfloor area generally showed the soils had
dried out. However, there was a pool of water lying in the sub-floor
adjacent to the inside front wall of the front bedroom.
In the same general area and running along the inside of the front wall
parallel to the pooled water, a plastic agri pipe had been installed.
The soils under the house exhibited severe cracking and appeared to
be highly reactive to changes in moisture content. Due to this cracking
of the soils a number of concrete stumps in the subfloor were
misaligned and not standing vertically.
Case No: 314789 Determination Page 7 of 14
There was also evidence of previous structural work having been done
in the subfloor area.
The source of the pooled water was not immediately obvious and there
appeared to be one of two possible causes, first being the water supply
pipe entering the subfloor through the front wall and the second being
the agri drain installed in the subfloor area adjacent to the wall.
The reasons for the repairs to the timber beam under the lounge floor
need to be identified as this may have a bearing on the movement
taking place in the superstructure.
Recommendation for further drying period of two months was
suggested.
IL’s CCTV Footage Investigation Report
A CCTV investigation of the stormwater system inspected
approximately 20m of stormwater pipe work in the vicinity of the
dampness was completed on 8 December 2011. .
No obvious displacement or imperfections were sighted within the
stormwater pipe work to the side of the building.
IL believes the purpose of the agri PVC pipe line was to stop water
from accumulating in the front garden area revealing a long term
dampness issue in the front lawn, concerning which, IL noted the land
was sloping towards the building.
It is extremely uncommon for agri drainage pipes to be installed within
the sub-floor of a dwelling. Visual inspection revealed that the agri
piping was installed with negative gradient that would allow backflow
during heavy rainfall.
Escape of stormwater would affect nearby soils, if the agri pipe line was
inundated by water then seeping out of the pipe affecting soils in the
local area of the front bedroom and porch.
The drying out period had passed yet the subfloor remained wet at the
location of the repaired copper pipe work. IL formed the opinion that
storm water was still entering the location of the pipe work penetrating
the external brickwork as external soils were higher than the subfloor
soils.
The repaired copper pipe had been installed through an unsealed
conduit that leads externally. The old copper pipe work had not been
removed and an open end still remained.
IL formed the opinion that stormwater was likely still entering the
subfloor through the old open ends of the previous pipe network.
Leak detection testing revealed no drop in pressure to hot and cold
mains installed within the dwelling. IL concluded the primary cause of
current water entry within the subfloor was through the unsealed wall
penetrations and open ended pipes associated with the recently
repaired water line.
Case No: 314789 Determination Page 8 of 14
Due to the soft soils of the front yard, IL believed that the poor drainage
issues were allowing water to flow back towards the dwelling. This
causes saturation of the subfloor soils local to the front bedroom and
porch area.
It was considered unusual for the sub-soils to remain wet after the
repair of the burst water main sometime prior. IL considered a pre-
existing drainage problem had existed to the front lawn area, which is
the primary cause for all current dampness issues to the subfloor soils.
‘IC’s’ (Engineer) Structural Inspection Report dated 11 May 2012
25. The Panel notes the report provides the incorrect address for the insured
property. The parties have not raised any concerns in this regard in their
submissions to the Service. Further, having considered the report, the Panel
is satisfied that the information provided within is in relation to the insured
property and the damage subject to the claim of this dispute.
An inspection of the insured building was undertaken on 7 March 2012.
IC agreed with IL‟s opinion that the cause for damage to the dwelling
resulted from foundation soil heave and was caused by the burst water
main sometime in the months of September/October 2010.
The leak was subsequently repaired in December 2010.
IC also agreed with IL that water continued to enter the subfloor area to
the front of the residence as a result of stormwater run-off generated
from the veranda floor area.
The veranda floor is out of level, due to the foundation soils movement
associated with the burst water main, resulting in stormwater run-off
being directed towards the subfloor house vents.
The stormwater passes through these vents and continues to saturate
the foundation soils in the area.
IC did not agree with IL‟s recommendation for these vents to be
blocked. Although this may stop the ingress of water to the foundation
soils, it would be poor building practice and against the Australian
Building Regulations.
These subfloor vents allow for cross ventilation under the dwelling
which, with raised timber floors, ensures the subfloor area remains dry.
The blocking of the vents is the cause (or at least a contributing cause)
for the foundation soils remaining damp in these areas.
The installation of an agri drainage system is good practice and highly
recommended in the Australian Standards for design and construction
of residential footings where there is poor site drainage.
It was the consultant‟s understanding that the sub -surface agri
drainpipe was properly connected to the underwater stormwater
drainage system which is supported by the CCTC footage.
Case No: 314789 Determination Page 9 of 14
IL‟s observation that an agri drain was installed in the subfloor under
the existing bedroom was inaccurate. The existing agri pipe observed
by IL was located on the surface within the subfloor and was simply
storage material placed there by the Applicant. The pipe was located
on the ground surface and had not been connected to any stormwater
system. The agri pipe was not functional and had been removed.
IC recommended that:
All barriers to the subfloor vents be removed.
The concrete veranda floor be reconstructed to reinstate proper
grade and surface drainage away from the subfloor vents.
Then allow a further six months drying period.
If the dwelling stabilises after this period then repairs can be
undertaken as required.
Additional IL Report dated 28 August 2012
Revisited the insured property on 14 August 2012 with the Applicant,
I C, FSP‟s assessor and a plumber present.
Re-established CCTV footage of the stormwater system along the
eastern wall. However, IL does not believe that this stormwater system
had a significant contribution to the damage recorded.
Further, inspection of the subfloor area determined that soils
immediately inside the front wall and underneath the front bedroom
were still damp.
Also, that the agri drain pipe under the dwelling had been removed and
the water supply pipe running through the front bedroom wall and sub-
floor brickwork had been effectively sealed.
The source of the water dampening the foundation soils was not
obvious, however, IL was of the opinion it was due to water leaking
through the front wall from the front garden or leaking into the subfloor
from the porch surface or both.
IL maintains the view that an approximate of 30% contribution to the
damage claimed by the burst water main pipe was still a reasonable
conclusion.
IL’s Further Report dated 19 October 2012
In relation to IC‟s report , IL made the following comments:
IC assumed the water main was repaired adequately, however , as
per IL‟s report dated 1 December 2011 and the subsequent CCTV
footage, there was a continuing leak through the front brick wall
from the water main repair.
IC‟s statement attributing the out of level floor of the veranda to the
burst water main pipe has not been substantiated in its report
and/or any other documents made available.
Case No: 314789 Determination Page 10 of 14
Given the extensive cracking of the brittle surfaces around the front
door, if soil movement had also caused the veranda to drop, then
the very brittle surface material of the veranda floor would also
have cracked in the process.
There is no obvious cracking to the brittle veranda floor material. IL
suggests its level is not related to the event but most likely was out
of level from the start. So the level of the floor is a cause, rather
than an effect of the movement and resultant damage.
The subfloor vents are incorrectly installed in relation to the
veranda floor and permit water directly access the subfloor from the
veranda.
IL recommended partial blocking of the veranda vents to prevent
water flowing into the subfloor. In its view, there is sufficient
subfloor ventilation from other vents around the dwelling and other
openings into the subfloor to provide adequate ventilation of the
area.
Proximate cause for the damage
26. The Panel notes that the information made available by the consultants
commissioned to the claim has considered several possible causes for the
saturation of the foundation soils and therefore damage to the insured
building. The information supporting each of these possible causes has been
carefully considered by the Panel having regard to the relevant policy
provisions.
27. The common factors amongst all the possible causes for the damage
claimed, is the loss itself, i.e. the damage to the insured building arising from
saturation of the foundation soils and the fact that a burst water main pipe
was located by the plumber and which has caused and/or at the very least
contributed to the resultant damage.
28. Therefore, it is not in dispute between the parties that an insured event
(burst water main) had occurred resulting in damage to the insured building
and accordingly this establishes a prima facie claim for the purpose of the
policy. The onus therefore shifts to the FSP to establish, on the balance of
probabilities, an entitlement to decline and/or limit its liability to the Applicant
in line with the specified policy limitations provided within the PDS.
29. The Panel has not been provided with any evidence that would establish the
damage claimed was present prior to the burst water main event (insured
event). Therefore, it is satisfied that the damage subject to the claim has
occurred following the burst water main pipe being located and repaired by
the plumber in or around August/September 2010.
30. In the interests of the easy understanding of the parties, the Panel has
considered the various causes claimed to have caused and/or contributed to
the damage and relied upon by the FSP individually below:
Case No: 314789 Determination Page 11 of 14
The subfloor vents (the vents) located in the vicinity of the front door and
veranda
31. The Panel notes that the consultants are unanimous in accepting that, on
balance, it is highly likely that water pools on the surface of the veranda and
subsequently enters the subfloor area through vents causing/contributing to
the ongoing dampness issue of the soils. Further, it is not in dispute that
arising from the burst water main moisture had been introduced into the
home‟s subsoils which naturally results in heave. There is no limitation on
the policy for damage arising from “heave” as opposed to “subsidence”.
32. On review of the available evidence, the Panel finds IC‟s evidence to be
more persuasive i.e. it is satisfied that, as a result of the introduction of
moisture to the subfloor soils by the burst water main, the veranda floor level
was affected due to the heave resulting in pooling of water and it being
directed towards the vents. This is further supported by the fact that this
seems to only be a recent occurrence/problem (subsequent to the insured
event) otherwise it would be reasonable to expect the damage to have
occurred much earlier considering the dwelling was constructed in the
1970‟s.
33. In light of the matters discussed above, the Panel is satisfied that the
foundation soil movement resulting in the alteration of the veranda floor level
and resultant directing of water towards the vents was due to the insured
event (burst water main pipe), and therefore any resultant damage falls
within the scope of cover available under the policy.
Front Garden
34. The FSP has made several references to the front garden of the insured
property being a contributing factor to the ongoing moisture issue within the
foundation soils. It maintains that due to the extensive garden set up and the
fact the land slopes towards the building both stormwater and watering of the
garden will direct water towards the front brick wall of the home (the area of
concern).
35. The Panel also notes that IL does acknowledge that the cause for the
ongoing dampness noted within the subsoils is not obvious. Although, the
FSP in relying upon its consultants‟ view in this respect, maintains an
entitlement to limits its liability under the claim, the Panel is not satisfied that
it has been established that, on the balance of probabilities, water was being
directed and making its way into the founding soils in this manner. If this was
the case, it would be reasonable to form the opinion, the damage claimed
would have occurred much earlier in the life of the insured building which
was constructed around 40 years prior to the damage (subject to this claim)
occurring. There is no evidence that this had occurred.
Case No: 314789 Determination Page 12 of 14
Agri Pipe
36. The consultants seem to conflict in their opinions regarding the installation of
an agri drainage pipe and any associated benefits and/or disadvantage that
may arise from the installation.
37. IL maintains that there is a possibility that its installation could be considered
a contributing cause to the ongoing introduction of moisture to the foundation
soils in that area and that the installation of an agri pipe in the subfloor area
was not common.
38. IC maintains that the installation of an agri drainage system is good practice
and highly recommended in the Australian Standards for design and
construction of residential footings where there is poor site drainage.
39. Regardless of the purpose behind the installation of the agri pipe, the issue
to consider is whether the agri pipe actually allowed for introduction of
moisture into the subsoils and if so would this be considered an event
excluded under the policy.
40. In the Panel‟s view , the evidence in this regard is not compelling. Whilst IL
refers to the possibility of it being a contributing factor the evidence of IC is
persuasive that this was good practice. In the Panel ‟ s view, the evidence is
not sufficient to be satisfied the introduction of the agri pipe was a
contributing factor or that the FSP has established on the balance of
probabilities that an exclusion applies in this instance..
Unsealed wall penetrations
41. IL has made reference to unsealed wall penetrations being a probable point
of entry for water entering the subfloor area and saturating the subsoils. It
maintains that there occurred continual leaking into the area via these
openings in the front brick wall.
42. The Panel has not been provided with any substantiating evidence to
support this contention and notes that this remains only an educated
assumption at best by the FSP‟s appointed consultants. Further, the Panel
also notes that it is the F SP‟s position that these unsealed wall penetrations
were present due to the repairs completed on the burst water main pipe.
43. Therefore, if this is to be accepted by the Panel, it would establish that:
The unsealed wall penetrations came into existence as part of the
repairs completed upon the burst water main;
The burst water main was located by the plumber who was appointed
on the recommendation of the re-blocking expert consulted by the
Applicant;
The re-blocking consultant was contacted by the Applicant arising
from his concerns having noted the damage to the insured building;
Case No: 314789 Determination Page 13 of 14
Therefore, the damage subject to the claim had already occurred prior
to the existence of the unsealed wall penetrations left within the front
brick wall whilst repairing the burst water main pipe.
44. Accordingly, the Panel is not satisfied that the unsealed wall penetrations
can reasonably be accepted to be a contributing and/or dominant cause for
damage that occurred prior to the existence of the unsealed wall
penetrations.
Open ends of previous pipe network
45. The Panel is satisfied that the same applies to the FSP‟s reference and
reliance upon the noted open ends of previous pipe network present in the
relevant area. The ends were alleged to be left open after the repairs to the
burst water main pipe were completed and therefore only came into
existence after the damage had already occurred.
46. Also, the Panel notes that the pipe network referred to (with open ends) in its
understanding, was the repaired water main pipe network and not a
stormwater system drainage network. The Panel does not see how
stormwater would be able to enter and then escape the home‟s water main
pipe network.
CONCLUSION
47. The Panel is satisfied that the Applicant has been able to establish, on the
balance of probabilities, that the damage claimed was due to a proximate
cause (burst main water pipe) clearly covered under the policy. The FSP has
not established, on the balance of probabilities, that there was a contribution
to the damage by circumstances excluded under the policy or that it had an
entitlement to reduce its liability under the claim to the proposed 35% of the
total cost of repairs.
48. The Panel is therefore satisfied that the FSP is obliged under the policy to
provide complete indemnity to the Applicant for the damage assessed to be
due to the introduction of moisture into the foundation soils of the insured
building and its ongoing effects caused by the insured event.
Determination
49. On the basis of the available information the Panel determines:
The FSP is obliged to provide complete indemnity to the Applicant for
the loss claimed under the policy in line with the most recent quote
(scope of works) submitted by the Applicant in May 2013 from „IH‟
($87,620) by way of cash settlement.
Case No: 314789 Determination Page 14 of 14
The FSP is to pay interest upon the final settlement amount in line with
Section 57 of the Insurance Contracts Act 1984 from 6 May 2013 being
the date the latest scope of works was provided till payment is issued to
the Applicant.