Home / Financial Firm (Unknown - Insurer) / Determination 310557
Determination 310557
Denial of storm inundation claim under flood exclusion
Summary
Applicants' home and contents were inundated in January 2011 and the FSP denied the claim as flood. AFCA found inundation to 1.2m above benchmark was flash flood within 24 hours and covered, ordered a scope of works and cash settlement, and awarded interest on contents from 28 March 2011.
Flash flood cover responds to inundation caused by rain within 24 hours of the event, while later inundation is excluded as flood.
Subjects and remedies
home or building damagenatural disasterpay claimpay interestreassess claim
Text of the determination
Case No: 310557 Determination Page 1 of 9
Case number: 310557
General Insurance - Domestic Insurance - Home Building and Contents - Storm
- FSP Decision - Denial of claim - Exclusion/Condition - Flood
16 April 2013
Background
1. The Applicants held a home building and contents insurance policy with the
Financial Services Provider (FSP). The relevant insurance period operated
for 12 months beginning from 20 March 2010. During this period, the building
was insured up to a sum of $200,000 and the contents for $80,000.
2. On 13 January 2011, the Applicants lodged a claim under the policy due to
extensive water inundation to their property in Oxley following severe
weather events in Queensland.
3. The FSP denied the claim on the basis the damage was due to “flood”. The
Applicants have disputed this.
Summary of Applicants ’ position
4. Their policy covers flash flooding. They believe the initial flooding to their
house was caused by flash flooding due to heavy rain occurring between
4.00am – 8.00am on 11 January 2011.
5. Water levels reached their driveway by the afternoon of 11 January 2011.
Water appeared to be coming from stormwater drains further down the
street. Due to the speed of the rising waters, they had to leave by
approximately 2.00pm – 3.00pm to avoid being trapped in the house.
6. They were advised by other people in the area that the flooding which
occurred on 11 January 2011 is classified as flash flooding. This means they
should be able to claim for any damaged property.
7. Their neighbours have also been advised that anything that was affected up
to a certain level (water levels as at 4.00am on 12 January 2011) would be
covered.
8. At 4.00am on 12 January 2011, the water levels would have covered the
floor storage area under the house and reached the rear of the property
where the laundry is located.
Determination
Case No: 310557 Determination Page 2 of 9
9. At this level, the water would have been approximately 1.8m high in the
storage area under the house, which would have damaged anything stored
there, as well as damaging the air conditioning and solar equipment.
10. They should not be disadvantaged by the time taken to lodge the dispute.
They were covered by the same policy as their neighbours and affected in
the same way. They knew their neighbours had a dispute with the FSP and
they were waiting on their outcome instead of wasting resources. They had
also been busy restoring the house to a liveable state.
11. Their property is highset, they believe they should be compensated for
damage to all property stored below the level classified as being affected by
flash flood. These areas include the garage, laundry and storage area where
they had tools, gym equipment and other items.
Summary of FSP’s position
12. It relies on the statement of hydrologist SC to conclude that the property was
inundated by the rising levels of the Brisbane River and not stormwater or
other local runoff associated with rainfall.
13. The inundation was not due to rain that fell in 24 hours of the heavy rainfall,
but due to the cumulative effect of the rainfall on the Brisbane River and
Wivenhoe Dam over the period 6 – 11 January 2011.
14. In the alternative that it is considered the rainfall within 24 hours contributed
to the inundation of the property, then the Wayne Tank principle applies to
exclude inundation that is due to a combination of flash flood and flooding
within the terms of the policy.
15. Alternatively, it contends the W4 releases from the Wivenhoe Dam as a
result of the heavy rain occurring from 4.00am on 11 January 2011 had little
material impact on the property.
16. The factors relating to the Applicants‟ neighbour‟s dispute are different
fac tual circumstances to those relating to the Applicants‟ property and not
applicable to this dispute.
17. It notes there was a delay of over 20 months from the time the Applicants‟
claim was first declined to the time they lodged their dispute with the
Financial Ombudsman Service (FOS). In the event that FOS determines in
favour of the Applicants, the FSP says that the start date for calculation of
any interest should be the date of FOS‟s Determination.
18. The FSP relies on a number of hydrology reports authored by SC and the
following policy provisions to deny the Applicants‟ claim :
Page 4 of the Certificate of Insurance (COI)
“ What optional covers are included and not included
Home Contents
Case No: 310557 Determination Page 3 of 9
...
Flood and storm surge not included not included...”
Pages 10 – 12 of the Product Disclosure Statement (PDS)
“ Words / terms with special meanings
Word / term Meaning
...
Flood Rising water which enters your home as a result of it
running off or overflowing from any origin or cause.
This policy does not cover flood unless we have
agreed and it is shown on your certificate of insurance.
Flash flood and
stormwater run - off
A sudden flood caused by heavy rain that fell no more
than 24 hours prior to the flash flood or stormwater
run - off .
...
Storm A violent disturbance of the atmosphere associated
with strong winds including a cyclone, lightning, heavy
rain, hail or snow, but not continuous bad weather by
itself.”
Pages 17 – 18 of the PDS
“ Insured events you are covered for
Damage caused by weather...
What is covered What is not covered
Storm Loss or damage:
caused by rain, hail or snow
after it has reached the ground;
...
...
Flash flood and stormwater run-off
A sudden flood caused by heavy rain
that fell no more than 24 hours prior to
the flash flood or stormwater run - off
Loss or damage caused:
by flood; ...”
Page 27 of the PDS
“ Your home
The most we will pay you for home claims
What is covered What is not covered
Case No: 310557 Determination Page 4 of 9
Flash flood and stormwater run - off
We will pay up to 50% of your home sum
insured or $25,000, whichever is higher.
...”
Page 32 of the PDS
“ Your contents
The most we will pay you for contents claims
What is covered What is not covered
... ...
Flash flood and stormwater run-off
We will pay up to 50% of your contents
sum insured or $25,000, whichever is
higher, but not exceeding your contents
sum insured.
...”
Issue
19. Whether the cause of the Applicants ‟ loss was covered under the policy .
Reasons for decision
20. Due to the nature of the dispute, the parties have been informed that the
matter has been referred to the Panel for Determination in line with the
Operational Guidelines to the FOS‟s Terms of Reference. This dispute has
not been the subject of a FOS Recommendation and has proceeded directly
to Determination.
21. This decision has been made by a Panel consisting of an Ombudsman, a
person with extensive experience in the insurance industry and a person
with extensive experience in consumer claims.
22. The Panel is satisfied a full exchange of information has taken place
between the parties and each party has had the opportunity to address the
issues raised.
23. The Panel has reviewed the submissions of the parties and observes there
is no dispute that the Applicants‟ property was water damaged, albeit the
FSP contends the event was attributable to the excluded event of flood.
The Evidence
24. The hydrology report dated March 2011 entitled “Investigation of the January
2011 Inundation Event - Brisbane” notes:
Case No: 310557 Determination Page 5 of 9
In the Brisbane River catchment above Wivenhoe Dam, rainfall
commenced at approximately 6.00am on 9 January 2011. These
inflows contributed to a peak outflow from Wivenhoe Dam occurring at
approximately 12 midnight on 12 January 2011.
Significant dam discharges occurred later than 24 hours after the start
of the rainfall event that led to the significant inflows into the dam. Any
inundation associated with Brisbane River flows below the dam would
be attributable to the rain event that commenced at approximately
6.00am on 9 January 2011.
Damage directly associated with Brisbane River inundation within
Brisbane after 6.00am on 12 January 2011 was caused by flood.
Whereas, inundation before 6.00am on 12 January 2011 may be
partially attributable to rainfall that fell within the catchments
downstream of Wivenhoe Dam in the preceding 24 hours.
25. The FSP‟s hydrologist SC presented a statement dated 7 June 2012, which
contains general information and in summary says the following:
Heavy rain that fell on 11 January 2011 was not the only cause of the
substantial releases from the Wivenhoe Dam later that same day,
causing the Brisbane River to become vastly elevated.
Levels of water at the dam started increasing rapidly from around 12
noon on 9 January 2011. As a result of rain between 6 – 9 January, the
dam‟s level was at 68.54m AH D, 1.54m above the Full Supply Level.
The rainfall on 9 – 10 January 2011 contributed roughly 71% of the
increase in the Wivenhoe Dam levels.
The elevated water levels of the dam on the morning of 11 January
2011 were a result of substantial rain that fell o ver the Wivenhoe Dam
catchment between 9 – 11 January 2011 and earlier.
As such, what caused the identified rises in the Brisbane River was
water that had been released from the dam earlier than 11 January
2011 and inflows from other parts of the Brisbane River catchment.
26. SC also provided a report and a site -specific Key Conclusions Statement
both dated 5 February 2013. According to the Key Conclusions Statement:
The height of the property varied from 4.6 – 7.5m AHD. The benchmark
level of the property (the lowest point of the structure of the house on
the land) is considered to be at 5.1m AHD. The statement notes that
the property is a slab-on-ground house.
The effect of the W4 releases first reached the vicinity of the property at
2.39pm on 11 January 2011. At 4.00am on 12 January 2011, the river
level due to the W4 releases would have been at approximately 6.3m
AHD which is 1.2m above the benchmark level.
The Brisbane River level reached benchmark level of the Applicants‟
property at 8.30pm on 11 January 2011, before peaking at 9.2m AHD
being 4.1m above benchmark level at 3.01am on 13 January 2011.
Case No: 310557 Determination Page 6 of 9
27. SC provided a statement dated 6 February 2013 containing site -specific
information. This statement relevantly says:
The terrain data does not suggest the property is particularly vulnerable
to stormwater or other local runoff during the rainfall intensities
experienced during the January 2011 event.
By 8.30pm on 11 January 2011, the Brisbane River reached a level of
5.1m AHD, which would have been sufficient to inunda te the
benchmark level at the insured property.
This supports the conclusion that the property was inundated by the
rising level of the Brisbane River.
The relevant gauge data when compared with the time of inundation as
reported by the Applicants, clearly shows that the property was
inundated by the rising levels of the Brisbane River and not by
stormwater or local runoff.
The Applicants‟ observation that water seemed to come out of water
drains is consistent with inundation caused by the rising water level of
the Brisbane River causing water backflow through the stormwater
drainage system.
28. The loss assessor‟s report of 8 February 2011 says the following:
The loss was caused by river flood. Major partial damage to the
building, with eight rooms affected and total loss of contents. The
reserve for the claim is estimated at $171,200.
The water first entered the property on 11 January 2011 and came from
storm water. The water peaked at the property at 4.6m. It remained
inundated for 3 – 4 days.
The property‟s fou ndations are stumps and the distance between the
floor level and the ground level is 2.6m.
29. The Applicants have provided five photographs clearly showing water
damage to some rooms of the property. Other than this, they have not
provided any expert evidence. Instead, they rely on the outcome of their
neighbour‟s dispute. They allege their neighbour had a claim with the FSP
that was paid out after obtaining a positive outcome from FOS.
Analysis
30. The central issue for Determination in this dispute is whether the inundation
of the Applicants ‟ home was due to flash flood as defined within the policy.
That is whether rain that fell no more than 24 hours prior to the inundation of
the Applicants‟ property was the proximate cause of the inundation.
31. On 21 May 2012, FOS issued a memorandum to all relevant stakeholders
advising that after considerable deliberation of all material available to it, the
Panel formed a view that the heavy rain occurring from approximately
4.00am on 11 January 2011 and in particular the heavy rain between
Case No: 310557 Determination Page 7 of 9
4.00am – 8.00am on 11 January 2011 was a proximate cause of the W4
strategy being invoked and therefore a proximate cause or trigger that led to
the flooding of many of the properties along the Brisbane River.
32. At that time, the Panel noted that in relation to the approach each dispute
would depend upon the individual and unique factors relevant to the dispute.
33. The evidence from SC shows that by 4.00am on 12 January 2011 the river
level was at a height of 6.3m AHD, being 1.2m above the relevant
benchmark level.
34. The Panel also notes that DC a hydrologist employed by the same firm as
SC, by „Statement‟ dated 21 March 2013, conducted a site visit of the risk
address on 14 March 2013, primarily to confirm SC‟s benchmark level. DC
concluded the benchmark level was approximately RL 5.23m AHD which is
consistent with SC‟s approximation of RL 5.1m AHD, albeit SC‟s level is 13
centimetres lower; the Panel notes these are approximations and in the
circumstances accepts SC‟s benchmark of RL 5.1m AHD.
35. The Pane l further notes SC‟s comments that the property would have first
been inundated at 8.30pm on 11 January 2011, which is well within the
relevant 24-hour period.
36. The hydrology information available, in particular the Key Conclusion
Statement from SC, is con sistent in that the Applicants‟ property had been
initially inundated within that relevant 24-hour period.
37. In these circumstances, as the inundation occurred within the relevant 24-
hour period, the policy cover for “F lash flood and stormwater run-off ”
responds to the loss and the FSP is liable for the claim.
38. Based on the available evidence, the Panel is satisfied that the inundation of
the Applicants ‟ property to the level of 1.2m above benchmark was caused
by flood that occurred within 24 hours of the heavy rainfall and is therefore
covered by the policy event of “F lash flood and stormwater run-off ”.
39. It is clear that the inundation of the property continued after the relevant 24-
hour period with the property ultimately inundated to a height of 4.1m above
benchmark by 3.00am on 13 January 2011. This additional inundation is
properly classified as flood and accordingly the damage it caused is
excluded from cover.
Quantum
40. The Renewal Certificate of Insurance for the relevant period provides a sum
insured of $200,000 for the home with contents of $80,000. Pursuant to the
policy cap for the insured event of “Flash flood and stormwater runoff”, the
FSP is liable up to an amount of $100,000 for the damage to the building
and $40,000 for the contents.
Case No: 310557 Determination Page 8 of 9
41. The Panel accepts that as the relevant flash flood inundation was to a level
of 1200mm above benchmark, any damage or loss sustained as a result of
inundation above that level is not covered under the terms of the policy.
42. Given the time since the loss was sustained and the limitations on the
insured loss and damage, the Panel accepts that the parties may be unable
to provide an exact estimate of the total loss sustained or a breakdown of
that loss.
43. In these circumstances, it is reasonable for the FSP to arrange a scope of
works to be conducted to assess the extent of the loss and damage
sustained as a result of the inundation of the residence to a height of
1200mm above benchmark.
44. The Panel accepts this would have caused significant damage to the
building at this level and most likely a total loss of contents stored at this
level. The Panel also accepts that this inundation would have impacted on
appliances such as air-conditioning and solar equipment as described by the
Applicants.
45. Once the scope of works has been completed, the Applicants and the FSP
are asked to work cooperatively together to establish the extent of the loss
sustained to the property and to reach an agreement as to the cost of repairs
or replacement of the contents lost. Should agreement not be reached the
parties may return the dispute to FOS for determination of the extent of the
loss.
46. Insofar as the FSP may have made payment of a compassionate sum to the
Applicants, FOS does not have jurisdiction to deal with this payment but
acknowledges that the FSP, given the terms on which the compassionate
payment may have been made, may be entitled to deduct this payment from
any settlement sum.
Interest
47. The Applicants allege that they should not be disadvantaged because of the
time it took to lodge the dispute. They note their neighbours had the same
policy with the FSP and they were waiting on the outcome of their
neighbour‟s dispute instead of wasting resources.
48. The FSP notes the Applicants have taken 20 months to lodge the dispute
from the time their claim was declined and argues that interest should be
calculated from the date of the Determination.
49. The Panel notes that the following sub-sections of Section 57 of the
Insurance Contracts Act 1984 (the Act) are applicable to this particular issue
in dispute:
“ 57 Interest on claims
(1) Where an insurer is liable to pay to a person an amount under a
contract of insurance or under this Act in relation to a contract of
Case No: 310557 Determination Page 9 of 9
insurance, the insurer is also liable to pay interest on the amount to
that person in accordance with this section.
(2) The period in respect of which interest is payable is the period
commencing on the day as from which it was unreasonable for the
insurer to have withheld payment of the amount and ending on
whichever is the earlier of the following days:
(a) the day on which the payment is made;
(b) the day on which the payment is sent by post to the person to
whom it is payable.”
50. A plain read of sub-section 57(2) of the Act shows that the commencement
of the period, in respect of which interest is pa yable, starts “the day as from
which it was unreasonable for the insurer to have withheld payment”. The
Panel is satisfied that in this instance, as per the reasoning of this decision,
the date of the initial denial of the claim (28 March 2011) was the day in
which, after assessing the claim it would have been unreasonable to
withhold payment.
51. As the scope of works for any property damage will be calculated by
reference to current repair costs, the Panel determines that no interest is
payable by the FSP, in the event it elects to discharge its obligations in that
respect by cash settlement. Insofar as the FSP cash settles the claim for
loss of contents, the Panel determines that interest is payable from 28 March
2011 being the date of denial of the claim.
Determination
52. The Panel determines the FSP is liable to meet the Applicants claim for
damage to the building and loss of contents as a result of inundation of the
property above the relevant benchmark up to 1200mm, subject to the
limitations contained within the policy.
53. Further, the Panel determines the FSP pay interest pursuant to Section 57 of
the Act on the cash settlement sum applicable for the loss of contents from
28 March 2011 to date of settlement of the claim.