Text of the determination
Case No: 313663 Determination Page 1 of 16
Case number: 313663
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Claim amount
17 October 2013
Background
1. The Applicants (JG & CG) held a Home Building and Contents Insurance
Policy with the Financial Services Provider (FSP).
2. The insured property (including the external roof) was damaged as a result
of Cyclone Larry in 2006 and a claim was lodged and accepted by the FSP.
3. On 2 February 2011 the insured property was again damaged during
Cyclone Yasi and another claim was lodged with and accepted by the FSP.
4. The Applicants maintain that the repairs to the external roof completed after
the 2006 cyclone event were not of an acceptable standard and have
contributed/resulted in ongoing water damage occurring within their home.
5. The FSP maintains that it has accepted and rectified all claim/insured event
related damage assessed and identified by adequately qualified consultants.
The damage to the roof claimed by the Applicants is not considered insured
damage and therefore it is not obliged to authorise replacement of the
insured building‟s roof under the claim.
6. The Applicants are dissatisfied with the FSP‟s position and seek a review of
its decision by the Service.
Summary of Applicants ’ position
7. The Applicants‟ roof was repaired under the claim (2006) by the FSP‟s
preferred builders after Cyclone Larry. The Applicants later discovered that
the people appointed were not qualified builders by profession rather were
actually jewellers there to assist a relative who had moved to the area to
take advantage of the amount of work available after the cyclone.
8. The insured property was again damaged by Cyclone Yasi in 2011. Arising
from the Applicants‟ lack of confidence in the FSP‟s preferred builders they
requested to be cash settled under the second cyclone event claim.
Determination
Case No: 313663 Determination Page 2 of 16
9. When the Applicants‟ preferred builder assessed the roof of their home he
noted there was a lot more damage present than acknowledged by the FSP
given the cash settlement amount issued to the Applicants.
10. The roof was leaking in several locations however the FSP only paid for the
cost to repaint it. The Applicants question how painting the roof would rectify
the numerous areas where it was leaking. Further, their builder discovered
many faults with the repairs previously completed after Cyclone Larry.
11. The FSP received three separate quotes in relation to the proposed scope of
works during the course of the current claim. The first quote recommended
total replacement of the roof, the second was altered to recommend
replacement of all the screws used to tie town the roof sheets while the third
quote only recommending the roof be re-painted.
12. They were not made aware of the fact that the FSP had been provided with
the three separate quotes and were o nly made aware of the last quote.
Therefore, they were unaware the initial assessments of the roof
recommended complete replacement.
13. They are unable to authorise repairs to the internal damage until the external
roof is adequately repaired and/or replaced by the FSP. Further, the
Applicants are now without insurance cover for their home as the FSP (as
well as other insurers) is not prepared to offer insurance cover until all
repairs are completed.
14. Every builder and plumber that has attended the insured address cannot
believe what is happening and have attempted to discuss these concerns
with the FSP on behalf of the Applicants. However, the FSP will not accept
their opinions and continues to decline indemnity for this component of the
claim.
15. The only solution is for the roof to be fixed once and for all by the FSP, which
may mean a total roof replacement as first recommended by the FSP‟s
appointed builders.
16. The leaks in the ceilings are becoming worse, mould growth and the water
marks becoming more and more evident every time it rains. The Applicants
refute the FSP‟s position that the mould present in the bathroom is due to
ventilation issues alleged to exist in the room.
17. The Applicants maintain that this whole and continuing experience has been
very stressful and they are afraid of being left without insurance cover so
close to the cyclone season.
Summary of FSP’s position
18. The policy is an insured events contract of insurance which provides cover
for loss or damage arising from the listed insured events and does not cover
all risks. The onus rests with the Applicants to establish, on the balance of
Case No: 313663 Determination Page 3 of 16
probabilities, that the loss claimed falls within the scope of cover available
under the policy.
19. Principally the dispute between the parties is whether the FSP is obliged to
provide indemnity to the Applicants for the cost to repair/replace the roof
over and above what it has already cash settled under the 2011 claim.
20. The previous repairs to the roof were completed after Cyclone Larry in 2006.
The Applicants made no complaints about the repairs to or the leaking of the
roof for years thereafter.
21. The FSP maintains it was considered good roofing practice to use
replacement screws after Cyclone Larry that are longer than the original
screws. Although these longer screws penetrated out of the bottom of the
timber battens, this only created an unsightly appearance, however, it does
not diminish the structural integrity of the roof structure.
22. The FSP‟s commissioned engineers “C” confirm the work performed on the
roof sheeting and structure to date was adequate and sufficient. There was
no requirement to attend to any more works claimed to be due to the noted
insured events.
23. The FSP acknowledges that the aesthetic appearance of the roof should
have been a matter addressed after the previous Cyclone Larry claim by way
of painting the screws and roof to provide a uniform appearance. However,
there is no concern relating to the structural integrity of the roof and it
remains sound. It notes that an amount of $4,500 has been included within
the cash settlement calculation to account for the cost to repaint the entire
roof including the screws.
24. The damage noted within the bathroom and rear patio area was not due to
an event insured under the policy and therefore does not fall within the
scope of cover available under the policy. The FSP accepts C‟s opinion that
it (the engineer) was confident in respect to the integrity of the screws used,
fastenings, washers and battens with there only being minor repairs required
regarding the sarking.
25. The FSP maintains that the difficulties arising out of the Applicants not
having undertaken the repairs for which they have been cash settled are
highlighted in the inspection and noted damage within the bathroom and
living areas.
26. Three assessors, an engineer and two roofing consultants have
appropriately inspected the roof sheeting and cavity structures. As there was
no repairer damage or cyclone damage to the roof, its fixings or timber
battens that had not already been cash settled under the claim, the FSP is
not liable for the cost of any further works claimed in this respect.
27. There is no evidence the Applicants have appropriately mitigated their losses
by applying the cash settlement to repairs and the reinstatement of the
Case No: 313663 Determination Page 4 of 16
insured building. Therefore, any further resultant damage will not be
attributable to repairs undertaken or be considered cyclone damage.
28. The FSP notes the Applicants by way of additional submissions to FOS have
submitted further consultants‟ reports. It notes „JH‟ inspected the roo f on 14
August 2013, however, JH makes no mention which part of the roof the four
roof sheets were removed from. JH provides no correlation between the
foreign matter and any areas of leaking complained of by the Applicants or
commented on by the engineers.
29. Further, JH‟s report does not disclose any damage to the roof sheeting as a
result of an insured event. The works performed on the roof sheeting and
structure to date, are adequate and sufficient, with there being no
requirement to attend to any further or other works as a result of the claimed
events.
30. The FSP maintains that the Applicants have been appropriately cash settled
for the insured damage to the property covered under the policy and
therefore it has fulfilled its obligations under the policy.
Issue
31. Whether the FSP is obliged to provide further indemnity to the Applicants in
respect to the claimed damage to the roof of the insured building.
Reasons for decision
32. As advised to the parties, FOS has considered it appropriate to expedite the
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is due to the circumstances of the dispute. This dispute has
not been the subject of a FOS Recommendation and has proceeded directly
to Determination.
33. This decision has been made by a Panel consisting of an Ombudsman, an
industry representative and a consumer representative.
34. The Panel is satisfied the parties do not dispute the following:
The Applicants held an active Home Building and Contents insurance
policy with the FSP at the time of the loss.
The FSP provided and the Applicants received the relevant policy
documentation including the policy Product Disclosure Statement
(PDS) prior to the loss claimed.
The insured building and contents were damaged arising the from the
significant weather events experienced in the area both in 2006
(Cyclone Larry) and 2011 (Cyclone Yasi).
Case No: 313663 Determination Page 5 of 16
The FSP accepted two claims arising from the separate insured events,
however, it limited its liability under the second claim to what it accepts
to be damage caused by the insured event(s) and not to the extent
sought by the Applicants.
The Applicants are in receipt of payment from the FSP under the 2011
claim. However, the cash settlement is based on and in line with the
FSP‟s assessment of the damag e claimed and prior to the Applicants
engaging builders to undertake the approved repairs.
The issue in contention between the parties is in relation to the external
roof and its structure. The Applicants believe it requires
repair/replacement due to the damage caused by the insured event(s)
as well as faulty repairs completed by the FSP‟s preferred repairers
under the previous Cyclone Larry claim.
There were no issues in respect to water ingress into the home prior to
the occurrence of the insured events. It only became apparent
subsequent to the first event (Cyclone Larry), repairs completed under
the claim for this event and then later after the occurrence of the
second event Cyclone Yasi.
35. The Panel notes that the parties have made available multiple reports and
comments from their preferred consultants. The information relied upon by
the parties has been exchanged and in the interests of brevity, the Panel will
only reiterate information from the consultants‟ reports and associated
evidence it finds relevant in providing this Determination.
Assessor’s (RS) Report
The cause of the damage was noted as – Cyclone Damage.
The resultant damage was noted as Building 15 % Location of damage roof,
gutters, screens, doors, sheds, interior ceiling and walls. Conte nts 25 % of
contents, riding mower, freezer, clothes line, 2 trampolines, refrigerator, and
pressure washer.
The assessor formed the opinion that an engineer would need to be
commissioned to inspect the interior cracks to the cement render on the walls
over brick and gyp board ceilings. Also report needed as the Applicants
believed that the roof had lifted.
WC’s (Builders) Inspection Report dated 28 January 2012
Upon inspection of the ceiling cavity it was evident that when the roof was re-
screwed the builder used larger screws, this is an acceptable practice to
achieve more bite into the timber from replacing screws.
However they have used the wrong cyclone assembly to approximately half of
the roof area, the screws used are for mono-clad profile iron which may
impede the water proofing of the screw.
Case No: 313663 Determination Page 6 of 16
If the roof was going to have new screws put into the existing battens, the
consultant held reservations that they would achieve a strong enough hold,
given that it would be the third time screws will have been put into the same
timber now dry and 15 years old, WC believed this will cause major splitting of
the battens which is only minor now.
WC contacted an engineer seeking advice and was advised the following:
“ My question to you firstly is whatever you do will you be happy to guarantee
the screws won ’ t fail if another cyclone comes through? If not then if I was you
I would not be replacing the screws only but the battens as well. The fact you
have splitting of the battens would also make me hesitant to solely re-screw.
An assessment on the degree of splitting would be required though to
determine this (i.e. has it weakened the batten?) If it was decided that the
batten was not weakened by the cracking then a new screw could be inserted
but this would need to be in a different location and pre drilled. I would be
suggesting replace the battens (and I will admit that part of that assessment is
if the roof ever comes off again I don’t want anyone saying the engineer said
this would be ok) ”
As for painting of the roof which has been cash settled; the correct process in
the Blue Scope steel guide to painting colour bond roofs is very labour
intensive. It also voids any warranty given by Blue Scope against corrosion.
Pictures provided show there is rust present and WC noted the Applicants
claim this was not there prior to the cyclone. It appears to be rather new and
could be caused from the vibrating sheets during the high winds of Yasi
wearing off the protective coating. Note the paint missing on the lap joins
(arrows) due to the sheets vibrating.
Roof sheeting and structure estimate noted as $62,720.50.
C’s (Engineers) Report dated 24 February 2012
The residence is a freestanding, single storey slab on ground constructed with
a colour bond roof. The allotment is considered to be of a generally flat
natured building block.
According to the insured, the dwelling is approximately 15 years old and has
been owned and occupied by the Insured since the completion of its
construction.
Generally, the property and surrounding grounds have been maintained in a
fair condition with respect to its age and type of construction.
Water marks were evident to various areas of the timber members and
ceiling, indicating that leaking had occurred into the ceiling cavity. However,
the roof void appeared to be dry at the time of our inspection even through it
was raining outside. No excessive moisture was detected within the roof void.
Case No: 313663 Determination Page 7 of 16
Therefore, the water marks appeared to be old stains only and we belie ve that
they were from the Cyclone Larry event in 2006 before the roof was repaired.
All of the screws that connect the roof sheeting and the timber battens were
fully exposed on the bottom surface of the timber battens. This indicates that
the new screws that the repairing builder had used are longer than required. A
small portion of timber battens were found to be split around the screw holes.
Some of the screws were misplaced and penetrated outside the timber
battens instead of into the timber battens.
Even with the above mentioned observations, the entire roof system still
appears to be structurally intact. All the members of roof trusses and battens
are in their original position and no sign of uplift was observed in the roof
cavity. No stress cracks or deflections of any type were observed to the timber
trusses. We therefore do not believe that the structural integrity of the roof
structure has been compromised.
The washers used for the screws were for Custom Orb (corrugated) profile
and are entirely suitable for the corrugated roof shape of the Insured property.
No washers for square ribbed profile roof were observed over the entire roof
area.
The entire bathroom area was not ventilated properly to allow moisture to
evaporate away from the area. The window was fully shut at the time of our
inspection and no other measure was provided to allow cross -flow of
ventilation for the entire bathroom area.
The insured then showed us to the rear patio where we noted rotting and
deterioration was sustained to one of the edges of the soffit lining, indicating
that moisture has been accumulating in the area for a long period of time.
It can be concluded that although the washers are of old style and might be
more visually unpleasant than the contemporary washers, the fasteners used
to the Applicants‟ roof are correct for the roof profile.
Both the screws and washers should have been painted to match the colour
of the roof sheeting prior to installation on the roof. However, regardless of the
fact that whether the fasteners are painted, it will have no effect to the
structural and serviceability performance on the roof.
While there has been no Australian Standards or BCA requirements of
replacing the timber battens whenever the roof sheeting is re-screwed, it is a
common building practice to have the timber battens replaced prior to re-
screwing of roof sheeting.
Had C been required to scope the damage to the roof in the cyclone area in
2006, it would have no doubt in specifying the replacement of the timber
battens when re-screwing of the roof was to take place.
Case No: 313663 Determination Page 8 of 16
C did not believe that any modification should be made to the roof area at this
stage. Its only recommendation was that all of the loose sarking in the roof
void should be taped up to prevent water entry into the internal area of the
residence in the long run.
Flashing should be installed to the roof area directly above the moulded area
where the patio roof and main dwelling roof intersects to prevent water from
falling directly into the patio area. The rotten timber members can then be
removed and replaced as necessary.
C did not believe that the damages sustained to the internal area of the
residence were a direct result of the repair works to the roof completed after
the Cyclone Larry event in 2006.
C’s (Engineers) Scope of Works dated 20 March 2012
Roofer
The existing roof sheeting and associated capping shall be removed, set
aside for reinstatement at the required stage of the works;
The existing sarking on top of timber battens for the entire roof shall be
removed and disposed from site;
The existing timber battens and the entire roof shall be removed and disposed
from site;
Supply and install roof battens and Anticon blanket for the entire roof in
accordance with the BCA (approximate roof area: 300m 2 );
Reinstate roof sheeting and associated capping with new fasteners in
accordance with the BCA, AS1562.1-1992 – “Design and Installation of sheet
Roof and Wall cladding” and the manufacturers‟ recommendations;
Selection and installation of new fastening screws must conform to AS3566 –
Class 3 and manufacturer‟s recommendations along with sealing washers
specifically for cyclonic area and corrugated profiled roof;
Pre-finish screws to match existing colour of the roof to the best possible
extent;
Supply and install new flashings for all penetrations.
General
A professional builders clean is to be completed prior to handover;
Clean and remove all debris off site on completion.
RG’s (Builders) Report dated 20 April 2012
It is RG‟s professional opinion that the noted staining to a large portion of the
timber roofing battens is in fact the stains caused from when the timber is
initially delivered on to site at original point of construction of the home in a
bundled pack. The timber sweats and is exposed to the elements causing the
hardwood timbers to excrete sap and bleed.
This colorful bleeding of the timber leaves staining all over the hardwood
timber battens and is a natural and common effect that causes no damage or
Case No: 313663 Determination Page 9 of 16
compromise to the timbers ‟ integrity. This bleeding shows no indication of
coming from the fixings or the fixings being the source of moisture breach.
Upon inspection of the roofing cavity RG found only two minor areas of water
staining to the top side of the plaster boarding clearly indicating that the
roofing system was not largely breached and/or compromised.
Upon inspection of the re-screwing of the roofing system it has been found
that an isolated area to the southern ridge area, the roofing screw lines run off
the edge of the timber roofing batten and the timber batten is split. The screw
lines were not altered by the repairer previously conducting repairs. Therefore
this was pre existing damage and the original screw lines followed this same
path as the newly installed screws have simply been re-installed into the
same hole. This issue is clearly a defective construction flaw in the original
construction of the home.
The inspection conducted to the surface of the roofing system noted that there
was one screw missing to the south western hip ridging and one screw was
not adequately secured to the mid western face of the roofing system.
It was noted that the ridge and hip flashings had not been adequately affixed
& sealed from original point of construction and in RG‟s professional opinion
would be allowing moisture breach in severe weather conditions.
To the southern mid section of the roofing system it was noted that there was
approx 2mtrs of timber roofing batten split that may have been contributed to
by one of the recent events or even have split upon original construction as it
is not uncommon to see this degree of splitting where hardwood timber
battens have been installed. Damages are minimal and would only constitute
a minor repair, being a sectional roofing batten replacement to this area only.
Upon inspection of the roofing system it has been identified that the previous
repairer had replaced the roofing screws that were pre viously a colour
bond/powder coated cyclone washer roof fixings with two different varieties of
fixings neither being a colour bond/powder coated fixing.
‘RP’ Re -inspection Report by dated 17 August 2012
On attendance there was very little actua l physical review required and GC
mainly attended on-site to ensure he collected a full understanding of the
Applicants ‟ concerns.
The roof screws installed by „MR‟ were non painted versions of the screws
removed and replaced in 2006 after Cyclone Larry. GC contacted the
manufacture and supplie r of these screws, „B‟ and spoke to the main factory
in Melbourne and the Cairns manager (RM).
The main factory in Melbourne advised that the un-painted 65mm screw used
in the roof were exactly the same as the painted items just less the surface
coating. RM then advised that back in 2006 the housing industry was booming
Case No: 313663 Determination Page 10 of 16
and when Cyclone Larry hit the region they were overwhelmed with orders
and were running shifts 24/7 to try and keep up with demand.
RM advised that it would not have been un-reasonable to wait two months or
longer for supply of painted roof screws in Cairns region at that time. GC tried
to gather information from the original builder MR with no luck. So GC was
unable to determine if this was the exact reason for not using painted head
screws but it did appear viable that this could have been why they were used.
The engineer for C and RM both claim that the replacement of the roofing
screws with painted screws is purely for visual aesthetics and matching the
decor of the roof; there is no inferior quality of the screw construction.
GC‟s inspection noted that the mould is not on the ceiling linings where water
would wet the ceiling but above the shower area to the cornice only. He
agreed with the findings on the engineer ‟ s report supplied by C that the cause
is a result of the shower and a direct lack of ventilation. Further, the FSP has
already paid the insured for repairs to this ceiling and mould and these have
not been completed so no action required.
In respect to the split roof batte ns GC notes and concurs with the engineers‟
findings in this regard and maintains that the structural integrity of the roof
structure has not been compromised due to the use of longer screws.
Inspection of the old screws and washers when compared with the new ones
used confirmed that the screws used in the repairs were not inadequate for
the works.
The water staining is minor visual staining only and could have even possibl y
happened on or during original construction if not during one of the cyclones.
The staining of the solid hardwood battens has no affect on the structural
integrity of the timber or the roof in anyway. There is no requirement in a roof
cavity to replace stained timberwork for visual aesthetics.
In respect to the rotten timber at the rear of the dwelling GC notes that the
engineer from C has identified that a flashing is missing from this area and
was never installed at installation of the original roof structure and capping.
Long term water falling into the patio area has resulted in dry rot to the timber.
The engineer goes on to say that the damage was not the result of Cyclone
Larry.
On review GC could see no technical reason or requirement for replacement
of the roof sheeting, roof battens or the sarking insulation. The request to
touch roof screws etc GC personally believes appears to be driven by the
Applicants‟ understanding that any such actions by the FSP will require full
batten, sarking, roof sheet replacement suppling a new roof in total.
W’s Progress Report dated 30 October 2012
Repairs as per the approved scope of works were advised to be completed.
Case No: 313663 Determination Page 11 of 16
On contacting the Applicants to confirm completion they claimed W‟s builder
advised them there are a lot more split battens. W spoke to the builder
referred to and he advised that he did not say there were lots of split battens.
He did find a couple of roof sheets that had very minor impact damage that is
only visible when the sun is shining on the roof, but other than that he thought
the roof was in good condition.
CM’s (Engi neer) Report dated 18 February 2013
The damage observed at the inspection by CM was:
Severe water inundation through the roof sheeting causing damage to
ceiling linings and cornices in the kitchen, bathroom, part of the lounge
room as well as bathroom 3.
There was no evidence that the current water inundation was due to a
pre-existing and/or the pre-cyclone condition of the roof.
CM was of the opinion that partial rectification/replacement of the roof
sheeting and capping/flashing could be the cause of the leaking. The
manufacturers recommend laying/fixing procedures cannot be fully
applied due to existing sheeting restraints.
The roof battens had lifted over a majority of the roof with several
battens split. The battens uplift and splitting is due to the high uplift
forces generated by the cyclone event. The roof insulation has been
damaged.
There was no evidence of a lack of maintenance of the batten and roof
fixings.
Some of the roof repair/replacement of sheeting was evident. However, this
was incorrectly fixed with long screws which penetrate through the battens.
The remedial works required:
Roof sheeting including insulation to be removed.
Roof battens to be re-fixed.
New insulation and roof sheeting to be provided and fixed in
accordance with manufac turer‟s specifications.
Water damaged ceilings and cornices to be removed and replaced.
C’s Supp Report dated 26 April 2013
C was requested to review the CM Report and to provide comments on
the e ngineer‟s findings.
Based on the photos shown in the CM Report, C believed that the
rectification works listed in its scope of works dated 20th March 2012
had not been carried out.
The repairing builder initially assigned by the FSP after ex-tropical
Cyclone Larry in 2006 had only replaced screws to the roof without
replacing roof sheeting. Therefore, there are no issues of partial
rectification/replacement of roof sheeting and capping/ flashing to the
insured residence.
Case No: 313663 Determination Page 12 of 16
As noted in C‟s previous Engineer‟s Report, the mould su stained to the
bathroom area was due to the fact that the entire bathroom area was
not ventilated properly to allow moisture to evaporate away from the
area.
The water marks to various areas of the timber members and ceiling
appeared to be old stains only and C believes that they were from the
Cyclone Larry event in 2006 before the roof was repaired for the first
time.
At the time of C‟s inspection to the internal area of the residence, it did
not observe watermarks to the kitchen, bathroom, lounge room and
dining room area. C believes that the water marks found by CM in
these areas appeared at some time between C‟s inspection on the 1
February 2012 and CM‟s ins pection in early 2013.
Bureau of Meteorology weather records for the closest weather station
to the Applicants ‟ suburb confirmed that for the entire month of January
2013, a total rainfall reading of 928mm was recorded. Within this
amount of total rainfall, 526mm of which was recorded within 48 hours
between the 22 nd and 23 rd of the same month. It is highly likely that
water entry has occurred to the internal area of the residence during
this heavy rainfall event.
A small portion of timber battens were found to be split around screw
holes. Some of the screws were misplaced and penetrated outside the
timber battens instead of into the timber battens. These installation
defects, however, were only observed to a small portion of the roof.
Sarking was found to be loose in the roof void during the inspection.
This was due to the fact that the insulation was not taped up properly
and general deterioration. It is not a direct result from any cyclone
event.
Even with the above mentioned observations, the entire roof system
still appears to be structurally intact. All the members of roof trusses
and battens were in their original position and no signs of uplift were
observed in the roof cavity. No stress cracks or deflections of any type
were observed to the timber trusses.
The batten uplifts shown in photograph 6 and photograph 7 of the CM
Report were never observed during the inspection of the undersigned.
Our observation gained through these two photos indicates that the
condition of the roof framing has changed significantly since the
inspection of the undersigned in February 2012.
We did not reveal any damages to the roof sheeting in our inspection
and therefore replacement of roof sheeting is not required.
Although the current screws have penetrated out of the bottom of
timber battens by 18mm, it will only create an unsightly appearance to
the timber battens and would not pose any harm to the structural
integrity of the same.
Case No: 313663 Determination Page 13 of 16
Following the damage that occurred to the Applicants‟ roof from ex -
tropical Cyclone Larry i n 2006, the repairing builder engaged by the
FSP simply replaced the screws to the roof sheeting without realising
the need for replacing the timber battens and sarking underneath.
C was then engaged by the FSP to comment on the fixing on the roof in
early 2011. C commented in its original Engineer‟s Report dated 24
February 2012 that if it had produced the scope for the damage in the
roof area after ex-tropical Cyclone Larry in 2006, C would have
specified the replacing the timber battens and the sarking underneath.
Upon further request from FSP, C compiled a Scope of Works dated 20
March 2012 which C believes to be compliant to the current cyclonic
codes.
C noted that the repair works specified in its scope of works had not yet
been carried out. C maintains its position that the repair works are to be
carried out as per our scope of works dated 20 March 2012.
‘JH’ Builders Report dated 18 August 2013
Inspected the insured address on 14 August 2013 in respect to the
leaks.
During the inspection four roof sheets were removed and found foreign
matter in the laps of the sheets and ridge capping.
In JH‟s opinion this could only have been caused by a high wind/rain
event (cyclone) as the laps of iron appear to be in sound condition
unless the roof was re-screwed or re-tightened after the event.
JH believes the roof is leaking due to this foreign matter which is
causing capillary action i.e. when the lap has foreign matter this is
syphoning the water up and over the laps finally dripping into the ceiling
cavity. This also impacts (reduces) upon the life span of the iron roof
sheets.
JH provides the professional opinion that the iron needs to be removed,
replaced and the insulation will also to be replaced as it is torn and
damaged by the high wind set as well.
The roof battens will need attention as well because roof screws should
not be screwed right through the batten which causes batten splitting.
‘AC’ Builders Report
Upon inspection found impact damage to the roof, damaged gutters
and roof leaks in some areas.
Within the roof space found that roof battens had split and lifted in
areas due to being re-screwed with longer screws after Cyclone Larry.
Foreign matter was present, allowing water to travel up and over the
roof cladding. This water leaking had caused deterioration to the ceiling
lining due to water lying on plaster sheeting.
Case No: 313663 Determination Page 14 of 16
AC concluded that in its professional opinion there is a need to replace
the roof cladding/irons, insulation and the roof battens.
36. The Panel has carefully considered the available evidence and is satisfied
that the consultants (in respect to the dwelling‟s roof) generally agree that:
The insured dwelling was maintained in a reasonably good condition.
The insured dwelling sustained damage covered under the policy
subsequent to both significant weather events experienced in the area
i.e. Cyclone Larry and Cyclone Yasi.
The consultants appointed by the FSP under the Applicants‟ previous
claim subsequent to Cyclone Larry did not replace the roof timber
battens prior to re-screwing the iron roof sheets.
Further, the repairers appointed also used longer screws than required
which resulted in the screws being screwed right through the timber
battens. The manner by which the screws were installed has resulted in
and/or contributed to splitting of some timber batters.
There is a consensus between the consultants, including the FSP‟s
preferred engineers, that in the instance the proposed scope of repairs
include re-screwing of a roof, then accepted industry practice is to also
recommend replacement of the battens and sarking.
C (the FSP‟s appointed engineers) go so far as to acknowledge that
had it produced the scope of works to undertake repairs to the roof
area after C yclone Larry in 2006, C would have recommended
replacing the timber battens and the sarking underneath.
There does exist evidence of some minor impact damage to the roof
sheeting however for the most part the external roof sheeting remains
in a serviceable condition.
37. It is not in dispute that the FSP has cash settled the Applicants for the
internal damage assessed to have occurred arising from the insured event
under the current claim (after Cyclone Yasi). However, the Applicants
maintain internal repairs cannot be completed until such stage as the issues
with the external roof are resolved.
38. The policy provides a lifetime guarantee for the quality of materials and
workmanship it authorises through consultants it appoints and pays under a
claim. The guarantee extends to the standard of both materials and
workmanship being free of defect.
39. It is not in dispute that longer than required screws were used and which
were installed through the entire width of the timber battens contributing to
the splitting of the battens and which for all purposes should have been
replaced in the first instance in line with prevalent building practices.
40. Accordingly, the Panel is satisfied that in line with the FSP‟s obligations
under the policy it is obliged to indemnify the Applicants for the costs
associated with the removal of the roof sheets and replacement of the timber
Case No: 313663 Determination Page 15 of 16
roof battens. The roof sheets, except for the few sheets noted to have been
damaged during the insured events which are to be replaced, are to be
retained and re-installed to the new timber roof battens, providing they are
capable of being re-installed.
41. The FSP has cash settled the Applicants for the cost of repainting the
complete roof. Therefore, at the option of the Applicants, they can either
authorise the repainting of the roof themselves or allow the FSP to authorise
the repainting works to the same consultants it appoints to undertake the
battens replacement and re-screwing of the roof sheets. In the instance the
latter of these options is favoured by the Applicants, they are to return the
cash settlement amount accepted from the FSP for the cost of repainting the
roof.
42. As for the internal damage noted within the bathroom and the FSP‟s belief
that this arises from issues with the alleged lack of ventilation, the Panel
notes that the home is estimated to be approximately 15 years old . It would
not be unreasonable to accept that if the water damage was to occur due to
a lack of ventilation, this would have occurred much earlier. There is
evidence indicating that there was a hole in the roof (due to a missing screw
in the roof sheets) above the bathroom area which may have allowed water
entry into the roof cavity. The FSP maintains these internal repairs were
taken into account in the cash settlement offered under the claim.
43. Although the Applicant has been cash settled for the internal repairs, the
Panel notes that there has been a significant delay in authorising the internal
repairs which could not be completed until such stage the external roof
repairs were completed. It is fair in the circumstances that the FSP arrange
for fresh quotes for the approved scope of internal repairs and in the
instance these costs have risen since its previous cash settlement, pay to
the Applicants the difference between the two amounts.
Determination
44. On the basis of the available information the Panel determines:
The FSP is obliged to provide indemnity for the cost to replace the
timber roof battens and sarking as well as the cost associated with the
removal and re-screwing of the existing roof sheets and replacement
of the few noted damaged roof sheets. In the event it is found that
existing roof sheets cannot be satisfactorily re-used, the FSP is liable
to also replace same.
The FSP is not obliged to provide indemnity for the cost to replace the
whole roof, except as noted above.
Arising from the significant time that has transpired since the original
quote for internal repairs was cash settled by the FSP (and could not
be completed until the external roof is repaired) it is to arrange for
Case No: 313663 Determination Page 16 of 16
fresh quotes for the internal repairs and the cash settlement to the
Applicants be calculated accordingly (if repair costs have increased).