Home building claim denied for water inundation (flood exclusion versus flash flood cover)
Text of the determination
Case No: 310939 Determination Page 1 of 9
Case number: 310939
General Insurance - Domestic Insurance - Home Building - FSP Decision -
Denial of claim-Exclusion/ condition
1 July 2013
Background
1. The Applicants insured their home and contents in Graceville with the
Financial Services Provider (FSP). The relevant period of insurance
operated for twelve months beginning from 17 December 2010. During this
period, the building was insured up to a sum of $623,000 and the contents
for $189,000.
2. On 25 January 2011, the Applicants lodged a claim under the policy due to
extensive water inundation following severe weather events in Queensland.
3. The FSP denied the claim on the basis the damage was due to “flood”.
Summary of Applicants ’ position
4. The Applicants submit the following as alternative arguments in response to
the FSP‟s decision:
a. When first taking out the policy with the FSP, it was on a “like -for- like”
basis with their existing insurer “W” at the time. His existing insurer at
that time confirmed they were covered for flood.
b. Water entered the property from a drain in the park beside their
residence. Accordingly, they do not accept that the river caused the
flooding.
c. They reject the contention that they were clearly advised that they were
not covered for flood.
5. The Applicants seek to be indemnified for their claim.
Summary of FSP’s position
6. The FSP notes the policy was incepted in 1998. As such, there are no call
recordings to confirm the conversation. Further, a copy of the policy was
sent at the 2008-09 renewal which clearly informed the Applicants regarding
the lack of flood cover.
Determination
Case No: 310939 Determination Page 2 of 9
7. Further, at each renewal the Applicants have been provided with a renewal
certificate in which it clearly states that flood is not covered.
8. Accordingly, the FSP relies on the above, a number of hydrology reports
authored by SC and the following policy provisions to deny the Applicants ‟
claim:
Page 3 of the Certificate of Insurance (COI)
“ What optional covers are included and not included
Home Contents
...
Flood and storm surge not included not included...”
Pages 10-12 of the PDS
“ Words / terms with special meanings
Word / term Meaning
...
Flood Rising water which enters your home as a result of it
running off or overflowing from any origin or cause.
This policy does not cover flood unless we have
agreed and it is shown on your certificate of insurance.
Flash flood and
stormwater run - off
A sudden flood caused by heavy rain that fell no more
than 24 hours prior to the flash flood or stormwater
run - off.
...
Storm A violent disturbance of the atmosphere associated
with strong w inds including a cyclone, light ning, heavy
rain, hail or snow, but not continuous bad weather by
itself.
...”
Pages 17-18 of the PDS
“ Insured events you are covered for
Damage caused by weather...
What is covered What is not covered
Storm Loss or damage:
caused by rain, hail or snow
after it has reached the
ground...
...
Flash flood and stormwater run-off Loss or damage caused:
Case No: 310939 Determination Page 3 of 9
A sudden flood caused by heavy rain
that fell no more than 24 hours prior to
the flash flood or stormwater run - off
by flood...
...”
Page 27 of the PDS
“ Your home
The most we will pay you for home claims
What is covered What is not covered
Flash flood and stormwater run-off
We will pay up to 50% of your home sum
insured or $25,000, whichever is higher.
...
...”
Page 32 of the PDS
“ Your contents
The most we will pay you for contents claims
What is covered What is not covered
... ...
Flash flood and stormwater run-off
We will pay up to 50% of your contents
sum insured or $25,000, whichever is
higher , but not exceeding your contents
sum insured .
...
...”
Issues
9. Whether the FSP is entitled to rely on the policy provisions; and if so
10. Whether the cause of the Applicants‟ loss was covered under the policy.
Reasons for decision
11. Due to the nature of the dispute, the parties have been informed that the
matter has been referred to the Panel for Determination in line with the
Operational Guidelines to FOS‟s Terms of Reference. This dispute has not
been the subject of a FOS Recommendation and has proceeded directly to
Determination.
Case No: 310939 Determination Page 4 of 9
12. This decision has been made by a Panel consisting of an Ombudsman and
two Panel members with extensive experience in insura nce matters and
consumer claims.
13. It is appropriate to consider the issues under the various headings.
Whether the FSP can rely on the policy provisions with respect to “Flash flood
and stormwater run- off” and “Flood”
14. One of the Applicants‟ principal argume nts is that when they first incepted
the policy, they presumed it was a “like -for- like” replacement for the policy
they had with their previous insurer at the time. In addition, they note the
previous insurer covered flood.
15. The Applicants have not provided any corroboration that the previous insurer
did cover flood. Although they state they enquired with that insurer, there is
no information substantiating this enquiry related to the coverage available
back in 1998.
16. Further and in the alternative, even if it was established that the previous
policy did cover flood, the Panel does not accept they can rely on same with
respect to a claim that occurred almost 13 years after the fact for the
following reasons.
17. Contracts of general insurance, such as this one, operate on an annual
basis. They are renewable at the discretion of both parties. Further, a
renewal is not a continuation of the original contract. Accordingly, it is not
unusual that when a policy is renewed, the terms may vary if the insurer in
question has decided to alter its policy. This is normally done when the
insurer sends the renewal offer with its updated policy, which the FSP
submits was the case in this instance with respect to the 2008-09 period of
insurance.
18. Accordingly, the Panel cannot accept that any alleged misrepresentation
made in 1998 can be relied upon after approximately 13 renewals. This is
particularly the case where the FSP would have sent a number of policies
and annual certificates of insurance (CoI) explaining the extent and
limitations of coverage. The PDSs and CoIs would have clearly distinguished
the covers and exclusions it provided to that held by the Applicants prior to
1998.
19. Having reviewed the FSP‟s PDS and its CoIs, the Panel accepts that these
served to clearly inform the Applicants that „flash flood‟ was covered but all
other types of flood were excluded. Therefore the FSP can rely upon the
terms and conditions of its policy with respect to the Applicants‟ claim.
Case No: 310939 Determination Page 5 of 9
Water Inundation
The Evidence
20. The FSP‟s hydrologist (SC) provided a statement dated 28 February 2013
that contained the following of relevance:
A substantial amount of rain fell in the greater Brisbane area from 9
January 2011 and over the subsequent two days. This caused
significant inflows into the Wivenhoe Dam which peaked on the evening
of 11 January 2011.
Rain also fell in the area of the Bremer River from 6.00am on 11
January 2011. This rain travelled along the Bremer River to the junction
of the Brisbane River and ultimately contributed approximately 15-25%
of its peak flow.
A “small proportion” of the overall depth of the Brisbane River “may be
partially attributable to the rain that fell in the Bremer River catchment
on 11 January 2011”, although the “overwhelming influence” was the
rain that had fallen in the previous days.
The property‟s terrain varies between 3.3m AHD to 5.5m AHD. The
level of the lowest point of the property (the “benchmark level”) is
approximately 4.6m AHD. This was considered as the level required to
be reached in order to determine the time and inundation of the
property.
C Avenue (being the property‟s street address) drains from west to east
in the direction of Oxley Creek. The house is adjacent to the lowest
point in C Avenue. There is kerb and channelling along C Avenue
which lead to the low point in C Avenue. There are stormwater
drainage pits (immediately opposite the property) which drain run-off
from C Avenue into a stormwater pipe. This drains to Oxley Creek,
which in turn flows to the Brisbane River.
There is little catchment leading directly to the property other than a
residential block immediately adjacent to the south and the property
itself. The terrain information suggests it would be unlikely the property
would experience significant stormwater problems.
Rainfall records were obtained from Corinda High Alert, which is
approximately 2.3km from the property. 85mm of rain fell over the
period 9 to 10 January 2011. An additional 43mm (approximately) fell
during 11 January. The most intense period was recorded between 10
to 11am on 11 January during which approximately 15mm fell. No
rainfall was recorded after 5pm on 11 January.
The rainfall was of very low intensity throughout this period (i.e. a peak
intensity that was less than a 1 in 1 year event for all durations from 5
minutes to 48 hours). It is unlikely that rainfall of this magnitude would
cause stormwater or other run-off inundation.
He provided an interpolated level of the Brisbane River waters affecting
the property. This was based on levels recorded at Oxley Creek Mouth
Case No: 310939 Determination Page 6 of 9
Alert. Pursuant to this, he estimated the minimum ground level
inundation would have occurred at approximately 10.05am on 11
January 2011. Inundation at the benchmark level would have occurred
at approximately 3.50pm on 11 January 2011.
Given the minimal rainfall in the vicinity of the property, it is unlikely
stormwater run-off from local rainfall was the cause. Instead, the cause
of the inundation was the rising levels of the Brisbane River. The rising
level occurred due to the substantial volume of rain which fell over the
upper catchment of the Brisbane River between 9 and 11 January and
the subsequent releases from Wivenhoe Dam.
21. The Applicants submit the water entered the house from a drain in the park
located near their residence. It is unclear whether the male Applicant ‟ s
information was based on his observations or that of a witness and as such
has little evidentiary value. However, for reasons to become apparent, the
Panel does not consider this issue to be determinative for this dispute.
Analysis
22. In the Panel‟s view the evidence supports a view that the property was
inundated by the rising water levels from the Brisbane River. As flood is
excluded under the policy the central issue for Determination in this dispute
is whether the inundation of the Applicants‟ home was due to “F lash flood ”
as defined within the policy as this is the only insured event that would
respond to the Applicants‟ circumstances. That is, the Panel must determine
whether rain that fell no more than 24 hours prior to the inundation of the
Applicants‟ property was the proximate cause of the inundation.
23. On 21 May 2012, FOS issued a memorandum to all relevant stakeholders
advising that after considerable deliberation of all material available to it, the
Panel formed a view that the heavy rain occurring from approximately 4am
on 11 January 2011, and in particular the heavy rain between 4 – 8am on 11
January 2011, was a proximate cause of the W4 strategy being invoked and
therefore a proximate cause or trigger that led to the flooding of many of the
properties along the Brisbane River.
24. The parties have had the opportunity of making submissions with respect to
the timing of the inundation of the Applicants‟ property and with respect to
the individual and unique factors that relat e to the Applicants‟ dispute in light
of the memorandum.
25. Although the Panel accepts that the level of the Brisbane River may have
been increasing due to the W3 release strategy in place, the Panel having
considered all of the material provided in this dispute is satisfied that in fact
the heavy rain that commenced falling from approximately 4.00am on 11
January 2011 caused the need to adopt the W4 release strategy at 8.00am
on that same day. This combined with the heavy rain that commenced falling
from approximately 6.00am on 11 January 2011 over the Bremer River
contributed to the ultimate inundation of the properties downstream of the
Case No: 310939 Determination Page 7 of 9
Wivenhoe Dam and in the Panel‟s view, was the proximate cause of the
inundation to properties downstream of the dam.
26. There is no dispute the Applicants‟ property is located downstream of the
dam.
27. For the Applicants‟ claim to succeed and fall within the definition of “flash
flood” within the terms of the policy, it is necessary to establish the property
was inundated within 24 hours of this heavy rainfall. That is, the inundation
would have had to occur prior to 4.00am on 12 January 2011.
28. The Panel is satisfied, based on SC‟s analysis, that the local rainfall did not
cause the inundation. This is principally based on the fact the local rainfall
intensity was fairly low (an annual recurrence interval of less than 1 year)
and further, the estimated time of inundation was not contemporaneous to its
peak period.
29. In particular, the Panel is more persuaded by the fact the estimated time of
inundation matched the timing of the rising levels of the Brisbane River. This
is also consistent with the Applicants‟ evidence that the water was
surcharging from a drain in a nearby park.
30. In relation to the latter point, the Panel notes it is unusual for stormwater run-
off to enter the drain and then surcharge from it. Instead, stormwater run-off
occurs when it cannot enter the drain because it is either too full or the
accumulated run-off is of such sufficient depth and intensity that the drain
cannot cope. Accordingly, water surcharging from a drain is more consistent
with river or creek water backing up through it due to rising levels given, in
normal circumstances, stormwater usually drains into these watercourses.
31. Accordingly, the Panel accepts SC‟s conclusion that the water which
inundated the Applicants‟ property was due to the rising levels of the
Brisbane River. This, the Panel accepts, was due to the heavy rain that
commenced falling on 4am on 11 January that resulted in the W4 release
strategy being adopted.
32. Based on the interpolated graph provided by SC regarding the levels of the
Brisbane River affecting the Applicants‟ property, the estimated level of
inundation as at 4am on 12 January 2011 was 7m AHD. The peak level was
9.2m AHD and the benchmark level is 4.6m AHD.
33. SC has speculated that if the W3 strategy had been maintained, then,
according to the Key Conclusion statement, the Applicants‟ property would
still have been inundated by approximately 4.18pm on 11 January 2011 and
by 4am on 12 January, would have been inundated to a level of 1.7 metres
above the benchmark level.
34. The Panel is concerned however that to reach such a conclusion, it must be
speculated that the releases from the dam would have continued at the
same rate at the W3 level in the absence of any additional rainfall. The
Case No: 310939 Determination Page 8 of 9
report does not address the possibility of the inflow into the Wivenhoe Dam
decreasing.
35. The available information indicates the W3 strategy that was in place prior to
8.00am on 11 January 2011 had been successful in limiting the outflows and
flooding below the Wivenhoe Dam. Whether the outflows would have
continued at the same rate had the inflows continued to reduce is not known.
36. Instead, the Panel is satisfied that on the facts of what actually occurred on
11 January 2011, it was the heavy rainfall from approximately 4.00am on 11
January 2011 that caused the need to adopt the W4 strategy at 8.00am on
the same day. This led to the inundation of the Applicants‟ property.
37. Given the level of inundation at 4.00am on 12 January 2011 was at 2.4
metres above the Benchmark level, the FSP is required to indemnify the
Applicants for damage caused by inundation to that level.
38. The Panel notes that the ultimate level of inundation was to 9.2m AHD which
is 2.2 metres above the level at 4.00am on 12 January 2011. For clarity, the
FSP is not required to indemnify the Applicants for any damage caused by
inundation above the level of 7m AHD (equivalent to 2.4 metres above the
Benchmark level).
Quantum
39. The Renewal Certificate of Insurance for the relevant period provides a sum
insured of $623,000 for the home with contents of $189,000. Pursuant to the
policy cap for the insured event of “Flash flood and stormwater runoff”, the
FSP is liable up to an amount of $311,500 for the damage to the building
and $94,500 for the contents.
40. Given the time since the loss was sustained, the Panel accepts that the
parties may be unable to provide an exact estimate of the total loss
sustained, or a breakdown of that loss. Although an estimate was provided
by the male Applicant, namely $245,000 for the building and $80,000 for
contents, it is unclear how accurate these are with respect to the actual costs
required.
41. In the circumstances it is reasonable for the FSP to arrange a scope of
works to be conducted to assess the extent of the loss and damage
sustained as a result of the inundation. The Panel accepts the level of
inundation caused by the heavy rain would, at a minimum, have caused
significant damage to the first level and most likely resulted in a total loss of
the contents stored at this level. This would include fixtures and fittings.
42. Once the scope of works has been completed the Applicants and the FSP
are asked to work cooperatively together to establish the extent of the loss
sustained to the property and to reach an agreement as to the cost of repairs
or replacement of the contents lost.
Case No: 310939 Determination Page 9 of 9
43. Once agreed, the FSP is required to settle the dispute for the buildings
based on the costing of the scope of works at current rates. Insofar as the
value of the lost/damaged contents are concerned, where the FSP elects to
cash settle these, it is required to pay interest on that amount from the date
on which it initially declined the claim to date of settlement.
44. Should agreement not be reached, the parties may return the dispute to the
Panel and the Panel will determine the extent of the loss.
45. Insofar as the FSP may have made payment of a compassionate sum to the
Applicants, FOS does not have jurisdiction to deal with this payment but
acknowledges that the FSP, given the terms on which the compassionate
payment was made, may be entitled to deduct this payment from any
settlement sum.
Determination
46. The FSP is to indemnify the Applicants for the cost of repairs incurred as a
result of inundation of the property up to 2.4m above benchmark level,
subject to the limitations contained within the policy and in line with the
directions provided in this Determination.
47. The FSP is to pay interest at the statutory rate on the cash settlement of any
contents from the date of initial claim decline to the date of settlement.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.