Text of the determination
Case No: 314209 Determination Page 1 of 10
Case number: 314209
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Flood - Denial of Claim
13 December 2013
Summary
Description: Claim under Home and Contents Policy following inundation of
Applicants‟ home in January 2011 after the heavy rainfall in Queensland.
Basis of Determination: The information establishes that the home was first
inundated by stormwater as defined in the policy prior to the floodwater impacting on
the home.
Determination: The FSP is liable to cover the claim for damage to the building and
contents arising from inundation of the home to a level of 150mm above floor level.
Background
1. The Applicants held a home building and contents policy with the Financial
Services Provider (FSP).
2. In January 2011, the Applicants‟ home in Narangba was inundated with
water following severe weather events in Queensland.
3. The FSP assessed the subsequent claim and after obtaining a hydrology
report, refused liability on the basis the loss was caused by flood, which is an
exclusion under the policy.
4. The Applicants disputed the decision, saying the loss was caused by local
stormwater runoff. Further reports were obtained and the FSP maintained its
decision to refuse liability.
5. The Applicants seek a review of the FSP‟s decision.
Determination
Case No: 314209 Determination Page 2 of 10
Summary of Applicant s’ p osition
6. The Applicants say that the FSP‟s hydrologist has made a number of errors
in the reports and this is highlighted by the fact the conclusions across the
reports vary significantly.
7. Other insurers that do not cover flood covered their clients in the same
locality for the same event.
8. The Product Disclosure Statement (PDS) does not define the term “areas
surrounding the site”, so they expect this would include all runoff, including
water that may have escaped from Burpengary Creek.
9. A large drain adjacent to Burpengary Creek is a major collection point for the
areas‟ drainage system and connects directly to Burpengary Creek. Water
surcharges from this drain before Burpengary Creek breaks its banks and
given the drain has a „3m by 3m‟ capacity, it could have been the sole cause
of the water flow. The original hydrology report did not even mention this
drain.
10. Photographs of the drain the day after the event show no evidence of
significant water flow between the nearby Burpengary Creek and the drain;
however, there was significant mud and debris between the drain and
Lookout Place.
11. A number of witness statements from local residents support their
submission that the water was not from Burpengary Creek and that water did
not backflow up or overflow the open channel on Stony Creek Reserve.
12. The Applicants acknowledge the subsequent hydrology reports more
accurately reflect what occurred at the time of the loss, they have concerns
with the validity of the reports, given the significant shift in conclusions after
they challenged the hydrology reports. For example, the hydrologist now
accepts water backs up from the drain at Stony Creek Reserve, which is a
complete reversal from the earlier reports.
13. It is absurd for the hydrologist to suggest that a large volume o f water
overflowed over a narrow landscaped area from Burpengary Creek and left
no evidence of passing.
14. The hydrologist also concedes that stormwater drainage in the area may be
“complex” during major flood conditions, which is supported by the
inconsistencies across the reports. The hydrological conclusions cannot be
relied upon.
15. The explanation that silt only settled on Lookout Place because it is a low
point on the flow path is not acceptable. There are other low points that did
not have settlement. A more likely explanation is that the mud was in the
drainage system from the time of construction and it was forced out of the
drain and settled close by.
Case No: 314209 Determination Page 3 of 10
16. The Applicants say that the fact stands that there is no evidence of water
from the channel but there is ample evidence of water discharging from the
drains. Expert opinion and modelling must be tested against physical
evidence and in this case, there is far more evidence to indicate the
inundation was caused by water from the drainage system.
17. The Applicants say the overwhelming majority of water that caused the
insured loss was from drainage infrastructure and on this basis, the policy
should respond to the loss.
18. The Internal Disputes Resolution process was faulty as the FSP did not seek
further expert opinion from the hydrologist. Their claim and the dispute
process of the FSP were discussed at the Queensland Floods Commission
of Enquiry. They provide a copy of the relevant transcript.
19. The Applicants seek cover under the policy on the basis the loss was caused
by a storm event.
Summary of FSP’s position
20. The FSP has provided a number of submissions and five reports from its
hydrologist the latest on 11 October 2013. The FSP says the expert opinion
establishes the loss was caused by flood and as the policy excludes flood,
the claim is not covered under the terms and conditions of the policy.
21. The hydrologist has addressed the issues raised by the Applicants and
concludes the water that entered the home was a mix of stormwater runoff
and floodwater from Burpengary Creek.
22. If the water from Burpengary Creek inundated the home at the same time as
stormwater runoff then the Wayne Tank principle applies to defeat the claim.
23. The Applicants have acknowledged that overland flow from Burpengary
Creek was a cause of the loss.
24. The FSP relies on the following policy provisions contained in the PDS:
“ What we cover - insured events
This section describes under the heading:
Yes - the insured events you are covered for,
No - the conditions and exclusions that specifically apply to particular
insured events.
…
Yes
Storm and rainwater including stormwater runoff from areas surrounding the
site, or water escaping from any water main, drain, pipe, street gutter,
guttering or su rface.
Case No: 314209 Determination Page 4 of 10
Storm means violent wind (including a cyclone or tornado), thunderstorm or a
heavy fall of rain, snow or hail.
…
No
Damage or loss caused by flood . Flood means the inundation or covering of
normally dry land by water which:
escapes or overflows from , or
cannot enter, because it is full or has overflowed, or
is prevented from entering, because other water has already escaped or
been released from it,
the normal confines of any watercourse or lake, including any that may
have been modified by human intervention, or reservoir, canal, dam or
stormwater channel.
Flood does not mean stormwater runoff from areas surrounding the site,
or water escaping from any water main, drain, pipe, street gutter, guttering
or surface.
…
What we do not cover - general exclusions
You are not covered under any section of the policy for damage, loss,
cost or liability caused by or arising from or involving:
…
flood,”
Issues
25. Whether the loss was caused by stormwater runoff or flood?
26. Whether the FSP is entitled to refuse liability under the terms and conditions
of the policy?
Reasons for decision
27. As advised to the parties, the Financial Ombudsman Service has considered
it appropriate to elevate the dispute in accordance with the Operational
Guidelines to the Terms of Reference. This is because of the potential
amount of the claim and the issues to be considered. This dispute has not
been the subject of a Recommendation and has p roceeded directly to
Determination.
28. The decision has been made by a Panel of three decision makers, including
an Ombudsman and decision makers with experience in the insurance
industry and consumer rights.
Case No: 314209 Determination Page 5 of 10
The policy
29. While not a specific issue in dispute, the Panel has reviewed the terms and
conditions of the Product Disclosure Statements containing the details of
cover for the building and contents.
30. The Panel is satisfied the policy covers loss due to the storm but specifically
excludes loss caused by flood, defined as water escaping a watercourse,
lake or stormwater channel. The policy however does not exclude inundation
from water escaping from, mains, drains, pipes, street gutters, guttering or
surface.
Whether the loss was caused by stormwater runoff or flood?
31. The Applicants say that the inundation was caused by stormwater runoff
discharging from the drainage system and therefore the policy responds to
the loss.
32. The FSP says the loss was caused by flood as defined by the policy as
water from Burpengary Creek mixed with the runoff before the property was
inundated above floor level.
33. The Panel notes that there have been extensive exchanges between the
Applicants, the FSP and the hydrologist, „W‟. A total of five hydrologist
reports have been provided. The Panel does not propose reciting all the
reports in detail in this determination as they have been exchanged between
the parties but notes the first two reports from “W” dated 7 March 2011 and
15 April 2013 concluded as follows:
” Based on the available information we remain of the opinion that the initial
and maximum above floor inundation of the subject property was caused by
floodwater from Burpengary Creek. Stormwater runoff from the local
catchment could not have inundated the house on the subject property above
floor level during the event. ”
34. “…Following further concerns raised by the Applicant, W prepared another
report of some length, dated 7 August 2013, which relevantly states:
“…
…
5 CONCLUSIONS
The additional information provided by [male Applicant] and Moreton Bay
Regional Council, as well as detailed hydraulic modelling, have shown that
the maximum depth of stormwater runoff from the local catchment in the
vicinity of the subject property is likely to have reached a higher level than
indicated in our previous reports, but it is unlikely to have reached the floor
level of the house. Our further investigations have shown that the dynamics of
the local stormwater pipe network are complex. During major flood events in
Burpengary Creek which prevent stormwater outflow from the pipe network at
Lookout Place, there is the potential for stormwater from an additional
catchment area of 13 ha located to the south of Lookout Place to be diverted
down M Street. We estimate that this would have increased the rate of
Case No: 314209 Determination Page 6 of 10
surface flow down M Street to 4.36 m3/s and resulted in a water level close to
the house floor level.
To reach the observed peak flood level of 0.21 m above the house floor level,
we estimate a peak discharge of 12.86 m3/s down M Street. A flow of this
magnitude could not have been generated by the local stormwater catchment
(including the diverted catchment located to the south of Lookout Place). Our
opinion is that the additional flow was caused by floodwater overflowing from
Burpengary Creek at Lookout Place. Hence, the peak flood level at the
subject property was caused by a combination of local stormwater runoff and
overflow of floodwater from Burpengary Creek. ” [sic]
35. Again further issues were raised by the Applicant and W prepared a further
report, dated 3 September 2013, which relevantly states:
“…
5 CONCLUSIONS
The configuration of the drainage system in the vicinity of Lookout Place
indicates that overflow down M Street could not occur until Burpengary Creek
had broken its banks at Lookout Place. In addition, the stormwater pipe
network connecting the drainage system in Lookout Place to Burpengary
Creek is too small to convey the flow of water required to inundate the subject
property to the observed peak depth of inundation. Once the floodwater
reached sufficient height to begin overflowing into M Street from Moorhen
Court the head differential between water levels within and outside the
Burpengary Creek bank would have been minimal resulting in a much lower
pipe flow rate. This information indicates that Burpengary Creek overflowed its
banks in the vicinity of Lookout Place and contributed to the inundation of the
subject property. The observed minimal disturbance at the Burpengary Creek
overflow location upstream of the subject property was due to the significantly
lower flow velocities compared to Stony Creek Reserve.
Hydraulic modelling showed that inundation of the subject property above
floor level required significant additional inflows from the catchment area to
the south of Moorhen Court. When water overflowed from Lookout Place and
Moorhen Court there was a direct overland connection to Burpengary Creek.
For these reasons it is our opinion that the subject property could not have
been inundated above floor level prior to Burpengary Creek overtopping its
banks. ”
36. After further exchanges, W provided its fina l report, dated 11 October 2013,
which relevantly, states:
“…
4 CONCLUSIONS
[male Applicant] has estimated the elevations of the embankment crest prior
to the council modifications based on recent observations and photographs
obtained from Google Street View. The resultant cross-section is [male
Applicant‟s] best guess at how the embankment looked prior to the
modifications and is not an accurate representation of the embankment. The
aerial survey data used in our report provides an accurate representation of
the embankment elevations during the January 2011 flood event as it was
captured in 2009 prior to the council modifications. Therefore, we maintain
Case No: 314209 Determination Page 7 of 10
that the cross-sectional area (6.42 m2) and flow velocity (1.3 m/s) calculated
in our previous report (Report No. 0768-02-245C) is a more accurate estimate
of the flow characteristics at this location during the event.
When water overflowed from Lookout Place and Moorhen Court (into M
Street) there was a direct overland connection to Burpengary Creek.
Therefore, our opinion remains that the subject property could not have been
inundated above floor level prior to Burpengary Creek overtopping its banks.
Minimal flow in the low point of Lookout Place after the peak of the flood event
allowed sufficient time for the observed silt to deposit on the road. ”
37. The Applicant has provided a number of witness statements from locals in
Narangba. The statements provide the following relevant information:
„JA‟ says that on 11 January 2011, he went for a walk to a friend‟s
new home on Koel Drive to check the water level. He checked the
water level in Burpengary Creek and noted it was 4-5m from
breaking its banks. He returned home 40 minutes later to find he
had been inundated to a depth of 600mm. He claimed through his
insurer and was informed it was not a flood event because the
creek did not break its banks.
„ST‟ says the open channel did not overflow its banks.
„EE‟ says her property on Koel Drive (near B urpengary Creek) was
not inundated with water and the creek did not overtop it banks.
„ET‟ says she owns a small business and makes house calls and is
knowledgeable of local events. She says the hydrologist‟s flood
map is wrong and she knows 10 people whose homes are noted as
flooding that did not. No houses were inundated on the side of the
open channel.
„RE‟ says he investigated the area to establish the reason for the
inundation and found there was no evidence Burpengary Creek
broke its banks as there was no debris and damage to any
vegetation or landscaping. The only evidence of debris was around
the stormwater drains.
„KC‟ says there was heavier rain from 11:00am on 11 January 2011
and water was rising in the area. In the days after the event, he
took his camera and discovered the source of the water was the
stormwater drain at Lookout Place. He attended a community
meeting and those who were present all reported that the water
came out of the large stormwater drain and no water came over the
embankment between the stormwater drain and Burpengary Creek.
KC says the loose rocks in the channel between the drain and
Burpengary Creek appeared to be undisturbed.
Case No: 314209 Determination Page 8 of 10
Discussion
38. At law, the onus to establish a loss has occurred to which an insurance
policy responds rests with the insured. This is known as establishing a prima
facie claim. If an insured is able to establish a prima facie claim and the
insurer seeks to refuse the claim on the basis of an exclusion in an
insurance policy, then the onus shifts to the insurer to establish the exclusion
applies to the circumstances of the claim.
39. As it applies to this claim, the Applicants say the loss was caused by the
discharge of water from the drainage system which falls within insured event
of storm. The FSP says the excluded event of flood from a watercourse was
the cause on the basis that Burpengary Creek overtopped its banks and
mixed with the stormwater runoff. It must be remembered in determining this
dispute that inundation caused by water, regardless of its source, escaping
from any water main, drain, pipe, street gutter, guttering or surface is
covered under the terms of the policy. With this in mind the Panel has
reviewed the various reports and submissions of the parties.
40. The hydrological conclusions of W have changed significantly since the first
report. The third report dated 7 August 2013 states “the dynamics of the
local storm water pipe network are complex” , and that while the peak
inundation was deemed to be a combination of stormwater runoff and
floodwater from Burpengary Creek, the report indicates that stormwater
runoff could have been “close to the floor level” under certain circumstances.
41. This is a marked difference to W‟s first report which stated stormwater runoff
could only have reached a depth of around 36mm.
42. W‟s later reports state that the Applicants‟ home could not have been
inundated above floor level by stormwater runoff alone.
43. However, the various statements provided by the Applicants from locals in
the area, are consistent in their view that Burpengary Creek did not overtop
its banks.
44. Further, RE and KC state that there was no evidence Burpengary Creek
broke its bank in the location of the drain at Lookout Place, with KC stating
there was little evidence the channel between Burpengary Creek and the
drain had been disturbed, while there was ample debris around the drain.
45. The Applicants have provided photographs of the channel between
Burpengary Creek and the drain, taken the day after the event. The Panel
has reviewed these photographs and accepts there is little evidence of
debris in the channel.
46. Bearing in mind W‟s statement that under certain circumstances stormwater
runoff could have come close to the floor level of the home, and the fact W
has changed his conclusions significantly across various reports, the Panel
accepts the Applicants‟ submission that limited reliance can be placed on
W‟s conclusions.
Case No: 314209 Determination Page 9 of 10
47. It is always concerning when a technical expert provides a report and then is
forced to amend conclusions because certain aspects of the initial report
have been drawn into question. This has occurred on a number of occasions
in this dispute. The evidence of the eye witnesses has not been disputed
and in the circumstances should not be easily discarded.
48. Referring back to the legal onus on the parties, the Panel is satisfied that a
severe storm event occurred in January 2011 and the Applicants‟ home was
inundated with water. The FSP has refused the claim on the basis the loss
was caused by the excluded event of flood and therefore bears the onus to
establish the exclusion of flood applies to the claim.
49. In the Panel‟s view, the FSP has failed to sufficiently establish that the cause
of the initial loss was floodwater.
50. The Panel accepts the peak inundation was likely caused by a mix
stormwater runoff and floodwater from Burpengary Creek, which would
invoke the Wayne Tank principle; however, the Panel is not persuaded the
FSP has established the initial inundation was necessarily caused by
floodwater.
51. Further, that the Applicants concede some water may have overtopped
Burpengary Creek is a secondary consideration to the FSP‟s onus to
establish the exclusion. The Panel is not persuaded the male Applicant‟s
limited concession is overly relevant in this instance.
52. Given W has changed conclusions significantly between reports, locals in
the Narangba have provided statements which indicate Burpengary Creek
did not break its banks and there is some question as to whether the channel
between Burpengary Creek and the drain was affected by floodwater, the
Panel determines that the initial inundation of the home above floor level was
most likely due to an insured event of storm and rainwater. The Panel
accepts the evidence that the peak level of inundation would have been due
to a combination of stormwater runoff and flood.
53. The evidence does not allow for an accurate assessment of the height of the
initial inundation however given the time that has elapsed since the
inundation, the Panel considers it would be fair in the circumstances to
determine the initial inundation to a height of 100 to 150mm. The FSP is
liable to meet the cost of repair and contents loss sustained as a result of
inundation to this height.
54. The Case Manager at the Financial Ombudsman Service spoke with the
male Applicant on 21 November 2013 and he indicated that he had
undertaken most of the repair work himself and he had a number of receipts
for materials etc.
55. In the circumstances, the Panel determines that the Applicants are to
provide receipts and details of the work done to the FSP and the FSP is to
obtain a scope of works and quotation to cover the repairs and provide these
to the Applicants. The parties are asked to work cooperatively to agree on a
Case No: 314209 Determination Page 10 of 10
reasonable settlement of any building damage and contents loss sustained
as a result of inundation up to 150mm inside the home, including an
allowance for Applicants‟ labour in undertaking repairs.
56. If there is any unrepaired damage that should be covered up to 150mm in
the home, then the FSP is to allow for this or undertake the further repair
itself, at its option.
57. For the sake of clarity, the FSP is not liable for damage over 150mm inside
the home. The Panel notes the latest hydrology identifies the maximum
inundation to be 210mm.
Determination
58. On the basis of the available information the Panel determines the FSP is to
cover building damage and any contents loss up to 150mm inside the home,
including a reasonable allowance for the Applicants‟ labour given most
repairs have reportedly been completed.
59. Further, the FSP is to pay interest on any settlement at the statutory rate
from 11 March 2011, being the date the claim was initially declined.
60. The Panel trusts that the parties will co-operate in good faith in reaching a
resolution, although the matter can be referred back to the Panel if the
parties cannot agree on the settlement amount.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.