Claim for storm water inundation damage declined under flood exclusion
Summary
A landlord claimed for water damage to two ground-floor units after May 2009 storms, and the insurer declined under the flood exclusion. AFCA's Panel found the inundation was a mix of floodwater and stormwater, so the exclusion applied and no payment was ordered.
Stormwater that mixes with overflowing creek water is floodwater under the policy exclusion, consistent with the Wayne Tank principle.
Issues
- Claim denial primary · not upheld“the Panel is satisfied that the proximate cause for the Applicant's loss was floodwater inundation; the FSP is entitled to deny the Applicant's claim.”
Subjects and remedies
home or building damagenatural disasterno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case No: 310582 Determination Page 1 of 11
Case number: 310582
General Insurance - Domestic Insurance - Home Building and Contents - FSP
Decision – Flood - Denial of claim-Exclusion/ condition
22 August 2013
Background
1. The Applicant held a Landlord Residential Insurance Policy (the policy) with
the Financial Services Provider (FSP).
2. A claim was lodged under the policy for damage to two units (the units) on
the ground level of the insured property in Windsor arising from the
significant weather events experienced in Queens land during May 2009.
3. The FSP declined the claim on the basis the damage assessed was due to
the event „Flood‟, which is specifically excluded from cover under the policy.
4. The Applicant remains dissatisfied with the FSP‟s decision to decline his
claim and is seeking indemnity for his loss.
Summary of Applicant‟s position
5. Severe storm cells located in and around Brisbane in the period between 19
May 2009 – 21 May 2009 caused stormwater inundation damage to the
insured building. Following the storms, a claim was lodged under the policy
for resultant loss or damage which occurred on 20 May 2009.
6. The intense storm cell on 19 May 2009 inundated areas surrounding the
insured property causing the stormwater drains in the vicinity of the property
„T‟ Street and „V‟ Street to fail to cope with the volumes of stormwater run-off
generated by the storm event.
7. The water pooled and built up at the stormwater drains from higher areas to
the west, north and east of the property. The Applicant maintains arising
from this pooling of water and the drains failure to cope with the volume of
stormwater run-off, the units at the insured property were inundated with
stormwater run-off between 2.00pm – 3.30pm on 20 May 2009.
Determination
Case No: 310582 Determination Page 2 of 11
8. The data relied upon by the FSP‟s commissioned hydrologists‟ “W” , means
nothing, if taken out of context with all other relating matters and facts, which
are:
The Clem 7 tunnel and Cover Leaf infrastructure embedded into
Enoggera Creek (the creek) with collected debris and local flood plain
areas adjacent to Bowen Bridge Road (500m from the insured
property) caused enormous damming effects on the creek.
There was no great volume of rain preceding 20 May 2009 and yet
there still was substantial flooding of the creek due to the infrastructure
and debris noted above.
There was substantial rainfall leading up to 8.00pm on 20 May 2009
with only two short breaks of an hour or so from the heavy down pour.
W‟s estimated that the relevant catchment areas added up to 6ha,
however, the Applicant maintains the catchment actually extends
slightly further and is around 16ha in total.
Due to the creek flooding and stormwater drains being at capacity,
there was nowhere else for water to go but to inundate the 16ha
catchment areas and the properties immediate to the catchment vortex
ie V and T Streets.
9. The Applicant acknowledges that data suggests that the creek did flood to a
record level of RL2.43m between 4.00pm-6.00pm on 20 May 2009.
However, he maintains that the inundation of the units by stormwater
occurred prior to the creek flooding. He also refutes the reference and/or
application of the „Wayne Tank Principle‟ and maintains that the initial
inundation was solely due to stormwater run-off alone.
10. Having considered the FSP‟s submission to the Service, the Applicant
maintains:
At lodgement of the claim, a tenant and an eye witness of the event
advised that it was rainwater run-off that entered the units. However, it
seemed that the FSP was not prepared to accept the eyewitness
account as credible evidence.
W‟s report f ails to comment on the extreme nature of rainfall from
10.00am to 2.00pm on 20 January 2009 or the ensuing run-off from the
street gutters, gardens and house roofs over the substantial catchment
area.
A tenant witnessed the water entering the property at about 2.30pm
which he says coincides with the tenant‟s (D‟s) statement that water
was flowing between T Street and V Street at 1.30pm about 60 minutes
prior to that. These streets and the insured property on the corner are
at the same level (prior to surrounding elevated ground levels).
D did his level best to provide answers to the FSP‟s questions and was
also at a later stage able to provide more precise answers to the FSP‟s
very specific questions.
Case No: 310582 Determination Page 3 of 11
The Applicant maintains he cannot see the point of considering the
colour of the water that inundated the units as, considering the
turbulent water from any direction late in the day under heavy storm
clouds, the water would appear to be black.
The FSP‟s hydrologists accept “The significant local storm water
cat chment that drains towards low lying land in the vicinity…” Its
precise vortex of drainage (as it actually is) occurs exactly at the
property boundary of V and T Streets. All three streets/hillsides
intersect at the footpath in front of the property.
The peak rainfalls occurred between 10.00am – 2.00pm with ensuing
catchment run-off, again at 4.00pm – 5.00pm at about the time the
Creek reached peak flood levels of RL 2.4m and again between
6.00pm- 8.00pm on 20 May 2009, which is contrary to W‟s statement.
11. T he Applicant strongly refutes the FSP‟s position that he has not made
available any evidence to support his position. He maintains the matters
discussed above, eye witness accounts and the facts of the matter all
support what actually occurred on the date of loss as opposed to what the
FSP alleges the circumstances of the loss to be.
12. On the basis of the matters discussed above, the Applicant is seeking
indemnity under the claim for the loss and damage arising from stormwater
ingress within the two ground level units at the insured property.
Summary of FSP‟s position
13. The policy provides cover for accidental loss or damage, including the listed
insured events, subject to the specified policy limitations/provisions provided
in the Product Disclosure Statement (PDS). The policy specifically excludes
from cover loss or damage arising from the event „Flood‟.
14. The Applicant contacted the FSP on 21 May 2009 to lodge a claim for water
damage at the insured property. The FSP appointed loss adjusters , “M”, to
undertake an assessment of the property and determine the cause and
extent of damage subject to the claim.
15. On completing an assessment of the property, M determined that the
services of a hydrologist would be necessary and commissioned W to the
claim. W inspected the property on 28 May 2009 after which a site specific
assessment report was submitted to the FSP. It concluded that the insured
property was inundated by floodwaters and local stormwater run-off would
not have inundated the insured property above floor level.
16. The FSP maintains that the surcharging water from the stormwater drains at
around 1.30pm on 20 May 2009 (referred to by the Applicant) would have
been due to the rising water levels in the creek and based on D‟s
observations, this surcharging water alo ne did not enter the insured property
above floor level.
Case No: 310582 Determination Page 4 of 11
17. When the proximate cause for the inundation and resultant damage is storm
or rainwater run-off, the inundation usually occurs at around the same time
as the peak intensity rainfall. However, the available data shows that there
was a delay between the time of peak rainfall and the subsequent inundation
of the insured property.
18. Floodwater rarely acts alone and in most cases will have stormwater
intermingled with the floodwater before inundation of properties occur.
Floodwater that mixes with stormwater run-off and subsequently inundates a
property is still viewed as floodwaters and any resultant damage is still
considered to be flood damage, in line with the Wayne Tank principle.
19. Further, rainwater that cannot drain into a watercourse because the
watercourse is already in flood is also considered floodwater. The FSP
discussed the levels of inundation of the insured property with the tenant (D).
He confirmed the initial inundation was due to a combination of stormwater
as well as floodwater from the Creek.
20. Therefore, on the basis of the consultants‟ determining the proximate cause
for the claimed loss as being flood damage, which is excluded from cover
under the policy, the FSP is entitled to decline the Applicant‟s claim.
21. The FSP relies on the following policy provisions:
“ Accidental Damage Cover
We will cover your buildings or contents for any accidental loss or damage.
There are also a number of incidents we will cover under specific conditions –
these are listed on the following pages.
…
Any cover we provide is subject to exclusions.
Incident cover provided under specific conditions
…
Storm, rainwater or wind
We will cover your buildings or contents for loss or damage as a result of
storm, rainwater or wind”
Page 26 “ Exclusions to your cover
Any cover we provide is subject to the following exclusions
Accidental Damage cover, Additional cover and Optional cover
exclusions
We will NOT cover any loss or damage as a result of, or caused by
…
Flood
…
Case No: 310582 Determination Page 5 of 11
General Exclusions
We will NOT cover any loss or damage, or liability as a result of, or arising
from
…
Flood or storm surge ”
Glossary of words with a special meaning
…
Flood
the covering of normally dry land by water escaping or released from the
normal confines of a watercourse or lake, whether or not it is altered or
modified. Flood also includes water escaping from the confines of any
reservoir, channel, canal or dam . ”
Issues
22. Whether the Applicant has established a prima facie claim under the policy.
23. Whether the FSP was entitled to decline indemnity to the Applicant for the
claimed loss or damage in line with the policy.
Reasons for decision
24. Due to the nature and complexity of the dispute, it has been directly referred
to the Panel for Determination in accordance with the Operational Guidelines
to the Financial Ombudsman Service‟s (FOS) Terms of Reference.
25. The Panel consists of an Ombudsman and two Panel members with
extensive experience in the insurance industry and consumer claims.
26. The Panel is satisfied that the material has been exchanged and the parties
have had the opportunity to respond to the issues raised.
27. The Panel having reviewed the submissions of the parties is satisfied the
parties do not dispute the following:
The Applicant held a current landlord residential insurance policy with
the FSP at the time of the loss.
The FSP provided and the Applicant received the relevant policy
documentation prior to the loss.
The insured property suffered damage within two ground level units
arising from water ingress during the significant weather event
experienced in the area on 20 May 2009.
Tenants of the property witnessed the circumstances leading up to and
resulting in the inundation of the ground floor units.
Case No: 310582 Determination Page 6 of 11
The policy provides cover for accidental damage including the specified
insured events, however, specifically excludes from cover, loss or
damage arising from the event „Flood‟.
The property is located in close proximity to the Enoggera Creek.
28. It is not in dispute that the inundation was fortuitous and not intended and as
such a prima facie claim is established. Therefore the onus is on the FSP to
establish that the loss was caused by an exclusion, in this instance, flood.
29. The Panel has been provided with various reports by the parties to this
dispute. As there has been an exchange of material between the parties
both having had the opportunity to comment, information from the various
reports relied on will only be reiterated, where considered relevant.
Statement of record from „AH‟ provided by the Applicant
Drove home in the middle of the day at approximately 1.00pm-1.30pm
(20 May 2009).
On arrival at the intersection of T and V Streets, it was evident that
water in the surrounding streets would be of ongoing concern.
Uncertain of the amount of water at the time.
When AH returned at 4.30pm, it was discovered that stormwater had
accumulated and inundated the garage and flats at the insured
property.
Water was still visible and accumulating in T and V Streets.
Evidence from “ D ”
30. A copy of D‟s email response to the FSP‟ s questions provided include:
“ Question 1 – Did you observe the water first coming in to the downstairs
apartments 1 and 2?
Answer : “ Yes, I was present at the time water began to enter the apartment
downstairs ”
Question 2 – What direction was the water coming from that initially
inundated the apartments?
Answer : “Difficult to say as I was not paying that much attention”
Question 3 – Can you recall the time when the initial inundation occurred?
Answer : “Not exactly, but it would have been approx. 3pm AEST”
Question 4 – Can you recall the colour of the water?
Answer : “ Generally murky ”
Case No: 310582 Determination Page 7 of 11
Letter from Applicant‟s appointed builder “AR” dated 20 July 2009
AR formed the opinion that the extent of damage repaired (with the
exception of some electrical equipment) would have been caused by
rising water from 50mm to 1,200mm in height.
Further, the same damage would have occurred (regardless of
difference between minimum and maximum level of inundation)
requiring the same amount of repairs once the water entered the units,
regardless of height.
“M‟s” Loss Adjuster Report dated 30 May 2009
Ground floor inundated by water to a depth of approximately 1m on the
afternoon of 20 May 2009.
Potential that proximate cause of the loss was flood, and Applicant was
made aware of this as well.
Appointed hydrologists‟ W , to the claim.
“W‟s” Water Damage Claim Report (site specific) dated 22 June 2009
The ground floor units were inundated to a maximum depth of
approximately 1 metre above floor level. The floor level of these units
was around 0.1 metre higher than surrounding ground levels.
Data for 15 minute rainfalls between 6.00pm on 19 May 2009 to 12.00
(midnight) on 20 May 2009, were recorded at the Bureau of
Meteorology (BoM), Alderley Alert rainfall station (ARS) located about
3.5km north west of the property and the Bowen Hills Alert rainfall
station (BRS) located about 520m south east of the property.
Total rainfall levels of 274mm (ARS) and 187mm (BRS) were recorded
over the period. In the preceding 24hrs, rainfalls of 93mm and 85mm
were also recorded. The most intense burst of rainfall at both stations
occurred between 10.00am and 2.00pm on 20 May 2009.
Rainfall levels recorded at ARS are likely to better represent rainfall
over the creek catchment upstream of the property. While rainfall levels
recorded at BRS would likely represent rainfalls over the local drainage
catchment.
For durations less than an hour, the recorded rainfalls at ARS had an
ARI of two years or less, while durations of between 6 hours to 24
hours had an ARI of 25-37 years. Less than three years rainfall records
at BRS had an ARI of two years or less and 6 hours to 24 hours was a
three to seven years ARI.
The property is located 400m from the northern bank of the creek,
which become Breakfast Creek further downstream. The water level
records for the creek over 20 and 20 May 2009 show the water level
peaked at 2.43mRL at about 5.00pm on 20 May 2009.
Case No: 310582 Determination Page 8 of 11
The response time (time taken for run-off to flow from the top of the
catchment to the property) for the local catchment would be no more
than 10-20 minutes.
The Applicant advised that he received a telephone call from his
property manager at around 2.30pm to advise there was approximately
two or three inches of water in the ground level units. He also received
another call at around 6.30pm to advise approximately four feet of
water went through the units.
A tenant (D) at the property advised he arrived home from university at
around 1.30pm and noted at that time there appeared to be water
coming out of the stormwater drains. About an hour to an hour and a
half later, he saw water coming into the downstairs units, and which D
believed peaked at around 5.00pm. D also observed water running
down V Street towards the creek as well as water coming up V Street
from the Creek.
W notes that the occupants‟ version of events is generally consistent
with the time of the recorded water levels in the creek. The maximum
depth of inundation at the property was caused by floodwater
overflowing the confines of the creek. It is unlikely that local stormwater
alone would have inundated the property prior to the arrival of
floodwaters from the creek.
W concluded that the inundation of the insured property was due to
floodwaters.
Further comments by W via email dated 15 September 2009
The area between the creek and the insured property is very flat
(approximately 2m AHD) and as floodwater overflowed from the creek,
it would have spread out over this area.
The property is located in a gully bounded by elevated land to the east
and west and would have been affected by backwater flooding from the
creek.
In line with advice from the tenant (D) and W‟s original report, the time
of initial inundation of the units corresponds with the timing of the
elevated water levels in the creek.
The surcharging stormwater in T and V Streets at 1.30pm would have
been caused by rising water levels of the creek. However, based on the
witness statements, the surcharging stormwater did not inundate the
units at the property above floor level.
W‟s Inundation of Property Report dated 22 February 2013
The Applicant appears not to dispute the source of the peak inundation
level at the property was the creek. The time indicated for the peak
inundation level in the Applicant‟s submission (5.00pm) corresponds
with the time of recorded peak water levels of the creek.
Case No: 310582 Determination Page 9 of 11
W does not dispute that there is a significant local stormwater
catchment that drains towards the low lying area in the vicinity of the
insured property. However, the main reasons for W‟s opinion that the
property was not initially inundated by stormwater run-off relates to the
timing and intensity of local rainfall.
Based on the time required for water to travel from the top of the local
catchment to the property, short duration rainfalls up to 30 minutes,
would produce the greatest peak flows in the stormwater system.
While a significant total volume of rainfall was recorded over several
days, the short duration rainfall intensities were not exceptionally
intense in the area. Similar rainfall intensities would be expected to
occur, on average, more than once year.
The high water levels of the creek were due to the higher rainfalls
recorded in the upper catchment than those near the property.
The initial inundation did not occur until 1.5-2 hours after peak rainfall
intensity, there had only been a few millimetres of rainfall in the
preceding 30 minutes. The initial inundation corresponds with the time
at which the creek flood levels would have reached floor levels of the
property.
If the May 2009 rainfalls caused sufficient stormwater run-off to
inundate the insured property above floor level, then stormwater
inundation above floor level at this property would have occurred many
times over the previous five years.
Comments from W after reviewing Applicant‟s comments
Acknowledged the Applicant‟s reference to the size of the catchment
and noted there was a „typo‟ and instead of the 6.3ha noted it should
have been 9.3ha, however, definitely not 16ha as alleged by the
Applicant.
However, W noted that his findings were not dependent upon whether
the local catchment is 6.3ha, 9.3ha or 16ha because the findings are
based primarily on the intensity and timing of recorded rainfall
compared to the recorded timing of initial inundation and recorded
creek water levels.
The Applicant appears to think the peak water levels recorded at BRS
represents the creek‟s levels in the vicinity of the prop erty. However,
BRS is downstream of the property and flood levels further upstream
along the creek would be higher than the level recorded at the gauge
(station).
The reported timing of initial inundation is consistent with the time at
which the creek floodwaters would have reached floor level at the
property.
31. The Panel notes that it is not in dispute that there are stormwater drains in
the area of the insured property or that water was witnessed running towards
and escaping from these stormwater drains at around 1.30pm (D‟s statement
Case No: 310582 Determination Page 10 of 11
and observations) on 20 May 2009. However, at this point there was no
water inundation at the insured property (according to D) and this occurred
later in the afternoon within the two ground level units on 20 May 2009.
32. Althoug h the FSP relies on a number of D‟s comments in respect of source
and mixing of the inundation, the Panel is not inclined to accept that this
assists the FSP given there is no evidence that D is appropriately qualified to
form such a view.
33. However, of note is that D reported that the initial inundation occurred at
about 3.00pm on 20 May 2009. This is significant given the timing of the
peak rainfalls, being between 10.00am and 2.00pm on 20 May 2009.
34. W formed the view that the rainfall was not sufficient to generate a level of
run-off which would alone be sufficient to inundate the insured property
above floor level. Further, it was reported that at 1.30pm water was unable to
drain away via the stormwater infrastructure rather, water was escaping
these drains and mixing with the stormwater run-off.
35. Any backflow water which either came from the creek via the drainage
system, or water build up that could not drain into the creek because of the
rising creek water levels, would be considered floodwater. While the intense
rainfall may be regarded as the initial cause for the rivers and creeks
flooding, it is accepted law that when rainwater mixes with river water or
water overflowing from a river, creek or dam, then that rain water is deemed
to be flood water.
36. Based on the evidence presented, it can be reasonably concluded that as
early as 1.30pm water had accumulated around the stormwater drains in the
vicinity of the property. Further, water was observed to be escaping these
drains as well as stormwater run-off was prevented from escaping to the
creek via these drains. Based on D‟s observations , it is accepted that the
inundation of the insured property did not occur until about 3.00pm in the
afternoon on 20 May 2009 with peak inundation occurring at around 5.00 -
5.3 0pm. This appears to support W‟s view that this timing is consistent with
the recorded levels of the creek, which it is accepted, is in close proximity to
the Applicant‟s property.
37. Accordingly, in the Panel‟s view, this leads to a conclusion that, on the
balance of probabilities, the initial and ultimate inundation of the property
would have been a mixture of floodwater and stormwater run-off and was not
stormwater run-off alone.
38. As the policy does not cover loss or damage caused by flood, it follows that
the Applicants‟ claim does not succeed.
39. In light of the matters discussed previously, the Panel is satisfied that the
proximate cause for the Applicant‟s loss was floodwater inundation. The
Panel notes that the policy excludes cover for loss arising from flood within
the “Accidental Damage” as well as the “General Exclusion” provisions which
apply to all sections of the policy.
Case No: 310582 Determination Page 11 of 11
Determination
40. On the basis of the available information and the above reasons, the Panel
determines that:
the Applicant was clearly informed of the policy exclusion of flood;
the damage to the Applicant‟s property was caused by floodwater;
the FSP is entitled to deny the Applicant‟s claim.