Home / Financial Firm (Unknown - Insurer) / Determination 310136

Determination 310136

Claim amount - quality of repairs and policy in force at later loss

FirmFinancial Firm (Unknown - Insurer)
Decided2014-03-26
ProductGeneral Insurance · Boat
OutcomeFor the complainant in part
Amount awarded$8,000
Non-financial loss$2,000
Amount claimed$178,000
SourceAFCA PDF

Summary

Applicant's boat was damaged in 2010-11 and the FSP's repairs were disputed, and the boat was later destroyed in a 2013 flood after the FSP had stopped insuring it. AFCA refused the balance of the claim but ordered $8,000 for unreplaced items plus $2,000 non-financial loss.

The FSP was not liable for the 2013 flood loss because the vessel was no longer insured and had been accepted by the Applicant as his responsibility, but it had to pay for items the defective repairs omitted.

Issues

Subjects and remedies

pay claimpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case No: 310136 Determination Page 1 of 11 Case number: 310136 General Insurance - Domestic Insurance - Personal and Domestic Property- Pleasure Craft - FSP Decision - Claim amount 04 March 2014 Summary Description  Dispute under a Marine Boat Insurance policy following damage sustained to the vessel in December 2010. Basis of Determination  The Applicant‟s vessel was damaged in December 2010.  Despite the FSP‟s claim that it had completed all repairs, the evidence establishes that as at March 2012, the Applicant was still in dispute with the FSP as to the quality of repairs.  There is no evidence of any contact by the Applicant with the FSP since 16 March 2012.  The vessel was subsequently destroyed on or about 28 January 2013 when the Bundaberg slipways were flooded during the Bundaberg floods of 2013. At this time, the vessel was not insured.  At 28 January 2013, the FSP had not replaced the dinghy, motor, anchor, chain or solar panels. Determination  The Panel determines that the FSP is to pay the Applicant the sum of $8,000 to cover the replacement costs of those items not replaced during the repair process and further, the FSP is to pay the Applicant the sum of $2,000 compensation for non financial loss pursuant to section 9.3 of the Terms of Reference.  The FSP is entitled to refuse payment for the balance of the Applicant‟s claim on the grounds that at the time of the loss in January 2013, the Applicant did not hold a valid policy of insurance. Determination Case No: 310136 Determination Page 2 of 11 Background 1. The Applicant held a Marine Boat Insurance Policy (the policy) with the Financial Services Provider (FSP) for his 2005 Custom Built „Easy 10.5‟ Auxiliary Catamaran (insured vessel), with an agreed value of $178,000. 2. The insured vessel was extensively damaged during significant weather events experienced in Bundaberg, Queensland during December 2010/January 2011. A claim was lodged with and accepted by the FSP for the claimed damage. 3. The FSP arranged for a repair quote through its agents „AMC‟ which in turn obtained the quote from „MM‟. The Applicant also obtained a quote fro m his preferred repairer „SC‟, however, the FSP authorised repairs on the basis of its preferred repairer‟s quote. 4. The Applicant from very early on in the claim brought his concerns to the attention of the FSP with respect to the quality as well as extent of repairs being completed by MM. Disagreement between the parties with respect to the quality of MM‟s repairs continued during which time the policy period expired. The FSP maintained that it had fulfilled its obligations under the claim and that from there on the Applicant was responsible for the safety and maintenance of the vessel. 5. The Applicant registered his dispute with FOS on 11 January 2013 at which stage the vessel remained at the hardstand facility where it had been stored during the course of the claim. On 13 January 2013, as a result of a second significant weather event, the vessel was again significantly damaged to the extent it may now be a total loss. 6. The Applicant is of the opinion that arising from the FSP‟s failure to fulfil its obligations under the claim, the responsibility and possession of the vessel remained with it for the entire period. However, the FSP maintains that as per its notification to the Applicant on 14 March 2012, the vessel was the responsibility of the Applicant and there was no policy in place at the time of the second weather event. 7. The Applicant is dissatisfied with the FSP‟s position and is seeking a review and determination from FOS. Summary of Applicant’s position 8. The insured vessel was damaged in December 2010/January 2011. Two original quotations were obtained from MM and SC that provide two different methods/approaches to complete the repairs. The Applicant had concerns with respect to the repair method proposed by MM which he brought to the FSP‟s attenti on as early as 12 September 2011. Despite cooperating with the FSP and identifying continual issues with the nature of the repairs, he maintains that the FSP had not adequately completed the repairs. Case No: 310136 Determination Page 3 of 11 9. The Applicant maintains that the actions of the FSP‟s re presentative AMC were not reasonable and that they failed to ensure that the vessel was properly repaired and returned to its pre-event condition. 10. Despite the FSP‟s claims that the repairs were completed, its repairers were still attending to repairs and rectification work. 11. He has not paid any of the excess due to the FSP nor did he ever take possession of the vessel from the FSP. He maintains that the FSP was responsible for the safe keeping of the vessel and that as the vessel was rendered a total loss whilst in the care of the FSP, then the FSP should pay out the claim in full. Summary of FSP’s position 12. The FSP has sought the assistance of legal representatives „H‟ in disputing this matter before FOS. In the interest of brevity and the easy understanding of the parties, both the FSP and H will be referred to as „the FSP‟ for the purpose of this Determination. 13. The FSP maintains that its position is simple, the Applicant agreed with the repairs undertaken on the insured vessel and therefore signed the „Release‟ document. 14. The FSP on several occasions indicated a willingness to consider further losses arising from the original flood event provided the Applicant substantiated those losses and co-operated with the FSP and its agents. However, there was no co-operation and/or substantiation of any further losses forthcoming from the Applicant. 15. Even in the instance the Applicant was now able to substantiate any further losses, the events and resultant damage to the vessel that occurred on 13 January 2013 means that further repairs, if justified, cannot be completed. 16. In essence, the Applicant was advised, as at 30 December 2011, the vessel was his responsibility as it had been repaired. Further, that in the instance he was able to identify and support the existence o f other losses related to the insured event, the FSP would consider them. 17. No further losses were reported/substantiated by the Applicant and on 13 January 2013 the vessel, which was no longer insured with the FSP, suffered further significant damage during the second flood event. Basically, it was prepared to consider further indemnity under the claim until such time that the vessel was effectively destroyed in January 2013. 18. The opinion provided by „RE‟ is of no assistance as is the case with the email from „WR‟ dated 27 April 2012 advising the Applicant was trying to sell the vessel. The report from „TC‟ dated 5 August 2013 is of no relevance as it does not provide when the alleged inspection of the vessel took place while it was at the storage area. Case No: 310136 Determination Page 4 of 11 19. The photographs alleged to have been taken on 11 February 2013 are of no assistance as they do not establish they are of the vessel itself, if so what section and also when they were taken. Comments on these photos are nothing more than unqualified opinions of the Applicant regarding what they are alleged to show. 20. The FSP submits that the claim was adequately adjusted under the circumstances. There is no evidence that any act or omission of the FSP or its agents could be characterised as requiring the Applicant to sign the release in circumstances where he was under some duress to do so. 21. The evidence establishes that the Applicant despite being put on notice, as of 14 March 2012, of the FSP‟s position that it would consider further substantiated and documented claim for damage, took no steps to protect the vessel. The additional significant damage to the vessel after the FSP ceased to be on risk would probably not have occurred had the Applicant acted on the options suggested to him on 14 March 2012. 22. The FSP maintains that it had fully discharged its obligations under the policy and therefore the vessel was most certainly the responsibility of the Applicant while it remained on the high stand after the FSP clearly informed him that it was no longer on risk i.e. p rior to the second event occurring in January 2013. Issues 23. Whether the FSP fulfilled its obligations to restore the insured vessel to its pre-event condition under the claim. 24. Whether the FSP was still on risk and therefore liable to provide indemnity to the Applicant for the damage to the vessel caused in January 2013. Reasons for decision 25. As advised to the parties, FOS has considered it appropriate to elevate the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the complex nature of the issues. This dispute has not been the subject of a FOS Recommendation and has proceeded directly to Determination. 26. This decision has been made by a Panel consisting of an Ombudsman and two Panel members with extensive e xperience in insurance industry matters and consumer claims. 27. Prior to arriving at a determination the Panel has read and considered all the material submitted by the parties to FOS. It notes the parties do not dispute the following: Case No: 310136 Determination Page 5 of 11  The Applicant held an active marine boat insurance policy with the FSP at the time of the initial loss.  The FSP provided and the Applicant received the relevant policy documentation including the Product Disclosure Statement (PDS).  The insured vessel was initially damaged during a significant weather event in January 2011. The FSP accepted the claim and repairs were authorised through its preferred repairer.  The Applicant very early on in the life of the claim identified and expressed concerns with respect to the quality and method of repairs completed by MM.  The FSP acknowledged the concerns raised by the Applicant and sought to address these through its appointed agents.  The Applicant and his wife (involved due to the vessel forming part of matters before the Family Court) signe d a „Partial Release‟ required by the FSP. The Applicant within a short period sought to revoke his acceptance of the release due to his concerns with the quality of repairs completed at the time.  The vessel for the most part was repaired and stored outdoors and therefore exposed to the elements.  The vessel suffered significant additional damage due to a second flood event which occurred in January 2013 after the Applicant had lodged this dispute with FOS.  The insurance application form shows that the vessel was constructed by the Applicant himself between 2003-2005, and therefore it is reasonable to accept he has reasonable knowledge and experience in respect to boats/vessels. 28. A detailed quote was provided to the Applicant by SC dated 27 May 2011. WJ of SC attended Bundaberg to undertake the assessment and was accompanied by TC of SS Marine. 29. They found extensive damage to all sides of the vessel including impact damage to the port side and waterline area that in their opinion could have been causing slow saltwater ingress into the vessel. 30. The Panel notes that the quote provides an extensive and detailed list of damage noted and provided a warning of potential further freshwater (rainwater) ingress due to the existing damage and the vessel being left in the open air which needed to be addressed as soon as possible. 31. There is no need to list the entire quote however the Panel is satisfied that it is a comprehensive and detailed quote which estimated the cost of repairs to be $87,690. 32. This quote was provided to the FSP however it preferred the quote from MM. Case No: 310136 Determination Page 6 of 11 33. It is clear from the information exchanged that the Applicant had serious concerns about items that were not included in the quote from MM. There is evidence of an exchange of emails between the Applicant and AMC with the Applicant expressing concern as to the quotation. There is also evidence that AMC did not provide the Applicant with a copy of the revised quote. This was despite the Applicant‟s request for the same on 16 August 2011. 34. No real explanation has been given for the delays in attending to the repairs or reason for failing to provide a copy of the relevant quotation. 35. MM was authorised to commence repairs and notified the Applicant on 21 August 2011. According to AMC, in an email dated 5 December 2011, they received confirmation from the repairer that he would be finished with repairs by Thursday of that week. 36. On 9 December 2011, the Applicant notified AMC that following an inspection of the vessel, he found the repairs far from complete and identified a number of items requiring rectification. 37. The response from AMC of 11 December 2011 rather than acknowledging the issues and conducting its own inspection, seems to focus on finalising the matter. It is unclear whether AMC was in contact with the FSP during this time or acting without consultation. 38. The Applicant signed a partial release under some pressure from AMC, in particular advice that they were instructed that all hardstand and other fees incurred as a result of the Applicant‟s failure to cooperate in the finalisation of the matter, will be to the Applicant‟s account. There is absolutely no evidence that the Applicant failed to cooperate with AMC or the FSP. If anything, the delays to this stage of the claim can be directly related to the FSP, its repairer and the conduct of AMC. 39. The Applicant raised issue with respect to a number of matters and works that had not been completed. The Applicant was advised by AMC on 30 December 2011 that there was no impediment to the vessel being returned to the wate r and into the Applicant‟s care. The Applicant provided information to AMC that there were a number of issues with the vessel including:  no decals, boat name or registration number on the vessel;  no forestay or furler;  starboard front staunchin wobbly;  cleats and staunchins not bolted;  windows and chain plates still leaking;  motors unable to start;  navigation or internal electrics not working;  water in both hulls; Case No: 310136 Determination Page 7 of 11  damage to keel and chines below water line;  no rear fairleads;  cleats screwed not bolted as previously;  no anchor or chain, no dingy or solar panels. 40. In an email to the Applicant on 18 January 2012, it is apparent that the repairer attended to a number of the items listed by the Applicant. Remarkably with respect to the lack of anchor and chain, AMC responded that the Applicant should check if the anchor is still located where the vessel had been buoyed. If not, they suggested that the Applicant replace it and the cost be reviewed and submitted for consideration as part of the claim. It is reasonable to expect this would have been replaced as part of the repair costs. 41. As far as the dinghy or solar panels are concerned, AMC claimed that this had not been mentioned until recently. There is an email on file dated 7 April 2011 in which the Applicant notified the boatyard where the vessel was being housed for the purpose of obtaining a quote that there were solar panels, regulator and stainless steel pipe davits at the rear, HF Antenna, a stress crack on the starboard bedroom, that the anchor on the vessel was a borrowed one as the other was fouled and he estimated he had lost 30 metres of chain, that the anchor winch did not appear to be working and that he also lost a 3 metre double skinned fibre glass dinghy with 9.8 horsepower Tohatsu motor, safety gear etc. This information would have been available to the FSP and AMC. 42. In the Panel‟s view, given the information exchanged, AMC had not handled this file with sufficient diligence to this time. It is clear that the repairs were still being conducted on the vessel in January 2012 despite claims that the repairs had been completed and that there was no impediment to the vessel being returned to the water in December 2012. The Panel is not satisfied that AMC had acted appropriately to this stage to ensure the repairs had been completed. 43. During the period that the vessel was being repaired, the Applicant was involved in a matrimonial property settlement dispute. Part of that settlement appears to have been based on the sale of the Applicant‟s vessel. There is a letter from solicitors to the Applicant dated 3 February 2012 noting the Applicant‟s request to nominate SC to assess the vessel. According to that letter, there were advices from AMC that there was no impediment to the vessel being relaunched. AMC apparently was able to provide a letter from an accredited surveyor stating the vessel had been reinstated to its pre-loss condition. The Panel notes the FSP has not provided any such letter. 44. There is a comment from AMC that it had inspected the vessel on completion. AMC is an accredited Marine Surveyor. AMC is not an independent surveyor. There is no indication in earlier correspondence that AMC had ever inspected the vessel on completion and there is certainly no indication that the vessel was in anything but excellent condition prior to the Case No: 310136 Determination Page 8 of 11 original event. Comments such as “the deck was rotten before the loss” are not consistent with other information that is on the file. 45. There is correspondence on the file on 14 March 2012. That correspondence indicates the FSP believed all outstanding claims issues had been notified and addressed and in the absence of any notification to the contrary, the FSP believed the required repairs had been carried out to a reasonable standard consistent with the rest of the vessel. Whilst there is an email from the Applicant to the FSP dated 19 March 2012 identifying some ongoing issues, no further correspondence appears to have been entered into between the Applicant and the FSP after that date. 46. In the Panel‟s view, it is reasonable in these circumstances to accept that at that point the Applicant believed the repairs had been substantially completed and any ongoing issues were issues with the boat yard. 47. There is a series of emails between the Applicant and the boat yard where the vessel had been slipped. These emails suggest that the Applicant was disputing some charges imposed by the boat yard but did not raise any issues with the condition of the vessel. There is an email dated 19 April 2012 referring to his wife‟s solicitors taking control of the vessel. 48. There is an email on file to the Applicant‟s wife‟s solicitors indicating that the vessel had been with a boat brokerage firm and was for sale. This email is dated 27 April 2012. This email from WR indicates that the current condition of the vessel was “not pretty” and that there is “at least 300mm of water in each hold”. It is unclear whether this email was ever provided to the Applicant or to the FSP. 49. The Applicant has provided evidence from TC in a letter dated 5 August 2013, that he had inspected the vessel and sighted it around September/October 2012. He identified the following damage to the vessel: “there were blisters along the port hull showing evidence of moisture from inside the boat.” 50. Photographs were provided of the vessel, taken on 14 April 2012. These photographs purportedly identify areas of damage indicating poor quality repair by the FSP‟s repairer. 51. RE in an email to FOS dated 17 July 2013 considered, given the additional information exchanged, that there were in fact ongoing issues with the vessel after 14 March 2012 but as indicated it would appear that the Applicant did not raise these issues with the FSP or its repairer until the matter was lodged with FOS in January 2013. 52. By the time the Applicant raised these further issues with respect to the condition of the vessel, the FSP was no longer insuring the vessel. 53. There is some confusing information as to the renewal policy but it is clear that the Applicant did not renew his policy of insurance when it was available to be renewed in December 2011 or in January 2012. Although the Applicant Case No: 310136 Determination Page 9 of 11 was going through a property settlement, it is unclear why the Applicant would not have maintained his insurance on the vessel in particular given the FSP had offered a renewal of the policy. 54. It is clear that when the vessel was subsequently damaged in the January 2013 floods that impacted Bundaberg, it was not insured under a policy of insurance with the FSP. 55. In the Panel‟s view, the only way by which the Applicant can succeed with the claim for the loss of the vessel in 2013, would be to establish that as at the time of the loss, the vessel was still in the possession of the FSP and the FSP was still responsible for its upkeep and maintenance. 56. In the Panel‟s view, the evidence does n ot establish that that was in fact the case. Whilst the vessel was still at the boat yard, in the Panel‟s view, the evidence establishes that most likely the Applicant had largely accepted that the FSP had substantially completed repairs and it was certainly reasonable for the FSP to have concluded this, given the apparent lack of contact after March 2012. This view is further reinforced given the subsequent email correspondence between the Applicant and the boat yard in which the dispute appears to be more as to some additional charges placed on the Applicant, rather than the condition of the vessel from a completed repair perspective. 57. The Panel is of the view that if the Applicant had have made the FSP aware of his ongoing concerns and in particular aware of the comments made by WJ in April 2012 or subsequent comments by TC in September/October 2012 that there may be some argument to say that the FSP still had control of the vessel. There is no evidence he did this. 58. In the Panel‟s view, the evidence establi shes that at the time of the loss of the vessel in January 2013, the Applicant had accepted that the vessel was now his responsibility or his wife‟s and as the FSP no longer provided insurance cover for the vessel, the FSP is not liable for the additional damage. Unrepaired damage 59. Whilst the FSP no longer insured the vessel as at 2013 and was therefore not liable for the additional damage sustained during those floods, there was damage to the vessel from the original incident that had not been completed nor had the FSP replaced all items claimed by the Applicant. The Panel notes there are a number of items including the dinghy and motor, solar panels and an anchor and chain that had not been replaced. The Panel considers the FSP should have replaced these items. 60. The Panel notes that the policy schedule for 2011/12 included the dinghy with an insured value of $3,500 and the motor at $1,800. It considers it is reasonable that the FSP meets its liability with respect to the replacement of the dinghy and motor. Solar panels had not been replaced. It is difficult to estimate the cost of the solar panels however the Panel considers a figure of Case No: 310136 Determination Page 10 of 11 $200 would be a reasonable figure. The anchor and chain was not replaced. Research suggests that to allow for a 3/8 chain, there would need to be an allowance of approximately $30-$35 per metre and a suitable anchor given the nature of the vessel being a catamaran and its size would be in the order of $600-$950. In these circumstances, the Panel considers an allowance of $1500 would be fair and reasonable. Safety gear and other miscellaneous item had not been replaced. The Panel considers a further allowance of $1,000 for these items to be reasonable. 61. The Panel determines that the FSP pay the sum of $8,000 to meet the replacement costs of the items outlined above and not covered in the repairs. Compensation 62. Although the Panel accepts the FSP is not liable for the subsequent loss of the vessel, the Panel is concerned as to the manner in which this dispute has been dealt with by the FSP and in particular the significant delays incurred in repairs. 63. The claim originally arose from damage sustained on or about 26 December 2010. It was more than eight months before the FSP appointed a repairer. The Applicant at that time had already e xpressed considerable concern as to the nature of the quotation provided and given the Applicant‟s experience, having actually built the vessel, these concerns were not unreasonable. 64. The FSP‟s Agent AMC has, in the Panel‟s view, acted with diffidence towards the Applicant and not provided due attention to the issues raised by the Applicant. It would appear that this ultimately lead to a breakdown in the relationship, with the Applicant being informed that repairs were completed when they had not been compl eted. The Applicant‟s disappointment and frustration during this time is understandable. 65. Pursuant to paragraph 9.3 of the Terms of Reference, it is open to the Panel in circumstances where there is an unreasonable degree of inconvenience or time taken to resolve a dispute to award compensation of up to $3,000 for non financial loss. 66. Such compensation is rarely awarded however it can be awarded in particular in circumstances where there is unusual amount of time taken or interference with an Applicant‟s ex pectation of enjoyment or peace of mind. In the Panel‟s view the frustration experienced by the Applicant when dealing with the FSP‟s Agents in this matter and the repairer has led to an unusual degree of time taken and loss of enjoyment. 67. In the Panel‟s v iew given the circumstances of this dispute, it is appropriate to award compensation for non financial loss pursuant to 9.3 of the Terms of Reference in the sum of $2,000. In reaching this view, the Panel has taken into account the delays in commencing the repairs and in particular the manner in which the Applicant was treated by the FSP‟s agent including the agent‟s conduct in requiring the Applicant to sign a release despite repairs Case No: 310136 Determination Page 11 of 11 not having been completed and making threats to the Applicant with respect to his liability for hard stand costs despite the fact that the repairs had not been completed. Determination 68. The FSP is to pay the Applicant the sum of $8,000 in accordance with the terms of the policy to cover the costs of those items that were not replaced as part of the original repairs in accordance with the terms of the policy. 69. The FSP is to pay the Applicant the sum of $2,000 by way of non financial compensation pursuant to paragraph 9.3 of the Terms of Reference. 70. The FSP is otherwise not liable to meet the Applicant‟s claim, as at the time of the subsequent loss the Applicant did not hold a valid policy of insurance with the FSP.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.