Denial of storm and flood claim for building movement damage (earth movement exclusion)

FirmFinancial Firm (Unknown - Insurer)
Decided2013-08-09
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Homeowners claimed indemnity for building movement damage they attributed to a January 2011 storm and flood. The FSP declined under the earth movement exclusion after engineering reports attributed the damage to long-term soil moisture change and tree roots. AFCA found the exclusion applied and upheld the denial, while criticising the FSP's claims handling.

Earth movement is excluded, and the subsidence exception applies only if damage occurs within 72 hours of a storm or flood, which the expert evidence did not show.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 313624 Determination Page 1 of 11 Case number: 313624 General Insurance - Domestic Insurance - Home Building - FSP Decision – Storm & Flood – Policy Exclusions - Denial of claim 6 August 2013 Background 1. The Applicants held a Home Building and Contents Insurance Policy (the policy) with the Financial Services Provider (FSP). 2. A claim was lodged under the policy seeking indemnity for what the Applicants maintain is Storm/Flood damage to the insured building. 3. The FSP declined the claim on the basis the damage had occ urred due to circumstances clearly excluded from cover under the policy. 4. The Applicants remain dissatisfied with the FSP‟s declinature of their claim and are seeking complete indemnity for their loss. Summary of Applicants ’ position 5. The Applicants have sought the assistance of „G‟ in disputing the FSP‟s decision to decline the claim. In the interest of brevity both G and the Applicants will be referred to as the “the Applicants” for the purpose of this Determination. 6. The Applicants believe the damage sub ject to this claim has been caused due to the significant rainfall event that occurred in the area of their home between 11 January - 14 January 2011. 7. The storm and sewer drains were unable to cope with the downpour, resulting in water cascading through T Street properties from D Street (which is at a higher elevation) and bubble up the sewer drains. The drain next to the Applicants‟ home over flowed and water went under their home. This was also the case with other properties in the area which have been co vered under different insurers. 8. The Applicants were advised to wait for the soils to dry out before lodging a claim and so in January 2012 (12 months later) a claim was lodged for movement of the structure as well as plaster falling off ceilings. Determination Case No: 313624 Determination Page 2 of 11 9. They maintain no damage had occurred at the insured address since its construction in 1963, and it was only after the sewer drains had overflowed that the damage was noticed. 10. The expert report submitted by engineers “D” is clear in that a large portion of the damage claimed was caused by deep moisture source under the soil. 11. Based on this report, the FSP originally accepted the claim, however, when „F‟ (engineers) were appointed to provide a scope of works as D had not provided such in its report, the FSP proceeded to decline the claim. 12. F declined to observe photos taken by the Applicants of the stormwater under the house when it attended the insured property. Also, at the time F attended to undertake the assessment, 23 months had already elapsed since the event giving rise to the loss occurred. 13. Furthermore, F has assumed the downpipe for the carport is just flowing out onto the ground near the south western corner. However, it is actually attached to a stormwater drain and flows out onto the street. The Applicants believe that there exist a few discrepancies in F‟s report and that F has obviously not taken into account the fact that it rained very heavily between the above noted dates and the overflowing of the sewerage drains. 14. The Applicants are seeking indemnity for their loss and would accept a cash settlement for the re-blocking, levelling, structural and painting repairs. Summary of FSP’s position 15. On 3 January 2012, the Applicants contacted the FSP to lodge a claim for damage they maintained was due to floodwater. The version of the event provided was: “During the year after the flood we noticed that the home was not settled correctly and have had plaster crack and more recently and (sic) cracked window in the office of the home. This did not start until a few months after the floods.” 16. At lodgement of the claim, the FSP informed the Applicants of the policy exclusion for earth movement, as well as any damage due to earth movement is excluded unless it occurs within 72 hours of the insured event (storm and flood). 17. The contract of insurance is an accidental damage policy, however, it does not provide cover for all types of risks and specifically excludes cover for certain events, occurrence and causes. 18. The onus rests with a claimant to establish, on the balance of probabilities, that the loss claimed falls within the scope available under the policy. If a claimant is successful in this, the onus shifts to the FSP to establish, on the balance of probabilities, that it is entitled to decline/limit its liability under the claim in line with the policy conditions or exclusions. Case No: 313624 Determination Page 3 of 11 19. The policy clearly specifies that loss or damage caused by, or as the result of erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other type of earth movement is excluded from cover. However, cover is available for loss or damage arising from subsidence if caused by flood but only if it occurs within 72 hours of the event. 20. The FSP maintains loss or damage caused by soil swelling or movement and shrinkage is specifically excluded from cover. Also, damage caused by the roots of trees is also excluded from cover under the policy. Accordingly, the FSP had correctly declined the Applicants‟ claim. 21. In addition to the history of the area and 13 years of unreasonably dry (drought) conditions prior to 2010, D also identified long term soil movement, seasonal soil changes and moisture stabilisation problems as causes for the damage, which came to light because of a very wet spring and summer over 2010 and 2011. 22. F also concluded the general pattern of the floor level survey led to a conclusion of significant contribution by large trees in near proximity to the home building. Further, F said that the heavy rainfall reported by the Applicants, was not the cause of the building distress experienced since January 2011. 23. At no point have the Applicants offered any expert evidence specifically addressing the cause of the damage claimed. In the absence of such, the FSP believes it is entitled to rely on the opinions/advice of its commissioned consultants, to decline indemnity to the Applicants for the loss claimed on this occasion. 24. The FSP relies on the following policy provisions: “ What you are not covered for This section details what is not covered under any part of your policy. We do not cover: Erosion, subsidence Caused by or as a result of erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement but we will cover subsidence damage to your home if it is caused by: › liqu id bursting, leaking or overflowing of water or liquids from water containers › any of these insured incidents if the damage they cause happens within 72 hours of the insured incident:  storm and flood  explosion (except from any nuclear or radioactive cause)  earthquake or tsunami. ” Case No: 313624 Determination Page 4 of 11 Issues 25. Whether the Applicants have established a prima facie claim under the policy. 26. Whether the FSP was correct in its decision to decline liability to the Applicants in line with the policy conditions and exclusions. Reasons for decision 27. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This is due to the circumstances of the dispute. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 28. I am satisfied that a full exchange of information has taken place between each party and that each party has had the opportunity to address any issues raised. 29. I have reviewed the submissions of the parties in relation to the terms and conditions of the policy and will only refer to the relevant submissions and materials raised. 30. The Applicants are seeking a benefit under the policy and therefore has the burden of establishing, on the balance of probabilities, that the cause for the damage claimed falls within the cover provided by the policy. If established then the onus shifts to the FSP to establish the facts necessary to rely on a policy condition or exclusion. 31. In this instance, the Applicants must establish the damage to the property was caused by storm and flood in January 2011 and then the onus shifts to the FSP to establish the damage was caused not by an insured event but by erosion or subsidence. 32. I am satisfied that the parties do not dispute the following:  The Applicants held a current home building and contents insurance policy with the FSP at the time of loss.  The FSP provided and the Applicants received the relevant policy documentation including the Product Disclosure Statement (PDS) prior to the loss.  The policy provides cover for accidental loss or damage as well as insured events, and also specifies the circumstances excluded from cover under the policy. Case No: 313624 Determination Page 5 of 11  The Horsham area experienced an extended period of drought conditions leading up to 2010 and 2011, after which it experienced a wet spring and summer in these years (2010/2011). A heavy rainfall event was recorded for the area between 11 January – 14 January 2011.  The FSP commissioned two separate engineering consultants to investigate the cause for the damage claimed and for which they have submitted reports to the FSP.  There does exist movement damage at the insured property, however, it is the cause of the damage that remains in dispute between the parties. 33. The FSP has made available the consultants‟ reports and I am satisfied that this information has been exchanged between the parties. Therefore, I will now restate information from the reports I find relevant in providing this Determination. “C” Assessors’ Report dated 19 January 2012  The damage could possibly be due to a rainstorm occurring in Horsham on 11 January 2011. Between 11 January and 14 January 2011, Horsham and surrounding areas suffered severe storm conditions including torrential rains, gale force winds and isolated flooding.  In excess of 210mm of rain with wind speeds in excess of 75kmh occurred during this time.  The property was inundated with rain run-off from surrounding properties and the sewerage system backed up and back-flowed under the stumped residence.  The City of Horsham is founded on highly reactive soils and it is possible part of the damage is due to differential soil movement.  An engineer would be required to confirm the cause of the loss/damage claimed.  The issues described with the house were noticed over the past few weeks/months.  Photographs were taken depicting the inundation at the time of the event and showing the damage. D’s Engineers Report dated 15 June 2012  Undertook an assessment/investigation of the cause of footing movement and subsequent building damage.  D attended the insured property on 26 March 2012.  This region had experienced thirteen years of unreasonably dry weather prior to 2010 and a very wet spring and summer over 2010 and 2011. Case No: 313624 Determination Page 6 of 11  The home was constructed in around 1960 and has been owned and occupied by the Applicants since construction.  While damage is wide spread throughout the home , the more serious damage is located around the north-west half of the building.  The stumps appeared to be in good condition and no chocks were observed. The area around the house has been built up leaving a lower depressed area under the building itself.  Surface drainage away from the house is poor.  Soil conditions of the area are reasonably well known. Four sets of dynamic cone penetrometers readings were used to assess the soil strength and moisture variations around the house.  The floor levels were recorded as ranging from relatively low points of 200 and 205 near the south east corner to relatively higher points of 360 around the middle of the meals area. This is a maximum elevation difference of 160 over the whole house area which is a significant reading even for a stumped building.  Generalised contour lines drawn at 20mm intervals were drawn over floor levels which identified a number of patterns. The largest most intense pattern is characteristic of soil swelling caused by deep moisture source influence on the soil.  The next largest and other smaller patterns are characteristic of soil shrinkage caused by drying of the soils usually due to tree roots.  The site would be classified as “E - D” (i e) extremely reactive with deep soil moisture changes. More recent standards (AS2870) make no provision for stumped footings on E classified sites indicating they should not be used for new buildings.  For a house this age, surrounded by poor surface drainage and with some trees nearby, it is common in these highly reactive soils to experience significant foundation movement.  While the depth of the footings is unknown, the relatively low readings give an indication that bearing failure may not be the cause of the footing movement with this building. Also, the condition of the stumps would rule out stump deterioration as a problem.  The damage in the north-west half of the house is characteristic of soil swelling caused by deep moisture source influence on the soil. While the damage near the south-east corner of the house and along the southern wall of the lounge which covers bedroom 1 and 2, the bathroom and parts of bedroom 3 and hall, is characteristic of soil shrinkage caused by relative drying of soils usually due to tree roots.  Tree roots are able to extract large amounts of moisture from the sub- soil and continue to do so unless removed. As moisture is extracted from the soil, it tends to shrink and the soil surface level falls. Case No: 313624 Determination Page 7 of 11  A number of 2-3 meter high trees are located around the south eastern corner of the home. These along with a 5 meter high tree further out and an 8 meter high tree to the south are probably all contributing to the lower floor levels. F’s Engineering Investigation Report dated 15 November 2012  An inspection of the insured property was completed on 7 November 2012 in the presence of one of the Applicants.  It was confirmed that water did not enter the home, however, it inundated the sub-floor area.  For the purpose of the report, the front of the house was considered to face east.  The home is located on a relatively flat land and considered to have poor drainage.  The downpipe servicing the carport roof discharges on to the ground at the south-east corner of the carport, rather than to the legal point of discharge.  There are a number of significant trees growing in relatively close proximity to the house. Also, a tree estimated by the Applicants to be over 10m high was removed from the carport side of the site around three years ago, and a tree directly outside the house about five months ago.  The floor levels across the entire house vary between +10mm to - 120mm relative to the arbitrary datum. There is a general pattern of relative settlement from the southwest corner of the house toward the north eastern corner.  The pattern of relative settlement is in the general direction of a number of significant trees located at the north-east side of the property, the nature strip along T Street, and within the neighbouring property.  Bureau of Meteorology records show 153mm rainfall fell in the area over a five day period in January 2011, with the maximum 24hr rainfall recorded during this period being 91mm on 12 January 2011.  Based on geological survey maps and geotechnical investigations carried out at other nearby sites, the soils at this site would be expected to be highly reactive (ie) H type soils. Such reactive day soils experience notable volumetric changes with relative changes in moisture content.  Damage has occurred throughout the dwelling but the majority of damage is located around the dining room area. Distress to the walls generally falling within the (minor) categories 1and 2 , and therefore would be considered cosmetic only.  Based on its investigation/assessment, F formed the opinion, the observed distress has been caused by on-going long term differential movement of the footings due to a combination of the following: Case No: 313624 Determination Page 8 of 11  Highly reactive soils.  The soil drying effects of the group of trees located towards the north eastern side of the home. He says “these trees are expected to be a major contributing factor to building moveme nts.”  The relatively low rainfall (drought conditions) in Victoria in recent years, followed by the return of normal rainfall levels.  Seasonal changes in soil moisture content.  Decay of timber stumps over time.  In F‟s opinion, short term flooding of the su b-floor area of the home due to the heavy rainfall event would not have caused the long term differential movements of the stumps and associated building distress.  Clay soils typically have low permeability and generally form a barrier to storm water ingress and so it takes months of water to penetrate deep enough to create movement in the soils.  The movement to the connections between the car port roof and the support columns would have also been exacerbated by:  The removal of the large tree about three years ago, resulting in an increase of moisture content (ie rehydration) in the soils.  Discharge from the downpipe at the south-east corner of the carport which would lead to an increase in the magnitude of the wetting and drying cycles. 34. After the FSP rejected the claim, the Applicants emailed the FSP and sent photographs to the FSP (some of which are attached to the assessor‟s report) complaining F did not wish to view the photos and saying: “these images depict the extent of the sewer drains overflowing res ulting in water damage to our property.” 35. In addition the Applicants said: “the sewer drains could not cope with this amount of rainfall in such a short time” and so their drain overflowed and the water went under the house. They said the house was not damaged until after this incident. 36. The Applicants have a quote from “ ABP ” dated 11 February 2013 to re-level all areas of the house. ABP says: “in our opinion , the excessive movement seems to be consistent with the four other insurance claims we have done in the street due to heavy rains/floods in 2010/11.” 37. G wrote to the Service on 6 May 2013 and I note a summary of the issues from the point of view of the Applicants: “Why the (Applicants) are not happy with the decision of the (FSP).  The engineer‟s report from D is clear that a large portion of the damage is caused by a deep moisture source on the soil. Case No: 313624 Determination Page 9 of 11  Originally the assessor C had accepted the claim from the report from D and they organised builders to quote on the repairs however the builders would not as D had not supplied a scope of works.  A different engineer – F was then appointed by the FSP to provide a scope of works however he was not very thorough in his investigation. The claim was then denied.  F declined to observe the photos of the storm water under the house. F turned up in December 2012 and the original damage/event was in January 2011 – so 23 months had elapsed.  F made assumptions in regards to the down pipe just flowing out onto the ground near the Southwest corner – it actually is attached to a storm water drain and flows out to the street.  FSP had accepted the claim as they had paid for some temporary repairs and all was going smooth until F was involved. We are seeking full compensation from FSP. With winter coming on “again” this is no quite urgent as there are large cracks etc letting drafts into the house.” (sic) 38. I have carefully considered the available information and I am satisfied that the matters discussed, raised and relied upon by the two separate engineers are for the most part c onsistent. Further, although the Applicants‟ seem to favour the report by D, this report in itself does not support a conclusion favourable to them. Rather, based on this report alone, in my view, the damage claimed does not fall within the scope of cover available under the policy. I agree with the Applicants - D does confirm a long term moisture source but in my view, D says this is inconsistent with flood or storm but rather it is more likely that it is tree roots that have extracted the moisture from the soil over the years and relevant trees are identified by D. 39. In my view, the consultants‟ expert opinions establish, on the balance of probabilities, that the movement damage to the insured building , the subject of the claim, did not occur due to the storm and flood conditions that occurred in January 2011. The evidence supports the conclusions reached by the consultants (ie) the damage claimed occurred over an extended period of time due to the weather conditions over previous years (seasonal changes in moisture levels) and trees located in close proximity of the building. 40. In addition to these matters, I have also considered the relevant provisions of the policy and am satisfied that essentially loss or damage arising from earth movement is excluded from cover. There is the exception to this exclusion ie loss or damage due to subsidence but only if it occurs within 72 hours of the insured event. However, on this occasion the damage did not occur within 72 hours of the event, rather, (as per the Applicants‟ own account) the damage was not noted until months after the significant rainfall period between 11 January and 14 January 2011. 41. The information made available by F also makes reference to there being evidence of previous repairs to cracks as shown in pic ture 17 of F‟s report. This indicates that the damage claimed, although may have been highlighted Case No: 313624 Determination Page 10 of 11 by the storms in January 2011 and the fact that a few well established trees had been quite recently removed, had been occurring gradually over an extended period of time. 42. ABP might be considered to be supportive of the Applicants but in my view, his report lacks detail and is not sufficiently robust to cause me to set aside the opinions of D and F. He says merely: “ the excessive movement seems (my emphasis) be consistent with the four other insurance claims we have done in the street due to heavy rains/floods in 2010/11.” 43. I disagree with the Applicants ‟ contention that the assessor accepted the claim. Rather in my view, the material establishes that he made no decision but wanted to appoint an engineer to assess the cause of the damage. 44. I do note however, that the FSP appeared to have accepted the claim on or about 7 August 2012 but then about 2 months later it did determine that it needed more information and then appointed F. It is not clear to me why the FSP took this path as in my view, the report from D supports its position. It is poor claims practice but does not derogate from its position that the policy does not respond to this claim. 45. I have carefully reviewed he report from F and I do not find discrepancies that derogate from the overall conclusion. If he did refuse to look at the photographs, then I doubt his opinion would have changed had he seen them. They mainly show the inundation of water which the FSP does not deny. It is the contention of the FSP that there was inundation under the house after the heavy rain in January 2011 but that this inundation did not cause the current damage. 46. I note F says the downpipe servicing the carport discharges on the ground rather than to the legal point of discharge. I cannot see from photograph no. 7, exactly where the downpipe finishes at ground level. The Applicants say that it is attached to the storm water drain and flows out to the street but I have no photograph demonstrating that from them. In any event, even if F was incorrect in this regard, he pin points the main area of damage in the dining room which is not proximate to this downpipe and I am not persuaded by the Applicants that this issue is so greatly significant that it makes his entire conclusion wrong. 47. As for the contention that the neighbours‟ claims were paid, I can make no comment in the absence of the specifics of the damage to their properties, the expert opinion about the cause of that damage and the specific policy response. 48. Therefore, on the basis of the available information and in the absence of substantiating evidence to the contrary, I am satisfied that the FSP has established, on the balance of probabilities, that the damage claimed is specifically excluded from cover under the policy. Case No: 313624 Determination Page 11 of 11 Determination 49. On the basis of the available information and for the reasons stated, I determine the FSP has established the entitlement to decline indemnity to the Applicants under the claim in line with the policy.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.