Determination 312292

Building cash settlement amount after fire; temporary accommodation

FirmFinancial Firm (Unknown - Insurer)
Decided2014-04-15
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$102,830
Non-financial loss—
Amount claimed$500,000
SourceAFCA PDF

Summary

Owners of a home destroyed by fire sought a further $500,000 on top of a $559,569.70 cash settlement. The panel set a compromise building settlement of $650,000, requiring a further $102,830.30, extended temporary accommodation to 30 November 2012 with interest, and rejected the other compensation claims.

Where the cash settlement quote was unreliable and time had elapsed, the panel compromised between the two quotes, and temporary accommodation runs from when the FSP made the rebuild funds available.

Issues

Subjects and remedies

home or building damagepay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 312292 Determination Page 1 of 12 Case number: 312292 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim 14 March 2014 Summary Description  A claim under a Home and Contents Insurance Policy following a fire in October 2010. The parties are unable to agree as to the settlement amount. Basis of Determination  The property was substantially destroyed by fire in October 2010.  A Scope of Works to repair the property was arranged and not disputed.  The FSP have cash settled the Applicant s‟ claim for the sum of $559,569.70 pursuant to a quotation obtained having determined that the property needs to be demolished.  The Applicants have now commenced rebuilding the property but it is unclear whether they are building in accordance with the Scope of Works.  Three detailed quotations have been exchanged. Given the time since the original incident, the Panel accepts it is appropriate to finalise this dispute by way of cash settlement based on a compromise of the quotation. Determination  The FSP is to cash settle the Applicants‟ claim for the total sum of $650,000 with respect to the loss of the home building.  The FSP is to pay temporary accommodation at the rate previously paid until 30 November 2012. Background 1. The Applicants held a home insurance policy with the Financial Services Provider (FSP) for their residential home. During the relevant period of insurance, the building was covered for complete replacement and contents for a sum up to $75,000. Claims were subject to a $100 excess. Determination Case No: 312292 Determination Page 2 of 12 2. On 6 October 2010, the Applicants lodged a claim for damage sustained by fire. The FSP accepted liability for the claim. The contents were ultimately settled by way of payment of the full sum insured. 3. The claim became protracted with respect to the building damage. The FSP initially decided the damage was repairable although substantial aspects of the home would be required to be rebuilt. However, the FSP ultimately accepted the property needed to be demolished and decided to cash settle the Applicants‟ claim by way of payment in the sum of $559,569.70 comprised of the following:  $547,169.70 for the cost to demolish and rebuild.  $12,400 for temporary accommodation (40 weeks @ $320 per week). 4. The Applicants have disputed the FSP‟s d ecision and believe they are entitled to a further $500,000. Summary of Applicants ’ position 5. They are dissatisfied with the FSP‟s handling of the claim, particularly with respect to the following:  The delays experienced before the FSP decided to cash settle the claim;  The arrangement of temporary accommodation; and  The fact the FSP stopped paying storage costs for their contents without notifying them. 6. The cash settlement offered would not be sufficient to restore the house to the condition it was in prior to the fire. For instance, it did not include all bigger hardwood beams and silky oak windows and features. To this end, they obtained two quotes and the cheapest available was $751,926. However, obtaining these quotes was very difficult as many builders were too busy or found the process too time consuming. 7. In addition, they seek compensation for the fact they were not placed in temporary accommodation comparable to their home, have had to underg o an owners builders course to arrange the rebuild of their home, paid for storage costs of new contents and incurred professional fees when engaging lawyers, architects, designers and certifiers. In particular, with respect to the amounts allowed in the F SP‟s cash settlement for architects, designers and certifiers, all of these professionals sought higher amounts than budgeted for . 8. Based on the above, the Applicants submit they are entitled to a payment of a further $500,000. Case No: 312292 Determination Page 3 of 12 Summary of FSP’s position 9. In regards to the settlement for the building damage, the FSP submits the following:  The Applicants have not disputed the Scope of Works set out. Accordingly, the dispute in this regard is limited to quantum.  Although both parties have provided quotations, the FSP has relied on a contractor who has both supplied a more complete quote and was prepared to do the work privately for the Applicants.  The basis for deciding to cash settle the claim was due to the numerous instances of the Applicants stating they wanted to alter the design and layout of the insured building.  There is no basis to state the Applicants could not rebuild their home for $547,169.70. 10. With respect to temporary accommodation, the FSP denies the Applicants‟ submission that they were compelled to stay in a location unacceptable to them. The FSP undertook reasonable attempts to locate an appropriate property but there were no equivalent places available, as acknowledged by the Applicants. Further, the FSP has paid 24 months of temporary accommodation, which is double the maximum allowable under the policy. 11. The FSP acknowledges there were delays experienced in the claim. However, these delays were due to the FSP awaiting builders, architects, engineers, certifiers and the council to assist it in determining its liability. Despite this, the FSP has paid amounts beyond the Applicants‟ entitlements such as an additional 10% towards building costs, 12 months temporary accommodation and in excess of $5,000 for storage costs of new contents purchased by the Applicants. Accordingly, the FSP disputes the award of any compensation for either consequential financial loss or non-financial loss. 12. The FSP therefore relies on the above and the following policy provisions to substantiate its position: “ What we will pay – new for old Repairing or rebuilding your building If your home building is damaged during the period of cover by an insured event, we will decide if the damage: can be properly repaired, or is so severe that we reasonably believe your building will need to be rebuilt. Rebuilding your building When we establish that your home building will need to be rebuilt, we will decide to: rebuild it to the same size and standard as your current building, or Case No: 312292 Determination Page 4 of 12 pay the cost of rebuilding it to the same size and standard as your current building. When we rebuild your building, we will use new materials. … What we cover – additional benefits We help with… The cost of temporary accommodation When an insured event has caused damage or loss to your building, we will help with the cost of temporary accommodation for you and, where necessary, for your domestic pets, provided: we are satisfied your building is no longer habitable, and you were living permanently in it at the time, and you have claimed on this policy and we are satisfied everything is in order. We will pay the reasonable cost incurred by you for comparable accommodation for up to 12 months while your building is being rebuilt or repaired. … What happens when you claim on your [FSP] policy … Changes to your building You can have changes made to the design and structure of your building before repair or rebuilding. Any extra cost of such changes will be your responsibility. We may decide to pay you the cost of repairing or rebuilding your building without the changes you require.” Home Contents Policy “ Other costs … When your contents are removed for storage or repair If your building is damaged or destroyed by an insured event, we will pay: the reasonable cost and, at our option, make the necessary arrangements for any necessary removal and storage of your contents during the reasonable period for up to 12 months while your building is being rebuilt or repaired, Issues 13. Whether the FSP‟s settlement offer for the building is fair and in accordance with its policy obligations. 14. Whether the Applicants are entitled to additional compensation for temporary accommodation and storage of new contents. 15. Whether the Applicants are entitled to compensation for the additional costs incurred in the claim (such as legal costs, owners builders course, etc). Case No: 312292 Determination Page 5 of 12 Reasons for decision 16. As advised to the parties, due to the nature of the dispute, the matter has been referred to the Panel for Determination in line with the Operational Guidelines to the Service‟s Terms of Ref erence. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 17. The Panel consists of an Ombudsman and two Panel members with extensive experience in the insurance industry and consumer claims. Building Settlement 18. There is a significant disparity between the quotations provided by the parties. The FSP‟s contractor, CQ, in its job number 10509 quoted an amount of $497,427. The FSP added 10% to this amount to arrive at the total of $547,169.70. In contrast, the Applicants obtained two quotations from different builders, WQ and GH, for amounts $769,231.89 and $751,926 respectively. This is an additional 50% loading of the amount quoted by CQ. 19. Upon reviewing these quotations in more detail, both of the Applica nts‟ builders provided a fairly substantial builders margin. WQ allowed for $116,550.28 and GH allowed $128,000. This is approximately 20% of the amount quoted, a fairly substantial margin which has not been explained. 20. Even if the builders‟ margin is excl uded from the two quotations, the difference in amounts quoted is approximately $150,000, a substantial sum. 21. Other differences in the quotations include:  WQ‟s quote allowed $78,527.27 for demoli tion as compared to $23,650 for CQ. The Applicants stated buil ders laughed at CQ‟s amount but provided no evidence to support this. On the face of it, $78,000 for demoli tion appears excessive .  GH‟s quote allowed $12,099 for BSA insurance whereas CQ allowed $4,070. It is unclear why there is such a significant disparity. 22. The FSP has advised that CQ is prepared to do the work directly for the Applicants for the amount quoted. This does not of course allow for variations that may arise in the building process and builders‟ margins that may be applied by CQ. The Panel not es that CQ has not included a builders‟ margin in the quotation. 23. One of the principal complaints by the Applicants raised has been the delays experienced. The delays were substantially due to the FSP attempting to certify the draft plans with Council for the proposed repairs to the property. Issues arose with the Council and the zoning of the area. Given this, the Applicants‟ concerns regarding the certified fees and the potential for CQ‟s costing to be inaccurate are justified as it is difficult to anticipate what further delays and issues may arise. Case No: 312292 Determination Page 6 of 12 24. The Panel would normally accept a quotation provided the builder is prepared to commit to the repairs for the sum quoted. In this dispute however, the Panel is concerned that the Applicants would not in fact be able to have the repairs completed for the cash settlement amount. The Panel is concerned as to the accuracy of CQ‟s quotation even though the FSP has allowed an additional 10% margin on the quote in the settlement amount. 25. As the FSP elected to cash sett le the dispute based on CQ‟s quote , no allowance has been provided for possible variations or the likelihood CQ would impose a builder‟s margin over and above the 10% allowed by the FSP. The Panel accepts the difficulty for all parties when determining an appropriate cash settlement in circumstances such as this in particular where there is no evidence to dispute any of the actual building estimates provided by either the Applicants or the FSP. 26. One view is that it would be fair to allow the FSP‟s cash settl ement to stand whilst the Applicants proceeded to rebuild the property. The Applicants could then claim from the FSP, subject to providing proof of the actual costs incurred, the amount that exceeds the cash settlement offer. As indicated earlier, the Panel understands the Applicants have commenced rebuilding, but it is unclear whether the Applicants are rebuilding based on the Scope of Works agreed between the parties or not. Such a resolution may see a further protracted dispute between the parties. 27. The Panel is also mindful that the fire occurred in October 2010 and this dispute has been ongoing for some time. To leave it unresolved until the building had been completed would in the Panel‟s view not be in the best interests of either party. Given the time that has elapsed since the original claim, in the Panel‟s view it is only fair that this matter be finalised as early as possible. 28. With this in mind, the Panel believes it is more appropriate that rather than rely purely on the quotation provided by CQ, that there be a compromise of the quotations provided by both parties. The Panel as indicated whilst having concerns with the quotation of CQ also has concerns as to the accuracy of the quotations provided by the Applicants from WQ and GH. The variation in the quotations is considerable. 29. Whilst CQ did not include a builders ‟ margin, the Panel notes the builders‟ margins provided for by GH and WQ are significant although the Panel accepts it is not unusual to see a builders‟ margin of between 10 and 20% applied. The Panel considers a builders ‟ margin of 15% to be a fair compromise. 30. The quotation from GH of $751,926 includes a builders‟ margin of $128,000 but does not allow for GST. Not only is the builders ‟ margin at the top end of the range, the failure to include GST raises concern as to the accuracy of the quotation. Case No: 312292 Determination Page 7 of 12 31. The quotation from WQ of $769,231.89 includes GST and a builders‟ margin of $116,550.28. Although the quotation is relatively brief, it appears to consider the Scope of Works and in the Panel‟s view, the quotation is the more reliable of the quotations provided by the Applicants. 32. In the circumstances the Panel considers it fair in the circumstances that settlement be reached based on a compromise between the quotations of WQ and CQ. In reaching a compromise between these quotations, the Panel considers it appropriate to apply a builders‟ margin of 15%. 33. If a builders‟ margin of 15% is applied to the quotation from WQ based on the building repair tender of $582,751.44, then the builders‟ margin is reduced to $87,412.65 and after allowing for GST, reduces the quotation to $737,180.70.If the same process is applied to the quotation of CQ, based on the quotation for the rebuilding at $452,206.34, then a 15% builders‟ margin would equal $67,830.95 and after allowing for GST, would bring the total quotation to $572,041.02.If you were to average these two quotes, you will come out with a figure of approximately $654,000 which averaged down gives a figure of $650,000. 36. The Panel accepts that the foregoing assessment is arguably a crude way of dealing with this dispute. However as this claim arose from a 2010 incident and a cash settlement is the preferred settlement option of both parties, it is a fair and appropriate compromise. To leave the final cash settlement of the dispute until such time as the house is rebuilt is likely to simply prolong the dispute and create uncertainty for both parties. In the Panel‟s view an appropriate figure to cash settle the claim in these circumstances is $650,000. As the FSP has already paid the Applicants the sum of $547, 169.70 then the FSP would be liable, subject to the Applicants‟ acceptance of this Determination, to pay an additional $102,830.30 by way of settlement for the cost to rebuild the Applicants‟ property. Additional Compensation for Temporary Accommodation 37. The Applicants maintain the accommodation they ultimately stayed in for a large portion of the claim was not comparable to their home. In particular, their home had four bedrooms, was particularly large, had air-conditioning and was fenced. In contrast, the home they have predominantly stayed in only had two bedrooms, no air-conditioning, no fencing (for their two dogs) and a toilet outside. 38. Given this, they are seeking the difference in rent between the amount paid by the FSP versus the rent the FSP would have incurred had comparable accommodation been found. 39. The policy provision notes the following regarding this benefit: “ The cost of temporary accommodation When an insured event has caused damage or loss to your building, we will help with the cost of temporary accommodation for you and, where necessary, for your domestic pets, provided: Case No: 312292 Determination Page 8 of 12 we are satisfied your building is no longer habitable, and you were living permanently in it at the time, and you have claimed on this policy and we are satisfied everything is in order. We will pay the reasonable cost incurred by you for comparable accommodation for up to 12 months while your building is being rebuilt or repaired.” 40. The Panel accepts the FSP‟s obligation is to pay the actual cost incurred by the Applicants, provided the costs were reasonable and associated with comparable accommodation. It does not extend to the costs that would have been payable had comparable accommodation been found. 41. With respect to the Applicants‟ allegation that the FSP compelled them to move into non-comparable accommodation, the Panel is not satisfied this has been established as:  Both parties appear to agree that at the relevant time, there were no properties available in the area the Applicants‟ property was located which were comparable to their insured property.  For more than a month, the Applicants remained at a motel in two rooms whilst attempting to find alternative accommodation. The only one that appeared suitable was the two bedroom home offered by their friends.  There is no evidence that during the claim process, more suitable accommodation was available or that if it was, the FSP would not have allowed the Applicants to utilise same. 42. The Applicants have claimed for their temporary accommodation to be covered until their home is rebuilt. The FSP has limited the payment for approximately 24 months in total which takes into account the following:  The time it spent assessing the claim and attempting to finalise plans with the council before deciding to cash settle.  Allowing a period of approximately 40 weeks for the estimated time of repair, which is 8 weeks more than allowed by the contractor they based their settlement on. 43. The Panel notes th at the actual funds for the rebuilding costs were not made available to the Applicants until 24 February 2012. Prior to this, the FSP did attempt to cash settle the claim but it appeared their offer was contingent on the Applicants accepting it in full and final settlement . 44. It was only when the matter was reviewed through the FSP‟s Internal Dispute Resolution (IDR) process that the FSP paid the Applicants the actual funds that would enable them to begin the rebuild. This was by way of two payments issued on 14 February and 24 February 2012. Case No: 312292 Determination Page 9 of 12 45. In the Panel‟s view, it is fair in all the circumstances that the temporary accommodation allowance should have been calculated from the time the FSP made the funds available. This is based on the following. 46. Although the Applicants disputed the amount offered, there is no dispute between either party that, at a minimum, the FSP was liable to pay the amount offered. What was in dispute was whether this amount was sufficient to discharge its obligations under the policy. 47. Secondly, the FSP does not dispute that the period of time to complete the repair, based on its contractor‟s quote, is 40 weeks. However, it would be unfair in all the circumstances that in settling the claim, it would include the period of time it retained the funds which the Applicants would have required access to, in order to start the repair process. 48. The Panel notes the FSP did not pay any amount to the Applicants for almost four months after attempting to cash settle the claim. It appears that the period allowed for temporary accommodation included this portion of time when it is clear that even if the Applicants wanted to, they could not begin the repair process as they did not have the funds necessary to do so. 49. The Panel acknowledges the FSP‟s counter position is that its offer was reasonable and it was the Applicants‟ disputation of same that led to the delay. However, the Panel would have regard to the terms of the policy and the FSP was obliged to make these funds unconditionally available once it decided to cash settle the claim and had determined the extent of its liability. 50. In regards to the actual period allowed, the Panel notes the FSP nominated 40 weeks based on their contractor‟s estimate of 32 weeks with an additional allowance of 8 weeks. T he Applicants‟ contractors allowed 48 weeks. 51. The Panel considers the 40 weeks allowed by the FSP was reasonable given there is no dispute that CQ‟s period was achievable if th at company was engaged to conduct the rebuild. Accordingly, the Panel considers that the temporary accommodation allowable should be extended until 30 November 2012. This is based on 40 weeks being calculated from 24 February 2012 being the date when all of the funds were made available to the Applicants. 52. It is unclear up to what date the FSP has paid temporary accommodation. According to the FSP, it states it has paid for 2 years of temporary accommodation, which would mean that this was paid until 7 October 2012. Given this, it is clear the FSP has not paid for temporary accommodation until 30 November 2012. 53. As a result, the Panel accepts that it is fair in all the circumstances that the FSP pay for temporary accommodation, at the rates it was previously paying, until 30 November 2012. In addition, the FSP should pay interest on the amount owing with the rate of interest to begin from 30 November 2012 until the date of payment, in accordance with Section 57 of the Insurance Contracts Act 1984 ("the Act"). Case No: 312292 Determination Page 10 of 12 Storage of New Contents 54. There is no dispute the Applicants were paid out the full contents sum insured. In such circumstances, the policy states the following: “If we decide to pay the cost of repairing or replacing your contents: our payment will not exceed any limits detailed in this policy and it will not exceed the contents amount covered, except as provided for under „What we cover – additional benefits‟ …” 55. The relevant provision that addresses contents removed for storage or repair is not found under “What we cover – additional benefits”. Instead, it is an amount payable subject to there being available funds under the sum insured. 56. Given this, it is clear that the FSP was not liable to pay for these costs under the policy. 57. However, in recognition of the substantive delays experienced, the FSP decided to pay storage costs for the new contents up to a period of 32 weeks on an ex gratia basis. The period of time allowed was to reflect the period of time the FSP initially accounted for with respect to the building repairs. 58. According to the FSP‟s claim notes, this period was expanded t o 40 weeks with the period of time to cease on 7 June 2012. 59. The initial decision to pay for these storage costs was set out in the FSP‟s claim notes dated 5 September 2011 and 20 October 2011. In regards to the initial period of time allowed, this was apparently communicated to the Applicants‟ solicitors via email dated 20 October 2011. 60. The Panel acknowledges that the FSP was not liable under the terms of the contents policy to pay for the storage costs. In the Panel‟s view, the FSP in agreeing to make payment to the Applicants has acted fairly. Whilst the Applicants may argue that they were not informed by the FSP that they intended ceasing such payments and whilst there is no evidence of the FSP actually informing the Applicants that it intended to cease such payment, there is no evidence that the Applicants were actually prejudiced as a result of this. There is no evidence that the Applicants incurred any additional expenditure by the failure of the FSP to notify the Applicants of its intention to cease payment of the storage costs. 61. There is no evidence that the contents were removed or stored in a manner that resulted in the Applicants reducing their expenses. The evidence establishes that the storage facility notified the Applicants that payment of the storage costs was to cease. In the absence of any information to suggest that the Applicants were subsequently prejudiced, the Panel is not of the mind to award payment in respect of this aspect of the dispute. Case No: 312292 Determination Page 11 of 12 Whether the Applicants are entitled to compensation for the additional costs incurred in the claim (such as legal costs, owners builders course, etc) 62. The Applicants have sought a range of additional costs associated with the claim. This is particularly set out in their email dated 15 July 2013. 63. It is clear however that there is no provision in the policy that would entitle them to these costs. For instance, these costs being sought are not covered in any way under the policy:  Daily car trips to the insured property.  Installation of a watering system to maintain the property and poultry.  Items they purchased for the temporary accommodation, such as little air-conditioning units, heaters and small cupboards for storage. 64. The Panel is not satisfied that these costs can be directly linked to the FSP‟s mishandling of the claim. For instance, the Applicants have not explained the purpose of the daily car trips to the insured property or the reasons why these costs would have been avoidable had the FSP handled the claim differently. This similarly extends to the installation of the watering system. 65. In regards to the purchasing items for the temporary accommodation, this appears to be attributable to the fact there was no other place available for the Applicants to stay in, that was comparable to their insured property. As stated previously, the Panel does not accept that the limited accommodation available can be attributable to the FSP‟s conduct. 66. In so far as compensation is concerned, the Panel accepts that the Applicants have suffered a substantial degree of i nconvenience as a result of the circumstances in which they have found themselves and delay due initially to the FSP efforts in dealing with the Council and its subsequent decision to cash settle the claim. Under paragraph 9.3(b)(i) of the Terms of Reference, FOS may award up to $3,000 for non-financial loss in the following circumstances: “an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with the Applicant‟s expectation of enjoyment or peace of mind has occurred” . 67. The Panel notes the Applicants have received remuneration and compensation beyond their entitlements under the policy. The amounts exceed the compensation allowed under the Terms of Reference. 68. For instance, the FSP had no liability to pay for storage costs of their new contents but already paid more than $5,000 in this regard on an ex gratia basis. 69. The Panel accepts that the FSP has already paid a substantial sum to the Applicants by way of a cash settlement. The proposed further cash settlement determined by the Panel is designed to take into account the various contingencies that could occur in rebuilding a property. Case No: 312292 Determination Page 12 of 12 70. The accommodation costs arguably exceed the amount payable under the terms of the policy. 71. Given all of this, the Panel does not consider an award under paragraph 9.3(b)(i) of the Terms of Reference is appropriate. 72. In regards to legal costs sought by the Applicants, FOS may award an amount in this regard pursuant to paragraph 9.4 of the Terms of Reference. This paragraph states the following: “FOS may decide that the Financial Services Provider contribute to the legal or other professional costs or travel costs incurred by the Applicant in the course of the Dispute.” 73. The Panel does not accept an award in this regard is appropriate. Legal costs are normally awarded when legal issues arise that require the assistance of a lawyer, particularly in advocating the dispute before FOS to properly articulate the Applicants‟ legal position. The Panel notes the Applicants were able to clearly enunciate their concerns and the legal issues involved were neither complex nor controversial. Determination 74. On the basis of the available information the Panel determines that: a. The FSP is to cash settle the Applicants‟ claim for the total sum of $650,000; as the FSP has already paid the Applicants the sum of $547,169.70, then the FSP is to pay the Applicants the sum of $102,830.30 in satisfaction of this award with respect to the cost of rebuilding the property. b. The FSP is liable to pay for temporary accommodation, at the rates it was previously paying, until 30 November 2012. c. In regards to the shortfall owing with respect to temporary accommodation at the time of this Determination being made, the FSP is to pay interest on that amount owing in accordance with Section 57 of the Act. The relevant period that interest is to be calculated on is from 30 November 2012 until payment is made. d. The FSP is not liable to pay any additional amount to the Applicants.