Text of the determination
Case No: 310645 Determination Page 1 of 11
Case number: 310645
General Insurance - Domestic Insurance - Home Building and Contents - Storm
- FSP Decision - Denial of claim - Exclusion/Condition - Flood
04 September 2013
Background
1. The Applicant held a home building and contents insurance policy with the
Financial Services Provider (FSP). The relevant insurance period operated
for 12 months beginning from 4 June 2010. During this period, the building
was insured up to a sum of $362,000 and the contents for $119,000.
2. On 13 January 2011, the Applicant lodged a claim under the policy due to
extensive water inundation to his property in Riverhills, following severe
weather events in Queensland.
3. The FSP denied the claim on the basis that the damage was due to “flood”.
The Applicant has disputed this.
Summary of Applicant’s position
4. The weather event resulted in 1.3 – 1.5m of water going through his house,
damaging carpets, tiles, skirting, gyprock, shoes and everything that was on
the floor.
5. His house is on an angle, with the front being higher than the back. On the
afternoon before the flood, at approximately 1.00pm (11 January 2011)
water came in from the front due to constant heavy rain. He believes this
should be covered. On the morning of the flood (12 January 2011) water was
rising from the river into his backyard.
6. The FSP denied the claim under the policy exclusion for “riverine flood”. The
FSP gave him a compassionate payment of $12,500 which is unacceptable.
7. He never made a claim in 28 years of being a customer of the FSP. His
policy covers for storm, runoff, etc. The FSP should cover his cost of
$10,000 plus to repair his house.
Determination
Case No: 310645 Determination Page 2 of 11
Summary of FSP’s position
8. The FSP relies on the statements by hydrologist SC and other hydrology
information to conclude that the property was inundated by the rising levels
of the Brisbane River and not stormwater or other local runoff associated
with rainfall.
9. The inundation was not due to rain that fell within 24 hours of the heavy
rainfall, but due to the cumulative effect of the rainfall on the Brisbane River
and Wivenhoe Dam over the period 6 – 11 January 2011.
10. In the alternative, even if it is considered the rainfall within 24 hours
contributed to the inundation of the property, then the Wayne Tank principle
applies to exclude inundation which is due to a combination of flash flood
and flooding within the terms of the policy.
11. Alternatively, the inundation to the benchmark level began after 4.00am on
12 January 2012. As per the Financial Ombudsman Service’s (FOS’s) broad
approach, the rainfall, which caused the inundation, would have fallen more
than 24 hours earlier than the inundation and it is excluded from cover, even
if contributed to by further rainfall (in application of the Wayne Tank
principle).
12. The Applicant alleges that water came into the house in the afternoon of 11
January 2011, but his images only depict water outside the house.
13. There was a delay of over 22 months from the time the Applicant’s claim was
first declined to the time he lodged his dispute with FOS. As such, if FOS
determines in favour of the Applicant, the start date for calculation of any
interest should be the date of FOS’s Determination.
14. The FSP relies on a number of hydrology reports authored by SC and the
following policy provisions to deny the Applicant’s claim :
Page 4 of the Certificate of Insurance (COI)
“ What optional covers are included and not included
Home Contents
...
Flood and storm surge not included not included...”
Pages 10 – 12 of the Product Disclosure Statement (PDS)
“ Words / terms with special meanings
Word / term Meaning
...
Flood Rising water which enters your home as a result of it
running off or overflowing from any origin or cause.
This policy does not cover flood unless we have
Case No: 310645 Determination Page 3 of 11
agreed and it is shown on your certificate of insurance.
Flash flood and
stormwater run - off
A sudden flood caused by heavy rain that fell no more
than 24 hours prior to the flash flood or stormwater
run - off.
...
Storm A violent disturbance of the atmosphere associated
with strong winds including a cyclone, li ghtning, heavy
rain, hail or snow, but not continuous bad weather by
itself.”
Pages 17 – 18 of the PDS
“ Insured events you are covered for
Damage caused by weather...
What is covered What is not covered
Storm Loss or damage:
caused by rain, hail or snow
after it has reached the ground;
...
...
Flash flood and stormwater run-off
A sudden flood caused by heavy rain
that fell no more than 24 hours prior to
the flash flood or stormwater run - off
Loss or damage caused:
by flood; ...”
Page 27 of the PDS
“ Your home
The most we will pay you for home claims
What is covered What is not covered
Flash flood and stormwater run-off
We will pay up to 50% of your home sum
insured or $25,000, whichever is higher.
...”
Page 32 of the PDS
“ Your contents
The most we will pay you for contents claims
What is covered What is not covered
... ...
Flash flood and stormwater run-off ...”
Case No: 310645 Determination Page 4 of 11
We will pay up to 50% of your contents
sum insured or $25,000, whichever is
higher, but not exceeding your contents
sum insured.
Issue
15. Whether any part of the Applicant’ s loss was covered under the policy.
Reasons for decision
16. Due to the nature of the dispute, the parties have been informed that the
matter has been referred to the Panel for Determination in line with the
Operational Guidelines to the FOS’s Terms of Reference. This dispute has
not been the subject of a FOS Recommendation and has proceeded directly
to Determination.
17. This decision has been made by a Panel consisting of an Ombudsman and
two Panel members with extensive experience in insurance industry matters
and consumer claims.
18. The Panel is satisfied that a full exchange of the relevant information has
taken place between the parties and each party has had the opportunity to
address the issues raised.
19. On 26 August 2013, the Panel Chair Ombudsman attended on site where he
met with the Applicant and a representative of the FSP.
20. The Panel has reviewed the submissions of the parties and observes there
is no dispute that the Applicant’s home and contents were water damaged,
albeit the FSP contends the claimed event was attributable to the excluded
event of “ flood ”.
The Evidence
21. The FSP’s hydrology report by “W” dated March 2011, entitled “Investigation
of the January 2011 Inundation Event - Brisbane” notes:
In the Brisbane River catchment above Wivenhoe Dam, rainfall
commenced at approximately 6.00am on 9 January 2011. These
inflows contributed to a peak outflow from Wivenhoe Dam occurring at
approximately 12 midnight on 12 January 2011.
Significant dam discharges occurred later than 24 hours after the start
of the rainfall event that led to the significant inflows into the dam. Any
inundation associated with Brisbane River flows below the dam would
be attributable to the rain event that commenced at approximately
6.00am on 9 January 2011.
Case No: 310645 Determination Page 5 of 11
Damage directly associated with Brisbane River inundation within
Brisbane after 6.00am on 12 January 2011 was caused by flood.
Whereas, inundation before 6.00am on 12 January 2011 may be
partially attributable to rainfall that fell within the catchments
downstream of Wivenhoe Dam in the preceding 24 hours.
22. The FSP’s hydrologist SC presented a statement dated 7 June 2012, which
contains general information and in summary says:
Heavy rain that fell on 11 January 2011 was not the only cause of the
substantial releases from the Wivenhoe Dam later that same day,
causing the Brisbane River to become vastly elevated.
Levels of water at the dam started increasing rapidly from around 12
noon on 9 January 2011. As a result of rain between 6 – 9 January, the
dam’s level was at 68.54m AHD, 1.54m above the Full Supply Level.
The rainfall on 9 – 10 January 2011 contributed roughly 71% of the
increase in the Wivenhoe Dam levels.
The elevated water levels of the dam on the morning of 11 January
2011 were a result of substantial rain that fell over the Wivenhoe Dam
catchment between 9 – 11 January 2011 and earlier.
As such, what caused the identified rises in the Brisbane River was
water that had been released from the dam earlier than 11 January
2011 and inflows from other parts of the Brisbane River catchment.
23. SC also provided a site specific report and a Key Conclusions Statement
both dated 21 February 2013. According to the Key Conclusions Statement:
The height of the property varied from 11.2 – 12.9m AHD. The
benchmark level of the property (the lowest point of the structure of the
house on the land) is considered to be at 12.6m AHD. The statement
notes that the property is a slab-on-ground house.
The effect of the W4 releases first reached the vicinity of the property at
1.14pm on 11 January 2011. At 4.00am on 12 January 2011, the river
level due to the W4 releases would have been at approximately 12m
AHD, which is 0.6m below the benchmark level.
The Brisbane River level was estimated to have reached the
benchmark leve l of the Applicant’s property at 5.53am on 12 January
2011, before peaking at 14.3m AHD being 1.7m above benchmark
level at 5.50pm on 12 January 2011.
24. SC provided a further statement dated 7 March 2013, containing site-specific
information. This statement relevantly says:
The terrain data does not suggest the property is particularly vulnerable
to stormwater or other local runoff during the rainfall intensities
experienced during the January 2011 event.
By 1.24am on 12 January 2011, the Brisbane River reached a level of
11.2m AHD, which would have been sufficient to inundate the minimum
Case No: 310645 Determination Page 6 of 11
level of the property. By 5.53am on that date, the river reached a level
of 12.6m AHD, which was sufficient to begin inundating the property.
This supports the conclusion that the property was inundated by the
rising level of the Brisbane River.
The Applicant’s observation of inundation up to 1.3m is broadly
consistent with the identified water levels which show that the property
was inundated by approximately 1.7m above benchmark level.
The inundation of the property was due to the rising level of the
Brisbane River, which was caused by rain which fell over the river
catchment more than 24 hours earlier.
25. SC provided an additional statement dated 22 May 2013, in response to the
Applicant’s most recent email and attached images. SC relevantly says:
The first four images, identified as taken at 1.00pm on the “afternoon
before the flood”, show water pooling in the front yard, which may have
been caused by rainwater runoff. This water does not appear to be
inside the house or causing damage to the building. SC assumes that
the referenced date is 11 January 2011.
The fifth image identified as taken “on the morning of the flood” shows
partial inundation of the house’s backyard. A ccording to topographic
information, the natural surface at the edge of the inundation shown in
this image would be at a level between 12 – 12.5m AHD.
The water in the vicinity of the property would have been at this level
between 3.50 – 5.30am on 12 January 2011. This is consistent with the
water level shown in the fifth image and with the Applicant’s comment
that water was rising from the river. The inundation observed does not
appear to be inside the house or causing damage to it.
The rainfall which occurred on 11 January 2011, was not particularly
intense and on average would occur once every year. The Applicant
has not said that stormwater damage occurs at the property on a yearly
basis.
This suggests that, in the absence of the rising levels of the river
inundating the immediate vicinity of the property, the house would not
have suffered damage from stormwater or other inundation associated
with rainfall intensities that were experienced on 11 January 2011.
26. The loss assessor’s report of 15 February 2011, sa ys:
The loss was caused by flood on 12 January 2011. Major partial
damage to the building, with 10 rooms affected and total loss of
contents. The reserve for the claim is estimated at $240,000.
27. The Applicant has provided five photographs. The first four, as per the
Applicant’s submission, show clear water pooling at the front of the property
in the afternoon before the flood (11 January 2011). There is no observable
entry of water into the building.
Case No: 310645 Determination Page 7 of 11
28. The fifth image, the Applicant states, shows the backyard partially inundated
by muddy water in the morning of the flood (12 January 2011). It is readily
observable that a metal shed to the left is affected by these waters.
However, it seems that at that point the water had not reached the floor level
of the home building. The Applicant has not provided any other evidence.
Analysis
29. The central issues in this dispute are:
Whether the inundation of the Applicant’s home was due to flash flood
as defined within the policy. That is, whether rain that fell no more than
24 hours prior to the inundation of the Applicant’s property was the
proximate cause of the inundation.
Whether the Applicant’s home was inundated by stormwater runoff,
prior to any flash flooding or flooding and thus whether the FSP is liable
under the co ver for “stormwater run - off”.
30. On 21 May 2012, FOS issued a memorandum to all relevant stakeholders
advising that after considerable deliberation of all material available to it, the
Panel formed a view that the heavy rain occurring from approximately
4.00am on 11 January 2011 and in particular the heavy rain between
4.00am – 8.00am on 11 January 2011, was a proximate cause of the W4
strategy being invoked and therefore a proximate cause or trigger that led to
the flooding of many of the properties along the Brisbane River.
31. At that time, the Panel noted that, in relation to the approach, each dispute
would depend upon the individual and unique factors relevant to the dispute.
32. The Panel will consider the dispute in two parts. Firstly the Panel will
consider the major inundation which occurred on 12 January 2011 (referred
to by the Applicant as the day of the flood). Secondly, the Panel will consider
the Applicant’s contention that rainwater pooling at the front of the home first
inundated the home at floor level on the afternoon of 11 January 2011,
(referred to as the day before the flood).
Inundation 12 January 2011
33. As noted above, based on the Panel’s established view, the FSP would be
liable for any inundation which occurred prior to 4.00am on 12 January 2011;
any damage occurring after that time would be properly considered to be
flood and thus excluded from cover.
34. SC’s evidence shows that by 4.00am on 12 January 2011, the river level
was at a height of 12m AHD, being 0.6m below the estimated benchmark
level. F urther, SC’s evidence suggests that the water levels would have
reached the benchmark level at 5.53am, on 12 January 2011.
35. The Panel notes that this information is based on the acceptance that SC’s
estimated benchmark level represents the lowest point of the structure of the
Case No: 310645 Determination Page 8 of 11
house on the property. As the benchmark level was obtained from
topographic information, it usually would be deemed an acceptable estimate.
36. On this basis, on the balance of probabilities, as at 4.00am on 12 January
2011, the home would not have been inundated to benchmark level and as
such any damage to the home or the contents therein, which occurred after
that time, would be excluded from cover.
37. However, in this case, satellite images from Google Maps and the fifth image
provided by the Applicant, clearly show that there is a shed at the back of the
house, at a lower level than the main building. In the Panel’s view, the level
of the shed is the lowest point of any built structure covered under the policy.
38. There is no precise indication of the level at which the shed is built.
However, SC’s information (attachment B of his report and Key Conclusions
Statement of 21 February 2013) indicates that it is likely the shed would
already have been inundated by 4.00am on 12 January 2011.
39. Based on the Applicant’s fifth image and SC’s information, the Panel is
satisfied that the FSP is liable to cover damage to the shed and its contents,
up to a height of 800mm, measured from the property’s minimum height
(11.2m AHD), which is consistent with the wa ter levels reaching 12m AHD,
in the vicinity of the property, at 4.00am on 12 January 2011.
Inundation 11 January 2011
40. The Applicant submits that rainwater pooling at the front of his home at
approximately 1.00pm on 11 January 2011, came in front of his home. In
support of this he has provided a number of photographs which show water
at the front of his home. He states that this water caused damage to the
carpet and tiles and soaked into the gyprock, as well as damaging items at
floor level.
41. Although the photographs do not carry any date/time stamp, the level of the
water seen in these images is generally consistent with the known history of
the inundation events on 11 January 2011 and hydrologist SC accepts that
these are likely representative of the water levels at that time.
42. The Panel has carefully considered these images and notes that whilst the
images show water pooling in the front of the property, they do not clearly
show water entering the building. The Applicant has not provided any
photographic evidence of the water inside the home, or indeed any images
of water entering the home from the front. It appears from the images that
the level of pooled water is around the concrete/tiled apron at the front, but
not to the level of the apron. It further appears that the level of the apron
would be at or below the floor level of the home.
43. The Panel notes that one of the images shows a step up into the front door.
What is clear from that image, is that the water is below the step.
Case No: 310645 Determination Page 9 of 11
44. Having attended on site and on the basis of this limited evidence the Panel
considers that, in the absence of further information to support the
Applicant’s contention, such as photographic evidence to support the entry
of water above floor level at approximately 1.00pm on 11 January, that there
is insufficient evidence to establish that the property was affected by
stormwater runoff, on the afternoon of 11 January 2011.
Conclusion
45. The result is that the Panel is satisfied that the FSP is liable to cover damage
up to a height of 800mm measured from the property’s minimum height
(11.2m AHD), which is consistent with the water levels reaching 12m AHD,
in the vicinity of the property at 4.00am on 12 January 2011. Such damage is
likely to include the shed and its contents.
46. The FSP is not liable for any damage above that level, either for rainwater
inundation on 11 January 2011, or flooding on 12 January 2011.
Quantum
47. The Renewal Certificate of Insurance for the relevant period provides a sum
insured of $362,000 for the home with contents of $119,000. Pursuant to the
policy cap for the insured event of “Flash flood and stormwater runoff”, the
FSP is liable up to an amount of $181,000 for the damage to the building
and $59,500 for the contents.
48. The Panel accepts that as the relevant flash flood inundation was to a level
of 800mm from the property’s minimum level, any damage or loss sustained
as a result of inundation above that level is not covered under the terms of
the policy.
49. Given the time since the loss was sustained and the limitations on the
insured loss and damage, the Panel accepts that the parties may be unable
to provide an exact estimate of the total loss sustained or a breakdown of
that loss.
50. In these circumstances, it is reasonable for the FSP to arrange a scope of
works to be conducted to assess the extent of the loss and damage
sustained as a result of the inundation of the property to a height of 800mm,
measured from the property’s minimum level.
51. Once the scope of works has been completed, the Applicant and the FSP
are asked to work cooperatively together to establish the extent of the loss
sustained to the property and to reach an agreement as to the cost of repairs
or replacement of the contents lost. Should agreement not be reached the
parties may return the dispute to FOS, for determination of the extent of the
loss.
52. Insofar as the FSP may have made payment of a compassionate sum to the
Applicant, FOS does not have jurisdiction to deal with this payment but
acknowledges that the FSP, given the terms on which the compassionate
Case No: 310645 Determination Page 10 of 11
payment was made, may be entitled to deduct this payment from any
settlement sum.
Interest
53. The FSP notes that the Applicant has taken over 22 months to lodge the
dispute from the time his claim was declined and argues that interest should
be calculated from the date of the Determination.
54. The Panel notes that the following sub-sections of Section 57 of the
Insurance Contracts Act 1984 (the Act) are applicable to this particular issue
in dispute:
“ 57 Interest on claims
(1) Where an insurer is liable to pay to a person an amount under a contract
of insurance or under this Act in relation to a contract of insurance, the
insurer is also liable to pay interest on the amount to that person in
accordance with this section.
(2) The period in respect of which interest is payable is the period
commencing on the day as from which it was unreasonable for the
insurer to have withheld payment of the amount and ending on whichever
is the earlier of the following days:
(a) the day on which the payment is made;
(b) the day on which the payment is sent by post to the person to whom
it is payable.”
55. A plain read of sub-section 57(2) of the Act shows that the commencement
of the period, in respect of which interest is payable, starts “the day as from
which it was unreasonable for the insurer to have withheld payment”.
56. The Panel is satisfied that in this instance, as per the reasoning of this
decision, the date of the initial denial of the claim (15 March 2011) was the
day in which, after assessing the claim it would have been unreasonable to
withhold payment. Accordingly, the Panel considers that interest is payable
from 15 March 2011.
Determination
57. The Panel determines the FSP is liable to meet the Applicant’s claim for
damage as a result of inundation of the property above the minimum
property level up to 800mm as outlined in paragraph 45, subject to the
limitations contained within the policy.
Case No: 310645 Determination Page 11 of 11
58. Insofar as the FSP is to cash settle the claim, the FSP is to pay interest from
15 March 2011 (being the date of denial of the claim) to date of payment of
the claim, in accordance with section 57 of the Act.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.