Home / Financial Firm (Unknown - Insurer) / Determination 314244

Determination 314244

Denial of flood-related building damage to upper level and front steps

FirmFinancial Firm (Unknown - Insurer)
Decided2013-06-20
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainants claimed under a building policy for flood-related damage to the upper level and front steps of an investment property after the 2011 Queensland floods. AFCA found the FSP was entitled to deny the disputed items under the flood and subsidence exclusions.

Where stormwater and floodwater combine to cause damage and the policy excludes flood, the insurer may deny the claim; subsidence is excluded and the storm cover does not respond to it.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 314244 Determination Page 1 of 8 Case number: 314244 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim 18 June 2013 Background 1. The Applicants held an insurance policy with the Financial Services Provider (FSP) for an investment property in Chelmer. The relevant period of insurance operated for twelve months beginning from 15 June 2010. During this period, the building was insured for a sum of $180,000 and loss of rent up to $13,000. Claims were subject to a $50 excess. 2. The Applicants lodged a claim for extensive damage sustained to the property as a result of severe weather events experienced in south east Queensland in 2011. The property is a two storey structure. 3. The FSP engaged a hydrologist (SL) to review the circumstances. Following receipt of SL‟s report, the FSP accepted that the property was initially inundated by stormwater and/or run off up to a level of 400mm. The property was further subsequently inundated by flood water from the Brisbane River. 4. Given this, the FSP accepted the following portions of the Applicants ‟ claim:  The damage sustained to the lower level of the property. An amount of $34,500 was paid.  The maximum payment allowed under the policy flood cover for contents cover, being $895.  The full sum insured for the loss of rent. 5. The FSP has declined the following items as it submits these were caused by flood :  The damage associated with the steps at the side of the property.  Damage to the upper level. 6. The Applicants have disputed this decision. Summary of Applicants ’ position 7. The Applicants are represented by their broker in this dispute. For the sake of convenience, reference to Applicants will include their broker. Determination Case No: 314244 Determination Page 2 of 8 8. In relation to the damage to the steps, the Applicants have submitted the following in substantiating their position:  There was a bursting of the storm water drain about 30m in front of the house resulting in about a 1m x 2m x 1m deep cavity. This indicates a shock wave was generated and transmitted to the surface of adjoining structures, including the piers of the front steps in the subject house. In particular, the burst occurred with such force that it caused a cavitation to the road and a water geyser erupting over one metre in height.  There is also a connecting storm water main pipe that may have been affected by this shock wave.  The heavy rain and strong surface movement of the storm water which entered the house would have also caused movement to the piers of the front steps.  The area damaged was localised to the front as the rear deck steps, of equal age and construction, remained undamaged by the same storm water inundation. 9. With respect to the upper level, the Applicants submit the following in substantiating their position that the damage was caused by stormwater:  Stormwater inundated the house to a depth of 1m, not the 400mm estimated by SL. This is supported by the observations of an adjoining neighbour.  The low lying park, referred to by SL as a draining pond of higher lying waters, was already filled with rainwater. This was witnessed by residents in the street and reported anecdotally.  These events resulted in a three layers of inundation, the first being storm water, the second being a dispersed layer (mix of two layers of salinity between storm and flood water) and the third being flood and more saline water. Accordingly, the initial damage to the upper part was caused by stormwater.  News articles stating that FOS has accepted that flood damage to properties downstream of the Wivenhoe Dam from 11 January onwards was proximately caused by heavy rain that fell on 4am on 11 January. 10. The Applicants therefore seek to be indemnified for the items in dispute. Summary of FSP’s position 11. The FSP relies on photographs, loss adjuster reports, SL‟s report and the following policy provisions to maintain its denial with respect to the items in dispute: “ Definitions ... ‘Flood’ means the inundation of normally dry land by water overflowing from the normal confines of any natural watercourse or lake whether or not altered or modified or of any reservoir, canal or dam Case No: 314244 Determination Page 3 of 8 ‘Storm’ means violent atmospheric disturbance which may be accompanied by rain, hail, snow or sleet. Storm does not mean persistent bad weather, or intermittent rain, persistent rain or heavy rain by itself. ... Section 1 – Building & Contents DEFINED EVENTS ... 7. Storm but excluding loss or damage: (a) by ... Flood ... erosion, subsidence ...” Issue 12. Whether the FSP is entitled to maintain its denial with respect to the items in dispute. Reasons for decision 13. Due to the nature of the dispute, the parties have been informed that the matter has been referred to the Panel for Determination in line with the Operational Guidelines to FOS‟s Terms of Reference. This dispute has not been the subject of a FOS Recommenda tion and has proceeded directly to Determination. 14. This decision has been made by a Panel consisting of an Ombudsman and two Panel members with extensive experience in the insurance industry and consumer claims. Damage to Upper Level 15. SR has provided two reports regarding the water inundation events. The first report was dated 6 April 2011 and provided a detailed analysis of the events, which ultimately led the FSP to accept that 400mm of initial inundation was caused by stormwater. 16. SR‟s second report was dat ed 7 December 2012 and addressed the Applicants‟ contention that the upper floor also sustained damage from stormwater inundation. SR‟s report contains the following comments of relevance on this substantive issue in dispute: The first report concluded that due to the presence of an overland flow route, with a crest of approximately 6m AHD, along the footpath between L Street and the low lying park area to the west, stormwater runoff would have been able to drain away from the property into the low lying park area. This would have prevented any further rise. Accordingly, localised stormwater could not have resulted in the damage claimed to the second storey, which is at a level of 8m AHD . Case No: 314244 Determination Page 4 of 8 Therefore, localised stormwater could not have resulted in the damage claimed to the second storey, which is at a level of 8m AHD. 17. SR reviewed these previous findings based on additional evidence provided by the Applicants: “Firstly, the storm water backflow from drains in the area had already filled the lower surrounding areas to the point where water was overflowing from these areas into [L] Street, immediately above & opposite the property insured under the policy. This indicates the 400mm depth as assessed in dry conditions, would have been exceeded. Secondly, the water main did not just backflow, but burst with such force as to cause cavitation to the road & a water geyser erupting to over a meter in height, which continued unabated throughout the day.” 18. Having regard to their previous detailed report and the additional i nformation provided above , SR then made the following comments which the Panel considers to be s ignificant : “In a worst case scenario, if the stormwater network outlet was completely blocked, for the entire period of 6 th to the 12 th January, the entire 51,500 m 3 of stormwater runoff generated in that period would fill the local floodplain storage to a depth greater than 6.0m AHD but well under the 7.0m AHD level. With a burst water main contributing an additional 18.7L/s of water to the pooled runoff, and an extra 12,900 m 3 , the water level at the Property would remain below 7m AHD.” 19. Following his analysis, SR provided the following conclusions: “During the heavy rainfall that preceded the peak flood from the Brisbane River, the local stormwater network in Chelmer may have failed causing water to surcharge from stormwater manholes resulting in localised ponding around the property. Based on catchment runoff and catchment storage calculations, there is no potential for this ponding to reach a level of 8m AHD. The entire rain volume, allowing for rainfall losses through infiltration, over the entire rain period leading up to the start of the Brisbane River peak flood would have generated a potential water level no greater than 7m AHD. This estimate is based on a worst case scenario ...” 20. The Panel finds SR‟s conclusions and analysis persuasive for the following reasons:  Its initial report was detailed and provided a thorough analysis of the topography surrounding the Applicants‟ property, the local stormwater infrastructure and the terrain.  The initial report took into account rainfall data from two stations located proximate to the Applicants‟ property (1.8km and 3.8km distance) which would likely reflect the local rainfall affecting the property‟s catchment.  SR provided a reasonable methodology regarding the estimated Brisbane River levels that would affect the property. Case No: 314244 Determination Page 5 of 8  SR also provided a reasonable reconstruction of the floodwater path of travel. For instance, SR accepted the floodwater would have come from the tributary to the east of R Terrace as opposed to the Brisbane River itself as the latter had a southern embankment that prevented its overflow.  The initial report, which conclud ed that the stormwater runoff inundation would not have exceeded 6.0m AHD, appeared reasonable and plausible as it took into account the fact water which exceeded this would have a drain path to the low lying parkland nearby .  Its later report took into account the worst case scenario and still could not find sufficient evidence to substantiate that stormwater could have accumulated to such a depth as to inundate the top level of the property . 21. In particular, the Applicants have estimated that stormwater runoff would have reached 1m which, if accepted, is still 1.2m below the top level. Accordingly, the Panel accepts that the only method for the first level to have been inundated is through a combination of floodwater and stormwater. 22. This also appears to be advocated by the Applicants who although accepting that water from the river would ultimately have contributed to the depth of inundation, argue that the upper level of the rising water would have been the stormwater part, with the more saline riverwater constituting the lower part of the water. Thus it was the rising stormwater which caused damage to the upper level. The Applicants believe the policy can still respond in such circumstances. 23. However, such an outcome within Australia insurance law is misconceived. The Panel notes there is clear case law which states that when damage is caused by water which is a combination of stormwater and floodwater, then the FSP is entitled to deny the claim provided its policy exc ludes damage from floodwater ( Petersen v Union des Assurances de Paris IARD (1997) 9 ANZ Ins Cases 61-366). 24. Accordingly, the Applicants‟ argument regarding the mixture of the two waters causing the inundation does not assist them given the FSP‟s policy excludes damage caused by flood. 25. The Applicants have also referred to previous FOS Determinations regarding the payment of claims involving rainfall that fell from 4.00am on 11 January 2011, and comments reported in various media outlets in respect of the application of that rainfall. The Panel can clarify that those findings and comments were in respect of an insurer's specific policy provision that describes an insured event of “flash flood” as being water inundation caused by heavy rain that fell within 24 hours. There is no such provision contained within the FSP‟s policy the subject of this dispute. Instead, there is a clear exclusion for damage caused by flood under the insured event of storm regardless of its cause. The effect of this provision is that if the FSP can establish the source of the water inundation was “Flood”, then it is entitled to Case No: 314244 Determination Page 6 of 8 deny the claim regardless if it is established the flood was caused by heavy rain or a storm. 26. As the Panel accepts that flood was a proximate cause of the loss s ustained to the upper level, the FSP is entitled to deny liability for all of the damage sustained to this area of the home. Damage associated with the steps at the side of the property 27. The FSP has relied on a claims specialist report (EA) dated 3 August 2012 which contained the following of relevance: “In brief, your Insured have lodged an additional claim for damage to the front steps and footings caused by water inundation, which h as caused slight settlement in the corner of the house near the front step s. ... The photographs originally supplied by [PM] (copies attached) clearly depict the steps in an aging state and there is evidence of timber rot/wet rot. The footing to the left side does appear to have partially subsided, however it is not known the quality and the depth of the original footing. ... The actual precise cause of the failed footing may never be known, however it should be noted that the steps were probably partially under water for 12-18 hours as a result of storm and flood water. The steps may have been partially inundated by storm water, however, they were finally inundated by flood water, which caused inundation for many hours. ... We consider the possibility of the footing failing as a result of the short term 1 day drain overflowing event of the 11 th of January 2011 is unlikely and the most likely scenario would be that the footing has failed as a result of being under water for a larger than normal period of time, which has caused settling. The rotting of the steps has occurred over a long period of time.” 28. The Applicants submit that the proximate cause was the inundation of stormwater following the forcible rupture of the stormwater pipe, combined with the shock wave this rupture caused. 29. The effect the rupture had on the steps is spec ulative in the Panel‟s opinion. There is no evidence to substantiate this shock wave, the extent of same and what effect (if any) it had on the front steps. 30. Instead, in the Panel‟s opinion, water inundation over a period of time appears to be the likely cause of the damage, which is substantiated by EA and not refuted by the Applicants. The issue is whether floodwater inundation was a proximate cause or alternatively, whether the limitation for subsidence can be relied upon. 31. It is not disputed the property was inundated for an extensive period of time. However, the evidence is unclear in establishing what effect the flood had on Case No: 314244 Determination Page 7 of 8 the stormwater inundation. That is, the evidence does not establish how long the steps would have been under water by the stormwater runoff (an insured event) and for what period they would have been under a mixture of floodwater and stormwater (an excluded event). 32. However, the FSP has also relied on its exclusion of damage caused by „subsidence‟. The Panel notes that „ settlement ‟ was an identified cause postulated by consultant EA, which is excluded by the policy‟s reference to subsidence and erosion. The Applicants have not disputed that settlement may have eventuated but argue that reference to this provision ignores the fact that storm is the proximate cause and this event is covered by the policy. 33. The Panel notes “subsidence” is defined by the Macquarie dictionary as follows: “1. to sink to a low or lower level. 2. to become quiet, less violent, or less active; abate: the laughter subsided. 3. to sink or fall to the bottom; settle, as lees; precipitate .” 34. Settlement has numerous definitions. The Panel considers the following are relevant: “ 1. the act of settling. 2. the state of being settled. 3. the act of making stable or putting on a permanent basis. 4. the resulting state. 5. arrangement; adjustment. 6. the establishment of a person in an employment, office, or charge. 7. the settling of persons in a new country or place. 8. a colony, especially in its early stages. 9. a small village or collection of houses, especially in a sparsely populated area. 10. the satisfying of a claim or demand; a coming to terms ... 16. a subsidence or sinking of a structure or part of one .” 35. Observ ing the definition of “settlement”, it appears this term and subsidence share inherently similar characteristics. For instance, a sinking to a lower level can result in settlement if such sinking stops at that point. This appears to have occurred in this instance as a result of the stormwater inundation. 36. In regards to the Applicants' argument that this ignores the proximate cause of storm, the Panel does not agree for the following reasons. Case No: 314244 Determination Page 8 of 8 37. The proximate cause argument applies to the extent that an insured event responds to the loss. However, when determining whether this is the case, one must construct how the policy sets out the insured event. 38. That is, the insured event of storm in the policy is defined in such a way to specifically exclude certain phenomena that is clearly associated with it. For instance, the reference to damage by flood, sea, tsunami, water entering the building and seeping through walls are all phenomena reasonably associated with this event. 39. Accordingly, the Panel considers that parties to this contract, when constructing these terms, would reasonably interpret the limitations to apply in circumstances when the insured event of storm is the proximate cause but the manner of the loss falls within these limitations. Such a construction is also consistent with how the flood exclusion is generally interpreted given, in almost all instances, a flood is normally caused by a storm (or storms). 40. It therefore follows that although subsidence to the steps was caused by storm, this is specifically carved out as the type of loss the policy responds to under such an insured event. 41. Given this, the Panel therefore does not accept that the insured event of storm applies to these circumstances. As there is no other insured event that responds, the Panel therefore accepts the FSP is entitled to deny liability for this item in dispute. 42. Insofar as the FSP has settled the remaining aspects of this claim on the basis of stormwater damage to 400mm, limited flood damage for contents and loss of rent, in the Panel‟s view these aspects have been appropriately settled. Determination 43. On the basis of the available information the Panel determines the FSP is entitled to deny liability for the disputed items.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.