Home / Financial Firm (Unknown - Insurer) / Determination 310645

Determination 310645

Denial of flood damage claim under flood exclusion and flash flood cover limits

FirmFinancial Firm (Unknown - Insurer)
Decided2013-09-25
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed$10,000
SourceAFCA PDF

Summary

The applicant's home was inundated during the January 2011 Brisbane floods and the FSP denied the claim as flood, after a $12,500 compassionate payment. AFCA found the FSP liable for flash flood damage up to 800mm above minimum level, with the quantum to be settled and interest payable from 15 March 2011.

Inundation before 4.00am on 12 January 2011 fell within the flash flood and stormwater cover, while later river flood damage was excluded, and the Insurance Contracts Act s57 governs interest from the date of unreasonable denial.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 310645 Determination Page 1 of 11 Case number: 310645 General Insurance - Domestic Insurance - Home Building and Contents - Storm - FSP Decision - Denial of claim - Exclusion/Condition - Flood 04 September 2013 Background 1. The Applicant held a home building and contents insurance policy with the Financial Services Provider (FSP). The relevant insurance period operated for 12 months beginning from 4 June 2010. During this period, the building was insured up to a sum of $362,000 and the contents for $119,000. 2. On 13 January 2011, the Applicant lodged a claim under the policy due to extensive water inundation to his property in Riverhills, following severe weather events in Queensland. 3. The FSP denied the claim on the basis that the damage was due to “flood”. The Applicant has disputed this. Summary of Applicant’s position 4. The weather event resulted in 1.3 – 1.5m of water going through his house, damaging carpets, tiles, skirting, gyprock, shoes and everything that was on the floor. 5. His house is on an angle, with the front being higher than the back. On the afternoon before the flood, at approximately 1.00pm (11 January 2011) water came in from the front due to constant heavy rain. He believes this should be covered. On the morning of the flood (12 January 2011) water was rising from the river into his backyard. 6. The FSP denied the claim under the policy exclusion for “riverine flood”. The FSP gave him a compassionate payment of $12,500 which is unacceptable. 7. He never made a claim in 28 years of being a customer of the FSP. His policy covers for storm, runoff, etc. The FSP should cover his cost of $10,000 plus to repair his house. Determination Case No: 310645 Determination Page 2 of 11 Summary of FSP’s position 8. The FSP relies on the statements by hydrologist SC and other hydrology information to conclude that the property was inundated by the rising levels of the Brisbane River and not stormwater or other local runoff associated with rainfall. 9. The inundation was not due to rain that fell within 24 hours of the heavy rainfall, but due to the cumulative effect of the rainfall on the Brisbane River and Wivenhoe Dam over the period 6 – 11 January 2011. 10. In the alternative, even if it is considered the rainfall within 24 hours contributed to the inundation of the property, then the Wayne Tank principle applies to exclude inundation which is due to a combination of flash flood and flooding within the terms of the policy. 11. Alternatively, the inundation to the benchmark level began after 4.00am on 12 January 2012. As per the Financial Ombudsman Service’s (FOS’s) broad approach, the rainfall, which caused the inundation, would have fallen more than 24 hours earlier than the inundation and it is excluded from cover, even if contributed to by further rainfall (in application of the Wayne Tank principle). 12. The Applicant alleges that water came into the house in the afternoon of 11 January 2011, but his images only depict water outside the house. 13. There was a delay of over 22 months from the time the Applicant’s claim was first declined to the time he lodged his dispute with FOS. As such, if FOS determines in favour of the Applicant, the start date for calculation of any interest should be the date of FOS’s Determination. 14. The FSP relies on a number of hydrology reports authored by SC and the following policy provisions to deny the Applicant’s claim : Page 4 of the Certificate of Insurance (COI) “ What optional covers are included and not included Home Contents ... Flood and storm surge not included not included...” Pages 10 – 12 of the Product Disclosure Statement (PDS) “ Words / terms with special meanings Word / term Meaning ... Flood Rising water which enters your home as a result of it running off or overflowing from any origin or cause. This policy does not cover flood unless we have Case No: 310645 Determination Page 3 of 11 agreed and it is shown on your certificate of insurance. Flash flood and stormwater run - off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run - off. ... Storm A violent disturbance of the atmosphere associated with strong winds including a cyclone, li ghtning, heavy rain, hail or snow, but not continuous bad weather by itself.” Pages 17 – 18 of the PDS “ Insured events you are covered for Damage caused by weather... What is covered What is not covered Storm Loss or damage:  caused by rain, hail or snow after it has reached the ground; ... ... Flash flood and stormwater run-off A sudden flood caused by heavy rain that fell no more than 24 hours prior to the flash flood or stormwater run - off Loss or damage caused:  by flood; ...” Page 27 of the PDS “ Your home The most we will pay you for home claims What is covered What is not covered Flash flood and stormwater run-off We will pay up to 50% of your home sum insured or $25,000, whichever is higher. ...” Page 32 of the PDS “ Your contents The most we will pay you for contents claims What is covered What is not covered ... ... Flash flood and stormwater run-off ...” Case No: 310645 Determination Page 4 of 11 We will pay up to 50% of your contents sum insured or $25,000, whichever is higher, but not exceeding your contents sum insured. Issue 15. Whether any part of the Applicant’ s loss was covered under the policy. Reasons for decision 16. Due to the nature of the dispute, the parties have been informed that the matter has been referred to the Panel for Determination in line with the Operational Guidelines to the FOS’s Terms of Reference. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 17. This decision has been made by a Panel consisting of an Ombudsman and two Panel members with extensive experience in insurance industry matters and consumer claims. 18. The Panel is satisfied that a full exchange of the relevant information has taken place between the parties and each party has had the opportunity to address the issues raised. 19. On 26 August 2013, the Panel Chair Ombudsman attended on site where he met with the Applicant and a representative of the FSP. 20. The Panel has reviewed the submissions of the parties and observes there is no dispute that the Applicant’s home and contents were water damaged, albeit the FSP contends the claimed event was attributable to the excluded event of “ flood ”. The Evidence 21. The FSP’s hydrology report by “W” dated March 2011, entitled “Investigation of the January 2011 Inundation Event - Brisbane” notes:  In the Brisbane River catchment above Wivenhoe Dam, rainfall commenced at approximately 6.00am on 9 January 2011. These inflows contributed to a peak outflow from Wivenhoe Dam occurring at approximately 12 midnight on 12 January 2011.  Significant dam discharges occurred later than 24 hours after the start of the rainfall event that led to the significant inflows into the dam. Any inundation associated with Brisbane River flows below the dam would be attributable to the rain event that commenced at approximately 6.00am on 9 January 2011. Case No: 310645 Determination Page 5 of 11  Damage directly associated with Brisbane River inundation within Brisbane after 6.00am on 12 January 2011 was caused by flood. Whereas, inundation before 6.00am on 12 January 2011 may be partially attributable to rainfall that fell within the catchments downstream of Wivenhoe Dam in the preceding 24 hours. 22. The FSP’s hydrologist SC presented a statement dated 7 June 2012, which contains general information and in summary says:  Heavy rain that fell on 11 January 2011 was not the only cause of the substantial releases from the Wivenhoe Dam later that same day, causing the Brisbane River to become vastly elevated.  Levels of water at the dam started increasing rapidly from around 12 noon on 9 January 2011. As a result of rain between 6 – 9 January, the dam’s level was at 68.54m AHD, 1.54m above the Full Supply Level.  The rainfall on 9 – 10 January 2011 contributed roughly 71% of the increase in the Wivenhoe Dam levels.  The elevated water levels of the dam on the morning of 11 January 2011 were a result of substantial rain that fell over the Wivenhoe Dam catchment between 9 – 11 January 2011 and earlier.  As such, what caused the identified rises in the Brisbane River was water that had been released from the dam earlier than 11 January 2011 and inflows from other parts of the Brisbane River catchment. 23. SC also provided a site specific report and a Key Conclusions Statement both dated 21 February 2013. According to the Key Conclusions Statement:  The height of the property varied from 11.2 – 12.9m AHD. The benchmark level of the property (the lowest point of the structure of the house on the land) is considered to be at 12.6m AHD. The statement notes that the property is a slab-on-ground house.  The effect of the W4 releases first reached the vicinity of the property at 1.14pm on 11 January 2011. At 4.00am on 12 January 2011, the river level due to the W4 releases would have been at approximately 12m AHD, which is 0.6m below the benchmark level.  The Brisbane River level was estimated to have reached the benchmark leve l of the Applicant’s property at 5.53am on 12 January 2011, before peaking at 14.3m AHD being 1.7m above benchmark level at 5.50pm on 12 January 2011. 24. SC provided a further statement dated 7 March 2013, containing site-specific information. This statement relevantly says:  The terrain data does not suggest the property is particularly vulnerable to stormwater or other local runoff during the rainfall intensities experienced during the January 2011 event.  By 1.24am on 12 January 2011, the Brisbane River reached a level of 11.2m AHD, which would have been sufficient to inundate the minimum Case No: 310645 Determination Page 6 of 11 level of the property. By 5.53am on that date, the river reached a level of 12.6m AHD, which was sufficient to begin inundating the property.  This supports the conclusion that the property was inundated by the rising level of the Brisbane River.  The Applicant’s observation of inundation up to 1.3m is broadly consistent with the identified water levels which show that the property was inundated by approximately 1.7m above benchmark level.  The inundation of the property was due to the rising level of the Brisbane River, which was caused by rain which fell over the river catchment more than 24 hours earlier. 25. SC provided an additional statement dated 22 May 2013, in response to the Applicant’s most recent email and attached images. SC relevantly says:  The first four images, identified as taken at 1.00pm on the “afternoon before the flood”, show water pooling in the front yard, which may have been caused by rainwater runoff. This water does not appear to be inside the house or causing damage to the building. SC assumes that the referenced date is 11 January 2011.  The fifth image identified as taken “on the morning of the flood” shows partial inundation of the house’s backyard. A ccording to topographic information, the natural surface at the edge of the inundation shown in this image would be at a level between 12 – 12.5m AHD.  The water in the vicinity of the property would have been at this level between 3.50 – 5.30am on 12 January 2011. This is consistent with the water level shown in the fifth image and with the Applicant’s comment that water was rising from the river. The inundation observed does not appear to be inside the house or causing damage to it.  The rainfall which occurred on 11 January 2011, was not particularly intense and on average would occur once every year. The Applicant has not said that stormwater damage occurs at the property on a yearly basis.  This suggests that, in the absence of the rising levels of the river inundating the immediate vicinity of the property, the house would not have suffered damage from stormwater or other inundation associated with rainfall intensities that were experienced on 11 January 2011. 26. The loss assessor’s report of 15 February 2011, sa ys:  The loss was caused by flood on 12 January 2011. Major partial damage to the building, with 10 rooms affected and total loss of contents. The reserve for the claim is estimated at $240,000. 27. The Applicant has provided five photographs. The first four, as per the Applicant’s submission, show clear water pooling at the front of the property in the afternoon before the flood (11 January 2011). There is no observable entry of water into the building. Case No: 310645 Determination Page 7 of 11 28. The fifth image, the Applicant states, shows the backyard partially inundated by muddy water in the morning of the flood (12 January 2011). It is readily observable that a metal shed to the left is affected by these waters. However, it seems that at that point the water had not reached the floor level of the home building. The Applicant has not provided any other evidence. Analysis 29. The central issues in this dispute are:  Whether the inundation of the Applicant’s home was due to flash flood as defined within the policy. That is, whether rain that fell no more than 24 hours prior to the inundation of the Applicant’s property was the proximate cause of the inundation.  Whether the Applicant’s home was inundated by stormwater runoff, prior to any flash flooding or flooding and thus whether the FSP is liable under the co ver for “stormwater run - off”. 30. On 21 May 2012, FOS issued a memorandum to all relevant stakeholders advising that after considerable deliberation of all material available to it, the Panel formed a view that the heavy rain occurring from approximately 4.00am on 11 January 2011 and in particular the heavy rain between 4.00am – 8.00am on 11 January 2011, was a proximate cause of the W4 strategy being invoked and therefore a proximate cause or trigger that led to the flooding of many of the properties along the Brisbane River. 31. At that time, the Panel noted that, in relation to the approach, each dispute would depend upon the individual and unique factors relevant to the dispute. 32. The Panel will consider the dispute in two parts. Firstly the Panel will consider the major inundation which occurred on 12 January 2011 (referred to by the Applicant as the day of the flood). Secondly, the Panel will consider the Applicant’s contention that rainwater pooling at the front of the home first inundated the home at floor level on the afternoon of 11 January 2011, (referred to as the day before the flood). Inundation 12 January 2011 33. As noted above, based on the Panel’s established view, the FSP would be liable for any inundation which occurred prior to 4.00am on 12 January 2011; any damage occurring after that time would be properly considered to be flood and thus excluded from cover. 34. SC’s evidence shows that by 4.00am on 12 January 2011, the river level was at a height of 12m AHD, being 0.6m below the estimated benchmark level. F urther, SC’s evidence suggests that the water levels would have reached the benchmark level at 5.53am, on 12 January 2011. 35. The Panel notes that this information is based on the acceptance that SC’s estimated benchmark level represents the lowest point of the structure of the Case No: 310645 Determination Page 8 of 11 house on the property. As the benchmark level was obtained from topographic information, it usually would be deemed an acceptable estimate. 36. On this basis, on the balance of probabilities, as at 4.00am on 12 January 2011, the home would not have been inundated to benchmark level and as such any damage to the home or the contents therein, which occurred after that time, would be excluded from cover. 37. However, in this case, satellite images from Google Maps and the fifth image provided by the Applicant, clearly show that there is a shed at the back of the house, at a lower level than the main building. In the Panel’s view, the level of the shed is the lowest point of any built structure covered under the policy. 38. There is no precise indication of the level at which the shed is built. However, SC’s information (attachment B of his report and Key Conclusions Statement of 21 February 2013) indicates that it is likely the shed would already have been inundated by 4.00am on 12 January 2011. 39. Based on the Applicant’s fifth image and SC’s information, the Panel is satisfied that the FSP is liable to cover damage to the shed and its contents, up to a height of 800mm, measured from the property’s minimum height (11.2m AHD), which is consistent with the wa ter levels reaching 12m AHD, in the vicinity of the property, at 4.00am on 12 January 2011. Inundation 11 January 2011 40. The Applicant submits that rainwater pooling at the front of his home at approximately 1.00pm on 11 January 2011, came in front of his home. In support of this he has provided a number of photographs which show water at the front of his home. He states that this water caused damage to the carpet and tiles and soaked into the gyprock, as well as damaging items at floor level. 41. Although the photographs do not carry any date/time stamp, the level of the water seen in these images is generally consistent with the known history of the inundation events on 11 January 2011 and hydrologist SC accepts that these are likely representative of the water levels at that time. 42. The Panel has carefully considered these images and notes that whilst the images show water pooling in the front of the property, they do not clearly show water entering the building. The Applicant has not provided any photographic evidence of the water inside the home, or indeed any images of water entering the home from the front. It appears from the images that the level of pooled water is around the concrete/tiled apron at the front, but not to the level of the apron. It further appears that the level of the apron would be at or below the floor level of the home. 43. The Panel notes that one of the images shows a step up into the front door. What is clear from that image, is that the water is below the step. Case No: 310645 Determination Page 9 of 11 44. Having attended on site and on the basis of this limited evidence the Panel considers that, in the absence of further information to support the Applicant’s contention, such as photographic evidence to support the entry of water above floor level at approximately 1.00pm on 11 January, that there is insufficient evidence to establish that the property was affected by stormwater runoff, on the afternoon of 11 January 2011. Conclusion 45. The result is that the Panel is satisfied that the FSP is liable to cover damage up to a height of 800mm measured from the property’s minimum height (11.2m AHD), which is consistent with the water levels reaching 12m AHD, in the vicinity of the property at 4.00am on 12 January 2011. Such damage is likely to include the shed and its contents. 46. The FSP is not liable for any damage above that level, either for rainwater inundation on 11 January 2011, or flooding on 12 January 2011. Quantum 47. The Renewal Certificate of Insurance for the relevant period provides a sum insured of $362,000 for the home with contents of $119,000. Pursuant to the policy cap for the insured event of “Flash flood and stormwater runoff”, the FSP is liable up to an amount of $181,000 for the damage to the building and $59,500 for the contents. 48. The Panel accepts that as the relevant flash flood inundation was to a level of 800mm from the property’s minimum level, any damage or loss sustained as a result of inundation above that level is not covered under the terms of the policy. 49. Given the time since the loss was sustained and the limitations on the insured loss and damage, the Panel accepts that the parties may be unable to provide an exact estimate of the total loss sustained or a breakdown of that loss. 50. In these circumstances, it is reasonable for the FSP to arrange a scope of works to be conducted to assess the extent of the loss and damage sustained as a result of the inundation of the property to a height of 800mm, measured from the property’s minimum level. 51. Once the scope of works has been completed, the Applicant and the FSP are asked to work cooperatively together to establish the extent of the loss sustained to the property and to reach an agreement as to the cost of repairs or replacement of the contents lost. Should agreement not be reached the parties may return the dispute to FOS, for determination of the extent of the loss. 52. Insofar as the FSP may have made payment of a compassionate sum to the Applicant, FOS does not have jurisdiction to deal with this payment but acknowledges that the FSP, given the terms on which the compassionate Case No: 310645 Determination Page 10 of 11 payment was made, may be entitled to deduct this payment from any settlement sum. Interest 53. The FSP notes that the Applicant has taken over 22 months to lodge the dispute from the time his claim was declined and argues that interest should be calculated from the date of the Determination. 54. The Panel notes that the following sub-sections of Section 57 of the Insurance Contracts Act 1984 (the Act) are applicable to this particular issue in dispute: “ 57 Interest on claims (1) Where an insurer is liable to pay to a person an amount under a contract of insurance or under this Act in relation to a contract of insurance, the insurer is also liable to pay interest on the amount to that person in accordance with this section. (2) The period in respect of which interest is payable is the period commencing on the day as from which it was unreasonable for the insurer to have withheld payment of the amount and ending on whichever is the earlier of the following days: (a) the day on which the payment is made; (b) the day on which the payment is sent by post to the person to whom it is payable.” 55. A plain read of sub-section 57(2) of the Act shows that the commencement of the period, in respect of which interest is payable, starts “the day as from which it was unreasonable for the insurer to have withheld payment”. 56. The Panel is satisfied that in this instance, as per the reasoning of this decision, the date of the initial denial of the claim (15 March 2011) was the day in which, after assessing the claim it would have been unreasonable to withhold payment. Accordingly, the Panel considers that interest is payable from 15 March 2011. Determination 57. The Panel determines the FSP is liable to meet the Applicant’s claim for damage as a result of inundation of the property above the minimum property level up to 800mm as outlined in paragraph 45, subject to the limitations contained within the policy. Case No: 310645 Determination Page 11 of 11 58. Insofar as the FSP is to cash settle the claim, the FSP is to pay interest from 15 March 2011 (being the date of denial of the claim) to date of payment of the claim, in accordance with section 57 of the Act.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.