Home / Financial Firm (Unknown - Insurer) / Determination 311717
Determination 311717
Flood exclusion relied on to deny fish hatchery flood damage
Summary
A fish hatchery was damaged first by stormwater and later by river flood. The FSP settled the stormwater damage, and AFCA found it was not liable for the later flood damage because flood was excluded and the broker-arranged policy relieved it of pre-contract information duties.
The flood exclusion applied to river overflow, and under section 71 of the Insurance Contracts Act the insurer's pre-contract information obligations did not apply where a broker arranged the policy without a binder.
Issues
- Claim denial primary · not upheld
“the FSP is not liable for the damage caused in the flood inundation which occurred subsequent to the inundation from stormwater”
- Failure to disclose secondary · not upheld
“the FSP is relieved of any obligation on it to provide information to the Applicant in writing about the flood exclusion”
Subjects and remedies
broker or intermediarynatural disastersmall businessno remedy
Text of the determination
Case No: 311717 Determination Page 1 of 7
Case number: 311717
General Insurance - Small Business/Farm Insurance - Commercial Property -
FSP Decision - Denial of claim- Exclusion/Condition
22 August 2013
Background
1. The Applicant runs an aquaculture business in New South Wales and held a
commercial insurance policy with the Financial Services Provider (FSP).
2. The policy provided accidental damage cover for the building infrastructure
and contents of the Applicant’s fish hatchery and was arranged through her
broker, “A”.
3. Aft er the Applicant’s fish hatchery was inundated by water in March 2012 a
claim was lodged for the resultant damage.
4. The FSP found that some of the damage was due to stormwater run-off and
accepted that part of the claim. However, it denied the balance of the claim
on the basis that the damage was caused by flood, which is excluded under
the policy.
5. The Applicant says she disagrees with the decision and wants the FSP to
pay the entire claim.
Summary of Applicant’s position
6. The Applicant says that the policy document was not provided to her and
even after she requested her broker to send her a copy of the policy
document, it was not received.
7. She says that the renewal invoice sets out the asbestos and terrorism
exclusions for the policy as well as an excess for earthquake, however, the
renewal document does not make mention of flood being excluded from
cover and as that was the only document received for the policy, the FSP
should honour her claim.
Determination
Case No: 311717 Determination Page 2 of 7
S ummary of FSP’s position
8. The FSP says that it has obtained site specific hydrology evidence indicating
that the initial inundation of the Applicant’s property was due to stormwater
and it has settled this portion of the claim.
9. However, the balance of that hydrology evidence also shows that the peak
inundation was caused by water overflowing from the river. According to the
policy, this is flood and is excluded from cover.
10. The FSP says that the Applicant arranged the policy through her broker, A. It
says that as a result, it is not responsible for any failure to issue appropriate
policy documents to the Applicant and it is entitled to rely of the flood
exclusion of the policy.
11. The FSP relies on the following policy provisions:
“ Definitions
The following definitions shall apply to the words used in your policy.
Word or Term Meaning
... ...
Flood The inundation of normally dry land by water escaping
from or released from the normal confines of:
any natural watercourse or
any lake (whether or not altered)
or
any dam, reservoir or canal.
...
Fire - Gold
...
Cover
We will pay up to the limit of liability in accordance with the Basis of
Settlement for property that is damaged at the premises during the period of
insurance .
...
Limitations of Cover
...
Exclusions
...
3. We will not pay for damage caused by or arising from:
..
(g) flood .
Case No: 311717 Determination Page 3 of 7
...
Optional Extension of Cover
If shown in the schedule the following extensions shall apply:
1. Flood
When flood is shown in the schedule , the word “Flood” is deleted from
Exclusion 3 (g). ”
Issues
12. Whether the FSP is entitled to rely on the flood exclusion of the policy to
deny liability for any damage caused by flood.
13. Whether the damage to the Applicant’s property was caused by flood or an
event to which the policy responds.
Reasons for decision
14. Due to the nature of the dispute, it has been referred to the Panel for
Determination in accordance with the Operational Guidelines to the Financial
Ombudsman Service’s Terms of Reference.
15. This decision has been made by a Panel of three decision makers including
an Ombudsman and two decision makers with extensive experience in
insurance industry matters and in consumer claims.
16. There has been an exchange of information between the parties and the
Panel is satisfied that each party has had an opportunity to address the
issues raised.
Provision of policy documents
17. The Applicant says that her insurance premiums were paid on the
understanding that cover was for the property of the fish farm business
including accidental damage.
18. She says the renewal invoice sets out the excess if earthquake occurred and
makes an exclusion for terrorism and a further exclusion for asbestos.
Nowhere in the renewal policy, is there any mention of other exclusions.
19. The Applicant says the policy document was never forwarded to her prior to
making a claim. She has provided a copy of an email to “PF”, authorised
representative of A, dated 14 March 2012 in which she requests a copy of
the policy document be sent to her by mail. The response from PF indicates
that the FSP does not print the policy booklet any more but makes them
available on their website.
Case No: 311717 Determination Page 4 of 7
20. The FSP argues that the Applicant arranged the policy through A, which is
an independent broker which is not operating under a binder and has its own
Australian Financial Services Licence and pursuant to Section 71 of the
Insurance Contracts Act 1984 (the Act), the FSP is not responsible for any
failure to issue the policy wording to the Applicant.
21. Section 37 of the Act provides that where as provision in a contract of
insurance (which is not a prescribed contract) is of a kind not usually found
in contracts of insurance that provide similar cover, an insurer can only rely
on that provision if it clearly informs the insured in writing of the effect of that
provision prior to the contract being entered into.
22. The Panel notes that the Applicant’s contract of insurance covering the
building and contents of her fish hatchery is not a prescribed contract as
described in the Act and the associated Insurance Contracts Regulations
1985.
23. However, Section 71 of the Act provides that where a contract of insurance
is arranged through an insurance broker not acting under a binder, any of
the insurer’s obligations (except those relating to the issue of renewal
notices) for giving of any information to the insured before the contract was
entered into, do not apply.
24. There is no dispute that the Applicant arranged the insurance through broker
A and the Panel accepts this to be the case. Further, the Panel accepts that
A was not operating under a binder whe n arranging the insurance policy for
the Applicant.
25. It follows that the FSP is relieved of any obligation on it to provide
information to the Applicant in writing about the flood exclusion of the policy,
such as that which might apply pursuant to Section 37 of the Act.
26. The evidence indicates that it is entirely possible that the Applicant was not
provided with a copy of the policy wording booklet by A.
27. The Panel recognises that the duty of a broker to its client includes the
requirement to provide assistance to its client in determining policy
requirements and providing advice which is appropriate to its client’s needs.
It also includes the requirement to take steps to satisfy themselves that the
client understands the policy being offered (refer Strategic Property Holdings
No. 3 Pty Ltd v Austbrokers RWA Pty Ltd [2012] NSWSC 1570 ).
28. However, the issue of whether A has fulfilled its obligations to the Applicant
is not the subject of this dispute and it would not be appropriate for the Panel
to examine this issue as part of this Determination.
29. In any event, the Panel finds that the FSP is not prevented from relying on
the flood exclusion of the policy to deny or limit its liability for the damage
claimed.
Case No: 311717 Determination Page 5 of 7
Cause of the damage
30. The FSP has provided a copy of a r eport from hydrologist “W”, produced
after an inspection of the property on 6 June 2012, with respect to the origin
of the water which inundated the Applicant’s property.
31. The report from W includes the following information:
The property was inundated to a depth of between 1.0m and 1.5m
above ground level resulting in damage to the infrastructure and stock.
It is located on the banks of the “G” River, approximately 4.8km south -
east (upstream) of the village of “L”.
“S” Creek flows in a south -westerly direction immediately to the north of
the property before joining the G River.
The water level hydrograph recorded at the G River gauging station at
L, downstream of the property, indicates three distinct water level
peaks in the G River during the period 27 February 2012 to 7 March
2012, occurring as follows.
i. The first peak occurred at 3.30pm on 28 February 2012;
ii. The second peak occurred at about 3.00pm on 1 March 2012; and
iii. The third (and largest) peak occurred at about 10.45am on 4 March
2012.
As the G River at L gauging station is downstream of the property, it is
likely that the three water level peaks occurred a short time earlier at
the property itself.
A very steep local catchment, with an area of approximately 0.5 square
kms, is located to the east of the property and as there are no defined
watercourses within this catchment, during periods of intense rainfall,
water would drain from it as sheet flow in a westerly direction towards
the G River and the Applicant’s property.
According to the Applicant:
i. It had been raining heavily during the week leading up to the event.
ii. A very intense storm occurred on 29 February/1 March 2012 and
the early hours of 1 March 2012 the property was inundated to a
shallow depth of water which flowed swiftly across the adjacent
road from the catchment to the east. The water was moving very
swiftly and flowed through the raceways and processing shed to the
G River. The water level in the river was rising steadily at this time.
iii. Later in the day on 1 March, the G River broke its banks, however,
the property was not substantially inundated and there was no
major damage to the raceways or processing shed. The water level
in the river remained high until early on 2 March 2012.
iv. A second intense storm came through the area on 3 March 2012
and the Applicant evacuated at about 3.00pm. (Her son stayed
Case No: 311717 Determination Page 6 of 7
behind and witnessed water from the catchment flowing towards the
property).
v. On the night of 3 March 2012 and into the early part of 4 March
2012, the G River again broke its banks. This time, the water level
was higher than the previous peak and the property was inundated
to a depth of 1.0m to 1.5 m and remained high until 5 March 2012.
vi. The Applicant noted that significant damage was caused by the
initial inundation, even though it was la ter inundated (twice) by
water overflowing the banks of the G River.
32. The findings of the report by W were that:
The version of events provided by the Applicant regarding the timing of
the rainfall event and of the inundation is consistent with the available
rainfall and water level data.
Given the intensity of the rainfall recorded in the vicinity of the property
and the steep slope of the catchment to the east, it is likely that
stormwater run-off would have flowed through the property after the
intense storm on 29 February / 1 March 2012 and on 3-4 March 2012.
The stormwater run-off would have resulted in shallow inundation of the
property and caused siltation of the raceways and damage to some
contents of the processing shed. This would have occurred shortly after
the peak rainfall from the storm (which occurred in the hour up to
2.00am on 1 March 2012).
Following the initial stormwater inundation on 1 March 2012, the
property would have been inundated by floodwater overflowing from the
nearby G River later that day, although (according to the Applicant) no
major damage resulted from this flooding.
A second inundation by floodwater overflowing from the G River
occurred late 3 March / early 4 March 2012. This second inundation
was to a higher depth than the previous flooding and resulted in
extensive damage to the property, including to the raceways and
processing shed.
The peak inundation of the property was caused by floodwater from the
G River which overflowed into the subject property later on 3 March
2012 and early on 4 March 2012.
33. After reviewing the submissions by the parties, the Panel is satisfied that the
initial inundation of the property was caused by stormwater run-off. As the
policy provides accidental damage cover to the buildings and contents of the
fish hatchery and stormwater run-off is not specifically excluded, the FSP is
liable for any damage caused by the initial inundation.
34. Further, the Panel is satisfied that the subsequent inundation was caused by
water overflowing from G River and acc epts that this is “flood”, as defined in
the policy. As flood is excluded from cover, and noting that the FSP is not
prevented from relying on the flood exclusion, the Panel finds that the FSP is
Case No: 311717 Determination Page 7 of 7
not liable for the damage caused in the flood inundation which occurred
subsequent to the inundation from stormwater early on 1 March 2012.
35. The Panel notes that subsequent to receiving the report from W, the FSP
assessed the damage from stormwater and a settlement for that damage
was agreed between the parties.
Determination
36. On the basis of the available information the Panel determines that the FSP
has no further liability with respect to the Applicant’s claim.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.