Text of the determination
Determination
Case No: 312175 Determination Page 1 of 16
Case number: 312175 8 February 2016
1 Overview
1.1 Dispute
The Applicant lodged a claim under her building and contents insurance policy with
the Financial Services Provider (FSP) for damage caused by water escaping from a
burst washing machine hose in November 2012.
The FSP accepted the Applicant’s claim and sought to arrange for the repair of her
property. However, after the parties were unable to agree on a scope of works, the
FSP cash settled the Applicant for $15,772, based on the estimated cost of the
repairs plus an allowance for temporary accommodation.
The Applicant says the cash settlement paid by the FSP is not sufficient to address
all of the damage to her home and contents caused b y the escape of water in
November 2012 and the subsequent actions of the FSP and its repairers. She also
seeks compensation for various financial and non-financial losses suffered as a
result of the manner in which the FSP handled her claim.
1.2 Issues and key findings
Is the FSP required to increase the amount paid for the building claim?
The cash settlement amount should be increased by an additional amount of $38,000
to reflect the cost of repairing the damage to the property caused by the escape of
water in November 2012. The Applicant is entitled to a further amount of $14,000 for
the cost of temporary accommodation while the repairs are completed.
Is the FSP required to increase the amount paid for the contents claim?
The cash settlement amount should be increased by $20,000 to reflect the damage
to the contents at the property, which the FSP failed to accurately assess at the time
of the claim.
Is the Applicant entitled to any additional amounts?
The Applicant is entitled to the amount of $3,000 as partial reimbursement of fees
paid to her building consultant. She is entitled to an additional amount of $2,000 as
compensation for non-financial loss due to the manner in which the FSP has handled
her claim.
Case No: 312175 Determination Page 2 of 16
1.3 Determination
This Determination is partly in favour of the Applicant.
The FSP is to pay the Applicant the amount of $77,000 in full and final settlement of
her claim. The FSP is not required to pay interest on this amount.
Case No: 312175 Determination Page 3 of 16
2 Reasons for Determination
2.1 Is the FSP required to increase the amount paid for the building
claim?
FSP has accepted Applicant’s claim for escape of water
The Applicant’s policy provides cover for damage to her property caused by the
events listed in the policy (including the insured event of “water and oil leaks”),
subject to the conditions and exclusions set out in the policy.
The FSP accepts that the Applicant’s property was damaged by water from a broken
washing machine hose in the downstairs (basement) laundry in November 2012. It
appears the damage was not discovered for some weeks, as the Applicant was
overseas at the time.
During an inspection of the Applicant’s property in May 2015, one of the FSP’s
contractors suggested that the damage caused by the escaping water was
exacerbated by the manner in which the laundry floor had been designed and
constructed.
However, based on the available information, the Panel is not satisfied the FSP has
established that the laundry floor did not comply with applicable building regulations
at the time it was built. Further, this issue was not raised by the FSP until more than
two years after it had cash settled the Applicant’s claim.
In these circumstances, the Panel does not consider that there is any basis on which
the FSP’s liability for the Applicant’s claim should be reduced. Accordingly, the FSP
is liable for all of the damage to the property caused by the initial escape of water in
November 2012.
Dispute concerns extent of repairs required
Shortly after the Applicant lodged her claim, the FSP appointed a builder (M) to
inspect the property and prepare a scope of works for the necessary repairs. When
the Applicant advised the FSP that M’s scope of works appeared to be incomplete,
the FSP appointed a structural engineer (IN) to report on the damage and prepare a
revised scope of works.
Howe ver, the Applicant remained concerned that IN’s revised scope of works did not
adequately address all of the damage to her property. Among other things, the
Applicant considered the scope of works should be amended to provide for the
replacement of the terracotta floor tiles and underfloor heating system in the rumpus
room and to address potential water damage to the concrete slab. She also believed
inadequate allowance had been made for structural drying and mould remediation.
The FSP advised the Applicant that IN’s scope of works covered all known repairs
required to her property and assured her that any additional works required during
the course of the repairs would be dealt with as variations to the scope of works. The
FSP sought the Applicant’s consent to commence repairs on this basis.
Case No: 312175 Determination Page 4 of 16
However, the Applicant continued to express concern and the parties remained
unable to agree on the scope of works. Accordingly, in February 2013, the FSP cash
settled the Applicant for a total of $15,722, included $12,420 for building repairs
(based on a quotation provided by M for the repairs set out in IN’s revised scope of
works).
The Applicant was dissatisfied with the cash settlement and lodged a dispute with
FOS seeking an independent assessment of the damage to the property. Since that
time, the parties have engaged in protracted on and off negotiations but have been
unable to agree on an appropriate resolution to the dispute.
Claim should be cash settled
Having carefully reviewed the extensive history of this dispute, the Panel is satisfied it
is appropriate for the Applicant’s claim to be cash settled.
While the FSP initially sought to repair the property (and remained willing to do so for
an extended period of time), the relationship between the parties has now
irretrievably broken down. The Applicant no longer has any trust or confidence in the
ability of the FSP and its contractors to carry out their appointed tasks.
In these circumstances, the Panel considers that a cash settlement is the only
feasible way to resolve the current dispute.
Accordingly, the Panel will now consider whether the amount of the cash settlement
previously paid by the FSP for the repair of the building damage is fair and
reasonable.
Cash settlement amount did not allow for repair of all claim-related damage
As outlined above, the cash settlement paid to the Applicant in February 2013
included the amount of $12,420 for building repairs, in accordance with a quotation
provided by M based on IN’s revise d scope of works.
The Applicant has raised a number of concerns about the adequacy of the revised
scope of work prepared by IN in early 2013. In particular, the Applicant says the
revised scope of works did not adequately provide for:
appropriate remediation measures to address mould at the property, particularly
on the upstairs level;
drying and, if necessary the repair or replacement of, structural timbers affected
by ongoing moisture issues resulting from the escape of water;
the replacement of the terra cotta floor tiles in the downstairs area which she
considered had “heaved” as a result of the inundation;
the replacement of the under floor heating in the downstairs area which she
advised had been affected by water and was no longer functioning; and
the repair of damage to specific areas of the property, including the garage floor
and walls and the bedroom wardrobes.
The Applicant was also concerned that the measures proposed to address certain
aspects of the damage may not be appropriate in the long term (for example, the
Case No: 312175 Determination Page 5 of 16
installation of tiled skirting to conceal ongoing dampness in the bathroom/laundry and
the application of a waterproof membrane to the moisture affected external wall).
Both parties have provided a number of reports prepared by the various contractors
who have inspected the property over the years, describing the damage caused by
the escape of water and outlining the necessary repairs.
There are significant inconsistencies between the various reports provided, both in
relation to the extent of the damage and the likely cost of the necessary repair and
remediation measures. Further, each party has expressed concerns about the
appropriate weight to be given to the reports provided by the other party’s
contractors.
Having carefully reviewed all of the available information, the Panel considers that
the cash settlement of $12,420 for building repairs paid to the Applicant in February
2013 was insufficient to allow for the repair of all the claim-related damage.
In particular, the Panel considers the cash settlement amount did not make sufficient
provision for drying of the excessive moisture affecting the Applicant’s property as a
result of the inundation of water, and the resulting mould growth.
The photographs provided by the parties confirm that, when the Applicant first
became aware of the damage, the downstairs area was already extensively affected
by mould.
The revised scope of works prepared by IN included the removal of the mould-
affected plasterboard walls on the downstairs leve l and the treatment of mould
spores on the timber wall framing. However, the FSP denied liability for any mould
affecting the upstairs level.
While the FSP says any mould issues currently affecting the upstairs level are not
claim-related, the contractors who inspected the property early in the claim process
observed visible mould on this level. In particular:
the Applicant’s restoration specialist (AD) reported that all contents and fixtures
on the upstairs level (which had not been directly affected by the water leak)
would need to be cleaned and decontaminated;
IN noted minor mould growth to the window furnishings on the upper level
during his inspection on 2 January 2013.
While IN noted that the presence of mould was partly due to the house having been
closed up and not ventilated, he did not clearly indicate that the mould would have
been present regardless of the escape of water downstairs.
Given the extent of the mould growth on the lower level during the relatively short
period of time following the water leak and the fact that the two levels were
connected by an open stairwell, the Panel considers that, on the balance of
probabilities, the mould growth on the upper level occurred as a result of the escape
of water on the lower level.
In respect of th e structural drying and related measures, the FSP’s builder (M)
confirmed that his quotation included an estimate for these works.
Case No: 312175 Determination Page 6 of 16
However, given the information subsequently provided by both the Applicant and the
FSP about the extent of the works required (number of humidifiers, estimated time
period) and the likely cost, the Panel considers that M’s quotation did not make
sufficient allowance for these items.
As regards the terra cotta floor tiles and the underfloor heating, there is conflicting
information about the extent of the damage to these items caused by the initial
escape of water.
In his report dated 4 December 2012, the FSP’s builder (M) noted that the tiled floor
in the rumpus room had a breakdown to the grout joint which was consistent with
movement of the substrate, exacerbated by the escape of water. However, M did not
specifically address this item in his initial scope of works (or his response to IN’s
scope of works).
While IN noted that the substrate material under the tiles had been sa turated by the
escaping water, he did not identify any resulting damage and therefore did not
include the replacement of the floor tiles in his scope of work.
Early on in the dispute process, the Applicant provided a photograph of the floor, in
support of her claim that the tiles had heaved. While the quality of this photograph
made the damage difficult to confirm, the FSP agreed to consider this damage to the
floor tiles as a potential variation to the scope of works, subject to carrying out further
investigations.
The Applicant has since provided a report from her builder (AB) which states that the
tiling in the middle of the rumpus room has heaved and lifted from the sub-strate by 5
millimetres after the tiles expanded when the sub-strate became saturated by water.
However, floor level surveys carried out by the FSP’s structural engineer (MP) did not
reflect any upwards movement of the floor in the relevant area but instead showed a
slight downwards movement. Accordingly, MP concluded that any damage in this
area was due to the location of the cold joint in the slab.
In these circumstances, the Panel considers the available information is inconclusive
regarding the extent to which the issues with the tiled floor are due to the escape of
water in November 2012.
Nevertheless, the Panel considers it is appropriate to make some allowance for the
repair/replacement of at least part of the tiled floor (which extends through various
areas), noting that the Applicant’s builder (AB) has also identified other damag e
(such as staining and efflorescence) to the floor tiles.
The underfloor heating system which extends throughout much of the downstairs
level was tested by a specialist (AS) in December 2013 and found to be working in
the bedroom, built in robes and en suite bathroom.
At the time these tests were carried out, the Applicant’s builder (AB) advised that the
under floor heating in the rumpus room would need to be replaced. However, AB’s
conclusion appears to have been based in part on his recommendation that the floor
tiles throughout this area be replaced which would in turn damage the underfloor
heating (rather than due to any problem with the heating system itself).
Case No: 312175 Determination Page 7 of 16
The Applicant has provided a copy of an earlier email from AS in which he states that
the underfloor heating in the rumpus room would need to be replaced because the
presence of water (and high salt levels) may have corroded the wiring. The Applicant
has also provided a quote from a heating supplier (FH) which states that the existing
system has been water damaged and therefore may not operate safely.
However, neither AS nor FH expressly state that they have tested the system and
found it not to be working.
Given the nature of the underfloor heating system and the volumes of water which
affected the property, the Panel accepts it is possible that the wiring in the rumpus
room area was damaged by the escape of water.
However, for the reasons outlined above, the evidence in this regard is inconclusive.
Further, it appears from AS’s testing that at least the wiring in the bedroom and
associated areas has not been damaged.
In relation to the various other areas of damage identified by the Applicant, the Panel
considers that the information provided (and, in particular, the detailed description
and colour photographs included in AB’s report) suggest s that there may be other
areas (such as the garage floor) which required cleaning and/or restoration as a
result of the initial escape of water but were omitted from IN’s scope of works.
Further, the FSP acknowledged from an early stage in the claim process that further
damage (for example, to structural timbers) may have become apparent as the
repairs progressed. Given the circumstances of the current claim, it is appropriate
that the final cash settlement make an appropriate allowance for this contingency.
FSP offered to repair all claim-related damage early in dispute process
As noted above, ongoing discussions between the parties over a number of years
have failed to resolve this dispute. The Applica nt’s property has remained unrepaired
during this time.
Some of the contractors who have inspected the property relatively recently indicated
that the damage has worsened due to the fact that no repairs have been carried out
since the claim was first lodged over four years ago.
However, other consultants have suggested that, due to the nature of the damage, it
has not worsened significantly over time. It is not possible to determine this with any
certainty from the photographs provided.
Having carefully reviewed the claim history, the Panel considers that the FSP is not
solely responsible for any additional damage which has arisen due to the protracted
nature of the current dispute.
As outlined above, the Panel considers that the scope of works approved by the FSP
in February 2013 did not allow for the repair of all of the claim -related damage.
The Panel also accepts that the Applicant’s reluctance to accept the scope of works
and authorise the repairs was due to genuine concerns that the proposed repairs
would not be adequate to return her property to its condition prior to the water leak.
Case No: 312175 Determination Page 8 of 16
However, the Panel recognises that, at an early stage in the dispute process, the
FSP made a genuine attempt to address the concerns raised by the Applicant so that
repairs to her property could commence.
Shortly after the Applicant lodged her dispute with FOS, the FSP offered to cancel
the cash settlement and arrange for its preferred repairer to carry out the repairs,
subject to the lifetime guarantee provided under the policy.
As part of this process, the FSP offered to “start [the claim] from scratch” by
arranging for a full reassessment of all aspects of the claimed damage, including any
additional items identified by the Applicant, such as the terra cotta floor tiles and the
underfloor heating. The FSP also confirmed that it would arrange for any drying out,
restoration and mould remediation measures required at the property.
At the time the FSP made its offer, the Applicant was being represented by a claims
consultant who recommended that she accept the offer on the basis that the process
outlined by the FSP would allow for the full re -assessment and repair of the claim-
related damage.
However, the Applicant ultimately rejected the FSP’s offer (and declined the further
services of her claims consultant), due to ongoing concerns about a number of
matters.
Among other things, the Applicant wanted the scope of works and the extent of
temporary accommodation benefits agreed upfront (prior to any reinspection of the
property). The Applicant also remained concerned about the nature of moisture and
mould remediation measures to be undertaken, even though the FSP had effectively
agreed to do whatever was required.
The Panel considers that the settlement offer made by the FSP in April 2013 was fair
and reasonable. The FSP offered to reassess the damage in its entirety and arrange
for the necessary repairs, without being constrained by the reports and scopes of
work previously obtained.
Further, having carefully reviewed the co rrespondence between the parties, the
Panel is satisfied that the FSP acted reasonably in explaining to the Applicant how
her ongoing concerns would be addressed.
The Panel considers that, had the Applicant accepted the FSP’s fair and reasonable
offer in April 2013, the necessary repairs to her property could have been
commenced and completed within a relatively short period of time.
It appears that the Applicant’s reluctance to accept the FSP’s offer was partly due to
her outstanding concerns about the be haviour of the FSP’s employees and
contractors, the manner in which the initial assessment of the property had been
carried out and the failure of the FSP to provide her with copies of certain documents
prepared during the claim process.
However, the Panel considers that none of these issues should reasonably have
prevented the Applicant from accepting the FSP’s offer to restart the assessment
process from scratch. In the event that the assessment and/or the repairs were
inadequate, the Applicant would have retained the right to seek redress from the FSP
under the lifetime guarantee (or lodge a further dispute with FOS).
Case No: 312175 Determination Page 9 of 16
While it was open to the Applicant to reject the FSP’s offer, the Panel must consider
the consequences which her decision to do so has had on the subsequent
progression of this dispute.
The Panel acknowledges that the Applicant suffers from an acquired brain injury
which affects her cognitive ability, including her ability to process information and
make decisions.
However, the Panel is also conscious that, during the course of this dispute the
Applicant has been assisted by at least six different advisers and/or representatives
with various expertise, including a legal aid lawyer, an insurance claims adviser and
a counsellor from a brain injury organisation.
On a number of occasions, the Applicant has failed to follow the recommendations of
her advisers which, in the Panel’s view would have facilitated the effective resolution
of this dispute.
While the Panel has sympathy for the circumstances in which the Applicant finds
herself, the Panel does not consider that the FSP can reasonably be held primarily
responsible for the protracted nature of this dispute, given the settlement offer made
in April 2013.
Having said that, the Panel recognises that both the FSP and the Applicant have
been responsible for some of the subsequent delays in resolving this dispute. In part ,
this stemmed from a desire by both parties to try and reach a negotiated settlement
which would allow the repairs to progress.
However, the extended delays by both parties in providing submissions and
responding to requests for further information has contributed to the ongoing delays
in resolving this dispute.
Cash settlement for building repairs should be increased by $38,000
In determining an appropriate cash settlement amount for the building repairs, the
Panel has carefully considered the matters outlined above, including the likely extent
of the initial claim-related damage and the effect of the subsequent delays in
resolving the claim.
The Panel has also considered the various quotations obtained by the parties for the
repair of the claim-related damage (including the remediation of the moisture and
mould issues at the property), noting that these quotations are not directly
comparable, being based on different scopes of work prepared at different times.
As part of this process, the Panel has given greater weight to scopes of work and
quotations prepared earlier in the dispute process, as these documents are more
likely to accurately reflect the extent of the claim-related damage.
On this basis, the Panel considers it is fair in all the circumstances that the FSP pay
the Applicant an additional amount of $38,000, comprising an additional $18,000 for
the building repairs and $20,000 for mould and remediation.
Case No: 312175 Determination Page 10 of 16
In determining this amount, the Panel has taken into consideration the time which
has passed since the claim was lodged. Accordingly, the FSP is not required to pay
interest on this amount.
Cash settlement for temporary accommodation should be increased by $14,000
The Applicant’s policy provides for the payment of temporary accommodation
benefits where an insured event causes loss or damage to her property and the FSP
agrees she cannot live in the property until it has been repaired.
The policy states that the FSP will not cover any temporary accommodation costs
caused by unreasonable delays in repairing the property.
The FSP paid the Applicant’s temporary accommodation costs for the period from 13
December 2013 (when she returned to Australia) until 31 January 2013, when it
decided to cash settle the claim.
The cash settlement amount paid to the Applicant in February 2013 included an
amount of $1,752, representing the cost of temporary accommodation for an
additional seven days.
This amount was determined by the FSP based on its builder’s estimate that a
maximum of four days would be required to strip out the mould-affected sections of
the downstairs area and make the property habitable.
The FSP anticipated the Applicant would be able to occupy the upstairs area of the
property while the remaining repairs were completed to the downstairs level.
As part of the revised settlement offer put forward in April 2013, the FSP offered the
Applicant temporary accommodation benefits for an additional four week period (or
such longer period as it took to make the property habitable).
The reports and quotations provided by the consultants who have inspected the
property include varying estimates of the time required to complete the necessary
repairs (and, in particular, the mould remediation measures required to make the
property safe for habitation).
In March 2013, the Applicant confirmed that she had been advised by her restoration
specialist (AD) that the drying and mould remediation process would take
approximately four to eight weeks.
This is consistent with the estimate provided by the FSP’s hygi enist (CS) in May
2015. However, in August 2015, the Applicant says she was advised that the process
of remediating the property (given its current condition) was likely to take between
three and twelve months.
Given the nature of the Applicant’s home and the areas affected by the escape of
water event, the Panel accepts that she would reasonably have been able to
reoccupy the property once the drying and mould remediation works had been
completed (that is, while the remaining repairs were undertaken).
In these circumstances, the Panel considers that the cash settlement amount should
be increased to provide for temporary accommodation benefits for an additional
Case No: 312175 Determination Page 11 of 16
period of approximately seven weeks (in addition to the one week paid as part of the
settlement in February 2013).
The Panel has assumed that temporary accommodation benefits would have
continued to be paid on the same basis as previously (that is at a rate of over $200
per day). Given the Applicant remained in the same accommodation and therefore
incurred these costs, it is appropriate that the settlement amount be increased to
reflect the passage of time.
On this basis, the Panel considers it is fair in all the circumstances that the FSP pay
the Applicant an additional amount of $14,000 for temporary accommodation costs.
2.2 Is the FSP required to increase the amount paid for the contents
claim?
Cash settlement did not address bulk of contents damage
The cash settlement paid to the Applicant in February 2013 included an amount of
$1,550 for the replacement of a freestanding cabinet in the laundry, which was
settled as a contents item under the policy.
However, the FSP has not paid the Applicant any other amount for damage to her
contents during the period of over four years since she lodged her claim. This is
despite the fact that:
the initial report provided by the Applicant’s restoration specialist (AD)
recommended cleaning and decontamination of contents items stored at the
property; and
the initial report provided by the FSP’s builder (M) noted ther e was a large
amount of boxed contents items on the lower level which had been affected by
the water and would require assessment by a specialist dry cleaner to identify
which items were restorable and which were non-restorable.
It appears that the assessment recommended by M was never completed, no
inventory of damage contents items was prepared and no attempts at cleaning and
restoration were ever undertaken.
When the FSP calculated the amount of the cash settlement paid to the Applicant in
February 2013, it failed to include any amount for damage to the stored contents
items.
The cash settlement also failed to include any amount for the replacement of
damaged carpet in the downstairs bedroom area, despite the FSP having previously
authorised the replacement of this carpet, at an estimated cost of approximately
$2,000.
There is limited information about the extent of contents damage
It is difficult to determine with any certainty the extent of damage to the Applicant’s
contents caused by the escape of wat er in November 2012, given the FSP’s failure to
undertaken any inventory and assessment process and the length of time which has
now passed.
Case No: 312175 Determination Page 12 of 16
As noted above, the Applicant was not living at the property, and had been travelling
overseas for an extended period of time, when the escape of water occurred.
Photographs of the property taken shortly after the damage occurred (together with
the reports provided by the various contractors) indicate that at the relevant time:
the downstairs (basement) level of the property was largely empty, except for a
number of cardboard boxes stored in one of the rooms. It appears from the
photographs that these boxes contained a variety of items including books,
clothing, small appliances and general memorabilia; and
the upstairs (street) level contained additional boxes as well as soft furnishings
and some large items of furniture, including a lounge suite and a dining room
table and chairs.
Cash settlement should be increased by $20,000 for damage to contents
The Applicant has provided a spreadsheet outlining the amounts she is seeking in
settlement of this dispute, which includes $5,000 for a damaged lounge suite and
$1,940.31 for other items (such as clothing) which she has purchased to replace
items left in her house.
Howe ver, it is not clear that the Applicant’s spreadsheet identifies all of the contents
items remaining in her house and/or all those which were damaged by the escape of
water event. The Applicant has been unable to return to her house to undertake a full
audit of the contents due to the property being severely affected by mould.
The FSP accepts that the boxed contents items on the basement level suffered
significant water damage. However, the FSP disputes that the contents and furniture
items stored on the ground floor level suffered any damage.
The FSP has provided photographs showing the underside of the sofa and one
dining room chair which it says demonstrate that these items were not affected by
water and/or mould at the time of the event.
Even if this is the case, recent tests at the property have confirmed that high levels of
mould are present on both the basement and ground floors.
Accordingly, even if items stored on the upper level were initially unaffected by
mould, it is highly likely that they will now require cleaning and decontamination (if
not replacement). The Applicant’s mould specialist (AD) observed visible mould on a
number of these items when he inspected the property in June 2015.
For the reasons outlined above, the FSP is not solely responsible for the protracted
nature of this dispute, which has potentially resulted in further damage to the
Applicant’s contents items.
However, the current difficulty in estimating the damage to the Applicant’s contents
items is primarily attributa ble to the FSP’s failure to fully assess the damage to these
items when the claim was lodged. Had the FSP done so, it could have made an
appropriate allowance in the cash settlement amount paid in February 2013.
In these circumstances, the Panel considers it is essential to ensure that the
Applicant is not disadvantaged by the FSP’s failure to carry out a proper assessment
at the time of the claim.
Case No: 312175 Determination Page 13 of 16
On this basis, and having carefully considered the limited information available, the
Panel considers that it is fair in all the circumstances that the FSP pay the Applicant
an additional amount of $20,000 for damage to her contents items (including the
replacement of the carpet in the downstairs bedroom area).
In determining this amount, the Panel has taken into consideration the time which
has passed since the claim was lodged. Accordingly, the FSP is not required to pay
interest on this amount.
2.3 Is the Applicant entitled to any additional amounts?
Applicant is entitled to reimbursement of $3,000 for professional costs
The Applicant seeks reimbursement for legal and professional costs of over $10,000
incurred during the course of this dispute. In addition to legal fees, these costs
include fees paid by the Applicant to her building consultant and mould specialist.
Under paragraph 9.4 of the FOS Terms of Reference, FOS may require a financial
services provider to contribute to legal costs incurred by an applicant in the course of
their dispute. However, a financial services provider will generally not be requi red to
contribute more than $3,000 unless exceptional circumstances apply.
As outlined above, had the Applicant agreed to the FSP’s offer to fully reassess the
claimed damage in early 2013, it may not have been necessary for the Applicant to
engage her own consultants to inspect the property.
However, the Panel recognises that the report prepared by the Applicant’s building
consultant (AB) and the colour photographs included therein identifies certain items
of damage which was excluded from the scope of works approved by the FSP.
Accordingly, AB’s report has been helpful to the Panel in determining how the
Applicant’s claim should be settled, particularly given the limited number of quality
photographs provided by the FSP during the early stages of the claim process.
In these circumstances, the Panel considers the FSP should be required to pay the
Applicant the amount of $3,000 as partial reimbursement for professional costs
incurred during the course of this dispute.
Applicant is dissatisfied with FSP’s c laim handling
Under paragraph 9.3(b) of the Terms of Reference, FOS may award compensation
for non-financial loss where an applicant has suffered an unusual degree or extent of
physical inconvenience, time taken to resolve the situation or interference wit h their
expectation of enjoyment or peace of mind. The compensation which may be
awarded is capped at $3,000 per claim made in the dispute.
FOS may award an additional amount (of up to $3,000 per claim) for consequential
financial loss incurred by an Applicant in connection with the dispute.
The Applicant has raised a number of concerns about the manner in which the FSP
has managed her claim. Among other things, the Applicant says that:
the FSP refused to assess the damage and commence repairs until the
Applicant returned from overseas;
Case No: 312175 Determination Page 14 of 16
the FSP’s assessor and other employees have deliberately tried to settle her
claim for less than she is entitled to under the policy, in pursuit of an ongoing
personal vendetta against her;
the FSP has deliberately withheld a nd falsified documents during the claim
process and has failed to provide her with the information required to make an
informed decision about the claim; and
the FSP’s employees have behaved in an abusive, aggressive and
unprofessional manner and disclosed the Applicant’s personal information to a
third party for use in civil proceedings.
FSP made errors during claims process
As outlined above, the Panel considers the FSP made a significant error in its
handling of the contents claim by failing to carry out a proper assessment of the
damage to the Applicant’s contents items and take appropriate measures to restore
or replace the contents.
The FSP also failed to cash settle the Applicant for the cost of replacing the carpet in
the downstairs bedroom area, despite having previously authorised these works.
In relation to the building claim, the Panel accepts that it was reasonable for the FSP
to delay the assessment of the damage to the property for the relatively short time
until the Applicant returned from overseas.
Further, the FSP was not obliged to arrange an immediate make safe, given it was
paying the Applicant’s temporary accommodation costs and provided such measures
were ultimately addressed in the scope of works for the building repairs.
However, the Panel acknowledges that the manner in which the FSP initially dealt
with the building claim has contributed in part to the Applicant’s ongoing distrust of
the FSP’s claim management.
In particular, it appears that the FSP’s assessor wrongly believed that the water
damage to the Applicant’s home was related to an earlier escape of water from a
pipe in the bathroom vanity which had been considered under a previous claim. This
misunderstanding appears to have arisen because the Applicant had cancelled the
earlier claim before the damaged vanity could be repaired (even though she had
already repaired the damaged pipe).
Further, the FSP’s assessor incorrectly advised the Applicant that she would not be
covered for mould growth at her property (due to the relevant policy exclusion). This
advice was incorrect as the mould growth at the property was caused by the escape
of water, which was insured against under the policy.
However, neither of the above issues were material to the FSP’s assessment of the
Applicant’s building claim. After obtaining further information, the FSP ultimately
accepted that the claimed damage was unrelated to the previous claim. The FSP
also accepted liability for remediation of mould growth at the property, to the extent
caused by the escape of water from the broken hose pipe.
The Panel acknowledges that the FSP failed to provide a copy of the report prepared
by the FSP’s assessor following her in spection of the property on 14 December 2012
Case No: 312175 Determination Page 15 of 16
until very recently. However, having considered the information contained in this
report, the Panel does not believe that t he FSP’s failure to provide the report was
driven by a deliberate attempt to mislead the Applicant.
A number of the concerns identified by the Applicant raise issues of serious
misconduct on the part of the FSP and its employees.
The Panel considers it inappropriate to make a finding on such matters without a
substantial weight of proof confirming the events alleged by the Applicant occurred in
the manner claimed.
In the absence of any such confirming proofs, the Panel is not satisfied that the
Applicant has established any misconduct on the part of the FSP or its contractors.
Applicant is entitled to compensation for non-financial loss
It is clear that the relationship between the Applicant and the FSP has deteriorated
significantly over the course of this claim.
The Panel accepts that the FSP’s failure to adequately settle the Applicant’s contents
claim has caused her significant stress and inconvenience over an extended period
of time.
However, the Panel considers the errors made by the FSP in the course of the
building claim to be less significant in nature.
The Panel accepts that , while these errors have diminished the Applicant’s trust in
the FSP, they were apparently inadvertent and did not ultimately affect the outcome
of the claim (particularly given the FSP’s offer to fully reassess the claim in April
2013).
In the circumstances, the Panel considers the FSP should pay the Applicant a total of
$2,000 as compensation for non-financial loss suffered in relation to her building and
contents claims.
Applicant is not entitled to compensation for consequential financial loss
The Applicant seeks compensation for consequential losses suffered as a
consequence of the manner in which the FSP has handled her claim.
Specifically, the Applicant says she has incurred costs (including utilities, phone calls,
internet access, contents storage and car hire) while she has been unable to occupy
the property. The Applicant also says she has lost the opportunity to earn
approximately $430,000 in income from the rental of the property.
As outlined above, the Applicant was paid temporary accommodation benefits under
the policy on the basis that she was intending to reoccupy the property when she
returned from overseas on December 2012. In these circumstances, the Applicant is
not entitled to also recover for loss of rent in relation to the property.
Given the reasons for the delay in resolving this dispute and the limited information
provided by the Applicant to support her claim for consequential financial loss, the
Panel does not consider an award of compensation to be appropriate in the
circumstances.
Case No: 312175 Determination Page 16 of 16
3 Supporting information
3.1 FOS approach to this dispute
This dispute has not been the subject of a FOS Recommendation. Due to the nature
of the dispute, it has been referred directly to a Panel for Determination, in line with
the Operational Guidelines to the FOS Terms of Reference. The Panel consists of an
Ombudsman and two representatives with consumer and insurance experience.
The Panel has decided this case on its merits, having regard to the relevant law,
good industry practice, codes of practice and previous Financial Ombudsman
Service (FOS) decisions.
There has been a full exchange of all material information relied on for the purposes
of this Determination and each party has had the opportunity to address any issues
raised by the other.
The Panel has reviewed and considered all of the material provided by the parties.
While the parties have raised numerous issues in their submissions, for the purposes
of this Determination, the Panel has restricted its commentary to those issues that it
considers directly relevant to the outcome only.
During the course of this dispute, the Applicant has been assisted by various
representatives. For the purposes of this Determination, submissions made by the
Applicant’s representatives have been treated as having bee n made by the Applicant
herself (except in cases where the Applicant has expressly advised that she
disagrees with the content of the submissions).
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.