Text of the determination
Case No: 313586 Determination Page 1 of 9
Case number: 313586
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim
16 September 2013
Background
1. The Applicants held a business insurance policy with the Financial Services
Provider (FSP) which was current at the time of the loss. Among other
things, the policy provided cover for a house owned by the Applicants which
was occupied by a tenant.
2. On 12 September 2012, the Applicants lodged a claim under the policy for
damage to the steel structures of a pergola and swimming pool pump house
located at the property.
3. The FSP declined the Applicants’ claim on the basis that the claimed
damage was not caused by an event insured under the policy. Further, the
FSP said that the damage had occurred over an extended period time in
circumstances which fell within various exclusions under the policy.
4. The Applicants dispute the FSP’s decision to decline their claim and seek
indemnity under the policy, on the basis that the claimed damage was
caused by Cyclone Yasi.
Summary of Applicants ’ position
5. The Applicants say that:
Cyclone Yasi caused stress to the steel structure of the pergola, which
resulted in the tiles around the structure cracking and moving, thereby
allowing water to get inside the steel beams. This caused corrosion
which started on the inside of the beams and developed outward for
some time before becoming evident to the Applicants;
this is supported by the opinion of their builder (“BB”) who has years of
experience in the local area;
if the cause of the claimed damage was splashing and continual
wetting and drying of the steel structure (as determined by the FSP’s
engineer), then the damage would have been evident much earlier than
it was; and
Determination
Case No: 313586 Determination Page 2 of 9
they have carried out regular preventative maintenance since they
purchased the property in 2007.
6. The Applicants say that, although the FSP accepts that the claimed damage
occurred over time, it has failed to recognise that no damage occurred until
after Cyclone Yasi hit the area on 3 February 2011.
7. The Applicants dispute the findings of the FSP’s engineer (“P”) as to the
cause of damage and say that P’s report contains various inconsistencies.
The Applicants say that their builder (BB) is as (if not more) qualified than P
to determine the cause of the damage, and the FSP has chosen to disregard
BB’s report in order to manipulate the facts to its own advantage.
8. The Applicants are greatly dissatisfied with the level of service provided by
the FSP during the claims handling process. They say that the FSP’s
representatives have been unco-operative, rude and abusive to them and
have failed to contact them and to return their calls or respond to their
enquiries within agreed timeframes.
9. The Applicants seek indemnity under the policy for the cost of repairs to the
pergola and pump house, as well as certain additional costs incurred in order
to fence off and make safe the swimming pool area before the repairs were
undertaken. They also seek compensation for loss of rent d ue to the reduced
rent paid by their tenant while the damage was repaired.
Summary of FSP’s position
10. Based on the report of its engineer (P), the FSP says that the claimed
damage was not caused by an event insured under the policy. Further, the
FSP says that as the damage was caused by gradual deterioration, wear,
tear, rust and/or corrosion, it falls within an exclusion under the policy.
11. The FSP says that the Applicants have not provided any evidence to support
their view that the claimed damage was caused by Cyclone Yasi.
12. Accordingly, the FSP says it is entitled to decline the Applicants’ claim.
13. The FSP relies on the following policy provision:
“ Excluded Circumstances
1. Wear and Tear
We will not pay for loss, destruction, damage or the incurring of a
liability caused directly or indirectly by gradual deterioration, wear,
tear, depreciation, rust, corrosion, wet rot, dry rot, mould or
mildew. ”
Case No: 313586 Determination Page 3 of 9
Issues
14. Whether the FSP was entitled to deny the Applicants’ claim for damage to
the pergola and pool house.
15. Whether the Applicants are entitled to compensation for non-financial loss
due to the handling of their claim.
Reasons for decision
16. As advised to the parties, FOS has considered it appropriate to expedite this
dispute in accordance with the Operational Guidelines to the FOS Terms of
Reference. This is because of the circumstances of the dispute. Accordingly,
this dispute has not been the subject of a FOS Recommendation and has
proceeded directly to Determination.
17. I am satisfied that a full exchange of information has taken place between
each party and that each party has had the opportunity to address any
issues raised therein.
18. The Applicants’ policy is a defined events policy which provides cover for
certain specified insured events (including storm).
19. The parties do not dispute that the pergola and pump house at the
Applicants’ property suffered damage. The issue in dispute relates to the
cause of that damage.
Evidence as to cause of damage
20. The FSP’s claim records show that, when the Applicants lodged their claim
on 12 September 2012, they advised that water had escaped from the
swimming pool and got into the beams of the pump room causing damage.
21. Following lodgement of the Applicants ’ claim, the FSP appointed an
assessor (“CL”) to inspect the damage. CL’s report da ted 28 November 2012
states that the steel framing of the swimming pool pump house (located
underneath the pool) showed clear signs of severe rotting and deterioration.
Report of FSP’s engineer (“P”)
22. Following the initial inspection by CL, the FSP engaged an engineer (P) to
undertake a structural inspection of the property and determine the cause of
the claimed damage. P’s report dated 22 November 2012 states that:
he conducted an inspection of the steel posts, floor framing and
immediate structures for the pergola above the swimming pool pump
house;
the suspended steel floor above the pump house showed minor to
severe corrosion to the steel members, despite having a protective
Case No: 313586 Determination Page 4 of 9
paint system. Significant corrosion was visible to the steelwork closer to
the pool, with severe loss of steel in some members;
the pergola structure above and below the floor framing also showed
moderate corrosion and there was significant corrosion to the
galvanised steel plate under the timber wall; and
the compressed fibre cement (CFC) wall sheeting in the pump house
appeared to be retaining soil and there was damage to the CFC
sheeting on the external walls. The concrete stairs to the pump house
entrance had also been displaced.
23. In relation to the cause of the damage, P stated that:
it was clear that chlorinated water from the swimming pool had caused
the corrosion of the steel floor structure;
it was probable that overtopping during heavy rainfalls and/or during
pool use had led to the steel work being exposed to the corrosive
chlorinated water. This was likely to have been exacerbated by the lack
of an overflow pipe. However, even if an overflow pipe had been
present, it would not have prevented overtopping during extreme
rainfall and/or splashing during normal use of the pool;
the lack of a water proofing system to the floor and top of the pool shell
allowed the steel work to be exposed to the corrosive chlorinated water
when overtopping and splashing occurred; and
the cause of the damage to the CFC wall sheeting was unclear.
However, the wall sheeting was not suitable for soil retaining purposes
and should be replaced with a solid wall suitable for earth retaining.
24. The Applicants do not accept P’s findings and say that the c laimed damage
arose as a result of Cyclone Yasi on 3 February 2011, which caused stress
to the steel structure of the pergola. This resulted in the tiles around the
structure cracking and moving, thereby allowing water to get inside the steel
beams causing them to corrode from the inside out. The Applicants say that
the fact that no damage occurred until after Cyclone Yasi hit the area,
supports the conclusion that the claimed damage was caused by the
cyclone.
25. The Applicants dispute P’s report on the follow ing bases:
if the cause of the claimed damage was splashing and continual
wetting and drying of the steel structure (as P found), then the damage
would have been evident much earlier;
P’s report refers to the corrosion as having been caused by chlorinated
water from the swimming pool, whereas the swimming pool is actually
filled with salt water;
P’s statements in relation to the lack of a pipe overflow are incorrect, as
an overflow pipe has been fitted (and the Applicants have provided an
invoice evidencing this); and
Case No: 313586 Determination Page 5 of 9
P’s statement that the CFC sheeting was used as a retaining wall is
incorrect. This wall is a cosmetic internal wall only and the build up of
soil behind it was due to water entering through cracks in the tiles
which were caused by Cyclone Yasi.
Report of Applicants’ builder (BB)
26. The FSP’s Notice of Response states that, on 4 February 2013, the FSP
was contacted by a builder representing the Applicants, who advised that in
his opinion the corrosion of the steel structures had occurred as the result of
a crack in the floor between the pergola and the pool, which had allowed
water to flow through, causing the pipes to rust. The builder also advised that
he believed that the crack in the floor may have been caused by strong
storm winds, during which the pergola acted as a lever on the floor.
27. The FSP subsequently requested that the Applicants provide a written report
from their builder (BB). In a brief letter dated 11 June 2013, BB stated that:
as a consequence of Cyclones Larry and Yasi, the flexible joint seal
between the pool coping and the tiled floor of the pergola had failed;
this caused the floor to become unsafe, with complete sections of
supporting steel floor joists rusting out and failing;
the movement of the structure as noted above also caused the grout in
the floor tiling to dislodge and fail, causing the floor tiles to become
drummy; and
in BB’s professional opinion as a licensed builder, the damage was
caused by the extreme weather events of Cyclones Yasi and Larry.
Comments from FSP’ s engineer (P ) on BB’s opinion
28. Following the FSP’s discussion with the Applicants’ builder (BB) on 4
February 2013, the FSP relayed BB’s comments to its engineer (P) and
asked him to provide comment. In an email dated 4 March 2013, P noted
that some of the terminology used by BB was unc lear but went on to state
that:
it was apparent that the corrosion of the steel hollow sections forming
the deck had occurred over a period of time. The environment around
swimming pools is very aggressive with splashing and continual wetting
and drying causing corrosive conditions for any steelwork;
while the observations in P’s initial report only noted some cracking
around one of the columns, it was apparent that there was significant
corrosion around the base of this column at floor level and all other
columns as well;
the joint sealer between the floor and the pool shell had failed,
presumably due to age/weathering and associated movement. This
joint failure would have contributed to allowing water to penetrate the
underlying structure;
Case No: 313586 Determination Page 6 of 9
it was difficult to support BB’s theory that one event had c aused
cracking which allowed water to penetrate underneath and corrode the
steelwork, given that the corrosion had clearly occurred over a number
of years; and
the pumping equipment was located within the cavity beneath the floor,
so any water penetrating to the deck members below the floor would
have been visible for many years and therefore should have been
attended to.
29. In response to P’s further comments, the Applicants stated that:
the cracking and corrosion around the base of the columns observed
by P had been caused by the movement of the column during the
cyclone. This movement had resulted in sealant joint failure allowing
water entry and resulting corrosion; and
while P’s initial report stated that a lack of waterproofing contributed to
the corrosi on damage, P’s further comments refer to failure of the joint
sealant. Joint sealant is a form of water proofing and therefore P’s
statements appear to be inconsistent.
30. The Applicants submissions also include copies of invoices relating to
maintenance works to the pergola and pool area carried out over a number
of year. These include an invoice dated 11 June 2009, which refers to work
undertaken to:
seal an extensive crack in the tiled area adjacent to the pool; and
angle brush the pool pump area and treat the pool pump area and all
galvanised framing with killrust rusteater / converter.
Analysis
31. There is an onus on an insured to establish, on the balance of probabilities,
that a claim fits the definition of an insured event. This is known as a prima
facie claim. Should this onus be discharged, it is then the responsibility of the
insurer to establish, on the balance of probabilities, that it is entitled to
reduce or deny liability for the claim.
32. Accordingly, the onus is on the Applicants to establish that the corrosion
damage to the steel structures of the pergola and pump house was caused
by the insured event of storm.
33. I have reviewed the available evidence, including the various photographs of
the claimed damage provided. I accept that, as a structural engineer, P is
appropriately qualified to determine the cause of the claimed damage. P’s
report states that, based on his observations it is clear that the corrosion of
the steel structures has occurred over an extended period of time. P also
casts significa nt doubt on the theory put forward by the Applicants’ builder
(BB) that the strong winds of Cyclone Yasi could have caused the floor to
crack, thereby allowing water to enter the steel structure and build up behind
the CFC wall sheeting.
Case No: 313586 Determination Page 7 of 9
34. I note that the Applicants have identified some apparent inconsistencies in
P’s report, which have not been addressed by the FSP in its submissions. In
particular, it is not clear whether P’s comments in relation to the failure of
joint sealant are necessarily inconsistent with his earlier reference to a lack
of waterproofing. In these circumstances, I accept that the issues raised by
the Applicants must be considered to cast some doubt on the conclusions
reached in P’s report.
35. The Applicants say that the claimed damage is the result of Cyclone Yasi on
3 February 2011. They say that the cyclone caused movement of the
columns and cracks in the floor of the pergola which enabled water to enter,
causing the steel structure to corrode.
36. However, the evidence provided in relation to maintenance repairs indicates
that there were cracks in the area in question which required attention as far
back as 2009. Further, at that time the pool pump area and galvanised
framing also required angle brushing and rust treatment/protection. This
evidence indicates that, on the balance of probabilities, the area was subject
to movement and cracking of tiles well before Cyclone Yasi, and was also
subject to, or at the very least considered to be at risk of, corrosion.
37. Further, having regard to the significant extent of corrosion and damage to
the steel structures as reflected in the photographic evidence, I am satisfied
that the claimed damage has occurred gradually over an extended period of
time (ie years rather than months).
38. As outlined above, the onus is on the Applicants to establish, on the balance
of probabilities, that the claimed damage was caused by an insured event
(being Cyclone Yasi). For the reasons outlined above, I am not satisfied that
they have done so.
39. Accordingly, the FSP is ent itled to deny liability for the Applicants’ claim on
the basis that they have not established that the claimed damage was
caused by an insured event and is not required to prove that the claimed
damage falls within an exclusion under the policy.
Compensation for non-financial loss
40. The Applicants say that they are greatly dissatisfied with the level of service
provided by the FSP during the claims handling process. They say that the
FSP’s representatives have been unco -operative, rude and abusive to them
and have failed to contact them and to return their calls or respond to their
enquiries within agreed timeframes.
41. Under paragraph 9.3(b) of the Service’s Terms of Reference, compensation
for non-financial loss may be awarded where there has been an unusual
degree or extent of physical inconvenience, time taken to resolve the
situation or interference with an insured’s expectation of enjoyment or peace
of mind.
Case No: 313586 Determination Page 8 of 9
42. The Applicants have provided contemporaneous file notes of various
conversations they have had with the representatives of the FSP. The FSP
has also provided copies of its call records.
43. The records of the Applicants and the FSP are not entirely consistent in
relation to the date and times of their telep hone discussions. However, the
available evidence indicates that:
the Applicants complained about the level of service early on in the
claims process, after the FSP’s representative who was dealing with
their claim failed to call them back promptly;
there was a short delay in the FSP’s assessor inspecti ng the damage
(possibly due to confusion around the need to contact the rental agent);
the assessor forwarded a copy of the engineer’s report to the
Applicants, without the approval of the FSP. The Applicants say that
when they advised the FSP’s representative of this, she said it was
illegal for the assessor to have done so;
when the FSP’s rep resentative advised the male Applicant on 13
December 2013 that the claim would be denied, there was a discussion
during which (in the opinion of the FSP’s representative), the mal e
Applicant became aggressive and (in the opinion of the male
Applicant), th e FSP’s representative abruptly refused to provide any
further help;
the FSP’s call records support the Applicants’ claim that the FSP’s
representatives have not on all occasions returned his calls when they
said they would;
at one stage during the process, the male Applicant was calling the
FSP several times a day to follow up on his claim;
there was a delay of approximately two weeks (over the Christmas
holiday period) in the FSP sending the letter formally declining the
Applicants’ claim. The FSP’s manag er acknowledged internally that this
letter had been outstanding for too long; and
the FSP refused the Applicants’ request that its assessor and engineer
re-attend the premises to undertake a further inspection, despite the
assessor and engineer offering to do so at no cost to the FSP.
44. It is clear from the available evidence that some difficulties arose in the
course of handling the Applicants’ claim and delays arose at various stages
of the claim handling process. It is also clear that there were communication
issues between the Applicants and the FSP’s representatives, and the level
of service provided by the FSP did not meet the Applicants’ expectations.
45. I accept that the Applicants’ claim could have been handled more efficiently
and effectively by the FSP. However, I do not consider that the time taken to
resolve the Applicants’ claim or the interference with their peace of mind as a
result of the claim handling process was such as would entitle the Applicants
to compensation for non-financial loss.
Case No: 313586 Determination Page 9 of 9
Determination
46. On the basis of the available information I determine that:
the FSP is entitled to decline the Applicants’ claim; and
the Applicants are not entitled to compensation for non-financial loss as
a result of the FSP’s handling of their claim.