Home / Financial Firm (Unknown - Insurer) / Determination 310741

Determination 310741

Flood inundation of commercial property declined under defined events policy; PDS not provided

FirmFinancial Firm (Unknown - Insurer)
Decided2014-03-13
ProductGeneral Insurance · Business / commercial
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$178,205
SourceAFCA PDF

Summary

A small business claimed $175,205 indemnity plus legal costs for flood-related inundation of its commercial premises in January 2011. AFCA found the inundation was flood or water overflowing a pipe, excluded under the policy, and that the PDS disclosure obligations were met, so the FSP could refuse the claim.

Under the policy wording, water overflowing from a stormwater pipe during flood is excluded, and concurrent excluded causes defeat the claim under the Wayne Tank principle.

Issues

Subjects and remedies

natural disastersmall businessno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 310741 Determination Page 1 of 12 Case number: 310741 General Insurance - Small Business/Farm Insurance - Commercial Property - FSP Decision – Flood - Denial of claim – Section 35 Insurance Contracts Act 1984 11 March 2014 Summary Description  Claim under a Commercial Business Insurance Policy for the inundation of the Applicants‟ property following the heavy rainfall that impacted Queensland in January 2011.  The FSP has denied liability for the claim on the grounds that the property was flooded and that the Applicants have been unable to establish a claim under the defined events policy. Basis of Determination  The policy is a commercial defined events policy.  There is no dispute that the Applicants‟ property was inundated on or about 12 January 2011.  The inun dation of the Applicants‟ property was on balance, due to a combination of water back flowing through the surrounding stormwater drainage pipes and subsequent overland flow from floodwaters from the Brisbane River.  The policy excludes inundation by floodwater and inundation by water overflowing the natural confines of a pipe.  The natural confines of a pipe would include a stormwater drainage pipe and accordingly overflow from a stormwater drainage pipe would be excluded under the terms of the policy. Determination  The FSP is entitled to rely upon the terms of the policy to refuse payment of the claim. Determination Case No: 310741 Determination Page 2 of 12 Summary of Applicant’ s position 1. The Applicants are represented by “DL” in disputing the FSP‟ s decision to decline the claim. Therefore, in the interest of brevity and the easy understanding of the parties, both the Applicants and DL, will be referred to as „the Applicant‟ for the purpose of this Determination. 2. The Panel notes the Applicant has been informed of and accepts FOS‟s jurisdictional limitations as provided in the Services Terms of Reference (TOR). 3. The original inundation was caused by stormwater that backed up through a blocked stormwater drain. It was at least 90 minutes later that floodwaters arrived and inundated the property to the maximum level. 4. The stormwater drain commences on „C Road‟ between the roundabout and „B Street‟ (Applicant‟s Street) and traverses the bend from there to the Brisbane River (the River) outlet. B Street runs parallel but 100m back from the River. 5. An investigation and related video commissioned by the Brisbane City Council (BCC) of the relevant stormwater drainage system some months after January 2011, shows the pipe to be blocked at its conclusions. 6. The Applicant maintains that the initial inundation of the insured property occurred at 1.30am on 12 January 2011 by stormwater, prior to when the floodwater from the River arrived at 3.00am on 12 January 2011, according to the FSP. 7. The principle of the business at 39 B Street, “WK” remained at his premises until 1.30am on 12 January 2011. When he walked to the corner of C Road and B Street, he maintains at this time, water on B Street was already at knee level and it was stormwater. 8. The insured property is approximately 200mm lower than street level (B Street) and therefore it would be reasonable to conclude water was already in the premises and above floor level at the insured property at 1.30am on 12 January 2011. 9. All first hand evidence from witnesses at the relevant time demonstrates that there was a rain event after 6.00pm on 11 January 2011 and this is the only way to account for the water over B Street at 1.30am. It may be the case that the rainfall event was local over this area and not recorded at the Jindalee Alert. 10. The Applicant has submitted a Statutory Declaration and a consultants‟ report from “L” , in support of his position. 11. The Applicant further maintains that the FSP failed to fulfil its obligations in respect to providing him with the policy Product Disclosure Statement (PDS) Case No: 310741 Determination Page 3 of 12 at inception of the policy. He had to contact the FSP and request that a copy of the PDS be made available to him after the date of loss. 12. Accordingly, the Applicant did not receive a clear and unambiguous warning that the policy did not include flood cover and/or excluded flood cover. He refutes the FSP‟s position that he failed to include flood cover upon the policy, for as noted above, he was never made aware that it was not covered and/or that he had to include it upon the policy as „Optional cover‟. 13. The policy provides a definition of the event „Flood‟ for the purpose of the contract and it is not an all inclusive term. The definition makes reference to specific „origins‟ of the water and does not include others. In its usual usage, the term „flood‟ encom passes far more meaning than the defined meaning within the policy. 14. The FSP only assumes and which is also inaccurate, that the inundation of the insured property did not occur until such time that both storm waters and floodwaters had mixed. The Applicant maintains that the initial inundation of the property was only due to stormwater. Contrary to the FSP‟s position that the origin of inundation is irrelevant, origin is the criterion specified by its own policy. 15. Therefore, inundation that occurs from „the normal confines of any natural watercourse or lake (whether or not altered or modified), or of any reservoir, canal or dam‟ is a flood. An inundation event whose origin is not a defined origin is not a flood within the meaning of the policy. 16. The FSP‟s resp onse to FOS dated 28 June 2013 is misleading. It comments in respect to the BCC video of the stormwater drainage system and states that on viewing the footage “ however we were unable to locate an image of a blocked pipe at or near the property ”. The locati on of the blockage is immaterial, rather, what is material is whether effect of the blockage was such as to prevent stormwater from escaping into the River. If the blockage was at the end of the pipe or the beginning such that the water was impeded or prevented, then the blockage is relevant. 17. In saying that, the Applicant maintains the video footage clearly documents the blockages referred to and which prevented the clearance of stormwater from the vicinity of the property. 18. The Applicant relies upon the recent decision of the Supreme Court of Queensland “ LMT Surgical Pty Ltd v Allianz Australia Insurance Ltd [2013] QSC 181” on 19 July 2013, in respect to the meaning of flood. 19. The relevant flood exclusion (considered in the above noted matter) is in terms almost identical to that provided in the FSP‟s policy. The result was that the insurer‟s liability to cover the insured for damage occasioned by the inundation of the premises was not negated by the flood exclusion. This being because the inundation occurred due to backflow from the pipes running from the River and was not by water overflowing from the natural confines of the River. Case No: 310741 Determination Page 4 of 12 20. The Applicant also maintains that the stormwater drainage system is not a pipe for the purpose of the policy or even in the ordinary meaning of the term. 21. The Applicant is of the opinion that the Statutory Declaration submitted to FOS by „GC‟ and relied upon by the FSP cannot be relied upon. There is no reliable evidence that he initiated the command that caused anyone at the FSP to send the Applicant a PDS at inception of the policy. Also, in respect to „CP‟s‟ Statutory Declaration, he also swears to have followed a set procedure, however, this in itself does not establish that in fact he actually did follow said procedure. 22. On comparing the documents claimed to have been sent to the Applicant and attached to CP‟s declaration, to the documents actually received by the Applicant (minus the PDS), there appears to be a significant difference between them. The statutory declaration by GC and CP contain untrue assertions and therefore cannot be considered reliable evidence. FOS should reject the conclusion and/or claim that a PDS was actually provided to the Applicant which he strongly denies. 23. The Applicant is seeking indemnity under the policy in the amount of $175,205 which he maintains fairly represents the cost of repairs (material and labour) as well as $17,117.52 in legal costs incurred in disputing the FSP‟s decision to decline the claim. Summary of FSP’s position 24. In essence, the dispute arises from the Applicant‟s misunderstanding that the cause or origin of a flood is somewhat relevant. The FSP maintains that whether the origin be from back surging drains or overland, a flood is a flood. 25. The Applicant had not chosen flood cover as part of his policy, flood was not only an exception to the insured events such as Storm, but it is also a general exclusion under the policy, regardless of the cause of the flood. The FSP notes that the Applicant‟s submissions to FOS, accepts the pro perty was affected by floodwater. 26. The FSP relies upon three levels of hydrology reports for the insured property ie reports by the panel of hydrologists commissioned by the Insurance Council of Australia (ICA), „W‟s‟ City Hydrology Report and its own commissioned hydrologists „WR‟s‟ Site Specific Hydrology Reports. The FSP maintains that all these expert reports confirm that the damage to the insured property was due to inundation by floodwater from the River and not stormwater run-off, which had ceased a long time before the inundation of the property. 27. The Applicant has not provided any evidence to establish the water inundation of the property was caused by an insured event. Although the Applicant describes the water initially entering the insured property to come from „the nearby stormwater system‟ and which is claimed to have Case No: 310741 Determination Page 5 of 12 surcharged from the drainage systems entry pits, he fails to appreciate that such circumstances constitute a flood for the meaning of the policy. 28. It has been determined in numerous previous FOS Determinations that the flooding of the River caused connected watercourses and drainage systems to backflow, causing flooding via the subsurface drainage systems. Unfortunately, regardless of the path of the floodwater – overland or under via the drains or both, in this case it was still „Flood‟ within the meaning of the policy. 29. Another misunderstanding of the Applicant is in respect to where the onus of proof lies. The Applicant bears the onus to prove, on the balance of probabilities, the damage claimed falls within the scope of cover provided by the policy, which the FSP maintains he has failed to do in this instance. 30. The FSP notes the Applicant has conceded to limit the original demand for legal costs in the amount of $17,117.52 to $3,000 having regard to the FOS TOR. However, the FSP maintains the Applicant has provided no evidence of why this should be considered given that the substantive claim is misguided. 31. The relevant policy provisions are provided both within the Certificate of Insurance (COI) as well as the PDS provided to the Applicant at inception of the policy. It is clear the Applicant, although had the opportunity to do so, failed to include the optional flood cover in the policy. 32. In line with the policy, it is clear that „ra inwater run- off‟ cannot be twisted in its definition to include rising floodwater. Rainwater run-off travels downwards as opposed to floodwater which rises. The Applicant‟s description of the loss is consistent with floodwater in the local area back flowing from the pipe drainage system and then being joined by overland floodwater before inundating the home, which establishes the application of the Wayne Tank principle to exclude the loss from cover under the policy. 33. The FSP acknowledges the Applicant‟s po sition that there may have occurred some initial stormwater run-off inundation of the insured property, prior to the arrival of floodwaters. However, he fails to note that in either instance both forms of flooding are excluded under the policy. 34. In respect to the consultant‟s (L) report submitted by the Applicant, the FSP maintains:  It was not prepared by a hydrologist.  The report contains mere speculation as to events that may have occurred.  The „Conclusion‟ relied upon is not supported by the content of th e report.  The report fails to appreciate that the circumstances speculated would still be considered „Flood‟ and would not be covered under the policy. Case No: 310741 Determination Page 6 of 12 35. Even if the Applicant‟s misguided submissions regarding the stormwater drain were relevant (which is denied), all available evidence establishes that the local drainage system worked effectively during earlier periods of much heavier rainfall and continued to work efficiently after cessation of the last period of rain in the area. Any overland rainwater run-off had ceased long before the flooding of the insured property started to occur and there is simply no evidence of an insured event occurring prior to the flood. All evidence points to the neighbouring River level rising and which caused back flow of floodwater up and out of the drainage system, which was joined by overland flooding. 36. The Applicant fails to recognise that the policy definition for flood applies to the insuring clause for flood cover if selected on the policy which he did not select. Further, the policy definition for rainfall cannot be ignored. Rainwater run-off for the purpose of the policy excludes: “…inundation of normally dry land areas by the overflow of water from… (a) the normal confines of any natural watercourse or lake whether or not altered or modified; or (b) any reservoir, canal, dam, water tank, apparatus or pipe.” 37. Therefore, even if the scenarios now suggested by the Applicant (stormwater escaping from a stormwater pipe) could somehow be proven, it would not be covered under the policy. 38. In respect to the Applicant‟s contention that he was not provided with the PDS, the FSP states that unfortunately its systems do not have the capability to provide a mail trace. The FSP in this respect seeks to rely upon statutory declarations provided by the staff member responsible for writing up the business and a further declaration by a senior Underwriter. 39. The FSP however, notes that the Applicant‟s suggestion that he did not receive the PDS came very late in the course of the claim/dispute, despite policy renewals and significant time spent in dealing with the claim and subsequent dispute. Since policy inception in June 2009 and subsequent renewals, the Applicant never contacted the FSP in this respect and continued to pay the required premium policy payment noted within policy documents sent to him. 40. The FSP notes the Applicant‟s reference to the “ LMT Surgical Pty Ltd v Allianz Australia Insurance Ltd [2013] QSC 181” case and notes that the decision is now on appeal and therefore cannot be considered to be the final finding in this regard. Further, the decision was in respect to a different contract of insurance and different policy wording. The judgement is very much constrained by the wording of the policy which is different to the FSP‟s policy. Each policy needs to be construed on its own wording. 41. The FSP notes that the Applicant (RG) has provided a Statutory Declaration claiming not to have received the PDS, however, he is not the only policyholder and therefore his declaration is limited to him not receiving the PDS and does not account for the other policyholders. It is not in dispute that Case No: 310741 Determination Page 7 of 12 the remaining policy documents (COI and invoice) were received and payment made on this basis, the PDS is always sent with this documentation. 42. In the alternative, the FSP relies upon Section 35(2) of the Insurance Contracts Act 1984 (the Act) and maintains that a reasonable person in the circumstances should have known there was no flood cover as it is not listed on the COI. Issues 43. Whether the FSP fulfilled its obligations to provide the Applicant with the relevant policy documentation prior to the loss. 44. Whether the Applicant has fulfilled the onus to establish, on the balance of probabilities, that the loss claimed was due to an event insured under the policy. Relevant Law 45. Section 35 of the Act provides that, where a claim is made under a prescribed contract and the event giving rise to the claim is a prescribed event in relation to the contract, an insurer may not refuse to pay an amount equal to the minimum amount of cover set out in the regulations made pursuant to the Act, unless it can prove that before the contract was entered into, the insurer clearly informed the insured in writing of the relevant provisions of the contract, or that the insured knew or a reasonable person in the circumstances could be expected to have known of such provision. 46. Section 37 of the Act provides that, an insurer may not rely on a provision included in a Contract of Insurance, not being a prescribed contract of a kind that is not usually included in Contracts of Insurance that provides similar insurance cover unless, before the contract was entered into, the insurer clearly informed the insured in writing of the effect of the relevant provision. Reasons for decision 47. As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the complex nature of the issues. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 48. This decision has been made by a Panel consisting of an Ombudsman and two representatives with extensive experience in the insurance industry and consumer claims. Case No: 310741 Determination Page 8 of 12 49. The Panel notes the parties do not dispute the following:  The Applicant held an active business insurance policy with the FSP at the time of the loss.  It is not in dispute that the Applicant‟s business falls within FOS‟s jurisdiction as a „Small Business‟.  The insured property was extensively damaged due to the inundation of the property during the significant weather events experienced in QLD.  The Applicant was not present at the property at the time of inundation and had vacated earlier in the day arising from the potential flooding of the area.  The provisions of the policy allow for cover for loss or damage arising from „Flood‟ only in the instance that such cover is included upon the policy as „Optional Cover‟. Otherwise there exist s a general exclusion in respect to loss or damage arising from a flood event.  The Applicant did receive policy documentation from the FSP ie COI and policy premium payment accounts, however, maintains that the PDS was not part of this documentation sent to him by the FSP.  The insured property is in close proximity to the Brisbane River as well as stormwater drainage infrastructure. Provision of the PDS 50. The Panel notes that there has been reference to Section 35 of the Act within the submissions presented to it, regarding obligations placed on the FSP to „Clearly Inform‟ a policyholder in writing of the relevant provisions of the contract. The Panel notes that the contract of insurance relevant to this dispute is a small business policy and therefore does not fall within the ambit of prescribed contracts for the purpose of the Act. 51. The relevant provision under the Insurance Contracts Act is Section 37. Section 37 provides that an insurer may not rely on a provision included in a contract of insurance, not being a prescribed contract of insurance, of a kind that is not usually included in contracts of insurance that provide similar insurance cover. 52. The Panel accepts that flood cover is not standard cover of a kind that is usually included in a small business insurance cover. It is often an option as it was for the Applicant in this case but it is not a usual provision in such a policy. Accordingly, as a flood exclusion would normally apply to insurance contracts of this ilk, it is not an unusual term and sectio n 37 is not enlivened. 53. Even were this not the case, the Panel accepts that the Applicant received after inception of the policy, policy documentation from the FSP. The Applicant admits receiving the COI and policy premium invoice. The FSP has provided evidence from GC, its business sales executive, to confirm that on or about 26 June 2009 he incepted the policy for the Applicant and believed he followed the procedure required. He sent an inception email to Case No: 310741 Determination Page 9 of 12 the operations department and the operations department is responsible for printing and providing to customers by ordinary pre -paid post, the PDS and other relevant policy documents. 54. In support of this information, the FSP provided a statutory declaration from CP, a senior underwriter. According to CP, inf ormation on the FSP‟s computer system confirms policy documentation was sent to the Applicant on 26 June 2009. On 2 July 2009, the Applicant received a call to pay the policy premium. 55. CP has attached documents obtained from the computer system which include the policy schedule. The policy schedule identifies “only the risks specified below are covered”. The policy schedule does not specify that flood is covered. 56. Although the information provided by the FSP is not ideal, in that it is unable to identify the actual policy documentation sent on a mail trace of the actual posting of the documentation to the Applicant, the Panel is satisfied that the information does establish that the FSP had a system for providing the relevant documentation and that on ba lance it has complied with that system. 57. The Applicant admits he received two documents, one being the COI. The COI clearly identifies that the policy only extends to cover those matters in the schedule. That document does not identify flood as covered. 58. In the circumstances, the Panel is satisfied that the Applicant has been informed of the nature and extent of the cover provided and that the FSP has met its obligations pursuant to Section 37 of the Insurance Contracts Act in so far as the FSP may have sough t to rely upon any “unusual terms” in the policy. The Claim 59. The central issue in this dispute is therefore whether the policy extends to cover the Applicant‟s loss and in this regard whether the loss is due to an insured event or not. 60. The policy is a defined events policy. It covers under Section 1 of the policy, fire and other defined events. Included within the defined events is the event of storm or rainwater. 61. Rainwater is defined in the policy as including rainwater run-off over the surface of the land or which has escaped from public road side gutters but not inundation on normally dry land areas by the overflow of water from:  The normal confines of any natural watercourse or lake whether or not altered or modified; or  Any reservoir, canal, dam, water tank, apparatus or pipe. Case No: 310741 Determination Page 10 of 12 62. The policy specifically excludes flood which is separately defined as being the partial or complete inundation of normally dry land areas by the overflow of water from normal confines of any natural watercourse or lake (whether or not altered or modified), or of any reservoir, canal or dam. 63. The Applicant in a detailed submission to the Service argues that, the damage sustained to the property was caused initially by stormwater being unable to escape from the stormwater pipe blocked at the end of the property. The Applicant maintains that water was already across B Street rising to knee height near C Road by 1.30am on Wednesday, 12 January 2011. The Applicant maintains water would have already entered his property by that time. The Applicant argues that the inundation of flood water from the Brisbane River would have occurred at around 3.00am on the same day and in these circumstances only stormwater was capable of covering the area before 3.00am. 64. In supporting this argument, the Applicant refers to a report from (L) that identifies seven gully pits in B Street as well as fences, containers, etc that would have prevented the overland flow and impacted on the drainage structure from the stormwater pipes. 65. It is the Applicant‟s argument t hat the drainage system did not function properly and the water damage caused to the property by inundation of water from the drainage system and gully pits prior to the inundation of floodwater from the Brisbane River should be covered within the policy definition of storm and rainwater. 66. The FSP on the other hand has relied upon hydrology reports obtained from the ICA and reports from a hydrologist (W), to argue that the damage to the property resulted from the inundation by floodwaters from the Brisbane River and not from run-off from local rainwater which had ceased long before the time of the flooding of the property. 67. Based on rainfall data obtained, the FSP maintains that the rainfall was relatively minor and that there was no evidence to suggest that the property had suffered from any run-off of local rainfall prior to the flooding. 68. In considering this dispute, the Panel considers it is first relevant to deal with the issue of the definition of flood as contained within the policy. The Applicant relies upon a recent decision of the Queensland Supreme Court in LMT Surgical Pty Limited v Allianz Australia Insurance Ltd [2013] QSC 181 in which the Court determined that, when considering the particular definition of flood, that the backflow of water from the Brisbane River through the stormwater drainage pipes did not fit within that policy‟s particular flood definition. 69. In that case, flood was defined as “inundation of normally dry land by water overflowing from the normal confines of any natural watercourse or lake (whether or not altered or modified), reservoir, canal or dam”. The Court found that the stormwater drainage pipes were not canals within the meaning of the flood exclusion and that whilst the river may overflow Case No: 310741 Determination Page 11 of 12 underground, the water discharged when back flowing through the stormwater drainage pipes was not overflowing from the normal confines of the River as the pipes were not part of the normal confines of the River. 70. In the current case, the flood definition despite the contrary arguments by the FSP‟s solicitors is very close to the definition referred to in the LMT case. In the current case, the flood definition provides as follows: “A general, temporary condition of partial or complete inundation of normally dry land areas by the overflow of water from the normal confines of any natural water course of lake (whether or not altered or modified) or of any reservoir, canal or dam”. 71. If the LMT case is accepted as relevant law to apply, then „canal‟ in these circumstances would not include a stormwater drainage pipe and therefore water overflowing from that pipe would not be considered to be the overflow of water from the normal confines of any natural water course. 72. The Panel accepts without analysing this aspect of the dispute further, that the LMT Surgical Case may have application if the flood definition was limited to that replicated above. 73. The Panel accepts however, that it is also necessary to consider the definition of rainwater. Rainwater without reciting the full definition as per the policy, excludes:  Inundation of normally dry land areas by the overflow of water from: a. The normal confines of any natural water course or lake, whether or not altered or modified or b. Any reservoir, canal, dam, water tank, apparatus or pipe. 74. The definition of rainwater is clear. The policy does not cover the inundation of a property by water overflowing from a pipe. A pipe would in the Panel‟s view, include stormwater drainage pipe. 75. The Panel accepts the weight of the evidence in this dispute establishes that most likely the inundation of the Applicant‟s property occurred as a result of the heavy rainfall in the area causing not only the levels of the Brisbane River to rise, but also the water to back up in the stormwater drainage pipes. 76. Accep ting the Applicant‟s eyewitness statements as to the water exiting the stormwater drainage pipe, the Panel accepts that this water was overflowing the stormwater pipes most likely prior to the arrival of the overland flow of water from the Brisbane River. Nevertheless, this water was water that was backing up the stormwater drainage pipes as it could not drain into the Brisbane River as the River was in flood, and water was escaping from the Brisbane River through the stormwater pipes. 77. Insofar as there may have been rain falling at the time and there may have been some water escaping from the roadside gutters, the Panel accepts that Case No: 310741 Determination Page 12 of 12 the Wayne Tank principle would apply and that as there are at least two concurrent causes occasioning loss, one which is subject to cover being rainwater and storm and the other which is not, being flood or water overflowing a pipe, that the exclusion operates to defeat the claim. 78. In the Panel‟s view, the evidence as presented is not sufficient to establish th e inundation of the Applicant‟s property occurred pursuant to a defined event. 79. Having considered the detailed submissions made by both parties in this matter, the Panel concludes that the FSP is entitled to refuse liability for the Applicant‟s claim in acc ordance with the terms of the policy. Determination 80. The FSP is entitled to refuse liability for the Applicant‟s claim in accordance with the terms of the policy.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.