Denial of storm damage claim to home, subsidence and pre-existing damage

FirmFinancial Firm (Unknown - Insurer)
Decided2013-11-25
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed$55,000
SourceAFCA PDF

Summary

The applicant claimed about $55,000 for storm-related damage to his home after heavy rain, which the insurer denied as subsidence, wear and tear and pre-existing defects. AFCA found a significant part was caused by the storms and ordered the insurer to pay 50% of the repair cost once an agreed scope of works is costed.

Where the insured shows a prima facie storm loss and the insurer cannot prove the exclusions apply to all the damage, the loss is apportioned in the absence of destructive testing.

Issues

Subjects and remedies

home or building damagepay claimreassess claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 314314 Determination Page 1 of 8 Case number: 314314 General Insurance - Domestic Insurance - Home Building – FSP Decision - Denial of Claim – Insured’s Onus of Proof - Insured Event – Policy Exclusions. 30 October 2013 Background 1. The Applicant is legally represented. For the sake of simplicity, he and his representative will be referred to as “the Applicant” herein. 2. The Applicant insured his home building under a home insurance policy issued by the Financial Services Provider (“FSP”) for a sum of $212,000, subject to an excess of $1,000. 3. On 6 December 2010, the Applicant lodged a claim on the policy for claimed damage to his property, said to have been caused by a storm event. On receipt of the claim, the FSP appointed an external assessor to assist it with the management of the claim. 4. The assessor engaged a building consultant (“S”) to provide a report on the cause and extent of the damage. On completion of the property‟s inspection on 22 December 2010, S advised the FSP that the damage was not consistent with any insurable event, but was due to general wear and tear, faulty workmanship and ground movement, all of which are excluded by the policy. On this basis, the FSP denied liability for the claimed loss. 5. The Applicant refutes the FSP‟s decision, stating that the damage was caused by a storm event. He seeks full indemnity for his loss in the amount of approximately $55,000. Summary of Applicant ’s position 6. The event giving rise to the claim fits the policy‟s definitions for storm and as such, he should be indemnified for that damage. 7. Rainfall data for late November and early December 2010 indicates that there had been little or no rainfall from 12 November until 30 November, when the rainfall recorded was 86.2mm. This is the highest rainfall recorded in November in a number of years. Determination Case No: 314314 Determination Page 2 of 8 8. The damage occurred to the property after the storm event of 30 November 2010 where 86.2mm of rain was recorded. This was an extraordinary storm event due to the fact that the State was just coming out of a drought. 9. Due to the high intensity of rainfall recorded on 30 November 2010, movement in the foundation has occurred because stormwater was unable to be absorbed into the ground. 10. The storm event has caused the following damage to his property:  Access doors and built in wardrobe doors have moved out of alignment and have suffered binding, such as to restrict proper closing;  Hairline cracks in the plasterboard ceiling at several locations within the home;  Hairline cracks in the joins of the plasterboard wall linings;  Cracks in the kitchen granite bench top;  Cracks the bathroom floor tiles; and  Water stains in the lounge room ceiling. 11. He had obtained reports from two experts (“B”) and (“KG”). Both builders do not concur with S‟s opinion. Their reports indicate that the dama ge was the result of movement in the piers which occurred due to heavy rainfall from a severe storm event. 12. The reports also state that the building was in good condition with no signs of previous water penetration into the roof prior to the 30 November 2010 storm event. 13. Based on the above reports, the FSP has failed to establish on the balance of probabilities that the exclusions it has relied on apply in this case. Therefore, he is entitled to indemnity for the loss claimed. Summary of FSP’s position 14. The FSP submits it is entitled to deny indemnity for the claimed loss for the following reasons:  The Applicant has not proven that a single one off insured event has caused the damage;  B‟s and KG‟s reports concurred with S‟s report that the damage was caused by settlement and subsidence of the timber stumps;  KG‟s report should not be relied upon because he did not inspect the damage until 9 months after S‟s inspection;  The Bureau of Meteorology (BOM) website, along with comments reported by the building experts confirmed that there was persistent bad weather prior to the date of loss; Case No: 314314 Determination Page 3 of 8  The policy does not cover ground water run-off or flood; and  The policy contains specific exclusions for damage caused by , wear/tear, lack of maintenance, gradual loss of any kind, structural defects, faulty workmanship, erosion and earth movement including shrinkage, subsidence and landslide. 15. The FSP relies on the following policy provisions: “ Glossary of words with special meaning Event – A single occurrence Flash flooding – The overflow of any lake, river, creek, stormwater channel, canal or any other watercourse (whether natural, altered or manmade), caused by a storm, where the flooding occurs within 24 consecutive hours of the storm having commenced. ... Insured events – the events listed on pages 21 to 24 Storm –  A violent wind (including cyclones), sometimes combined with thunder, heavy falls of rain, hail or snow; or  Thunderstorms or hailstorms, sometimes accompanied by heavy falls of rain or snow It is not persistent bad weather or heavy or persistent rain by itself. ... THE POLICY DOES NOT COVER EVERYTHING General exclusions – apply to the overall policy  Unless included in additional cover, we will not cover loss, damage or legal liability caused by: - Flood unless it is flash flooding; - Wear and tear and lack of maintenance, including rust, corrosion, deterioration..., - gradual loss or damage of any kind - structural defects and faulty workmanship in the construction of the building or lack of maintenance to the building and/or contents; - erosion or earth movement including shrinkage, and - Subsidence and landslide...” Issue 16. Whether the FSP is entitled to deny the claimed loss. Case No: 314314 Determination Page 4 of 8 Reasons for decision 17. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with clause 8.6 of the FOS Terms of Reference. This is due to the circumstances, quantum and complexity of the dispute. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination by the Pa nel. 18. This decision has been made by a Panel consisting of an Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. 19. The onus is on the Applicant to establish, on the balance of probabilities, that he suffered a loss caused by a risk insured against. Once it has been established that the loss was prima facie caused by a risk insured against, the onus shifts to the FSP to show that the loss did not occur as claimed, or that the loss is not covered by the policy if that is the FSP's belief. 20. When the Applicant referred his dispute to FOS, he stated that the damage was caused by flooding. In his latest submission, he now asserts that it was caused by the insured event “storm”. 21. The FSP conceded that there is no watercourse, river, canal or the like in the immediate area of the Applicant‟s property. As such, it had undertaken to review the claim under the “Storm” event of the policy. 22. The Applicant believes that proximate cause of the claimed damage was solely due to storms. The FSP considers the claimed damage was caused by subsidence of the rotten timber stumps which has been occurring over a period of time. 23. The FSP relies substantially on S‟s opinion dated 5 May 2011, a bui lder who attended on site on 22 December 2010; in a later report dated 14 May 2013 he noted about his December 2010 visit: „the ground was still water logged preventing vehicular access to the property via the driveway‟; the 5 May 2011 report stated in part as follows: “ SUMMARY: I am of the opinion that the binding of the access door and the built-in wardrobe doors are the result of recent building movement caused by the flood water. The building movement has occurred as a result of the settlement of the timber stumps below the common wall of the lounge room and bedroom 2. I am of the opinion that the movement of the building is the result of timber stumps that have settled, having varying amounts of timber rot and not been founded on firm foundation material. The rot has been occurring over an extended period of time. I am also of the opinion that the recent flooding of the entire sub-floor area of the building has softened the ground therefore contributing to the settlement of the building, however had the timber stumps been in good condition and Case No: 314314 Determination Page 5 of 8 been founded on a firm foundation I am of the opinion that this settlement would not have occurred. Therefore I consider this to be a maintenance related issue. I am also of the opinion that the cracks to the plasterboard ceiling are the result of the omission of the “back - blocking” and consider this to be defective building work. Due to the presence of dust residue in the hairline cracks in the plasterboard ceiling lining joints and vertical hairline cracks on the eastern wall elevation and the wall that is common to the lounge room I am opinion that the cracks occurred prior to and are not related to the flood event. I am of the opinion that the hairline crack in the granite bench top as well as the step up of approximately 3mm at the junction of the change of the direction of the bench top is the result of recent building movement as the result of the floodwater. The building movement has occurred as a result of the settlement of the timber stumps below the floor. Therefore, I consider this to be a maintenance related issue. I am of the opinion that the hairline crack in the tiled floor of the bathroom is the result of the failure to install a movement joint above the joints in the floor sheets in accordance w ith the manufacturer‟s installation recommendations. Therefore I consider this to be defective building work. I am also of the opinion that the bathroom floor tiles not being graded to the floor wastes have not been installed in accordance with ordinance No. 70 – building. Group VII. – Health and Amenity. – Part 47 – weatherproofing. Damp-proofing and Flashing, Clause 47.8 Therefore I consider this to be a maintenance related issue. I recommend that prior to any work being carried out that a period of approximately 6 months be allowed for the sub-floor ground to dry out. I also recommend that a Structural Engineer be engaged to prepare a scope of works for the design of the footings and piers” 24. The Applicant refutes the FSP‟s expert evidence and provided a re port from B, who provided the following summary: “ SUMMARY I would agree with the report in part with only the visual inspection but am unsure that all is a maintenance issue as most home owners would not be aware of piers and roof materials and would very rarely inspect these items, I do believe that a more destructive testing inspection will alleviate any opinions or argument if this was done. Scope of work I was not provided with the scope of works by [the FSP‟s] agent so cannot comment on the proposal. But I do believe that to fully understand where the issues of damage start from, some of the piers under the house must be removed and inspected for rotting, depth for bearing, and thickness, this would help determine if the piers had moved due to inundation of water. I would also like to remove some roofing sheets to determine if back blocking had occurred or if the sheets have cracked all the way thru and not just on the peaks again this would then help with the determination of movement. Case No: 314314 Determination Page 6 of 8 The wall sheet in bedroom 2 which has a crack could be carefully cut from the front and the same decisions could be made. Works will be required and both the roof and the piers should be looked at and designed by a structural engineer prior to any works taking place”. 25. Th e FSP argues that B‟s opinion is consistent with S and in any event, B‟s report does not link the damage to a single insured event. 26. The Applicant has provided a further report from KC who concludes “ CONCLUSION: In my opinion it is clear that water has flooded under the house causing eddies around the piers which removed the sand and undermined them. This resulted in the load bearing walls pushing down on the piers. Most of the subsidence of the floor is under the load bearing walls of the lounge room, hallway, kitchen and bathroom areas leading to the damage in these areas. Water has penetrated the roof in several places as described. It appears that the flood waters have removed most of the cracker dust from the driveway and surrounding area – approximately 200m2. [The Applicant] has constructed contour banks at the northern end of his house to restrict any flooding in the future” 27. Both parties have included BOM reports for the relevant period. The report shows 86.2 millimetres (ml) of rainfall was recorded on 30 November 2010, followed by no rainfall on 31 November 2010, 19.8 ml on 1 December, 22.8 ml on 2 December, no rainfall on 3 December, 23.0 ml on 4 December, 3.2 ml on 5 December and 4.4 ml on 6 December. 28. The Panel notes that it is common g round between the parties‟ experts that the claimed damage exhibited throughout the Applicant‟s property is a result of movement in the building. 29. According to the materials exchanged, the majority of the claimed damage did not appear to have been present until 6 December 2011. The experts agree that the various storm events between 30 November 2011 and 6 December 2011 have caused saturation of the sub-floor soil area (which was apparently dry for a number of years as a result of drought) and arguably caused the timber stumps to subside. 30. The Panel notes that S concludes that the building movement was largely attributable to the subsidence of the rotten timber stumps. He reached such a conclusion on the basis that the remainder of the building is supported by concrete piers which did not display the same movement. He has concluded that the damage occurred prior to the storms of late November early December 2010. By contrast KG observed that the timber stumps under the house were in good condition and that the stormwater having saturated the sub-floor caused the timber piers to subside. Again, in contrast to S who found presence of dust residue in the hairline cracks in the plasterboard ceiling as well as the wall in the lounge room, KG found in respect of Case No: 314314 Determination Page 7 of 8 bedroom 2 that there was no dust in the cracks at the joints and corners of the plasterboard walls and ceiling which would indicate the cracks were of recent origin. 31. B however observed that much of the technical argument in this dispute could only be settled by undertaking a more destructive testing inspection to alleviate any “opinions or arguments if this was done”. 32. Having considered the weight of the expert evidence, the Panel is satisfied that the evidence establishes a prima facie claim on behalf of the Applicant for storm related damage. The question for the Panel however is the extent of that storm related damage as against possible pre-existing damage. In this case, the FSP bears the onus of establishing the application of the general exclusions referred to and relied upon. 33. The Panel accepts that the weight of the expert evidence establishes that a significant amount of the damage was caused as a result of the storms. However, damage is also likely to have been related to movement. In the Panel‟s view w hilst there may have been some pre-existing damage in some defective building works, it is unlikely that the sub-floor soils of the Applicant‟s home would have reacted to the extent that they did and caused the damage to the home that they did if not for the storm events that occurred. 34. The FSP has not established the application of the exclusion in that the FSP‟s experts do not deny that the stumps s ank after the deluge. 35. S has concluded that the building movement was largely attributable to subsidence of the rotten timber stumps because the remainder of the building which is supported by concrete piers did not display the same movement. He goes on to say that the presence of dust residue in the hairline cracks in the plasterboard ceiling, in the eastern wall elevation, as well as the wall that is common to the lounge room suggests that this damage occurred prior to the storms of late November early December 2010. 36. Relevantly, KG observed „the timber stumps under the house were in good condition‟; he has then c oncluded that stormwater saturated the sub floor and caused the timber piers to subside. He also confirmed in respect of „bedroom 2‟ that there was no dust in the „cracks at the joints and cornice of the plasterboard walls and ceiling which would indicate they were of recent origin.‟ 37. B relevantly observed that much of the technical argument in this regard could only be settled by the undertaking of a „more destructive testing inspection (which) will alleviate any opinions or arguments if this was done.‟ 38. In the absence of the more destructive testing, the Panel accepts the damage is a combination of pre-existing damage, defective works and the storms. In the circumstances, the Panel considers that it is fair in these circumstances that each party bears a portion of the loss and in the absence Case No: 314314 Determination Page 8 of 8 of the more destructive testing suggested, the Panel determines it is appropriate to apportion the loss equally and that each party is to bear 50% of the cost of the repair. 39. The Panel is unable to set a monetary figure but considers it appropriate that the parties agree to a Scope of Works and costings to rectify the claim damage and that the FSP contribute 50% to the cost of the repair of this damage. Determination 40. On the basis of the available information, the Panel determines that the FSP is liable to meet 50% of the cost of repair of the Applicant‟s damage. 41. On acceptance of this Determination, the FSP is to arrange a complete Scope of Works to be conducted by an independent assessor. Once the Scope of Works has been received and the damage costed, the FSP is entitled to cash settle the Applicant for 50% of the cost to repair the assessed damage. 42. As the Scope of Works is to be assessed at current rates, the Panel determines interest is not payable.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.