Home / Financial Firm (Unknown - Insurer) / Determination 311407

Determination 311407

Denial of flood damage claim

FirmFinancial Firm (Unknown - Insurer)
Decided2013-08-14
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed$233,500
SourceAFCA PDF

Summary

The Applicants' Chelmer home and contents were inundated in January 2011, and the FSP declined the claim as flood, which the policy excludes. AFCA found the first 1.7m of inundation was flash flood within cover and ordered the FSP to indemnify that loss within the flash flood caps, after a scope of works, with interest on contents from the declinature date.

Heavy rain within 24 hours was the proximate cause of the first 1.7m of inundation, bringing it within flash flood cover, while the flood exclusion was clear and sufficiently communicated under section 35 of the Insurance Contracts Act.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interestreassess claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 311407 Determination Page 1 of 9 Case number: 311407 General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of claim 26 July 2013 Background 1. The Applicants‟ home (located in Chelmer, Queensland) and contents were insured with the Financial Services Provider (FSP) under a home building and contents insurance policy. 2. Their property was damaged as a result of water inundating their home on 11 January 2011, following severe weather events. 3. A claim was lodged with the FSP who declined liability o n the basis the damage was caused by flood which the policy excluded. 4. The Applicants maintain they are entitled to indemnity because their loss was caused by a flash flood within the meaning of their policy. Summary of Applicants ’ position 5. They are entitled to indemnity because their loss was caused by stormwater and flash flood. Their home was inundated:  On 11 January 2011.  Before 4.00am on 12 January 2011. 6. Their neighbour, located 2 doors away, received a payout from the FSP so they fail to understand why their claim should be treated differently. 7. The FSP failed to fulfil its obligation under section 35 of the Insurance Contracts Act, 1984 (the Act) because:  Experts in consumer communication have pointed out that a person of average intelligence and education would struggle to understand the FSP‟s product disclosure statement (PDS).  The definitions and exclusions relating to flood, flash flood and storm are confusing and ambiguous.  The PDS was drafted in a manner that discourages consumer engagement and comprehension. Determination Case No: 311407 Determination Page 2 of 9  The provisions with respect to caps on indemnity for flash flood and stormwater run-off are confusing and complex.  The definition of “flood” is so wide that it is confusing. 8. They seek a total sum $233,500, comprising:  $195,500 (being 50% of the $391,000 sum insured) for their home; and  $38,000 (being 50% of the $76,000 sum insured) for their contents. 9. If possible, the $12,500 compassionate payment they previously received from the FSP should not be taken into account in assessing their policy entitlements. This amount should be kept separate as compensation for the emotional and financial burden the FSP had placed on them due to its failure to promptly settle their claim. Summary of FSP’s position 10. The Applicants‟ property was not damaged b y flash flood or stormwater run- off, but by flood (as defined in the policy) because:  Its hydrological evidence shows that the proximate cause of the loss was the rains which fell in the Wivenhoe Dam catchment from 9 January 2011 or earlier. Releases from the dam caused the Brisbane and Bremer River levels to rise and subsequently inundated the Applicants ‟ residence. The Applicants ‟ property was therefore damaged by rain which fell more than 24 hours earlier.  Their property was damaged before the W4 release s had “substantial impact”. 11. The Applicants were clearly informed of the limitations of cover relating to flood, stormwater run-off and flash floods because:  They were provided with a PDS, and Certificate of Insurance which clearly stated they were not covered for flood.  FOS has previously determined that its PDS clearly informed policyholders of the relevant limitations with respect to flood, stormwater run-off and flash flood damage. 12. It is not required to pay interest on the Applicants‟ claim (if payable) for any period prior to the Determination because:  It had not acted unreasonably for purposes of section 57 of the Act.  It is entitled to a reduction on the interest payable to account for delays that were not its fault.  The Applicants took 22 months to dispute the denial of their claim. 13. The FSP relies on the following policy provisions contained in its PDS: “ Words / terms with special meanings Case No: 311407 Determination Page 3 of 9 Word / term Meaning Flood Rising water which enters your home as a result of it running off or overflowing from any origin or cause. This policy does not cover flood unless we have agreed and it is shown on your certificate of insurance Flash flood and stormwater run - off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flo od or stormwater run - off. … Storm A violent disturbance of the atmosphere associated with strong winds including a cyclone, lightning, heavy rain, hail or snow but not continuous bad weather by itself. … Insured events you are covered for Damage caused by the weather …. What is covered What is not covered Storm … … Flash flood and stormwater run-off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run - off Loss or damage caused:  by flood; … … Your home … The most we will pay for home claims What is covered What is not covered … Flash flood and stormwater run-off We will pay up to 50% of your home sum insured or $25,000, whichever is higher. … Your contents … The most we will pay for contents claims Case No: 311407 Determination Page 4 of 9 What is covered What is not covered … Flash flood and stormwater run - off We will pay up to 50% of your contents sum insured or $25,000, whichever is higher. ” Issues 14. Whether the Applicants were clearly informed of the policy limitations with respect to coverage for flood, stormwater run-off and flash flood. 15. Whether the Applicants‟ loss was caused by rain or storm water runoff, flash flood and/or flood (as defined in the policy). 16. Whether the Applicant is entitled to have the $12,500 compassionate sum they received to be excluded from consideration if they are entitled to indemnity for their loss. 17. Whether the FSP is required to pay interest and if so, is it entitled to a reduction in the amount payable. Reasons for decision Preliminaries 18. Due to the nature and complexity of the dispute, it has been directly referred to the Panel for Determination in accordance with the Operational Guidelines to the Financial Ombudsman Service‟s (FOS) Terms of Reference. 19. The Panel consists of an Ombudsman and two Panel members with extensive experience in the insurance industry and consumer claims. 20. The Panel is satisfied that the material has been exchanged and the parties have had the opportunity to respond to the issues raised. Lack of awareness of policy limitations 21. The Panel notes that the Applicants have not based their claim (of being unaware of the relevant policy limitations) on a suggestion that they never received the PDS or relevant policy documentation, but on a suggestion that the terms in the PDS were unclear. 22. In this respect, they appear to rely on a number of grounds which were previously considered and not accepted by the Service. Case No: 311407 Determination Page 5 of 9 23. Be that as it may, the Panel has considered the Applicants‟ assertions and notes:  The Applicants‟ claim of being unaware of the relevant policy limitations was belatedly raised.  The Applicants say that their PDS and other policy documentation were lost during the flooding event. This establishes that they have received the relevant documents before the loss.  T he FSP‟s Certificate of Insurance which was sent to the Applicants on renewal states: “Flood and storm surge – not included ”  The Panel has previously reviewed the FSP‟s PDS and policy documentation (which were no different to the ones the Applicants received) and is satisfied that: 1. They were clearly indexed; 2. The monetary caps for damage caused by flash flood and stormwater run-off have been clearly set out; and 3. The flood exclusion is not only clearly defined within the policy, but referenced in the Certificate of Insurance (COI) forwarded to the Applicants. 24. The Panel has also previously reviewed the paper written by the relevant consumer communication experts and has not accepted their findings. A fair reading of section 35(2) of the Insurance contracts Act 1984 requires that the relevant exclusions and limitations be in clear and unambiguous language and in a manner that a person of average education and intelligence would have little difficulty in finding and understanding should they choose to read the policy. 25. Having carefully reviewed the policy, the Panel is satisfied that if the Applicants had read the policy they would have been informed of the nature and extent of the exclusions and limitations, including flood. 26. In the circumstances, the FSP has met its obligation to clearly inform, pursuant to section 35 of the Act and is entitled to rely on the terms of its policy. Proximate cause of damage 27. The Panel notes the Applicants had chosen „Advanced Cover‟ (AD) as an optional extra; AD adds „accidental damage‟ to the defined events menu, albeit subject to the same exclusions applying to the defined events. The practical effect of the AD coverage is that the FSP bears the onus of proof demonstrating all the damage was caused by the policy excluded event of flood. Case No: 311407 Determination Page 6 of 9 28. The Applicants say their property was first inundated on 11 January 2011 and their assertion is not inconsistent with the information provided by the FSP‟s hydrologist. 29. According to the FSP‟s hydrologist‟s estimations by letter to the FSP dated 19 March 2013, in which „Attachment A – Key Conclusions‟ reveals:  The Applicants‟ property was elevated between 3m AHD (Australian Height Datum) and 6m AHD, the level of the ground floor level of their two storey home being at approximately 5.3m AHD (“benchmark le vel”). The Panel notes that the ground floor level consists of the garage and what he has described as a possible storage area.  The Brisbane River reached the benchmark level at about 8.21pm on 11 January 2011.  Water was 1.7m above the benchmark level at 4.00am on 12 January 2011. 30. The Applicants maintain that the initial inundation of their property was due to stormwater run-off and flash flood within the meaning of the policy. The FSP maintains that it was a flood within the meaning of the policy. 31. On review of the material, the Panel has considered it unnecessary to determine if the Applicants‟ home was first inundated by localised stormwater run-off. This is because:  Based on the relevant policy wordings, the Applicants entitlement to indemnity is the same whether their home was initially inundated by stormwater run-off or a flash flood. That is to say, they would only be entitled to a maximum of 50% of the sums insured for their contents and home in either case.  The available evidence satisfies the Panel that their home was inundated by some 1.7m of water that can appropriately be considered “flash flood” for the purposes of the policy. 32. In order for the Applicants to be entitled to cover for flash flood, the following elements must be established:  there was a sudden flood;  there was a heavy rain that occurred within 24 hours prior to that flood;  the sudden flood was caused by that heavy rain. 33. FOS has determined in other disputes, following consideration of all material exchanged, that the heavy rainfall commencing around 4.00am on 11 January 2011, was a proximate or effective cause of the inundation of the properties downstream from the Wivenhoe Dam. 34. Although each dispute is determined on its merits and in this dispute, detailed further submissions have been made by the parties, in particular by the FSP, the Panel is not satisfied that the evidence substantially changes the position adopted in earlier Determinations. Case No: 311407 Determination Page 7 of 9 35. The evidence supports the view that a substantial portion of the flooding downstream of the Wivenhoe Dam is attributable to the particularly intense rainfall over the dam that commenced at approximately 4.00am on 11 January 2011. This rainfall event caused a sharp rise in the dam‟s level, ultimately leading the dam‟s operating engineers to move fr om a W3 release strategy (which had been working well up to then) and to adopt a W4 release strategy from 8.00am on 11 January 2011. 36. The Panel is satisfied having considered all of the evidence presented and in particular the further submissions and hydrology reports provided by the FSP, specifically it‟s hydrologist‟s statement dated 19/3/2013, his letter dated 19/3/2013 and his supplementary statement dated 17/5/2013, that it was the heavy rainfall commencing at approximately 4.00am on 11 January 2011 that was the proximate, effective or dominant cause of the inundation of the Applicants‟ property. 37. The FSP‟s hydrology indicates that rising Brisbane River water level was likely to have caused an inundation of the Applicants‟ residence to a height of about 1 .7m above the “benchmark level” by 4.00am on 12 January 2011. This is within the relevant 24 hour period with the commencement of the heavy rainfall so as to attract cover under the flash flood provisions of the policy. 38. Coverage under the policy in respect of flash flood is limited to 50% of the home sum insured or $25,000 whichever is higher and 50% of the contents sum insured or $25,000, whichever is higher. In this dispute, the policy provided a home sum insured of $391,000 and contents sum insured of $76,000. Accordingly, under the terms of the policy for flash flood, the liability of the FSP would be limited to a maximum amount of $195,500 for the home sum insured and $38,000 for the contents insured. 39. The Panel notes that the FSP‟s assessor had provided reserves of $140,000 and $50,000 for the damage or loss to the Applicants‟ home and contents respectively. The assessor further reported that there was damage to a number of structures comprising the home while contents were destroyed; essentially suggesting that the Applicants have sustained extensive losses from the event. 40. However, it is possible the full extent of the Applicants‟ loss did not arise from the inundation by the first 1.7m of water (which the Panel considers to be “flash flood”). 41. In the circumstances, the Panel considers it reasonable that the FSP be given the opportunity of completing a thorough scope of works to identify the actual loss sustained as a result of inundation throughout the property to a level of 1.7m, above the benchmark level. 42. The FSP is requested to obtain the scope of works immediately upon the Applicants‟ acceptance of the Determination and the parties are requested to work cooperatively to then determine the extent of the damage attributable to the insured loss. If the parties are unable to reach agreement as to the Case No: 311407 Determination Page 8 of 9 extent of the loss, further submissions may be made and the Service will make a determination on the actual loss sustained. Compassionate sum 43. The Applicants have received a $12,500 compassionate payment from the FSP and has requested that they should be entitled to retain it as compensation for the FSP‟s failure to settle their claim promptly (instead of having it taken into account as part of their policy entitlement). 44. In previous Determinations, the Panel has indicated that FOS does not have jurisdiction to deal with this payment but acknowledges that the FSP, given the terms on which the compassionate payment was made, may be entitled to deduct this payment from any settlement sum. For this reason, the Panel is unable to make any Determination with respect to the compassionate payment the Applicants received. Interest 45. The FSP has argued that interest is only payable from the date from which it was unreasonable to withhold payment. The FSP maintains that it is e ntitled to a reasonable period to investigate and determine its position, and given the complex nature of the flood disputes, the delays are not unreasonable. Further, complex situations required substantial periods of time for independent bodies such as the Queensland Flood Commission of Inquiry and FOS, to make conclusions on the issues in dispute. 46. The FSP maintains that it did not act unreasonably in this dispute and therefore interest is not payable. Alternatively if some period of interest is to be awarded, it should be reduced to account for the substantial delays through the course of the process which were not the FSP‟s fault. 47. The FSP further points out that the Applicants did not seek a review of the FSP‟s initial denial of their claim for some 22 m onths. 48. Section 57 of the Act requires interest be paid when it becomes “unreasonable for the insurer to have withheld payment”. An examination of relevant case law indicates that most probably, interest will be awarded from either when an insurer first emphatically denied liability or disputed a matter, or from when in the normal course of events the claim should have been paid if liability had not been disputed. 49. The Panel accepts that the FSP was entitled to withhold payment of the settlement monies until such time as it had properly investigated the dispute and made its decision as to liability. 50. The FSP made its original decision to deny the claim after receiving relevant assessment reports, hydrology reports and other information. The FSP was aware of the terms of its policy and aware of the relevant provisions under which liability might arise and chose to deny the claim having reviewed those relevant provisions and the evidence available to it. Case No: 311407 Determination Page 9 of 9 51. The Panel is unable to agree with the FSP in this instance in respect to the question of interest. 52. Although the Panel is of the view interest should normally be paid in these circumstances, the Panel notes the FSP is to obtain a current scope of works to assess the loss caused by the first 1.7m of water that inundated their home, which would be based at current rates in respect of building repair. In these circumstances, the Panel accepts it is fair that interest not be awarded for that component. However, in respect of contents, as many will have been replaced by the Applicants such an approach is not fair in all the circumstances; accordingly, the FSP is to apply interest from the date of claim declinature, namely 9 March 2011 and it is to cash settle the Applicants in respect of the contents claim, once it has established the scope of contents that were damaged by inundation of the home to a level of 1.7m. Determination 53. In light of the above analysis, the Panel determines that the FSP is required to indemnify the Applicants for loss or damage caused by the inundation of the property to a level of 1.7m above the benchmark level of their home, subject to the applicable policy limits for flash flood. 54. The FSP is to proceed with settlement thereon as outlined in paragraph 52 above.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.