The applicants claimed for roof batten damage from Cyclone Yasi after the insurer's $2,670 cash offer excluded it. AFCA found the batten damage was caused by the cyclone and ordered the insurer to repair the roof and other covered damage.

The insurer had to establish the gradual deterioration exclusion, and the weight of expert evidence showed wind-related batten lift rather than shrinkage.

Issues

Subjects and remedies

home or building damagenatural disasterrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 314083 Determination Page 1 of 7 Case number: 314083 General Insurance - Domestic Insurance - Home Building - Storm - Cyclone Yasi - FSP Decision - Claim Amount - Exclusion/Condition - Gradual Deterioration 27 February 2014 Summary Description  Claim under a home contents policy for damage sustained during Cyclone Yasi in February 2011 and poor workmanship. While accepting the claim, dispute arises as to the extent of the damage. Basis of Determination  There is no dispute the property was damaged during Cyclone Yasi.  Four experts including the FSP’s experts identify roof damage due to the Cyclone Yasi.  On balance, the damage including batten lift is due to Cyclone Yasi.  There is evidence of poor workmanship by the FSP’s repairer that may have caused the damage. Determination  The FSP is liable to meet the cost of repair to the roof and other Cyclone Yasi related damage. Background 1. The Applicants held a home and contents insurance policy with the Financial Services Provider (FSP) which was current at the time of the loss. The policy provided accidental damage cover. 2. The Applicants lodged a claim on 8 February 2011 for damage to their property following the Cyclone Yasi event. The FSP accepted the claim and authorised repairs to the property. 3. On 4 June 2012, the Applicants lodged a claim for damage due to a leaking roof. The Applicants believed the damage was due to either previously Determination Case No: 314083 Determination Page 2 of 7 unidentified Cyclone Yasi damage or poor workmanship in the repairs performed by the FSP. 4. The FSP reassessed the claim, accepted there was previously overlooked Cyclone Yasi related damage and offered the Applicants a cash settlement of $2,670. 5. The Applicants disagree with this offer as it does not include cover for the cost to repair the roof battens. Summary of Applicants ’ position 6. The FSP’s authorised builder (J) repaired the roof after Cyclone Yasi. In April 2012, the Applicants found mildew on the ceiling due to water coming through one of the roof valleys. 7. During reassessment of the damage, it was identified there was damage to the roof structure due to batten lift caused by winds during Cyclone Yasi. 8. It says the batten damage cannot be due to shrinkage as the faults are confined to the peak area of the roof and are not across the entire roof. 9. It argues if a batten screw is partially lifted but not removed, the part remaining in the wood would still be secure. It contends the lever test performed by the FSP’s experts may not have revealed any movement but this does not mean there was no batten lift. 10. The batten lift was caused by Cyclone Yasi. The FSP should be accountable for the repairs of this and all other damage missed in the previous repairs. 11. The Applicants provided a quotation of $71,254 from builder CC to cover the repairs. Summary of FSP’s position 12. After inspecting the damage, the building consultant (S) appointed by the FSP reported there was cyclone-related damage including batten lift. The FSP agreed to cover part of the damage as cyclone-related but disagreed the event had any impact on the roof battens. 13. The FS P relies on structural engineer (KA’s) opinion to argue the spacing in the battens was due to the manner in which the building was originally built and batten shrinkage contributed to the spacing. 14. Further, it says according to Australian standards the gaps identified in the battens are well within the range of timber shrinkage allowance. Case No: 314083 Determination Page 3 of 7 15. It argues the battens have not sustained any damage or in the alternative, batten shrinkage occurred over a period of time which is considered gradual deterioration and/or wear and tear and is thus excluded under the policy. 16. The FSP accepts there was some damage overlooked and offered to cash settle the Applicants’ claim for $2,670. Otherwise, the FSP declines liability for the loss. 17. The FSP relies on the following policy provisions within the Product Disclosure Statement: “ Exclusions to your cover Any cover we provide is subject to the following exclusions. Accidental Damage cover, Additional cover and Strata Title Mortgagee Protection exclusions We will NOT COVER any loss o r damage as a result of, or caused by  …  erosion, rust, corrosion, gradual deterioration, depreciation, wear or tear …” Issue 18. Whether the FSP is entitled to deny the claim for the alleged damage to the roof battens according to the terms and conditions of the policy. Reasons for decision 19. As advised to the parties, due to the nature of the dispute, the Financial Ombudsman Service (FOS) has considered it appropriate to expedite the dispute to Determination in accordance with the Operational Guidelines to the FOS Terms of Reference. 20. This decision has been made by a Panel consisting of an Ombudsman and two Panel members with extensive experience in insurance industry matters and consumer claims. 21. The Panel is satisfied a full exchange of the relevant information has taken place between the parties and each party has had the opportunity to address the issues raised. 22. The Panel notes there is no dispute the property has cyclone-related damage which was not previously identified and the FSP has offered a cash settlement for part of this. 23. In a telephone conversation of 28 January 2014, the male Applicant confirmed to FOS that the central point of dispute with the FSP refers to the damage to the roof battens. The central issue is whether the cause of Case No: 314083 Determination Page 4 of 7 damage to the roof battens is batten lift or shrinkage and thus whether the FSP is liable for their repair. 24. The relevant evidence supporting the Applicants’ position is as follows:  A report by the Applicants’ builder (CO) which says “ all roof batton spacings top and bottom are not to Australian Standards some spacings are 1200 from nearest batton to ridge” [sic].  Two reports by the FSP’s building consultant S which say damage in the form of loose roof sheets and “uplift” of the roof framing is a direct result of the strong wind experienced during Cyclone Yasi and one can see batten lift at various locations over the entire roof cavity.  A report by the Applicants’ consulting engineer (CM) which says the roof battens have lifted in the high pressure areas at the apex of the roof and at the eaves/heel areas. It also says the observations do not indicate batten shrinkage.  CM’s second report which says: i. Shrinkage is not concentrated in a particular section of a roof, whereas batten separation as in this case is predominantly at the ridge which is the highest pressure area. ii. In other houses failed batten fixings will not “spring back” into position while walking on the batten. iii. It is incorrect to use a screw driver or pinch bar to assess the structural integrity of the roof fixings to resist future cyclonic loading. iv. The failure of the batten fixings is progressive due to the fluctuating loads and complexity of the screw fixing. v. The degree of damage to roof battens is dependent not only on the velocity of the winds but also on the travel speed of the cyclone. vi. The current battens have load-carrying capacity but it has been diminished by the wind damage.  A report by the Applicants’ consulting engineer (CA) which says: i. While many battens have not visibly lifted, gaps measured under affected ones were of 3-5mm. ii. Due to the allowance for shrinkage having been exceeded, lift of more than 1.5mm cannot be considered timber shrinkage. iii. Timber shrinkage will typically result in battens shrinking down onto the frame, not in defying gravity and lifting the battens off the roof frame. iv. A lifted batten screw would tend to jam up until it may fail completely if the loading is applied long enough. 25. The relevant evidence supporting the FSP’s position is as follows:  A report by consulting engineering company (IC) in which building consultant (BH) says: Case No: 314083 Determination Page 5 of 7 i. The roof batten to truss tie down connections are compliant with the current Australian Standard AS1684.3. ii. Gaps of around 2mm are present in various locations along the entire length of individual battens, save for one roof batten connection which has a gap of 6mm. iii. Where gapping was evident, BH tested the tie down strength using an 800mm prise bar to try separating the batten off the truss. At no point did the connections separate. If failure or batten lift had occurred, battens should be able to be separated. iv. There is no batten lift or failure of the roof batten to roof truss connections. The roof batten with the 6mm gap was likely not screwed down tight onto the roof frame at the time of initial construction.  IC’s second report in which structural engineer KA agrees with BH and adds: i. Some of the gaps to the battens appear to be of 2.78mm or larger. Gaps of 3mm would still be most likely due to shrinkage of timber. ii. No movement resulted from using a long screwdriver to attempt levering the roof battens from the trusses. iii. The battens are screw-fixed. When screws pull out, their thread strips the timber internal fibres along the full length of the thread, creating a total loss of effectiveness. It is not possible for half a screw to pull out and the rest to remain in place. iv. No batten lift or failure of roof battens has occurred.  Two emails where KA provides comments to CM’s reports as follows: i. If there was batten lift, the threaded screw pulling out would tear the timber and thus when applying pressure, there would be movement. ii. If battens had lifted, walking on the roof would have applied pressure and pushed the battens back down. There was no indication of this occurring. iii. The relevant Australian Standards say shrinkage can happen between 2% and 10% and the Australian Hardwood Network suggests 4-14% is possible. iv. The battens are 38mm deep, so it is conceivable that shrinkage of 3.8-5.3mm has occurred. As the gaps previously identified are between 2-3mm, they are consistent with shrinkage. v. Had there been sufficient uplift to lift and break batten connections across the entire roof, it would be expected that areas at the ridge and eaves would be greatly affected. There was no evidence of this occurring. vi. CM did no testing and said gaps are only present in selected areas around the ridge but the gaps were present across the full area of the roof, which corresponds with the effects of timber shrinkage. Case No: 314083 Determination Page 6 of 7 vii. Further, the wind experienced during Cyclone Yasi in the area where the property is built would have been insufficient to cause major structural damage. 26. S, IC and CM have also provided photographs of the roof cavity which clearly show separation between some of the roof battens and trusses. These images however do not assist in identifying whether the damage is localised or not. 27. Based on the experts’ explanation, the Panel c onsiders both positions are plausible. However, the Panel notes the majority of experts including an FSP appointed building consultant agree that the likely cause of damage was batten lift. 28. Further, following CA’s opinion, the Panel considers it reasonable to say shrinkage would usually result in battens shrinking down onto the frame. CA also notes that lifted batten screws tend to jam up when lifted, which provides a reasonable explanation as to why BH and KA found no movement. 29. Although KA has explained there has to be batten movement in order to establish batten failure, it seems he has not considered the possibility of the screws jamming up. No counterargument by a qualified expert has been provided to CA’s reasoning. 30. Having considered the evidence as a whole, the Panel is satisfied, on the balance of probabilities, that the damage was caused due to batten lift as a result of high wind pressures during the Cyclone Yasi event. 31. In the alternative, even if it were accepted that damage was due to shrinkage, all reports coincide in that uncompleted repairs and/or unidentified damage has allowed additional moisture to enter the roof cavity. 32. The period between the damage by Cyclone Yasi (February 2011) and the roof cavity inspections (between June 2012 and October 2013) was prolonged. The Panel is persuaded any potential shrinkage would have been caused by unusual exposure to the elements due to the uncompleted repairs or previously unidentified damage. 33. In that case, the proximate cause of shrinkage would still be Cyclone Yasi or J’s workmanship. In any case, it is the Panel’s view the FSP should provide cover for this damage. Other issues 34. The Applicants raised other issues related to J’s workmanship and Cyclone Yasi related damage. The FSP accepted there was at least previously unidentified Cyclone Yasi damage and offered a cash settlement of $2,670. 35. Following IC’s first report, this would cover only part of the previously unidentified Cyclone Yasi damage. Case No: 314083 Determination Page 7 of 7 36. The Panel notes that IC’s second report contains the most de tail regarding other damage to the building. 37. KA’s report is not challenged in these aspects by any other expert opinion. Therefore, the Panel is of the view that KA’s report should be relied upon to establish which damage to the building should be covered as previously unidentified Cyclone Yasi damage or rectification works to the first repairs. 38. Following KA’s report, other damage in the property that should be covered is: overtightened roof screws, hip and ridge capping damage, water ingress above the laundry and insulation on top of the laundry ceiling, cornice cracking and ceiling damage to one bedroom. 39. On the evidence presented, it appears that the roof is capable of repair and would not require replacement, unless demonstrated to the contrary during repair work. Determination 40. On the basis of the available information, the Panel determines the FSP is liable for the repair of the roof battens. 41. Within 30 days of being notified of the Applicants’ acceptance of this decision, the FSP is to organise a quote for the repair of the roof battens and other building damage as described in paragraph 38 of this Determination. 42. Within 45 days of being notified of the Applicants’ acceptance of this decision, the FSP is to organise for a builder of its choice to start repairs to the property based on the quotation previously obtained.