Home / Financial Firm (Unknown - Insurer) / Determination 310901
Determination 310901
Denial of building damage claim after January 2011 severe weather
Summary
A homeowner's claim for building damage after the January 2011 severe weather was denied as gradual damage. AFCA found the policy covered accidental damage and the FSP had not proven an exclusion, so it must pay the claim with interest on any cash settlement and contribute up to $3,000 to an engineer's report.
Once the insured establishes a prima facie accidental damage claim, the insurer bears the onus of proving an exclusion, which it did not discharge given conflicting expert evidence.
Subjects and remedies
home or building damagenatural disasterpay claimpay compensationpay interest
Text of the determination
Determination
General Insurance - Domestic Insurance - Home Building - FSP Decision - Denial of
claim
Determination
Case No: 310901 Determination Page 1 of 6
Case number : 310901 14 August 2014
1 Overview
1.1 Dispute
The Applicant lodged a claim against his home building insurance policy held with
the Financial Services Provider (FSP) following the severe weather events in
January 2011.
The FSP denied the Applicant’s claim for building damage on the basis it was not
caused by a single insured event but occurred over a period of time and was due
to events which are excluded from cover.
The Applicant disagrees with the FSP’s decision and seeks a review by the
Service.
1.2 Issues and key findings
Is the FSP liable for the damage to the Applicant’s building ?
The FSP is liable for the damage to the Applicant’s building because:
the policy covers accidental loss or damage
the Applicant has established that, on the face of the facts, his home was
accidentally damaged
the FSP has not satisfactorily shown that a policy exclusion applies to defeat
the Applicant’s claim.
1.3 Determination
This Determination is in favour of the Applicant.
The FSP is liab le for the damage to the Applicant’s home building.
Should the FSP cash settle any part of the Applicant’s claim, in accordance with
policy provisions, the FSP is to pay interest on the cash settlement amount, in
accordance with the Insurance Contracts Act 1984, from the date of denial of the
claim, until the date of settlement.
Case No: 310901 Determination Page 2 of 6
2 Reasons for Determination
2.1 Is the FSP liable for the damage to the Applicant’s building ?
Applicant’s policy was for accidental loss or damage
Section Three of the Product Disclosure Statement booklet provided by the FSP
explains the Accidental Insurance Cover of the policy. It states that:
if the Applicant has home accidental cover, it will be shown on their certificate
of insurance
under this accidental cover, if accidental loss of or accidental damage to the
Applicant’s home occurs, the FSP will either repair or replace the lost or
damaged portion of the home, or pay him the amount it would have paid for
the repair or replacement (less the applicable excess).
The Certificate of Insurance confirms coverage for accidental loss or damage to
the home and contents.
The FSP’s argument that the Applicant’s policy was for defined events is not
accepted.
Sections One and Two describe the Home Insurance Cover and Contents
Insurance Cover respectively and there is no doubt that those covers are both for
defined events. The material provided by the FSP indicates that the Applicant’s
level of cover was for “Classic with Accidental Damage option” (for both building
and contents). However, the policy wording does not indicate that the Accidental
Insurance Cover is an optional extra to the Home or Contents Insurance Covers.
Rather, it appears that it can be selected as an alternative to the Home Insurance
Cover and/or the Contents Insurance Cover.
It is therefore accepted that the Applicant’s policy provided him with cover for
accidental loss and accidental damage, as described in Section Three of the
policy booklet. On that basis the specific exclusions of the defined event covers
for Home and/or Contents Insurance would not apply to the Applicant’s policy.
Applicant has established a prima facie claim under the policy
It is an accepted principle of general insurance law that an insured bears the onus
to establish, on the face of the facts, that they have suffered a loss caused by an
event to which the policy responds. This is known as a prima facie claim. Once so
established, the onus shifts to the insurer to prove the application of an exclusion
if it seeks to deny or limit its liability for the loss.
According to the definition section of the policy, accidental damage means
damage that is sudden, unforseen and occurs without intent.
The Applicant has stated that when he arrived back from Sydney after the severe
weather events in January 2011, he found that his home building had been
significantly damaged and the Applicant has provided photographs to show the
nature and extent of this damage.
Case No: 310901 Determination Page 3 of 6
It is therefore accepted that the Applicant has established a prima facie claim for
accidental damage and the onus now shifts to the FSP to prove the application of
an exclusion.
FSP has not satisfactorily shown that an exclusion applies
The FSP r elies on reports from engineers “J” and “C” and contends that the
damage to the Applicant’s building:
was due to foundation settlement over time
was due to structural defects and faulty workmanship
has been happening over an extended period of time and well prior to the
claimed event.
J provided reports dated 11 April 2012 and 11 September 2012, a letter dated 14
February 2012 (assumed to be 2013) providing additional information about the
penetrometer testing performed and a supplementary report dated 13 December
2013. J argued that:
there are differences in the density of the fill and the natural ground upon
which the home is located and could be the cause of differential foundation
movement over time
the retaining wall of the building was not constructed in accordance with
standard engineering practices.
C provided a report dated 4 January 2013 which, in the main, supported the
position of J. The report by C also noted that:
the 2007 pre-purchase inspection report for the property noted that there were
a number of settlement cracks to the front retaining wall and heavy bindings to
doors in the house at that time
the absence of cross bracings to the lower floor, which were specified on the
original house plans but were not installed by the builder, means the building
would have little capacity in resisting wind loads and ground movement.
Many of the statements put forward by J and C have been contradicted by
engineer “R”, who provided a report dated 21 November 2013, with respect to the
home and the damage to it.
It is noted that J later provided additional information in February 2012 (assumed
to be 2013) which stated that the foundation soil bearing capacities (both fill and
non-fill areas) were satisfactory for the type of construction, contrary to the
position J took in earlier reports.
Further reports by J and C were provided (dated 13 and 17 December 2013
respectively) in response to the report by R:
J conceded that it had altered its opinion and conclusions but maintained that
the movement of the timber framed structure was the result of poor
construction practices and the omission of cross-bracing between the steel
support posts
C referred to the approved plans for the building and noted that the actual
building works were different to these plans.
Case No: 310901 Determination Page 4 of 6
It is clear that the experts engaged by both parties have differing opinions with
respect to the damage and its cause.
Based on the evidence provided with respect to the soil testing and the floor
levels, it seems highly unlikely that ground movement (settli ng, subsidence,
shrinkage) caused the damage claimed.
Further, C argues the retaining wall did not reveal any degree of deviation from its
original position and was not out of alignment but also argues that the retaining
wall was not properly constructed.
It is not disputed that the local council approved the construction of the house,
including the revised wall and in light of this and the inconsistencies in the logic of
the arguments put forward by C, it is therefore difficult to accept that a structural
defect in the retaining wall caused the claimed damage.
C has stated that cross bracing to the lower floor of the home was not installed by
the builder. However, the Applicant has provided photographs of walls in the
lower floor area which show cross bracing in place, albeit to a lesser degree than
shown on the depictions of the plans provided by C. In addition, while C has
stressed the importance of cross bracing to the stability of the home, it cannot be
concluded that the absence of cross bracing caused the claimed damage to the
building.
After a consideration of the evidence presented, it is concluded that the FSP has
not proven the application of any of the exclusions relevant to the Accidental
Insurance Cover.
Accordingly, the FSP is liable for th e damage to the Applicant’s home.
Further, the FSP is required to contribute up to a maximum of $3,000 towards the
Applicant’s cost for the report by R dated 21 November 2013, subject to the
Applicant producing appropriate proof of the costs incurred.
3 Supporting information
3.1 Expert reports
Report Key points
FSP’s engineer J
Reports:
- 11 April 2012 and
- 11 Sept ember 2012
there are difference s in the density of the fill and the natural ground
upon which the home is located
the retaining wall of the building was not constructed in accordance
with standard engineering practices:
o the original site plans show the wall was to be constructed in a
different location and was to retain about half the soil it is now
retaining
o the size of the footings were less than expected for the wall size
and retained load
o horizontal steel was not able to be located in places where it would
reasonably be expected
o there was no drainage medium at the base and no base drain at the
Case No: 310901 Determination Page 5 of 6
bottom of the wall
o the waterproofing behind the wall is non compliant .
FSP’s engineer J
Letter
14 Feb 2013
The results of dynamic cone penetrometers testing of the home’s
foundation soil indicates that the bearing capacities of both fill and non -
fill area are acceptable for the type of construction.
FSP’s engineer C
Report
4 January 2013
the 2007 pre - purchase inspection report noted a number of settlement
cracks to the front retaining wall, and heavy bindings to doors at that
time
the building would have little capacity in resisting wind loads and
ground movement due to the absence of cross bracings.
Applicant’ s engineer
R
Report
21 November 2013
the floor levels show that vertical movements have not occurred and
the rise in the central part of the house is normal for slab - on - ground
construction
t he southern side of the home, which is located on fill, has not
experienced any movement and this area is in fact slightly higher than
the northern side (which is located it the cut ground)
the bearing capacities of the foundation soils (both fill and natu ral
ground) are satisfactory
cracking to the retaining wall, noted in the pre - inspection report, is
normal for buildings on reactive clay soils and construction standards
of 1981
there is a plastic membrane present behind the wall and agricultural
drainage pipe at the bas e
the central bow in the retaining wall, the southerly lean of the
supporting posts and the lateral translation of the upper floor
diaphragm are consistent with lateral pressures to the back of the
retaining wall
local council approval of c onstruction in 1981 indicates that the work
complied with the standards at the time
FSP engineer J
Supplement ary report
13 December 2013
Maintained previous position that the movement in the timber framed
structure is a result of poor construction practices plus the omission of
any cross - bracing .
FSP engineer C
Supplement ary report
17 December 2013
Comparison of house plans to construction:
o plans show cross bracing to several walls on lower level, yet the
builder “simply did not install them during construction”
o plans show retaining wall locat ed at in the cent re of the home,
retaining fill to 600mm. However the constructed wall is located at
the front of the home retaining soils to 1.9m
o plans show f ooting s of 500mm x 400mm (for fill height to 600mm)
but structural analysis shows footing for wall “is far from adequate
to support 1.9m high fill obs erved” and movement would have
occurred over life of structure
o plans show 75mm agric ultural pipe at the bottom of rubble fill at
base of wall, but inspection s show only PVC pipe and thin layer of
pebble fill.
at southern elevation, PVC pipe connected to small drain which is also
collecting overland flow from higher up and water from retaining wall
Case No: 310901 Determination Page 6 of 6
would not drain effectively.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.