Text of the determination
Case No: 313392 Determination Page 1 of 9
Case number: 313392
General Insurance - Domestic Insurance - Home Contents - FSP Decision -
Denial of claim - Exclusion/Condition
12 July 2013
Background
1. The Applicant insured her contents with the Financial Services Provider
(FSP). The relevant period of insurance operated for twelve months
beginning from 20 April 2010. During this period, the contents were insured
up to a sum of $36,000.
2. On 12 January 2011, the Applicant lodged a claim under the policy due to
extensive water inundation following severe weather events in Queensland.
3. The FSP denied the claim on the basis the damage was due to “flood”. The
Applicant, through her solicitors, has disputed this.
4. For the sake of simplicity, reference to the Applicant will include her legal
representatives.
5. Both the Applicant and the FSP have provided detailed submissions on the
relevant issues. For the sake of brevity, the Panel will summarise these
submissions given all of the material made available has been exchanged
with the other party.
Summary of Applicant’s position
6. The Applicant submits that the damage was due to “Flash flood and
stormwater run- off”, which is an insured event. In particular, the inundation
was due to heavy rain that fell from 4.00am on 11 January 2011 which
resulted in the Wivenhoe Dam operators elevating their strategy to W4. This
decision resulted in massive discharges of water into the Brisbane River that
ultimately inundated her property.
7. The Applicant seeks to be indemnified for her loss.
Summary of FSP’s position
8. The FSP relies on a number of hydrology reports authored by “SC” and the
following policy provisions to deny the Applicant’s claim :
Determination
Case No: 313392 Determination Page 2 of 9
Page 3 of the Certificate of Insurance (COI)
“ What optional covers are included and not included
Contents
...
Flood and storm surge not included...”
Pages 10-12 of the PDS
“ Words / terms with special meanings
Word / term Meaning
...
Flood Rising water which enters your home as a result of it
running off or overflowing from any origin or cause.
This policy does not cover flood unless we have
agreed and it is shown on your certificate of insurance.
Flash flood and
stormwater run - off
A sudden flood caused by heavy rain that fell no more
than 24 hours prior to the flash flood or stormwater
run - off.
...
Storm A violent disturbance of the atmosphere associated
with strong w inds including a cyclone, light ning, heavy
rain, hail or snow, but not continuous bad weather by
itself.
...”
Pages 17-18 of the PDS
“ Insured events you are covered for
Damage caused by weather...
What is covered What is not covered
Storm Loss or damage:
caused by rain, hail or snow
after it has reached the
ground...
...
Flash flood and stormwater run-off
A sudden flood caused by heavy rain
that fell no more than 24 hours prior to
the flash flood or stormwater run - off
Loss or damage caused:
by flood...
...”
Page 32 of the PDS
Case No: 313392 Determination Page 3 of 9
“ Your contents
The most we will pay you for contents claims
What is covered What is not covered
... ...
Flash flood and stormwater run-off
We will pay up to 50% of your contents
sum insured or $25,000, whichever is
higher , but not exceeding your contents
sum insured .
...
...”
Issue
9. Whether the Applicant’s loss was covered under the policy.
Reasons for decision
10. Due to the nature of the dispute, the parties have been informed that the
matter has been referred to the Panel for Determination in line with the
Operational Guidelines to FOS’s Terms of Reference. This dispute has not
been the subject of a FOS Recommendation and has proceeded directly to
Determination.
11. This decision has been made by a Panel consisting of an Ombudsman and
two Panel members with extensive experience in insurance industry matters
and consumer claims.
12. There has been an exchange of information between the parties and the
Panel is satisfied that each party has had the opportunity to address any
issues raised by the other.
Policy Cover
13. It is not in dispute that the FSP provided and the Applicant received a copy
of the PDS.
14. The Panel has reviewed the relevant PDS on a number of occasions and
has concluded that the policy clearly informs that damage caused by flood,
as defined, is excluded from cover, however, the policy does provide cover
for flash flood and stormwater runoff, as defined.
15. The Panel concludes that the FSP is entitled to rely on the terms of its policy.
Case No: 313392 Determination Page 4 of 9
Water Inundation
16. The Panel accepts that the FSP’s policy does not extend cover to
circumstances where a loss is caused by a flood. The policy also
distinguishes between flood, flash flood and stormwater run-off (the latter
two of which are covered). Flash flood extends cover to damage from
sudden flood events “caused by heavy rain that fell no more than 24 hours
prior” to the flash flood.
17. The Applicant noted that water entered the property at about 4.00pm on 11
January 2011. The home was situated about 200 metres from the Brisbane
River.
18. After the lodgement of the claim, the FSP appointed a loss adjuster (MY) to
investigate and report on the damage caused to the Applicant ’ s property.
The report estimated that the Applicant’s contents were a total loss.
19. MY considered that the cause of the loss was water from the creek but
recommended that a hydrologist’s report be obtained. The FSP
subsequently engaged hydrologist SC to provide a report as to the cause of
the damage.
20. SC provided a sworn statement dated 15 March 2013 , in which he reported
on the cause of the loss in the region surrounding and specifically affecting
the Applicant’s home. He found that:
a substantial amount of rain fell in the greater Brisbane area from 9
January 2011 and over the subsequent two days, which caused
significant inflows into the Wivenhoe Dam, which peaked on the
evening of 11 January 2011;
rain also fell in the area of the Bremer River from 6.00am on 11
January 2011. This rain travelled along the Bremer River to the junction
of the Brisbane River and ultimately contributed about 15-25% of its
peak flow;
a “small proportion” of the overall depth of the Brisbane River “may be
partially attributable to the rain that fell in the Bremer River catchment
on 11 January 2011”, although the “overwhelming influence” was the
rain that had fallen in the previous days.
the terrain data for the Applicant’s home suggests that it was unlikely
that the Applicant would have experienced significant stormwater or
local run-off problems during the period;
inundation from stormwater run- off requires “intense levels of rain”
which is sufficient to overcome the stormwater drainage system. Any
such run-off generally occurs during or very shortly after such an
intense period of rainfall;
a review of the Opossum Alert rainwater gauge, approximately 3.7
kilometres from the Applicant’s property and representative of its
rainfall in the expert’s opinion, revealed that 61 millimetres of rain fell
over 9 and 10 January 2011, with a further 44 millimetres falling on 11
Case No: 313392 Determination Page 5 of 9
January 2011. The most intense rainfall on 11 January 2011 fell
between 10.00am and 11.00am;
the overall intensity of the rainfall was very low and unlikely to result in
run-off or stormwater inundation to the property;
the Applicant’s property was inundated by the rising level of the
Brisbane River and not stormwater run-off.
21. The Applicant has suggested that the releases of water from the Wivenhoe
Dam on 11 January 2011, were a significant factor in the increased water
levels in the Brisbane River and that this was a major influence in the
inundation of her home. This is largely now agreed by the parties, although
the dispute centres on whether such an event is covered under the policy.
Releases from Wivenhoe Dam & Proximate Cause
22. The central issue for Determination in this dispute is whether the inundation
of the Applicant’s home on 11 January 2011, was due to flash flood as
defined within the terms of the policy, that is, whether rain that fell no more
than 24 hours prior to the inundation of the Applicant’s property was the
proximate cause of the inundation.
23. The Panel suspended issuing Determinations relating to this question after
the Queensland Flood Commission of Inquiry had been recalled to hear
further evidence from the Wivenhoe Dam flood engineers. Once the final
report was released, all relevant stakeholders were invited to put further
submissions to the Panel relating to the impact of the heavy rainfall that
commenced falling over the Wivenhoe Dam around 4.00am on 11 January
2011 and in particular the impact this had on the decision to adopt the W4
release strategy.
24. On 21 May 2012, FOS issued a memorandum to all relevant stakeholders
advising that after considerable deliberation of all material available to it, the
Panel formed a view that the heavy rain occurring from approximately
4.00am on 11 January 2011 and in particular the heavy rain between
4.00am and 8.00am on 11 January 2011, was a proximate cause of the W4
strategy being invoked and therefore a proximate cause or trigger that led to
the flooding of many of the properties along the Brisbane River.
25. At that time, the Panel noted that in relation to the approach that each
dispute would depend upon the individual and unique factors relevant to the
dispute and in that regard the parties were invited to make further
submissions in relation to disputes before FOS.
26. In view of this, the FSP provided detailed further submissions to FOS on 18
March 2013, in relation to this dispute. Included with the submissions were
the following documents:
A Reference document for disputes relating to Queensland Floods (this
is a general reference document) relating to the various submissions
Case No: 313392 Determination Page 6 of 9
the FSP makes in relation to a number of issues. Not all issues raised
in the reference document appear in the current dispute;
Letter dated 7 March 2013 from the FSP’s hydrologist a ttaching a “Key
Conclusions” information sheet for the Applicant’s property;
Hydrologist report “Investigations of January 2011 inundation event –
Brisbane” dated March 2011;
Statements from hydrologist SC dated 7 June 2012 and 15 March
2013.
27. The Panel has reviewed the reference document. Insofar as the reference
document relates to the current issues in dispute, those matters have been
considered.
28. In summary the FSP argues that the proximate cause of the inundation of
the properties, that is the real or effective cause of the damage caused to the
properties downstream of the dam, is not simply the rain that occurred from
4.00am on 11 January 2011. The FSP maintains that on any reasonable
view, the damage sustained to the downstream properties was the combined
effect of all of the rainfall and not just the rain that had fallen from 4.00am on
11 January 2011, leading to the implementation of the W4 strategy from
8.00am that day.
29. There is no dispute that heavy rain fell over the Wivenhoe Dam catchment
area and in fact parts of the Brisbane River from approximately 4.00am on
11 January 2011. It is not disputed that in addition to this there was heavy
rain over the Bremer River which influenced the level of the Brisbane River
and that rain commenced at approximate ly 6.00am on 11 January 2011.
30. The FSP’s hydrologist has relied on data from SEQWater dated 2 March
2011, which confirms the rapid increase in releases from the Wivenhoe Dam
from 8.00am on 11 January 2011. Examination of the SEQWater report
identifies the rapid increase in the inflows to the Wivenhoe Dam
commencing from about 4.00am, 11 January 2011. The report confirms the
inflows into the dam had been decreasing from as early as 8.00am from 10
January 2011, with steady decreases from approximately 3.00pm o n 10
January 2011, to 2.00am on 11 January 2011.
31. The Queensland Flood Commission of Inquiry report confirms that prior to
4.00am on 11 January 2011 and in fact prior to 8.00am of 11 January 2011,
the dam releases were being managed at the W3 strategy. Whilst it is
accepted that the W3 strategy had led to an increase in the levels of the
Brisbane River, the W3 strategy was designed to avoid, where possible
inundation of the properties below the Wivenhoe Dam, by flooding from the
Brisbane River.
32. There is no dispute that there were two significant rainfall spikes with rain
that fell from 9 to 10 January 2011 being considered the first spike and rain
that commenced falling from approximately 4.00am on 11 January 2011,
being the second spike.
Case No: 313392 Determination Page 7 of 9
33. There is no dispute that following the second spike that the W4 strategy was
adopted. The FSP has argued that the switch to strategy W4 was not the
natural and ordinary consequence of the rain that fell and in fact the move to
W4 strategy was not taken in accordance with the Wivenhoe Dam manual.
34. In the Panel’s view, the Queensland Flood Commission of Inquiry final report
does not find the adoption of W4 strategy at 8.00am on 11 January 2011,
was inconsistent with the manual. Although there may be issues as to how
the Wivenhoe Dam had been managed prior to this time, there is nothing in
the material that has been provided to the Panel to suggest that the earlier
management of the Wivenhoe Dam influenced to any significant degree, the
adoption of the W4 release strategy at 8.00am on 11 January 2011.
35. The Insurance Council of Australia’s hydrology data and the information
provided by the FSP’s hydrologist confirms that the increased releases from
the Wivenhoe Dam after the adoption of the W4 strategy, led to the
development of a flood wave that ultimately caused the flooding of many
properties downstream of the Wivenhoe Dam.
36. The question arises as to what was the proximate cause of this inundation.
In determining the proximate cause of the inundation, it is necessary to look
at the effective or dominant cause of the inundation. The Panel agrees with
the FSP’s general submission that the proximate cause is a cause
determined by common sense evaluation of the relevant facts. In the event
that there are two or more proximate causes, one within the policy and the
other excluded, the policy does not respond. The proximate cause is not
determined by identifying the last event or final trigger, but by determining
what is the dominant, effective, direct or efficient cause of the loss.
37. The FSP has maintained that the impact on the Wivenhoe Dam from the
rainfall that fell in the early hours of 11 January 2011, was only 29%, while
71% of the volume of the inflow came from the rain that fell on 9 and 10
January 2011, or earlier. The FSP maintains that to find the rainfall which
had fallen from 4.00am on 11 January 2011, is the proximate cause, is
without foundation, as such an approach produces an entirely artificial
outcome.
38. With respect to the FSP’s argument the Panel disagrees. Whilst the Panel
accepts there has been a significant impact on the levels of the Wivenhoe
Dam by the rainfall that commenced falling on or about 9 January 2011 or
earlier, the Panel is satisfied having regard to the information that has been
exchanged and the relevant legal principles, that the heavy rain that
commenced falling on or about 4.00am on 11 January 2011, was the
proximate or effective cause of the adoption of the W4 strategy.
39. The Panel is also satisfied that whilst the level of the Brisbane River may
have been increasing under the W3 strategy, it was the heavy rainfall from
approximately 4.00am on 11 January 2011, that caused the need to adopt
the W4 strategy at 8.00am on the same day.
Case No: 313392 Determination Page 8 of 9
40. Therefore, any damage caused by the W4 releases within 24 hours of the
causative rainfall, that is, within 24 hours of 4.00am on 11 January 2011
(concluding at 4.00am on 12 January 2011) would fall within the definition of
flash flood and as such be would be covered by the policy.
The Applicant’s Inundation
41. SC’s “Key Conclusions” information sheet indicates the effect of the W4
releases first reached the vicinity of the Applicant’s property at 12.50pm on
11 January 2011. He estimated that the property was first inundated by the
backflow waters from the Brisbane River at 4.00pm on 11 January 2011 and
by 4.00am on 12 January 2011, the property was inundated up to 4.1 metres
above the relevant benchmark level.
42. The relevant benchmark level was SC’s estimate of the lowest point of the
house, in this instance the slab on the ground. This estimate has not been
refuted by the Applicant in any manner.
43. The Panel notes that the ultimate inundation of the property was 6.2 metres
above the benchmark level. SC identified this peak inundation occurred at
approximately 4.56pm on 12 January 2011.
44. The Panel accepts the possibility that these assessments may not be
entirely accurate.
45. The FSP ’s hydrologist has speculated that if the W3 strategy had been
maintained, then, according to the Key Conclusions Statement, the
Applicant ’ s property would still have been inundated above benchmark level
by approximately 5.46pm on 11 January 2011 and by 4.00am on 12 January
2011, would have been inundated to a level of 2.1 metres above the
benchmark level.
46. The Panel is concerned, however, that to reach such a conclusion it must be
speculated that the releases from the dam would have continued at the
same rate at the W3 level, in the absence of any additional rainfall. The
report does not address the possibility of the inflow into the Wivenhoe Dam
decreasing.
47. The available information indicates the W3 strategy that was in place prior to
8.00am on 11 January 2011, had been successful in limiting the outflows
and flooding below the Wivenhoe Dam. Whether the outflows would have
continued at the same rate had the inflows continued to reduce, is not
known.
48. Instead, the Panel is satisfied that on the facts of what actually occurred on
11 January 2011, it was the heavy rainfall from approximately 4.00am on 11
January 2011, that caused the need to adopt the W4 strategy, at 8.00am on
the same day. This led to the inundation of the Applicant ’ s property.
Case No: 313392 Determination Page 9 of 9
49. To this extent, the Panel is satisfied that the inundation of the Applicant ’ s
property to the level of 4.1 metres above benchmark, was caused by flood
that occurred within 24 hours of the heavy rainfall.
Quantum
50. The Renewal Certificate of Insurance for the relevant period provides a sum
insured of $36,000, for the Applicant’s contents. Pursuant to the policy cap
for the insured event of “Flash flood and stormwater runoff”, the FSP is liable
up to an amount of 50% of the sum insured or $25,000 whichever is higher,
for the damage to the Applicant’s contents.
51. There is insufficient evidence for the Panel to determine the exact quantum
of the loss, however, i t notes the loss adjuster’s conclusion that this was
likely a total loss. The parties are asked to work cooperatively together to
determine the value of the loss.
Determination
52. The FSP is to meet the cost of the replacement of items damaged as a result
of the inundation of the property to a height of 4.1m above the benchmark
level. Any payment is subject to the limitations expressed in paragraph 50 of
this Determination.
53. Insofar as the FSP is to cash settle the claim, the FSP is to pay interest from
21 April 2011 (being the date of rejection of the claim) to date of payment of
the claim, in accordance with Section 57 of the Act.