Determination 310582

Claim for storm water inundation damage declined under flood exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2013-08-26
ProductGeneral Insurance · Landlord
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A landlord claimed for water damage to two ground-floor units after May 2009 storms, and the insurer declined under the flood exclusion. AFCA's Panel found the inundation was a mix of floodwater and stormwater, so the exclusion applied and no payment was ordered.

Stormwater that mixes with overflowing creek water is floodwater under the policy exclusion, consistent with the Wayne Tank principle.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 310582 Determination Page 1 of 11 Case number: 310582 General Insurance - Domestic Insurance - Home Building and Contents - FSP Decision – Flood - Denial of claim-Exclusion/ condition 22 August 2013 Background 1. The Applicant held a Landlord Residential Insurance Policy (the policy) with the Financial Services Provider (FSP). 2. A claim was lodged under the policy for damage to two units (the units) on the ground level of the insured property in Windsor arising from the significant weather events experienced in Queens land during May 2009. 3. The FSP declined the claim on the basis the damage assessed was due to the event „Flood‟, which is specifically excluded from cover under the policy. 4. The Applicant remains dissatisfied with the FSP‟s decision to decline his claim and is seeking indemnity for his loss. Summary of Applicant‟s position 5. Severe storm cells located in and around Brisbane in the period between 19 May 2009 – 21 May 2009 caused stormwater inundation damage to the insured building. Following the storms, a claim was lodged under the policy for resultant loss or damage which occurred on 20 May 2009. 6. The intense storm cell on 19 May 2009 inundated areas surrounding the insured property causing the stormwater drains in the vicinity of the property „T‟ Street and „V‟ Street to fail to cope with the volumes of stormwater run-off generated by the storm event. 7. The water pooled and built up at the stormwater drains from higher areas to the west, north and east of the property. The Applicant maintains arising from this pooling of water and the drains failure to cope with the volume of stormwater run-off, the units at the insured property were inundated with stormwater run-off between 2.00pm – 3.30pm on 20 May 2009. Determination Case No: 310582 Determination Page 2 of 11 8. The data relied upon by the FSP‟s commissioned hydrologists‟ “W” , means nothing, if taken out of context with all other relating matters and facts, which are:  The Clem 7 tunnel and Cover Leaf infrastructure embedded into Enoggera Creek (the creek) with collected debris and local flood plain areas adjacent to Bowen Bridge Road (500m from the insured property) caused enormous damming effects on the creek.  There was no great volume of rain preceding 20 May 2009 and yet there still was substantial flooding of the creek due to the infrastructure and debris noted above.  There was substantial rainfall leading up to 8.00pm on 20 May 2009 with only two short breaks of an hour or so from the heavy down pour. W‟s estimated that the relevant catchment areas added up to 6ha, however, the Applicant maintains the catchment actually extends slightly further and is around 16ha in total.  Due to the creek flooding and stormwater drains being at capacity, there was nowhere else for water to go but to inundate the 16ha catchment areas and the properties immediate to the catchment vortex ie V and T Streets. 9. The Applicant acknowledges that data suggests that the creek did flood to a record level of RL2.43m between 4.00pm-6.00pm on 20 May 2009. However, he maintains that the inundation of the units by stormwater occurred prior to the creek flooding. He also refutes the reference and/or application of the „Wayne Tank Principle‟ and maintains that the initial inundation was solely due to stormwater run-off alone. 10. Having considered the FSP‟s submission to the Service, the Applicant maintains:  At lodgement of the claim, a tenant and an eye witness of the event advised that it was rainwater run-off that entered the units. However, it seemed that the FSP was not prepared to accept the eyewitness account as credible evidence.  W‟s report f ails to comment on the extreme nature of rainfall from 10.00am to 2.00pm on 20 January 2009 or the ensuing run-off from the street gutters, gardens and house roofs over the substantial catchment area.  A tenant witnessed the water entering the property at about 2.30pm which he says coincides with the tenant‟s (D‟s) statement that water was flowing between T Street and V Street at 1.30pm about 60 minutes prior to that. These streets and the insured property on the corner are at the same level (prior to surrounding elevated ground levels).  D did his level best to provide answers to the FSP‟s questions and was also at a later stage able to provide more precise answers to the FSP‟s very specific questions. Case No: 310582 Determination Page 3 of 11  The Applicant maintains he cannot see the point of considering the colour of the water that inundated the units as, considering the turbulent water from any direction late in the day under heavy storm clouds, the water would appear to be black.  The FSP‟s hydrologists accept “The significant local storm water cat chment that drains towards low lying land in the vicinity…” Its precise vortex of drainage (as it actually is) occurs exactly at the property boundary of V and T Streets. All three streets/hillsides intersect at the footpath in front of the property.  The peak rainfalls occurred between 10.00am – 2.00pm with ensuing catchment run-off, again at 4.00pm – 5.00pm at about the time the Creek reached peak flood levels of RL 2.4m and again between 6.00pm- 8.00pm on 20 May 2009, which is contrary to W‟s statement. 11. T he Applicant strongly refutes the FSP‟s position that he has not made available any evidence to support his position. He maintains the matters discussed above, eye witness accounts and the facts of the matter all support what actually occurred on the date of loss as opposed to what the FSP alleges the circumstances of the loss to be. 12. On the basis of the matters discussed above, the Applicant is seeking indemnity under the claim for the loss and damage arising from stormwater ingress within the two ground level units at the insured property. Summary of FSP‟s position 13. The policy provides cover for accidental loss or damage, including the listed insured events, subject to the specified policy limitations/provisions provided in the Product Disclosure Statement (PDS). The policy specifically excludes from cover loss or damage arising from the event „Flood‟. 14. The Applicant contacted the FSP on 21 May 2009 to lodge a claim for water damage at the insured property. The FSP appointed loss adjusters , “M”, to undertake an assessment of the property and determine the cause and extent of damage subject to the claim. 15. On completing an assessment of the property, M determined that the services of a hydrologist would be necessary and commissioned W to the claim. W inspected the property on 28 May 2009 after which a site specific assessment report was submitted to the FSP. It concluded that the insured property was inundated by floodwaters and local stormwater run-off would not have inundated the insured property above floor level. 16. The FSP maintains that the surcharging water from the stormwater drains at around 1.30pm on 20 May 2009 (referred to by the Applicant) would have been due to the rising water levels in the creek and based on D‟s observations, this surcharging water alo ne did not enter the insured property above floor level. Case No: 310582 Determination Page 4 of 11 17. When the proximate cause for the inundation and resultant damage is storm or rainwater run-off, the inundation usually occurs at around the same time as the peak intensity rainfall. However, the available data shows that there was a delay between the time of peak rainfall and the subsequent inundation of the insured property. 18. Floodwater rarely acts alone and in most cases will have stormwater intermingled with the floodwater before inundation of properties occur. Floodwater that mixes with stormwater run-off and subsequently inundates a property is still viewed as floodwaters and any resultant damage is still considered to be flood damage, in line with the Wayne Tank principle. 19. Further, rainwater that cannot drain into a watercourse because the watercourse is already in flood is also considered floodwater. The FSP discussed the levels of inundation of the insured property with the tenant (D). He confirmed the initial inundation was due to a combination of stormwater as well as floodwater from the Creek. 20. Therefore, on the basis of the consultants‟ determining the proximate cause for the claimed loss as being flood damage, which is excluded from cover under the policy, the FSP is entitled to decline the Applicant‟s claim. 21. The FSP relies on the following policy provisions: “ Accidental Damage Cover We will cover your buildings or contents for any accidental loss or damage. There are also a number of incidents we will cover under specific conditions – these are listed on the following pages. … Any cover we provide is subject to exclusions. Incident cover provided under specific conditions … Storm, rainwater or wind We will cover your buildings or contents for loss or damage as a result of storm, rainwater or wind” Page 26 “ Exclusions to your cover Any cover we provide is subject to the following exclusions Accidental Damage cover, Additional cover and Optional cover exclusions We will NOT cover any loss or damage as a result of, or caused by …  Flood … Case No: 310582 Determination Page 5 of 11 General Exclusions We will NOT cover any loss or damage, or liability as a result of, or arising from …  Flood or storm surge ” Glossary of words with a special meaning … Flood the covering of normally dry land by water escaping or released from the normal confines of a watercourse or lake, whether or not it is altered or modified. Flood also includes water escaping from the confines of any reservoir, channel, canal or dam . ” Issues 22. Whether the Applicant has established a prima facie claim under the policy. 23. Whether the FSP was entitled to decline indemnity to the Applicant for the claimed loss or damage in line with the policy. Reasons for decision 24. Due to the nature and complexity of the dispute, it has been directly referred to the Panel for Determination in accordance with the Operational Guidelines to the Financial Ombudsman Service‟s (FOS) Terms of Reference. 25. The Panel consists of an Ombudsman and two Panel members with extensive experience in the insurance industry and consumer claims. 26. The Panel is satisfied that the material has been exchanged and the parties have had the opportunity to respond to the issues raised. 27. The Panel having reviewed the submissions of the parties is satisfied the parties do not dispute the following:  The Applicant held a current landlord residential insurance policy with the FSP at the time of the loss.  The FSP provided and the Applicant received the relevant policy documentation prior to the loss.  The insured property suffered damage within two ground level units arising from water ingress during the significant weather event experienced in the area on 20 May 2009.  Tenants of the property witnessed the circumstances leading up to and resulting in the inundation of the ground floor units. Case No: 310582 Determination Page 6 of 11  The policy provides cover for accidental damage including the specified insured events, however, specifically excludes from cover, loss or damage arising from the event „Flood‟.  The property is located in close proximity to the Enoggera Creek. 28. It is not in dispute that the inundation was fortuitous and not intended and as such a prima facie claim is established. Therefore the onus is on the FSP to establish that the loss was caused by an exclusion, in this instance, flood. 29. The Panel has been provided with various reports by the parties to this dispute. As there has been an exchange of material between the parties both having had the opportunity to comment, information from the various reports relied on will only be reiterated, where considered relevant. Statement of record from „AH‟ provided by the Applicant  Drove home in the middle of the day at approximately 1.00pm-1.30pm (20 May 2009).  On arrival at the intersection of T and V Streets, it was evident that water in the surrounding streets would be of ongoing concern.  Uncertain of the amount of water at the time.  When AH returned at 4.30pm, it was discovered that stormwater had accumulated and inundated the garage and flats at the insured property.  Water was still visible and accumulating in T and V Streets. Evidence from “ D ” 30. A copy of D‟s email response to the FSP‟ s questions provided include: “ Question 1 – Did you observe the water first coming in to the downstairs apartments 1 and 2? Answer : “ Yes, I was present at the time water began to enter the apartment downstairs ” Question 2 – What direction was the water coming from that initially inundated the apartments? Answer : “Difficult to say as I was not paying that much attention” Question 3 – Can you recall the time when the initial inundation occurred? Answer : “Not exactly, but it would have been approx. 3pm AEST” Question 4 – Can you recall the colour of the water? Answer : “ Generally murky ” Case No: 310582 Determination Page 7 of 11 Letter from Applicant‟s appointed builder “AR” dated 20 July 2009  AR formed the opinion that the extent of damage repaired (with the exception of some electrical equipment) would have been caused by rising water from 50mm to 1,200mm in height.  Further, the same damage would have occurred (regardless of difference between minimum and maximum level of inundation) requiring the same amount of repairs once the water entered the units, regardless of height. “M‟s” Loss Adjuster Report dated 30 May 2009  Ground floor inundated by water to a depth of approximately 1m on the afternoon of 20 May 2009.  Potential that proximate cause of the loss was flood, and Applicant was made aware of this as well.  Appointed hydrologists‟ W , to the claim. “W‟s” Water Damage Claim Report (site specific) dated 22 June 2009  The ground floor units were inundated to a maximum depth of approximately 1 metre above floor level. The floor level of these units was around 0.1 metre higher than surrounding ground levels.  Data for 15 minute rainfalls between 6.00pm on 19 May 2009 to 12.00 (midnight) on 20 May 2009, were recorded at the Bureau of Meteorology (BoM), Alderley Alert rainfall station (ARS) located about 3.5km north west of the property and the Bowen Hills Alert rainfall station (BRS) located about 520m south east of the property.  Total rainfall levels of 274mm (ARS) and 187mm (BRS) were recorded over the period. In the preceding 24hrs, rainfalls of 93mm and 85mm were also recorded. The most intense burst of rainfall at both stations occurred between 10.00am and 2.00pm on 20 May 2009.  Rainfall levels recorded at ARS are likely to better represent rainfall over the creek catchment upstream of the property. While rainfall levels recorded at BRS would likely represent rainfalls over the local drainage catchment.  For durations less than an hour, the recorded rainfalls at ARS had an ARI of two years or less, while durations of between 6 hours to 24 hours had an ARI of 25-37 years. Less than three years rainfall records at BRS had an ARI of two years or less and 6 hours to 24 hours was a three to seven years ARI.  The property is located 400m from the northern bank of the creek, which become Breakfast Creek further downstream. The water level records for the creek over 20 and 20 May 2009 show the water level peaked at 2.43mRL at about 5.00pm on 20 May 2009. Case No: 310582 Determination Page 8 of 11  The response time (time taken for run-off to flow from the top of the catchment to the property) for the local catchment would be no more than 10-20 minutes.  The Applicant advised that he received a telephone call from his property manager at around 2.30pm to advise there was approximately two or three inches of water in the ground level units. He also received another call at around 6.30pm to advise approximately four feet of water went through the units.  A tenant (D) at the property advised he arrived home from university at around 1.30pm and noted at that time there appeared to be water coming out of the stormwater drains. About an hour to an hour and a half later, he saw water coming into the downstairs units, and which D believed peaked at around 5.00pm. D also observed water running down V Street towards the creek as well as water coming up V Street from the Creek.  W notes that the occupants‟ version of events is generally consistent with the time of the recorded water levels in the creek. The maximum depth of inundation at the property was caused by floodwater overflowing the confines of the creek. It is unlikely that local stormwater alone would have inundated the property prior to the arrival of floodwaters from the creek.  W concluded that the inundation of the insured property was due to floodwaters. Further comments by W via email dated 15 September 2009  The area between the creek and the insured property is very flat (approximately 2m AHD) and as floodwater overflowed from the creek, it would have spread out over this area.  The property is located in a gully bounded by elevated land to the east and west and would have been affected by backwater flooding from the creek.  In line with advice from the tenant (D) and W‟s original report, the time of initial inundation of the units corresponds with the timing of the elevated water levels in the creek.  The surcharging stormwater in T and V Streets at 1.30pm would have been caused by rising water levels of the creek. However, based on the witness statements, the surcharging stormwater did not inundate the units at the property above floor level. W‟s Inundation of Property Report dated 22 February 2013  The Applicant appears not to dispute the source of the peak inundation level at the property was the creek. The time indicated for the peak inundation level in the Applicant‟s submission (5.00pm) corresponds with the time of recorded peak water levels of the creek. Case No: 310582 Determination Page 9 of 11  W does not dispute that there is a significant local stormwater catchment that drains towards the low lying area in the vicinity of the insured property. However, the main reasons for W‟s opinion that the property was not initially inundated by stormwater run-off relates to the timing and intensity of local rainfall.  Based on the time required for water to travel from the top of the local catchment to the property, short duration rainfalls up to 30 minutes, would produce the greatest peak flows in the stormwater system.  While a significant total volume of rainfall was recorded over several days, the short duration rainfall intensities were not exceptionally intense in the area. Similar rainfall intensities would be expected to occur, on average, more than once year.  The high water levels of the creek were due to the higher rainfalls recorded in the upper catchment than those near the property.  The initial inundation did not occur until 1.5-2 hours after peak rainfall intensity, there had only been a few millimetres of rainfall in the preceding 30 minutes. The initial inundation corresponds with the time at which the creek flood levels would have reached floor levels of the property.  If the May 2009 rainfalls caused sufficient stormwater run-off to inundate the insured property above floor level, then stormwater inundation above floor level at this property would have occurred many times over the previous five years. Comments from W after reviewing Applicant‟s comments  Acknowledged the Applicant‟s reference to the size of the catchment and noted there was a „typo‟ and instead of the 6.3ha noted it should have been 9.3ha, however, definitely not 16ha as alleged by the Applicant.  However, W noted that his findings were not dependent upon whether the local catchment is 6.3ha, 9.3ha or 16ha because the findings are based primarily on the intensity and timing of recorded rainfall compared to the recorded timing of initial inundation and recorded creek water levels.  The Applicant appears to think the peak water levels recorded at BRS represents the creek‟s levels in the vicinity of the prop erty. However, BRS is downstream of the property and flood levels further upstream along the creek would be higher than the level recorded at the gauge (station).  The reported timing of initial inundation is consistent with the time at which the creek floodwaters would have reached floor level at the property. 31. The Panel notes that it is not in dispute that there are stormwater drains in the area of the insured property or that water was witnessed running towards and escaping from these stormwater drains at around 1.30pm (D‟s statement Case No: 310582 Determination Page 10 of 11 and observations) on 20 May 2009. However, at this point there was no water inundation at the insured property (according to D) and this occurred later in the afternoon within the two ground level units on 20 May 2009. 32. Althoug h the FSP relies on a number of D‟s comments in respect of source and mixing of the inundation, the Panel is not inclined to accept that this assists the FSP given there is no evidence that D is appropriately qualified to form such a view. 33. However, of note is that D reported that the initial inundation occurred at about 3.00pm on 20 May 2009. This is significant given the timing of the peak rainfalls, being between 10.00am and 2.00pm on 20 May 2009. 34. W formed the view that the rainfall was not sufficient to generate a level of run-off which would alone be sufficient to inundate the insured property above floor level. Further, it was reported that at 1.30pm water was unable to drain away via the stormwater infrastructure rather, water was escaping these drains and mixing with the stormwater run-off. 35. Any backflow water which either came from the creek via the drainage system, or water build up that could not drain into the creek because of the rising creek water levels, would be considered floodwater. While the intense rainfall may be regarded as the initial cause for the rivers and creeks flooding, it is accepted law that when rainwater mixes with river water or water overflowing from a river, creek or dam, then that rain water is deemed to be flood water. 36. Based on the evidence presented, it can be reasonably concluded that as early as 1.30pm water had accumulated around the stormwater drains in the vicinity of the property. Further, water was observed to be escaping these drains as well as stormwater run-off was prevented from escaping to the creek via these drains. Based on D‟s observations , it is accepted that the inundation of the insured property did not occur until about 3.00pm in the afternoon on 20 May 2009 with peak inundation occurring at around 5.00 - 5.3 0pm. This appears to support W‟s view that this timing is consistent with the recorded levels of the creek, which it is accepted, is in close proximity to the Applicant‟s property. 37. Accordingly, in the Panel‟s view, this leads to a conclusion that, on the balance of probabilities, the initial and ultimate inundation of the property would have been a mixture of floodwater and stormwater run-off and was not stormwater run-off alone. 38. As the policy does not cover loss or damage caused by flood, it follows that the Applicants‟ claim does not succeed. 39. In light of the matters discussed previously, the Panel is satisfied that the proximate cause for the Applicant‟s loss was floodwater inundation. The Panel notes that the policy excludes cover for loss arising from flood within the “Accidental Damage” as well as the “General Exclusion” provisions which apply to all sections of the policy. Case No: 310582 Determination Page 11 of 11 Determination 40. On the basis of the available information and the above reasons, the Panel determines that:  the Applicant was clearly informed of the policy exclusion of flood;  the damage to the Applicant‟s property was caused by floodwater;  the FSP is entitled to deny the Applicant‟s claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.