Home / Financial Firm (Unknown - Insurer) / Determination 312024

Determination 312024

Quantum of storm and plumbing damage settlement for retaining wall, rock face and costs to date

FirmFinancial Firm (Unknown - Insurer)
Decided2014-08-04
ProductGeneral Insurance · Strata
OutcomeFor the complainant
Amount awarded$67,566
Non-financial loss—
Amount claimed$255,000
SourceAFCA PDF

Summary

The Applicant sought a quantum determination for storm and plumbing damage to a retaining wall, following an earlier determination that the FSP pay 75% of the loss. AFCA rejected the FSP's scope of works and ordered 75% of repair costs, 75% of costs to date (stated as $67,566.31), a share of rock face assessment, and interest.

Under the earlier determination the FSP must indemnify 75% of the loss, limited to reinstatement to a new condition, so the FSP's scope of works could not be relied on.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 312024 Determination Page 1 of 13 Case number: 312024 General Insurance - Domestic Insurance - Residential Strata Title - FSP Decision - Claim Amount 21 April 2014 Summary Description  A claim under a residential strata insurance plan for loss and damage to the property. Basis of Determination  A consideration of the terms of an earlier Determination and the obligations of the FSP and rights of the Applicant in light of that earlier Determination and the coverage provided by the policy. Determination  On the basis of the available information the Panel determines that:  the FSP is to pay to the Applicant 75% of the cost of repairs, as provided in paragraph 30;  the FSP is to pay to the Applicant 75% of the rock face assessment and repairs, only if necessary, or 50% o f the rock face assessment only, if no repairs are required, as detailed in paragraphs 38 and 39; and  the FSP is to pay to the Applicant 75% of the costs incurred to date, as provided in paragraph 53.  Settlement of the above amounts are to be made within 14 days of receipt of the required documentation as detailed in paragraph 54.  The Panel reiterates that the FSP is to pay interest on the refund of costs incurred to date from 12 November 2008, in accordance with the previous Determination, to the date when this Determination is satisfied. Additionally, the FSP is to pay interest on the repair costs from 30 days from the date of the acceptance of the previous Determination (accepted on 24 June 2010). The applicable interest rate should be calculated pursuant to Section 57 of the Insurance Contracts Act 1984 (Cth). Determination Case No: 312024 Determination Page 2 of 13 Background 1. On 11 May 2010 the Financial Ombudsman Service (FOS) issued a Determination, mostly in favour of the Applicant. In part, the Determination states: “ Panel’s final assessment 43. The Panel is therefore satisfied, on the balance of probabilities, that the applicant has established a claim under the policy, and that the proximate cause of the loss was the excess water in the area at the back of the wall which was at least substantially contributed to by the volume of water that escaped over a substantial period of time from the leaking and/or inappropriately fitted pipes. Both parties agree that faulty workmanship is not a policy exclusion. The member has relied upon defect or error in de sign, but the Panel is not prepared to categorise the plumber‟s errors within this phraseology. 44. The Panel is prepared however to acknowledge that poor drainage played a small part in the process and that the storm as a precipitative event, was also a contributing factor. The Panel is satisfied that the various causes of the loss occurred independently as distinct from concurrently with one another, so that it is not proposing to employ the Wayne Tank Principle ( Wayne Tank and Pump Co Ltd v Employers Liability Assurance Corp Ltd [1974] QB57 ) in favour of the member. 45. The Panel is required to determine disputes both on the law and as to what is fair and reasonable in the circumstances. In the Panel‟s opinion, it would be appropriate for the member to meet 75% of the loss sustained by the applicant as a result of the events described above. 46. In terms of quantum, the applicant‟s claim is for the sum of approximately $255,000 including costs already incurred by the applicant. The Panel is aware of a possible betterment issue in the event that it was to award all of these costs (subject to apportionment) in favour of the applicant. The applicant‟s representative is of the opinion that the Panel Chair may have misunderstood this aspect of the applicant‟s cl aim. Whether that be the case or not, the Panel is not prepared to make any determination as to the precise sum which the member is required to pay, pursuant to the claim. The Panel would encourage the parties to endeavour to seek agreement on this issue, and if they are unable to do so within a reasonably short period of time, the Panel will provide a supplementary determination as to the sum payable to the applicant. 47. The Panel further determines that the member is to pay interest to the applicant on costs already incurred, assuming they are not the subject of any betterment dispute from the date when the member formally denied the claim on 12 November 2008 to the date when this determination is satisfied. The Panel is aware that it has nominated a date some 18 months after the precipitating event, but it believes in the circumstances this is a fair and reasonable resolution of this aspect of the claim. 48. Thus by way of summary, the Panel determines that the member is to indemnify the applicant for 75% of its loss together with interest subject to either a supplementary determination on quantum, or the parties otherwise reaching an agreement on this issue.” Case No: 312024 Determination Page 3 of 13 2. On 21 December 2012, the Applicant contacted FOS to advise the quantum of the loss had not yet been agreed upon between the parties. 3. The Applicant seeks a further Determination on the issue of quantum. Summary of Applicant’s position 4. The Applicant says he has been unable to reach an agreement with the FSP in respect to a fair and reasonable settlement. He accepts the Panel has awarded only 75% of his loss and that betterment needed to be quantified. 5. The Applicant has provided advice from the quantity surveyor (HO) and the architect (ST), who assisted him throughout the claim and dispute. HO and ST have confirmed that the costs provided made no allowance for any betterment. Rather, there had been a contingency of approximately $30,000 allowed for in the costs. This contingency has since been removed and the revised costs provided by HO, are for reinstating the damage caused by the faulty plumbing, poor drainage and storm. 6. The Applicant has also provided a breakdown of costs already paid in relation to making the property safe and other claims costs. 7. The Applicant seeks a fair and reasonable settlement in accordance with the Determination already issued by FOS. Summary of FSP’s position 8. The FSP says it has attempted to negotiate settlement with the Applicant based on a scope of works (SOW) prepared by its appointed engineer (RJ). The SOW does not allow for any betterment and as such should be relied upon to effect settlement. 9. AN provided a quotation to effect repairs as per the SOW from RJ for an amount of $98,960 and settlement was offered to the Applicant on 24 August 2010 for 75% of this amount ($81,642). A revised offer was made on 14 January 2014, to account for a 10% increase in the quoted amount since 2010. The revised offer was $81,642 (75% of $108,856). Issue 10. Whether a fair and reasonable settlement has been offered by the FSP. Case No: 312024 Determination Page 4 of 13 Reasons for decision 11. This decision has been made by a Panel consisting of an Ombudsman and two Panel members with extensive experience in insurance industry matters and consumer claims. 12. There has been a full exchange of material between the parties and each party has had the opportunity of clarifying the issues which arise from the material. 13. On 17 July 2014, the Panel Chair Ombudsman and a Panel member attended on site, where they met with the Applicant and a representative of the FSP. 14. The Panel considers the following policy provisions of the FSP‟s Product Disclosure Statement (PDS) to be relevant to this dispute: “ General definitions Some key words used in this policy wording have a special meaning and those words begin with a capital letter. ... Wherever the words listed hereunder are used throughout this policy wording they mean what is set out below. Building means i. Building/Buildings as defined by the Strata Titles Act, Community Titles Act, Company Titles Act or similar legislation applying where Your Building is situated, including outbuildings, walls, gates, fences, external signs and awnings, elevators, escalators, inclinators, ducted airconditioning, swimming pools, underground services, satellite dishes, radio, television and other antennas (including their lead-in wiring), masts, towers ... 3 other improvements of a structural nature ... at Your Situation ... or whilst temporarily removed or in transit. Building does not include:  carpets (whether fixed or unfixed) or carpet underlay  fixtures removable by a lessee at the expiration of a tenancy  paint, wallpaper or other wall and ceiling finishes or coverings within a Unit where Your Building is situation in New South Wales. ... Policy 1 – Building & common area contents This Policy 1 is a „broad form‟ accidental loss and damage insurance contract in terms of the Insurance Contracts Act, 1984 and on that basis We agree to indemnify You in respect of ACCIDENTAL LOSS or DAMAGE to your Building Case No: 312024 Determination Page 5 of 13 and Common Area Contents occurring during the period of insurance by payment, or at Our option, by reinstatement, replacement or repair subject to the following terms, conditions and exclusions. Property insured We cover, up to the limit of the sum insured specified in the Schedule  Your Building ... Additional benefits We will pay for Additional Benefits 1 to 6 , provided the sum insured of Your Building is not otherwise exhausted in respect of any one loss or series of losses arising out of the one event. 4 Architects and professional fees, removal of debris a. Architects fees, surveyors fees and other professional fees b. the cost of removal, storage and/or disposal of debris being the residue of Your damaged Building or Common Area Contents (including debris You are required to remove from adjoining or adjacent public or private land) c. the cost of dismantling, demolishing, shoring up, propping, underpinning, or other temporary repairs necessarily incurred with Our written consent in the repair or reinstatement of damage to Your Building or Common Area Contents arising from any cause not excluded under this Policy 1 . ... 3 Government fees, contributions or imposts Government fees, contributions or imposts payable to any Government or Local Authority necessarily incurred with Our written consent and incurred as a condition precedent to the obtaining of consent to reinstate Your Building, provided that We will not be liable for payment in respect of any fine or penalty imposed by any such authority. 4 Legal fees Legal fees necessarily incurred with Our written consent in making submissions and/or applications to State and/or Federal Government and/or Builders Licensing and/or Local Government Authorities and/or Land and Environment Courts as a result of loss or damage to Your Building or Common Area Contents arising from any cause not excluded under this Policy 1 . ... Special benefits We will pay for Special Benefits 1 to 17 in addition to the sum insured for this Policy 1 and where applicable will also treat Unit Owners as though they were You. ... 5 Exploratory costs, replacement of defective parts Case No: 312024 Determination Page 6 of 13 The exploratory costs reasonably incurred by You (including reinstatement of the area of Your Building necessarily damaged by exploratory work) in locating the source of bursting, leaking, discharging or overflowing of tanks, apparatus or pipes used to hold or carry liquid or any kind where the breach in the tank, apparatus or pipe is from any cause not excluded by this Policy 1 . Further where such breach is from any cause not excluded by this Policy 1 We will also pay the costs reasonably incurred in a repairing or replacing the defective part or parts of such tanks, apparatus or pipes, to a limit of $500 b rectifying contamination damage or pollution damage to Your land at Your Situation caused by the escape of liquid, to a limit of $500 ... Basis of settlement of claims Reinstatement, Replacement In the event of Your Building or Common Area Contents being destroyed or damaged, the basis upon which the amount payable under the Policy 1 is to be calculated will be the cost of Reinstatement or Replacement at the time of reinstatement or replacement of such loss or damage subject to the following Special Provisions and also the terms and conditions of this Policy 1 . Special provisions 1 Reinstatement and Replacement means a as regards Your Building i the reasonable and necessary cost of rebuilding, replacing or repairing to a condition which is equivalent to but not better nor more extensive than when it was new ...” Analysis 15. This dispute relates to the specific issue of quantum. The parties were encouraged, as part of the original Determination, to work together to come to a mutually agreeable settlement amount, taking into account any aspect of betterment. The parties have been attempting to negotiate settlement, however, after a considerable period of time has elapsed, an agreement has not been reached. 16. The FSP relies on the advice from RJ with respect to the SOW he prepared and the quotation provided by AN based on that SOW. The Applicant relies on the costs detailed by HO, with respect to the necessary repairs. He has also provided a list of costs expended to date. 17. The FOS Case Manager has confirmed with the Applicant that as of 2 April 2014, repairs have not started at the property, nor has any settlement amount been paid to the Applicant. This is not disputed by the FSP. Case No: 312024 Determination Page 7 of 13 Repairs 18. There seems to be no dispute that the items being claimed by the Applicant fall under the definition of “building”, contained within the PDS. Rathe r, the dispute over settlement of the repairs appears to be relating to the extent of repairs required to the property. 19. The preamble of RJ‟s SOW reads, in part: “A section of retaining wall at the north -western corner of the above property failed during a storm event in 2007. Works undertaken by the Owners since that time have included removal from site of all debris including a substantial length of wall unaffected by the event and fill material retained by that section of wall. The reconstruction of the wall, filling and paving unaffected by the event does not form part of this „Scope of Works‟. Similarly, installation and restoration of new drainage, both stormwater and sewerage does not form part of this „Scope of Works‟.” 20. The previous Determination clea rly stated that the FSP was to “... meet 75% of the loss sustained by the applicant as a result of the events described above” (emphasis added by the Panel). The “events” referred to were the proximate cause, as determined by the Panel, of the leaking faulty pipes (not excluded by the policy), the poor drainage and the storm event. 21. RJ‟s SOW refers only to the damage to the wall which failed during a “storm event”. There is no indication contained within the SOW to indicate damage caused by the leaking faulty pipes or the poor drainage have been considered. In fact, RJ infers that items “unaffected by the event” which he mentions as “storm”, have not been included. 22. The Panel is therefore not satisfied that the SOW or the subsequent quotation provided by AN, which is based on the SOW, is accurate or adequate, given the parameters of the previous Determination. 23. In its submission, the FSP has provided responses given by RJ in respect to the damage at the site and any “betterment”. These responses mostly relate to RJ‟s original opinion that the wall failed due to poor drainage during a storm event, a position he has continued to hold through the subsequent process. The only comments regarding “betterment” relate to sections of the wall removed by the Applicant bu t which were not affected, in RJ‟s opinion, by the “event”. 24. On this point, RJ says: “ Issue 2 ... (vi) In my report to [the FSP] of 9 May 2007 I advised that: ‘The advice given by the engineers acting for the Owners to demolish the remaining unaffected sections of the wall in my opinion is sound.’ This advice was given on the basis that the condition of that wall although not affected by the event was in a serious state of disrepair Case No: 312024 Determination Page 8 of 13 and presented a risk not only to the occupants of the subject property but also the adjoining property to the West. I also made the comment elsewhere that in my opinion maintenance generally throughout the building has not been a priority and there were several other serious safety issues that required attention. ... “(vii) [The Applicant‟s expert] in their report of 27 June 2008 advised: “that the sections of retaining wall which remain on either side of the failed area, seem to be in reasonably sound condition for the type of construction and age of the wall.’ This advice from [the Applicant‟s expert] confirms that the failure of a limited section of wall was the only section of wall affected by the storm event and other works outside that immediate area listed in the claim are not attributable to the event.” 25. RJ has continu ed to maintain that the “event” was the storm event and the cause of the wall collapsing was poor drainage. The Panel agreed these were contributing concurrent causes, however, only to the extent of 25% of the total damage caused. RJ does not appear to have acknowledged that the Panel considers the proximate or dominant cause as having been the leaking faulty pipes which had been incorrectly installed several years before the wall failure. He has not provided any further comment on whether or not the faulty leaking pipes could have caused or contributed to the “serious state of disrepair” of the relevant section of wall. 26. The Panel is satisfied RJ agreed with the Applicant‟s engineer‟s opinion that a section of wall was removed for safety reasons. However, it is unclear to what extent the “serious state of disrepair” of the wall referred to by RJ, was as a result of the faulty leaking pipes. 27. HO, on behalf of the Applicant, has provided an opinion on any “betterment” included in his original estimate of costs. He details the work required to brace the existing walls in order to incorporate the reinstatement work. He also suggests a method which he says is more cost effective to those methods suggested by ST and RJ. As a result of this, he adjusted his costs to reflect the more cost effective method of repair. 28. The FSP has made no comment on this aspect. Instead, it relies on RJ‟s advice that “betterment” is in respect to reinstating unaffected areas. 29. The Panel notes the PDS which provides cover for “reinstatement and replacement”. The definition clearly states that the insured property is to be repaired or reinstated to a condition it was in when it was new (emphasis by the Panel). With the type of cover provided, there will always be an element of betterment, at least in respect of the replacement of old materials by new materials. However, the Panel has no information before it to suggest any other betterment will be provided to the Applicant as a result of the repairs proposed by HO. Case No: 312024 Determination Page 9 of 13 30. The Panel is not persuaded by RJ‟s opinions or SOW, given he appears to have given no consideration to the proximate cause of the damage as already determined by the previous Panel‟s Determination. This Panel is satisfied that the SOW and costs provided by HO are, on the balance of probabilities, more accurate. 31. The Panel has also considered the positions of both parties in respect to the stability of the rock face, on top of which the retaining wall sits. The Applicant and his experts have suggested the rock face is unstable and will require stabilising before the retaining wall can be reinstated. The FSP, via RJ, suggests no such repairs will be required. 32. In fact, on reviewing the material, the information from both parties confirms that the stability of the rock face is unknown. An inspection of the rock face was to be done to confirm its condition and both parties were to share the expense of arranging this inspection. However, this did not occur as the FSP, through its representatives, advised that it was satisfied that the wall was stable. The Applicant has based his contrary opinion on observations at the site, that the rock face is still “dropping” rocks etc onto the property below. The FSP bases its opinion on RJ‟s advice which is simply that he has no evidence to suggest the rock face is unstable. 33. When the Panel Chair Ombudsman and Panel member attended on site, it was clear that debris was still dropping from the rock face. . 34. It is the opinion of the Panel that this issue would need to be addressed prior to any repairs being undertaken. The FSP previously agreed to share the costs involved with having this inspection undertaken. 35. The Panel notes that RJ has conceded he does not possess the same qualifications as PS, who the Applicant appointed to provide an opinion on the stability of the rock face. In fact RJ concedes he would be willing to rely on the advice of PS due to his experience and expertise. For this reason the Panel is also prepared to rely on the advice of PS. 36. In an email to ST dated 2 December 2009, PS says: “1. We cannot be specific about stabilisation works required on the rock face until we have had the opportunity to inspect it at close quarters. This means your options are to engage a contractor on a “do and charge” basis where we jointly work on the face, or we use a hydraulic boom lift to make a preliminary inspection of the face to try to identify the nature of any works sufficiently for contractors to price them in advance. In practice the latter may not be totally successful. 2. As it was always intended to scaffold the face in order to rebuild the retaining wall, it was always our expectation that any works necessary would be done at that time. 3. If the pavement below the rock face is reinstated initially, it must be made clear that any persons using the space at the foot of the cliff does so at their own risk. Until all the remediation work is completed there is an Case No: 312024 Determination Page 10 of 13 unquantifiable risk of rock falls, however, minor. This risk applies also to persons working below the cliff.” 37. It is clear from this email that PS has concerns regarding the stability of the rock face but that until a proper inspection can be undertaken, it cannot be confirmed. Additionally, PS notes it may be more cost effective and a more accurate assessment can be provided if the inspection is done on a “do and charge” basis. 38. The Panel agrees that this appears to be the fairest way for all parties to assess and quantify the rock face stability. It is therefore the Panel‟s opinion that this exercise should be undertaken during the remediation works and that the FSP be allowed the opportunity to attend during the assessment; it can then review the results of the relevant assessment, before issuing any settlement towards these costs. 39. Should such an assessment reveal that the rock face is unstable the FSP must contribute 75% of the costs of the assessment and necessary stability repair work. If there are no repairs required to the rock face, each party should pay 50% of the assessment costs. Costs to date 40. The Panel is concerned that the FSP has failed to provide any settlement to the Applicant for the costs already expended. In fact in its submissions in respect to this new dispute, the FSP has clearly indicated its offer represents “settlement of all costs associated with the repair/rebuild of the retainin g wall” (email from FSP dated 14 January 2014). 41. The Applicant has provided a breakdown of all costs associated with his claim. Those costs can be summarised as:  clearing of the site, demolition, removal of debris and “make safe” activities;  inspection of the property by professionals for the purpose of ensuring the property is safe and/or to provide opinions and quotations for necessary repairs;  legal fees;  general management of the claim and dispute; and  costs associated with imposts from Government authorities to make the site safe. 42. There is also a cost of $539 relevant to “Repair 100 PVC”. It is understood these costs relate to the repairs undertaken to the broken pipes which the Panel previously determined to be the proximate or dominant cause of t he Applicant‟s loss. 43. The Panel has reviewed the cost breakdown provided and the relevant PDS. As detailed above, the PDS provides cover for: Case No: 312024 Determination Page 11 of 13  architects and professional fees, removal of debris („Additional benefits‟);  Government fees, contributions or impo sts („Additional benefits‟);  legal fees („Additional benefits); and  exploratory costs, replacement of defective parts („Special benefits). 44. There is no definition contained within the policy for “professional fees”. The Panel is satisfied that the majority of the costs incurred by the Applicant fall into this category. That is, the Applicant appointed a professional, ST, (an Architect, although not acting in the capacity of Architect) to manage his claim and the site. ST in turn appointed a number of professionals to inspect and report on the cause and extent of damage to the site. The Panel is satisfied these costs are covered under „Additional benefits‟. 45. The Applicant attended to the removal of debris and rubbish from the site. He also appointed lawyers for claims advice and advice with respect to his dispute. The Panel is satisfied these costs are covered under „Additional benefits‟. 46. The Applicant was requested by Government authorities to make the site safe. The Panel considers this would fall under the heading of an impost. Accordingly, any work undertaken by the Applicant to rectify the site as a result of the fallen wall would be covered under „Additional benefits‟. 47. ST, on behalf of the Applicant, undertook investigation at the site to determine the cause. As a result of these investigations, excavation was undertaken and the faulty pipes were located. The Panel is satisfied the costs associated with these investigations are covered under „Special benefits‟. 48. The PDS also provides cover for the repair of a ny defective part under the sub- heading of „Exploratory costs, replacement of defective parts‟ of the „Special benefits‟ cover. These costs are limited to $500. The Applicant has indicated his costs for this item were $539. The Panel is satisfied the Appli cant‟s costs for this item are limited to $500 for this item. 49. The Panel notes „Additional benefits‟ are paid in respect of any one loss or series of losses arising out of one event, providing the sum insured has not been exhausted. „Special benefits‟ are p aid in addition to the sum insured. 50. Some of these benefits are subject to being covered only where the written consent of the FSP is obtained before the costs are incurred. In this instance, however, no written consent was provided as the FSP denied the Ap plicant‟s claim. It is the opinion of the Panel that the Applicant has incurred these costs in order to mitigate his loss and was effectively acting as if he was a „prudent uninsured‟. It is therefore reasonable, in this instance, that the Applicant not be disadvantaged by this policy restriction. Case No: 312024 Determination Page 12 of 13 51. The FSP has not made any submission on the fairness of the costs incurred by the Applicant. In the absence of any information to the contrary, the costs appear reasonable to the Panel. 52. As already detailed, the Panel is satisfied the FSP must accept the Applicant‟s claim, up to 75% of the total costs to reinstate the property, including the costs incurred to date. It follows that the Applicant would be entitled to 75% of the costs he has detailed and which can be considered as any of the defined „Additional benefits‟ or „Special benefits‟. 53. The Panel has calculated the settlement as: Amount claimed by Applicant $90,127.42 Less plumbing costs over limit of $500 (claimed $539) 39.00 Total $90,088.42 Total refund to Applicant (75% ) $67,566.31 54. The Applicant should provide invoices, receipts or payment confirmation of all costs being claimed. Upon receipt of these documents, the FSP is to issue the refund. Compensation 55. The Panel has given consideration to another aspect of the matter which is of concern. FOS Terms of Reference “ 9.3 Other compensation a) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the Financial Services Provider compensate the Applicant for consequential financial loss or damage up to a maximum amount of $3,000 per claim made in the Dispute. b) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the Financial Services Provider compensate the Applicant for non- financial loss but only where: (i) an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference wi th the Applicant‟s expectation of enjoyment or peace of mind has occurred; (ii) ... The maximum amount of compensation for non-financial loss will be $3,000 per claim made in the Dispute c) ...” 56. Given the complexity of this matter and the numerous submissions detailed by the parties, the Panel is not satisfied that compensation is appropriate. Case No: 312024 Determination Page 13 of 13 Determination 57. On the basis of the available information the Panel determines that:  the FSP is to pay to the Applicant 75% of the cost of repairs, as provided in paragraph 30;  the FSP is to pay to the Applicant 75% of the rock face assessment and repairs, only if necessary, or 50% of the rock face assessment only if no repairs are required as detailed in paragraphs 38 and 39; and  the FSP is to pay to the Applicant 75% of the costs incurred to date, as provided in paragraph 53. 58. Settlement of the above amounts are to be made within 14 days of receipt of the required documentation as detailed in paragraph 54. 59. The Panel reiterates that the FSP is to pay interest on the refund of costs incurred to date from 12 November 2008, in accordance with the previous Determination, to the date when this Determination is satisfied. Additionally, the FSP is to pay interest on the repair costs from 30 days from the date of the acceptance of the previous Determination (accepted on 24 June 2010). The applicable interest rate should be calculated pursuant to Section 57 of the Insurance Contracts Act 1984 (Cth) .

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.