A fish hatchery was damaged first by stormwater and later by river flood. The FSP settled the stormwater damage, and AFCA found it was not liable for the later flood damage because flood was excluded and the broker-arranged policy relieved it of pre-contract information duties.

The flood exclusion applied to river overflow, and under section 71 of the Insurance Contracts Act the insurer's pre-contract information obligations did not apply where a broker arranged the policy without a binder.

Issues

Subjects and remedies

broker or intermediarynatural disastersmall businessno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 311717 Determination Page 1 of 7 Case number: 311717 General Insurance - Small Business/Farm Insurance - Commercial Property - FSP Decision - Denial of claim- Exclusion/Condition 22 August 2013 Background 1. The Applicant runs an aquaculture business in New South Wales and held a commercial insurance policy with the Financial Services Provider (FSP). 2. The policy provided accidental damage cover for the building infrastructure and contents of the Applicant’s fish hatchery and was arranged through her broker, “A”. 3. Aft er the Applicant’s fish hatchery was inundated by water in March 2012 a claim was lodged for the resultant damage. 4. The FSP found that some of the damage was due to stormwater run-off and accepted that part of the claim. However, it denied the balance of the claim on the basis that the damage was caused by flood, which is excluded under the policy. 5. The Applicant says she disagrees with the decision and wants the FSP to pay the entire claim. Summary of Applicant’s position 6. The Applicant says that the policy document was not provided to her and even after she requested her broker to send her a copy of the policy document, it was not received. 7. She says that the renewal invoice sets out the asbestos and terrorism exclusions for the policy as well as an excess for earthquake, however, the renewal document does not make mention of flood being excluded from cover and as that was the only document received for the policy, the FSP should honour her claim. Determination Case No: 311717 Determination Page 2 of 7 S ummary of FSP’s position 8. The FSP says that it has obtained site specific hydrology evidence indicating that the initial inundation of the Applicant’s property was due to stormwater and it has settled this portion of the claim. 9. However, the balance of that hydrology evidence also shows that the peak inundation was caused by water overflowing from the river. According to the policy, this is flood and is excluded from cover. 10. The FSP says that the Applicant arranged the policy through her broker, A. It says that as a result, it is not responsible for any failure to issue appropriate policy documents to the Applicant and it is entitled to rely of the flood exclusion of the policy. 11. The FSP relies on the following policy provisions: “ Definitions The following definitions shall apply to the words used in your policy. Word or Term Meaning ... ... Flood The inundation of normally dry land by water escaping from or released from the normal confines of:  any natural watercourse or  any lake (whether or not altered)  or  any dam, reservoir or canal. ... Fire - Gold ... Cover We will pay up to the limit of liability in accordance with the Basis of Settlement for property that is damaged at the premises during the period of insurance . ... Limitations of Cover ... Exclusions ... 3. We will not pay for damage caused by or arising from: .. (g) flood . Case No: 311717 Determination Page 3 of 7 ... Optional Extension of Cover If shown in the schedule the following extensions shall apply: 1. Flood When flood is shown in the schedule , the word “Flood” is deleted from Exclusion 3 (g). ” Issues 12. Whether the FSP is entitled to rely on the flood exclusion of the policy to deny liability for any damage caused by flood. 13. Whether the damage to the Applicant’s property was caused by flood or an event to which the policy responds. Reasons for decision 14. Due to the nature of the dispute, it has been referred to the Panel for Determination in accordance with the Operational Guidelines to the Financial Ombudsman Service’s Terms of Reference. 15. This decision has been made by a Panel of three decision makers including an Ombudsman and two decision makers with extensive experience in insurance industry matters and in consumer claims. 16. There has been an exchange of information between the parties and the Panel is satisfied that each party has had an opportunity to address the issues raised. Provision of policy documents 17. The Applicant says that her insurance premiums were paid on the understanding that cover was for the property of the fish farm business including accidental damage. 18. She says the renewal invoice sets out the excess if earthquake occurred and makes an exclusion for terrorism and a further exclusion for asbestos. Nowhere in the renewal policy, is there any mention of other exclusions. 19. The Applicant says the policy document was never forwarded to her prior to making a claim. She has provided a copy of an email to “PF”, authorised representative of A, dated 14 March 2012 in which she requests a copy of the policy document be sent to her by mail. The response from PF indicates that the FSP does not print the policy booklet any more but makes them available on their website. Case No: 311717 Determination Page 4 of 7 20. The FSP argues that the Applicant arranged the policy through A, which is an independent broker which is not operating under a binder and has its own Australian Financial Services Licence and pursuant to Section 71 of the Insurance Contracts Act 1984 (the Act), the FSP is not responsible for any failure to issue the policy wording to the Applicant. 21. Section 37 of the Act provides that where as provision in a contract of insurance (which is not a prescribed contract) is of a kind not usually found in contracts of insurance that provide similar cover, an insurer can only rely on that provision if it clearly informs the insured in writing of the effect of that provision prior to the contract being entered into. 22. The Panel notes that the Applicant’s contract of insurance covering the building and contents of her fish hatchery is not a prescribed contract as described in the Act and the associated Insurance Contracts Regulations 1985. 23. However, Section 71 of the Act provides that where a contract of insurance is arranged through an insurance broker not acting under a binder, any of the insurer’s obligations (except those relating to the issue of renewal notices) for giving of any information to the insured before the contract was entered into, do not apply. 24. There is no dispute that the Applicant arranged the insurance through broker A and the Panel accepts this to be the case. Further, the Panel accepts that A was not operating under a binder whe n arranging the insurance policy for the Applicant. 25. It follows that the FSP is relieved of any obligation on it to provide information to the Applicant in writing about the flood exclusion of the policy, such as that which might apply pursuant to Section 37 of the Act. 26. The evidence indicates that it is entirely possible that the Applicant was not provided with a copy of the policy wording booklet by A. 27. The Panel recognises that the duty of a broker to its client includes the requirement to provide assistance to its client in determining policy requirements and providing advice which is appropriate to its client’s needs. It also includes the requirement to take steps to satisfy themselves that the client understands the policy being offered (refer Strategic Property Holdings No. 3 Pty Ltd v Austbrokers RWA Pty Ltd [2012] NSWSC 1570 ). 28. However, the issue of whether A has fulfilled its obligations to the Applicant is not the subject of this dispute and it would not be appropriate for the Panel to examine this issue as part of this Determination. 29. In any event, the Panel finds that the FSP is not prevented from relying on the flood exclusion of the policy to deny or limit its liability for the damage claimed. Case No: 311717 Determination Page 5 of 7 Cause of the damage 30. The FSP has provided a copy of a r eport from hydrologist “W”, produced after an inspection of the property on 6 June 2012, with respect to the origin of the water which inundated the Applicant’s property. 31. The report from W includes the following information:  The property was inundated to a depth of between 1.0m and 1.5m above ground level resulting in damage to the infrastructure and stock.  It is located on the banks of the “G” River, approximately 4.8km south - east (upstream) of the village of “L”.  “S” Creek flows in a south -westerly direction immediately to the north of the property before joining the G River.  The water level hydrograph recorded at the G River gauging station at L, downstream of the property, indicates three distinct water level peaks in the G River during the period 27 February 2012 to 7 March 2012, occurring as follows. i. The first peak occurred at 3.30pm on 28 February 2012; ii. The second peak occurred at about 3.00pm on 1 March 2012; and iii. The third (and largest) peak occurred at about 10.45am on 4 March 2012.  As the G River at L gauging station is downstream of the property, it is likely that the three water level peaks occurred a short time earlier at the property itself.  A very steep local catchment, with an area of approximately 0.5 square kms, is located to the east of the property and as there are no defined watercourses within this catchment, during periods of intense rainfall, water would drain from it as sheet flow in a westerly direction towards the G River and the Applicant’s property.  According to the Applicant: i. It had been raining heavily during the week leading up to the event. ii. A very intense storm occurred on 29 February/1 March 2012 and the early hours of 1 March 2012 the property was inundated to a shallow depth of water which flowed swiftly across the adjacent road from the catchment to the east. The water was moving very swiftly and flowed through the raceways and processing shed to the G River. The water level in the river was rising steadily at this time. iii. Later in the day on 1 March, the G River broke its banks, however, the property was not substantially inundated and there was no major damage to the raceways or processing shed. The water level in the river remained high until early on 2 March 2012. iv. A second intense storm came through the area on 3 March 2012 and the Applicant evacuated at about 3.00pm. (Her son stayed Case No: 311717 Determination Page 6 of 7 behind and witnessed water from the catchment flowing towards the property). v. On the night of 3 March 2012 and into the early part of 4 March 2012, the G River again broke its banks. This time, the water level was higher than the previous peak and the property was inundated to a depth of 1.0m to 1.5 m and remained high until 5 March 2012. vi. The Applicant noted that significant damage was caused by the initial inundation, even though it was la ter inundated (twice) by water overflowing the banks of the G River. 32. The findings of the report by W were that:  The version of events provided by the Applicant regarding the timing of the rainfall event and of the inundation is consistent with the available rainfall and water level data.  Given the intensity of the rainfall recorded in the vicinity of the property and the steep slope of the catchment to the east, it is likely that stormwater run-off would have flowed through the property after the intense storm on 29 February / 1 March 2012 and on 3-4 March 2012.  The stormwater run-off would have resulted in shallow inundation of the property and caused siltation of the raceways and damage to some contents of the processing shed. This would have occurred shortly after the peak rainfall from the storm (which occurred in the hour up to 2.00am on 1 March 2012).  Following the initial stormwater inundation on 1 March 2012, the property would have been inundated by floodwater overflowing from the nearby G River later that day, although (according to the Applicant) no major damage resulted from this flooding.  A second inundation by floodwater overflowing from the G River occurred late 3 March / early 4 March 2012. This second inundation was to a higher depth than the previous flooding and resulted in extensive damage to the property, including to the raceways and processing shed.  The peak inundation of the property was caused by floodwater from the G River which overflowed into the subject property later on 3 March 2012 and early on 4 March 2012. 33. After reviewing the submissions by the parties, the Panel is satisfied that the initial inundation of the property was caused by stormwater run-off. As the policy provides accidental damage cover to the buildings and contents of the fish hatchery and stormwater run-off is not specifically excluded, the FSP is liable for any damage caused by the initial inundation. 34. Further, the Panel is satisfied that the subsequent inundation was caused by water overflowing from G River and acc epts that this is “flood”, as defined in the policy. As flood is excluded from cover, and noting that the FSP is not prevented from relying on the flood exclusion, the Panel finds that the FSP is Case No: 311717 Determination Page 7 of 7 not liable for the damage caused in the flood inundation which occurred subsequent to the inundation from stormwater early on 1 March 2012. 35. The Panel notes that subsequent to receiving the report from W, the FSP assessed the damage from stormwater and a settlement for that damage was agreed between the parties. Determination 36. On the basis of the available information the Panel determines that the FSP has no further liability with respect to the Applicant’s claim.